Towns County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 40 - SUBDIVISIONS / Article III - PROCEDURES AND REQUIREMENTS FOR APPROVAL OF PLATS
Sec. 40-74. Sequence of administrative procedures.
Sobre este texto
- As published by Municode, current through 2019-07-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Listed below in normal sequential order are the generally occurring steps required to successfully complete development of a subdivision:
(1) Pre-application review session with the field representative (sketch plan and general data).
(2) Obtain a copy of this chapter and county road specifications and Mountain Protection Act standards.
(3) Consult with the county health department to identify any possible water or sewage problems associated with the land proposed for subdividing.
(4) Consult with the Natural Resources Conservation Service for assistance in ensuring development land does not propose building sites in flood plains, flood hazard areas and that natural waterways will not be interrupted. Building in a flood hazard zone is allowed provided that the developer provides a flood certificate for each lot, elevation and other construction requirements set forth for construction within a flood hazard zone. Also needs to be tied to building code provisions.
(5) Have land surveyed to obtain data for preliminary plat and final plat and to determine how land is to be divided. A developer or surveyor may use and incorporate a prior boundary line survey if same meets the minimum standards set forth for a preliminary and/or final plat approval.
(6) Develop preliminary plat with surveyors and submit to planning commission 15 days before meeting at which preliminary plat approval is to be sought.
(7) Be prepared to accompany field representative or commission members to development site prior to next commission meeting.
(8) Attend the commission meeting at which preliminary plat approval is sought, or send competent representative who can answer questions in your name. No action will be taken by TCPC when no representative is present.
(9) Obtain a land-disturbing permit from the appropriate authority when preliminary plat is approved.
(10) Begin initial subdivision work.
(11) Request inspection of earthwork, and utility work if any, by field representative prior to applying road surface material such as gravel or pavement and before seeding required by conditions of land disturbing permit.
(12) Obtain approval for electrical installation from the health department.
(13) Complete survey work as required for final plat.
(14) Develop final plat for submission to TCPC.
(15) Complete road, utility and soil erosion work.
(16) Request final planning commission on-site inspection of completed required improvement work.
(17) Submit final plat to planning commission office within on or before 15 days before meeting at which approval is sought. Plat must bear all required certificates noted in the ordinance as well as all notations or changes specified by the commission when the preliminary plat was tentatively approved.
(18) Attend planning commission meeting at which final plat approval is sought. No action will be taken by TCPC when no representative is present.
(19) Ascertained that approved subdivision final plat has been recorded in clerk of superior court office.
(20) Proceed to sale of subdivision lots. (If phased development is involved, only lots from final plats of approved phases can be sold in conjunction with any subdivision plat.)
(Amdt. of 5-21-2015, § 402)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.