Part II - CODE / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - BUILDING CODES

Sec. 18-75. Permit charges.

Sobre este texto

  • As published by Municode, current through 2010-11-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The county board of commissioners shall establish charges for such permits according to the following schedule:

(1) Fees; enumeration.

a. Permit fees:

Total Valuation Fees $1,000.00 and less No fee, unless inspection is required, in which case a $15.00 fee for each inspection shall be charged.

Total Valuation Fees $1,000.00 to $50,000.00 $15.00 for the first $1,000.00, plus $5.00 for each additional thousand or fraction

thereof, to and including $50,000.00 $50,000.00 to $100,000.00 $260.00 for the first $50,000.00, plus $4.00 for each additional thousand or fraction

thereof, to an including $100,000.00.

$100,000.00 to $500,000.00 $460.00 for the first $100,000.00, plus $3.00 for each additional thousand or fraction thereof, to and including $500,000.00.

$500,000.00 and up $1,660.00 for the first $500,000.00, plus $2.00 for each additional thousand or fraction thereof.

b. Moving fee: For moving of any building or structure, except a manufactured home, the fee shall be $100.00. The moving of a manufactured home and the setup with foundation and anchors shall be $65.00 plus the required electrical fee.

c. Demolition fee: For the demolition of any building or structure, the fee shall be:

(2) Plan-checking review fees. When the valuation of the proposed construction exceeds $1,000.00 and a plan is required to be submitted by 104.2 of the Standard Southern Building Code, a plan-checking review fee shall be paid to the building official at the time of submitting plans and specifications for checking. Such plan-checking review fee shall be equal to one-fourth of the building permit fee as set forth in 103.7.4 of the Southern Standard Building Code. Such plan-checking fee is in addition to the building permit fee.

(3) Reinspection fee. For all fees, including building, electrical, plumbing and mechanical, there shall be a reinspection fee of $25.00. Such reinspection fee shall not be charged until the third reinspection of the same work is required. The first two inspections of the same work shall be done without cost. Upon the reinspection for the third time, a fee of $25.00 shall be paid.

(4) Electrical permit fees.

New (Residential and Commercial) Work or Items Existing Services Without Upgrading Remodeling Repairs, Additions, Residential and Commercial 0-100 Amps $50.00 $20.00 Over 100 - 200 Amps $80.00 $30.00 Over 200 - 400 Amps $100.00 $50.00 Over 400 - 600 Amps $150.00 $60.00 Over 600-1,000 Amps $200.00 $80.00 Over 1,000 - 2,000 Amps $300.00 $100.00 Over 2,000 - up $400.00 $150.00 Swimming pool $20.00 M/H based on amp service

(5) Plumbing permit fees. New residential and commercial work or items: $10.00 per fixture.

(6) Mechanical fees. Permits shall not be issued by the director of inspections until after the following fees have been paid to the county:

a. Air conditioners:

b. Heating-Electrical:

c. Heating-Gas:

Any matters in such codes which are contrary to existing county ordinances shall prevail.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. No. 2000-01-02, 1-20-2000)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:turner-county/code/18-75@2010-11-02-a69f94c669

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.