Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - ON-SITE SEWAGE MANAGEMENT SYSTEMS

Sec. 18-52. Requirements.

Sobre este texto

  • As published by Municode, current through 2023-11-30
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Central sewage management systems, as defined in the rules of the state department of human resources, public health, chapter 290-5-26, on-site sewage management systems sections 290-5-26-.01 et seq. shall comply with the following requirements:

(1) A maintenance agreement and a trust indenture for the system must be approved by the commissioner with the advice of the county attorney; the maintenance agreement and the trust indenture shall comply with the terms and conditions in the Guideline for Maintenance Agreement Plans on file in the office of the commissioner.

(2) A soil study must be submitted by a soil classifier as defined by the rules and regulations of the state department of human resources.

(3) A complete design of the sewage management system must be submitted by a state registered engineer.

(4) The drain field must comply with regulations: There may be no reductions in size greater than 25 percent of the length of a gravel system.

(5) Both the collection system and the treatment plant must each be approved by the state health department and the state environmental protection division (EPD).

(6) All pumps used must be approved by the environmental protection division.

(7) The available approved area for replacement of the system in the event of failure must be no less than 100 percent of the original area allotted to the system.

(8) The entire system, upon completion, must be inspected and approved in writing by both the health department and the designing engineer.

(9) A permit must be issued prior to construction of the central system, and a separate permit fee must be paid for each home which will connect thereto, to be paid at the time the permit is applied for, for each individual lot.

(10) Each system must consist of 10,000 gallons or less; separate approval must be obtained for each system; any system of less than 10,000 gallons may share components with another system only if the combined total of both systems is less than 10,000 gallons.

All systems must be approved by the state department of human resources engineer.

(11) Failure to comply with any one or more of the requirements of this section shall result in mandatory denial of the permit application.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. O-98-001, § B, 11-24-1998)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:union-county/code/18-52@2023-11-30-f14e87ae11

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.