Sec. 78-142. Conditions to grant of perpetual utility easements.

Sobre este texto

  • As published by Municode, current through 2025-12-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All entities desiring to operate utility projects within the unincorporated areas of Ware County and its rights-of-way shall be subject to the following conditions in order to receive one or more perpetual utility easements:

(1) The entity shall submit to the planning and codes department, a "concept plan" for all projects, which shall include construction, specifications, and maps at least 30 calendar days prior to any prebid conferences for all contract work to be advertised, if any, or at least 30 calendar days prior to commencement of the project work to be performed directly by the entity. The planning and codes department or its designee, shall review the proposed project work prior to the entity advertising for bids, if any, and may inspect the proposed project site in order to determine whether the work would be detrimental to Ware County's rights-of-way or to the citizens of Ware County.

The work shall not commence until verbal or written approval has been given by the planning and codes department or its designee. This provision shall not apply to work that must be performed resulting from routine maintenance or from emergency circumstances. In the event Ware County is called upon to respond to an emergency due to the unavailability of the entity, the entity shall reimburse Ware County its reasonable costs in responding to the emergency.

(2) The entity shall be solely responsible when necessary and proper to construct, dig, bore, erect, acquire, own, repair, remodel, maintain, add to, extend, relocate, improve, equip, operate, and manage utility projects within the unincorporated areas of Ware County and its rights-of-way and all costs and fees associated therewith shall be paid by the entity operating the project.

(3) Boring shall be required for all utility projects involving the installation of piping that is six inches or less in diameter.

(4) The entity shall not block or hinder Ware County stormwater flow when interfacing with Ware County's storm drainage structures during the course of the entity's utility project work.

(5) The entity shall dress daily its job sites and maintain said sites in a manner that is free from unsightly debris, disarray and does not create unreasonably dangerous or unhealthy conditions for the public.

(6) The entity shall conduct vehicular traffic control in compliance with the Manual for Uniform Traffic Control Devices, latest edition. The entity shall also promptly notify 911 emergency operations for assistance with traffic control during the course of any utility work that may impact the flow of traffic.

(7) The entity shall execute all instruments necessary or convenient, including contracts for construction of projects and leases of projects or contracts with respect to the use of projects which it causes to be constructed, erected or acquired within the unincorporated areas of Ware County and its rights-of-way, and shall be solely responsible for performance thereof.

(8) Upon completion of all utility projects, the entity shall return the topography in a manner such that it is compacted to at least 98 percent standard proctor. The entity shall leave all land and surface areas in the same or better condition as existed prior to the commencement of the work performed.

(9) The entity shall comply with the provisions of Ware County Soil Erosion and Sedimentation Regulations.

(10) The entity shall comply with the provisions of any existing or future utility ordinance which may be enacted by Ware County. All entities providing sewer services shall be bound by the ordinance of the City of Waycross regulating disposal of sewage by delivery to the city facility.

(11) The entity shall designate an emergency contact person and telephone number to be furnished to 911 emergency operations and Ware County Planning and Codes Department on a 24-hour a day basis.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 12-8-2003, § III)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:ware-county/code/78-142@2025-12-08-b5a83d64a2

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.