Part II - CODE OF ORDINANCES / Chapter 28 - SOLID WASTE / Article III - SEWER USE REGULATION IN UNINCORPORATED AREAS / Division 8 - INSPECTIONS, MONITORING, AND RECORDS

Sec. 28-296. Monitoring facilities.

Sobre este texto

  • As published by Municode, current through 2026-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) All significant industrial users shall install a monitoring station of a standard design or 1 satisfactory to the Authority within 1 year from adoption of the ordinance from which this article is derived. All users who propose to discharge or who in the judgment of the Authority could now or in the future discharge wastewater with constituents and characteristics different from that produced by a domestic premises may be required to install a monitoring facility.

(b) Installation. Required monitoring facilities shall be constructed, operated, and maintained at the user's expense. The purpose of the facility is to allow inspection, sampling, and flow measurement of wastewaters. If sampling or metering equipment is also required by the Authority, it shall be provided, installed, and operated at the user's expense. The monitoring facility will normally be required to be located on the user's premises outside the building. The Authority may, however, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street right-of-way with the approval of the public agency having jurisdiction of that right-of-way and located so that it will not be obstructed by landscaping or parked vehicles.

(c) Access. If the monitoring facility is inside the user's fence, there shall be accommodations to allow safe and immediate access for Authority personnel. There shall be ample room in or near such facility to allow accurate sampling and compositing of samples for analysis. The entire facility and any sampling and measuring equipment shall be maintained at all times in a safe and proper operating condition by and at the expense of the user.

(d) The industrial user shall be required to design any necessary facility and to submit according to the permit compliance schedule an engineering report, including detailed design plans and operating procedures to the Authority for review in accordance with accepted engineering practices. The Authority shall review the plans and other documents within 45 days and shall recommend to the industrial user any changes deemed appropriate.

(e) Upon approval of plans and other documents, the industrial user shall secure all building, electrical, plumbing, and other permits required and proceed to construct any necessary facility and establish required operating procedures within the time provided in the industrial user's wastewater discharge permit.

(f) Wastewater monitoring and flow measurement facilities must be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. O-03-22, Exh. A, 11-10-2022)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:walker-county/code/28-296@2026-07-09-6a5f0765a7

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Walker County Code of Ordinances, Sec. 28-296. Monitoring facilities | Georgia Commons