Ir al contenido
Georgia Commons
Menú

Upson County · Código de ordenanzas

Part II - CODE / Chapter 22 - BUILDINGS AND BUILDING REGULATIONS / Article IV - FLOW-RATE RESTRICTIONS ON PLUMBING FIXTURES

Sec. 22-183. Residential construction.

Sobre este texto

  • As published by Municode, current through 2025-11-25
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

On or after July 1, 1991, no construction may be initiated within the unincorporated area of the county for any residential building of any type which employs:

(1) A gravity tank-type, flushometer-valve, or flushometer-tank toilet that uses more than an average of 1.6 gallons of water per flush; provided, however, this subsection shall not be applicable to one-piece toilets until July 1, 1992;

(2) A showerhead that allows a flow of more than an average of 2.5 gallons of water per minute at 60 pounds of pressure per square inch;

(3) A urinal that uses more than an average of one gallon of water per flush;

(4) A lavatory faucet or lavatory replacement aerator that allows a flow of more than two gallons of water per minute; or

(5) A kitchen replacement aerator that allows a flow of more than 2.5 gallons of water per minute.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:upson-county/code/22-183@2025-11-25-0a22157d57

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Upson County Code of Ordinances, Sec. 22-183. Residential construction | Georgia Commons