Walker County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 28 - SOLID WASTE / Article III - SEWER USE REGULATION IN UNINCORPORATED AREAS / Division 7 - WASTEWATER DISCHARGE PERMITS
Sec. 28-258. Evaluation of application and permit conditions.
Sobre este texto
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Upon receipt of complete applications, the Authority shall review and evaluate the applications and shall propose such special permit conditions as the Authority deems advisable. All wastewater discharge permits shall be expressly subject to all the provisions of this article and all other applicable ordinances, laws, and regulations.
Wastewater discharge permits must contain the following conditions:
(1) A statement that indicates wastewater discharge permit duration, which in no event shall exceed 5 years.
(2) A statement that the wastewater discharge permit is nontransferable without prior notification to and approval from the Authority, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit.
(3) Effluent limits, including BMPs (if appropriate), applicable to the user based on applicable standards in federal, state, and local law.
(4) Self-monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants (or BMPs) to be monitored, sampling location, sampling frequency, sample type, and analytical techniques based on federal, state, and local law.
(5) Statement of applicable civil, criminal, and administrative penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law.
(6) Any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law.
(7) The process for seeking a waiver for a pollutant neither present nor expected to be present in the discharge in accordance with subsection 28-296(f), and any grant of the monitoring waiver by the Authority under said section.
(8) Requirements to control slug discharges, if determined by the Authority to be necessary.
(b) The Authority may also propose that the wastewater discharge permit be subject to 1 or more special conditions in regard to any of the following:
(1) Pretreatment requirements.
(2) Requirements for the development and implementation of spill control plans necessary to prevent accidental or unanticipated discharges.
(3) Limits on rate and time of discharge or requirements for flow regulations and equalization.
(4) Requirements for installation of inspection and sampling facilities, including flow measurement devices.
(5) Development and implementation of waste minimization or pollution prevention plans to reduce the amount of pollutants discharged to the POTW.
(6) Other conditions deemed appropriate by the Authority to ensure compliance with this article or other applicable ordinance, law, or regulation.
(7) Requirements for the installation of facilities to prevent and control accidental discharge or spills at the user's premises.
(8) The unit charge or schedule of charges and fees for the wastewater to be discharged to a community sewer.
Historia
(Ord. No. O-03-22, Exh. A, 11-10-2022)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.