Sec. 41-28. Application procedures.

Sobre este texto

  • As published by Municode, current through 2019-07-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Applications for building permits or uses subject to commissioner approval shall be made by the person, company or organization that will own and operate the telecommunication facility. An application will not be considered until it is complete. The following information shall be submitted when applying for a building permit or use subject to commissioner approval:

(1) Basic information.

a. Each applicant requesting an administrative approval under this article shall submit a scaled site plan, scaled elevation view and supporting drawings, calculations and other documentation, signed and sealed by appropriate professionals licensed in the state, sho wing the location and dimensions of all improvements, including topography (utilizing minimum two-foot contour intervals) tower height requirements, setbacks, access driveways or easements, parking, fencing, landscaping, adjacent uses and any other information deemed to be necessary to assess compliance with this article and compatibility with adjacent land uses.

b. A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, streetscapes or scenic view corridors, schools, parks and playgrounds.

c. A description of anticipated maintenance needs for the telecommunications facility including frequency of sendee, equipment needs and traffic noise of safety impacts of such maintenance.

d. A report signed and sealed by an appropriate registered professional in the state, documenting the following:

1. Telecommunications facility height and design, including technical, engineering and other pertinent factors governing selection of the proposed design;

2. Total anticipated capacity of the telecommunication facility, including the number and types of antennae which may be accommodated;

3. Evidence of structural integrity of the tower structure; and

4. Structural failure characteristics of the telecommunications facility and a demonstration that site and setbacks are of adequate size to contain debris.

e. A definition of the area of service to be served by the antenna or tower, and whether such antenna or tower is needed for coverage or capacity.

f. Information showing the proposed facility would provide the needed coverage and/or capacity in the form of a radio frequency study to show the projected coverage of the new antenna and the present coverage provided by existing towers in the area.

g. The identity of a community liaison person appointed by the applicant to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility, including such person's name, address, telephone number, facsimile number and electronic mail address, if applicable.

h. Identification of the geographic service area for the tower installation, including a map showing the site and the nearest or associated telecommunications facility sites within the network. A description of the distance between the telecommunication facility sites shall be included, as well as how this service area fits into, and is necessary for, the service network.

i. Designation of the site as either a preferred location site or disfavored location site. If the proposed location is not a preferred location or is a disfavored site, or the configuration is not a preferred configuration, the applicant must follow the variance procedures set forth in section 41-34.

(2) Site inventory. Each application shall include a site inventory, including a list of all existing and proposed telecommunications facility sites within a five-mile radius of the county and a map showing such sites. The list must include the following information for each site:

a. Street address;

b. Assessor's block and lot or other applicable ad valorem tax identification number;

c. Type of building (commercial, residential, mixed use) and number of stories;

d. Number of antennae per site, and the location and type of antenna installation;

e. Height from grade to the top of the antenna installation;

f. RF study of the coverage area for the antenna.

(3) Additional information requirements.

a. The applicant must demonstrate that they cannot provide personal wireless communication services to the new area without the use of a new telecommunications tower.

b. The applicant shall submit information which describes the anticipated capacity of the proposed tower, and to what extent collocation will be possible on the proposed tower.

c. The applicant must provide a utility inventory showing the locations of all water, sewage, drainage and power lines impacting the proposed tower site.

d. The applicant must provide any other information which may be requested by the county to fully evaluate and re view the application and. the potential impact of a proposed telecommunications facility.

(4) Removal bond. The applicant shall provide the county with a bond covering the total cost for tower removal if the company abandons the tower, or becomes insolvent and cannot remove the tower.

(5) Insurance. The applicant shall provide the commissioner with proof of the tower installer's worker's compensation and public liability and property damage insurance during the construction of the tower. The public liability and property damage insurance shall remain in force during the lime the tower is on the owner's property, and shall protect, and shall protect against damages to the property owner caused by tower and antenna failure. Proof of renewal of such insurance shall be provided yearly.

(6) Uses subject to commissioner approval.

a. A request for a use subject to commissioner approval shall be initiated by application to the commissioner of the county , and the commissioner may issue a special use permit, provided it shall be determined that all of the requirements of sections 41-27 and 41-28 have been met.

b. In order to cover the actual cost to the county of obtaining expert opinion and studies, an initial application fee of $1,500.00 shall be paid to the county, and a deposit of $1,500.00 to hire experts, as necessary, to review the application. If the actual cost to the county is greater than the deposit, the applicant shall be billed for the difference and payment shall be made prior to the hearing before the commissioner. In no case shall the maximum total charger for expert's fees exceed $3,000.00, not including the application fee. If the actual cost is less than the initial deposit, the difference will be refunded to the applicant within 20 days following the commissioner's hearing.

c. In granting a telecommunications facilities permit:, the commissioner may impose additional conditions, to the extent determined necessary, to buffer or otherwise minimize adverse effects of the proposed tower or antenna on surrounding properties.

d. The permit shall allow for a construction period of one year, during which time the applicant must complete the construction, If after one year of construction time, the applicant is in noncompliance, the applicant must demonstrate that construction will be completed within 30 days thereafter and such construction shall actually be completed within such 30-day period or the permit shall be void. If construction is completed as required, the permit shall be issued.

e. When issued, the permit shall remain in force for a period of five years, and renewal of such permit shall be subject to inspection for continuing compliance with this article and existing building codes and standards. The fee for renewal of such permit shall be $1,500.00.

(7) Public notice.

a. The commissioner shall require public notice of the proposed erection of a telecommunications tower within the county. The applicant shall provide the county with the names and addresses of all abutting property owners and owners of property lying in whole, or in part, within a distance of 1,000 feet of the proposed telecommunications tower as measured from the property line of the parcel on which the tower is to be constructed. The applicant must notify such property owners by registered mail 30 days prior to the public hearing of the intent to erect a telecommunications tower, and must supply the county with proof of such mailing.

b. The applicant must place a sign facing the nearest street or road indicating that an application for the placement of a telecommunications tower on the site has been filed with the county. The sign must be readable from the street or road.

The applicant must publish a notice in the county legal organ of the intent to construct a telecommunications tower and setting forth the address of the proposed site. Such notice must appear four consecutive "dates in the newspaper prior to the public hearing to approve or deny the application.

c. Failure to comply with the public notice requirements will result in an automatic denial of the application.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 10-29-2018(2))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:towns-county/code/41-28@2019-07-26-104e1372c2