Ir al contenido
Georgia Commons
Menú

Tattnall County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 42 - MOBILE HOMES AND MANUFACTURED HOMES / Article II - REQUIREMENTS AND STANDARDS

Sec. 42-29. Requirements for manufactured home, modular home, or mobile home.

Sobre este texto

  • As published by Municode, current through 2025-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) In order to obtain a building permit, mobile home location/relocation permit or a certificate of occupancy, the owner of a manufactured home, modular home, or mobile home or the owner of the parcel, lot, stand, or site upon which a manufactured home, modular home, or mobile home is to be placed must apply at the county tax assessor's office.

(b) Before a manufactured home, modular home, or mobile home is placed on a lot, parcel or tract within the unincorporated area of the county, the owner of a manufactured home, modular home, or mobile home or the owner of the parcel, lot, stand, or site upon which a manufactured home, modular home, or mobile home is to be placed must:

(1) Obtain a 911 address.

(2) Contact the county health department to get a septic tank permit, and return a copy of the septic tank permit as issued by the county health department to the tax assessor's office.

(3) Obtain location/relocation permit from county tax assessor's office. Once the location/relocation permit has been acquired, only a hauler registered with the Georgia Department of Motor Vehicle Safety can locate or relocate a manufactured home, modular home or mobile home within the unincorporated area of the county.

(c) When the installation of the manufactured home, modular home, or mobile home has been completed, the owner of the manufactured home, modular home, or mobile home or the owner of the parcel, lot, stand, or site upon which a manufactured home, modular home, or mobile home has been placed must have the installer complete an installer certificate.

(d) The owner of the manufactured home, modular home, or mobile home or the owner of the parcel, lot, stand, or site upon which a manufactured home, modular home, or mobile home has been placed must contact the code enforcement office, schedule an inspection, and obtain an occupancy permit from the code enforcement officer.

(e) Fees.

(1) Location/relocation permit application, $75.00.

(2) Fee on properties with existing 911 addresses, $100.00.

(3) Fee on properties requiring a new 911 address, $100.00. Fee shall include a 911 sign and post.

(f) When moving a mobile home out of Tattnall County or to a valid mobile home dealership, a $5.00 exit permit must be purchased from the tax assessor's office.

Applicant must present a receipt from the tax commissioner indicating all Tattnall County taxes have been paid.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 12-12-2005; Ord. of 5-4-2009(3))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:tattnall-county/code/42-29@2025-04-07-0a637c7875

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Tattnall County Code of Ordinances, Sec. 42-29. Requirements for manufactured home, modular home, or mobile home | Georgia Commons