Walker County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 22 - LAND DEVELOPMENT / Article VI - SUBDIVISIONS
Sec. 22-396. Procedure for approval of subdivisions of land containing tracts consisting of 3 acres or more which front on existing County roads.
Sobre este texto
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) General. The division of land into parcels of 3 acres or more which front on existing roads, which are approved by the Governing Authority of Walker County, Georgia, are not subject to the subdivision regulations for the County whether for sale at auction or otherwise; however, the plat must be review and approved by the Planning Commission or Planning Director or his designee, whichever applies based on the number of lots.
However, this does not release a builder from State or Federal regulations regarding land disturbance.
(b) Pre-application. The subdivider and or the auction company shall consult early and informally with the Planning Commission to obtain advice and assistance before he begins to prepare the preliminary plat. This will enable him to become familiar with the County Thoroughfare Plan and other official plans, which might affect the area.
(c) Preliminary plat approval. The process for preliminary plat approval shall be the same for all auction plats as applicable in section 22-395. The process for preliminary plat approval for all subdivisions shall be the same as applicable in section 22-393. For the purpose of subdividing property for auction, preliminary plat is the concept plan. Therefore, subdivision requirements as far as building setbacks, road frontage, any requirements by the Health Department or the State, etc., do apply.
(1) If an existing drive will be utilized to access lots consisting of 3 acres or more that do not have County road frontage and no additional land will be disturbed, then no Erosion and Sedimentation Control Plan (ESCP) shall be required.
(2) If a new drive will be built, then an Erosion and Sedimentation Control Plan may be required depending on the amount of land to be disturbed and State law shall apply. If an ESCP is required, it shall be submitted to the Planning Office along with the Preliminary Plat for review and approval or disapproval.
(3) If no land-disturbing activity shall take place prior to the sale, then no ESCP is needed. However, the following shall be noted on the plat:
"Note: Any further development involving any land disturbance, including, but not limited to, clearing, grading, grubbing, etc., may require a Soil Erosion and Sedimentation Control Plan and Stormwater Management Plan before any permit is issued. All development involving land disturbance, including, but not limited to, clearing, grubbing, grading, etc., is required by State law and local ordinance to use best management practices (BMPs) to ensure that no soil leaves their site or enters into any State waters.
If a joint permanent access easement is to be installed by all affected property owners, it shall be their responsibility jointly to obtain an erosion and sedimentation control plan, if required, and/or to install and maintain BMPs."
(4) If 90 percent of the total land area is being subdivided into lots consisting of 3 acres or more then the ESCP shall be required for only those lots that are less than 3 acres. If more than 10 percent of the total land area is to be subdivided into lots consisting of less than 3 acres, then the Erosion and Sedimentation Control Plan shall be required for the entire project and this section shall not apply.
(d) Construction of improvements. After the preliminary plat and any required erosion control plans, if applicable, have been approved, the subdivider may proceed with any land disturbance to prepare the land for sale.
(e) Final plat. The application for final plat approval, including 6 prints of complete subdivision plans, shall be submitted to the Secretary of the Planning Commission at least 15 days prior to the Planning Commission's regularly scheduled meeting, for divisions of more than 8 lots. For divisions of 8 lots or less, the Planning Staff shall have 15 days to review and approve or disapprove the final plat. In the event that a plan is disapproved, the auction company or subdivider shall be provided a written statement as to the reason for the disapproval.
(1) The Planning Commission, before its review, shall transmit a print of the final plat to the Office of the County Board of Commissioners of Walker County, Georgia, and it shall be the duty of the ChairperLAND DEVELOPMENT § 22-396 son, or his designee, to inspect the property to be divided and the construction of any roads or streets in said subdivision. The Planning Commission, before its review, may transmit prints of the final plat to each utility service, Health Department, Fire Department, and any other agency for review and recommendations in relation to specific service problems. A print of the final plat may also be transmitted to the Coosa Valley Regional Development Center for its review and recommendations.
(2) Prior to a decision on the final plat by the Planning Commission, the Planning Commission shall afford a public hearing. Notice of the public hearing shall be sent at least 5 days prior to the date of hearing.
(3) Final plat approval shall be obtained by the subdivider or the auction company, only after all requirements of the Walker County Soil Erosion and Sedimentation Control Plan have been met or after a period of 15 days to review the plans. The final plat shall conform substantially to the preliminary plat as approved.
(4) The final plat shall contain all of the information which was required on the preliminary plat except the topographic contour lines shown on the preliminary plat and shall be drawn in compliance with all the appropriate laws of the State of Georgia which govern the recordation of subdivision plats.
(5) The following certification shall be presented along with the final plat, if applicable:
a. Certification by registered Georgia land surveyor (seal affixed) of the accuracy of the survey and plat and the placement of all required monuments.
b. Certification by the subdivider showing that the applicant is the legal owner of the land, and that he formerly dedicates all streets, roads and rights-of-way for public use.
c. Georgia Department of Transportation certification of approval must be included for the proposed project if the project abuts any State or Federal Roads, or certification by the Walker County Road Department if the property abuts any County Roads.
d. Certification by the subdivider that all lands considered for development do not fall within the floodplain or floodprone area. If any part of the development falls within a floodplain or floodprone area, then the requirements of sections 22-361 and 22-362 will apply.
e. Certification of Inspection by the Project Engineer that the site has been inspected and is installed according to the approved plan or that modifications to the plan are designed and installed using sound engineering principles and practices.
(6) When the plat has been approved by the Planning Commission or Planning Director, whichever is applicable, 1 copy with the approval of the Planning Commission certified therein shall be returned to the subdivider to be used for filing with the Clerk of the Court as the official plat of record. Within 10 calendar days from the date of final approval, the subdivider shall record the final plat in the office of the Clerk of Court.
(7) Copies of the approved final plat will be delivered by the Planning Commission to a minimum of the following locations, if applicable:
a. 2 copies of Plat to the Zoning and Development Department.
b. 1 copy of Plat to the Walker County Assessors' Office.
c. 1 copy of Plat to Emergency 911 Office.
d. 1 copy of Plat to Health Department (if property shall be serviced by septic systems).
(8) The Planning Commission must consider a final plat within 15 days after the submission of the final plat for review. Failure of the Planning Commission to act on a final plat submission within these 15 days shall be considered as approval of same. If the plat is disapproved, grounds for such disapproval shall be stated in writing in the official file of the Planning Commission and shall be stated in writing on 2 copies of the plat. One copy of the plat shall be retained in the Planning Commission files and 1 copy shall be returned to the subdivider at the time of the disapproval.
Historia
(Code 2005, § 34-483; Ord. of 7-20-1994, § 9.13; Ord. of 11-18-2004(2), § 9.14)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.