Part II - CODE OF ORDINANCES / Chapter 46 - MANUFACTURED HOMES AND TRAILERS / Article II - MOVEMENT AND INSTALLATION OF MOBILE HOMES

Sec. 46-33. Permitting, inspection and certificate of occupancy.

Sobre este texto

  • As published by Municode, current through 2023-11-30
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A permit shall be required to locate or relocate a pre-owned manufactured home in the jurisdiction.

(1) Permit. To obtain a permit, applicants shall provide, in addition to other necessary paperwork, to the building inspector:

a. A signed affidavit that the pre-owned manufactured home meets health and safety standards required by this Act.

b. Photographs providing evidence that minimum health and safety standards are met;

c. A refundable guarantee of condition bond or refundable cash deposit as determined by the inspection department; and

d. The permit and inspection fee required by subsection (4) of this section.

(2) Inspection. The building inspector shall inspect a pre-owned manufactured home prior to its being relocated to or within the jurisdiction. A reasonable fee shall be assessed based on the cost of the inspection. If the home is located outside the county, at the building inspectors option, he may go to that location or require inspection by a local reputable inspector, in which case the applicant shall pay the actual cost of inspection.

Upon receipt of a temporary permit, applicants may relocate the manufactured home on a residential site for the purposes of a final inspection. Applicant shall arrange for an inspection to be held once the final installation of the manufactured home is complete. The home must be built on a concrete block or similar foundation.

(3) Certificate of occupancy. A certificate of occupancy shall be issued to the applicant at such time that the building inspector certifies that the requirements of this article have been met.

(4) Fee. A permit and inspection fee as determined by the inspection department shall be charged to the applicant to cover the cost to the county to process the permit application and inspect the pre-owned manufactured home. Such fee shall cover the initial inspection and one follow-up inspection. The applicant shall be charged a fee as determined by the inspection department for each additional follow-up inspection that may be necessary.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 8-17-2010, § 3)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:union-county/code/46-33@2023-11-30-258e68eb90

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Union County Code of Ordinances, Sec. 46-33. Permitting, inspection and certificate of occupancy | Georgia Commons