Ware County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 14 - AVIATION AND AIRPORTS / Article II - WAYCROSS-WARE COUNTY AIRPORT
Sec. 14-36. Communication.
Sobre este texto
- As published by Municode, current through 2025-12-08
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) No person shall operate any ground-to-air radio or other communications device without having first obtained permission from the airport management.
(b) Before permission shall be granted for the operation of a ground-to-air radio or other communications, the person desiring to operate such radio or other communications, shall apply to the management for permission to do so. Upon such application, such person shall show in his application that he has the following equipment:
(1) Necessary radio and antenna.
(2) A suitable device, to be approved by the management, which gives the direction and velocity of the wind at the airport.
(3) That such person either holds or has applied for the necessary license to operate such radio from the necessary authority, such as the Federal Communications Commission.
(c) One hundred twenty-two and eight tenths (122.8) MHz is assigned to airports not served by a control tower. Its use is limited to the necessities of safe and expeditious operation of private aircraft pertaining to runway and wind conditions, types of fuel available, weather, and dispatching. Secondarily, communications may be transmitted concerning ground transportation, food and lodging during transit. This service shall not be used for air traffic control purposes.
Historia
(Code 1983, § 2-3.5-36)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.