Ir al contenido
Georgia Commons
Menú

Whitfield County · Código de ordenanzas

Chapter 14 - SITE DESIGN / Article II - PERMITS AND PROCEDURES

Sec. 14-30. Application and construction plan.

Sobre este texto

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(1) Only after all permit application items, as set forth below, are submitted in full, shall the application be considered

complete.

a. Completed application with original signature of entity making the application.

b. Maximum standard size of drawing sheets is 24 inches by 36 inches.

c. Five sets of construction plans or drawings are required unless otherwise specified.

d. Five sets of engineering studies or calculations (such as: storm drainage calculations, traffic studies, pavement analysis, etc.)

e. A �title block� is required on all construction plans. The title block is required to contain the following:

1. Name of development;

2. Firm that prepared the plan;

3. Date plan was prepared;

4. Sheet number in set of plans;

5. Revision block area;

§ 14-30

6. Seal and signature of the engineer or surveyor;

(2) Required components of construction plan.

Submittal Type Individual Subdivision Site

(a) |Approved preliminary | required n/a plat

(b) |Traffic impact study |if 60 or more |if a DRI lots

Unless specifically waived by the Whitfield County Uni- fied Board of Zoning Appeals or Whitfield County Board of Commis- sioners

(c) |Erosion and required required sedimentation control plan required

(d) | Utility plan (sub.to required required approval by utility

provider) required

(e) |Plan and profile of if construct- | if construct-roadways ing ing

(f) |Water line plan if construct- |if construct-ing ing

(g) |Plan and profile of if construct- | if construct-sanitary sewer ing ing

(h) |Stormwater manage- |required required ment plan required

(i) |Construction details |required required (Covers anything to

be constructed) (Gj) | Overall watershed required required drainage

(k) |GA DOT approval (if |required required on controlled road)

(1) |EPD approval Gf required at required at required) final final

(m) |Delineate 100-year required required flood plain required

(n) |Flood damage preven-|If construc- tion measures plan tion is within the areas of special flood hazard (0) Any specifics required for design which are stated elsewhere in this article are required to be shown on plans Supp.

NOTES:

1. For a utility company plan submit- tal:

a. Information and plans from a utility company shall be limited No. 11 (3) (4) to small drawings depicting location, scope, limits of work and time schedule for comple- tion;

b. Plans do not require a profes- sional engineer's seal and signature;

c. This submittal is to be used only by cable, telephone, power and the similar companies;

d. Two sets of the application and associated information are required.

2. A'"Traffic Impact study" is required and shall be signed and sealed by a Georgia licensed professional engineer whose primary business is traffic engineering.

3. A "Water Line Plan" and "Plan and Profile of Sanitary Sewer" to be signed and sealed by a Georgia licensed professional engineer.

The applicant shall submit with the application a plan which complies with this ordinance. Data relative to the requested permit will be furnished by the applicant without cost to the county.

It shall be a violation of this ordinance knowingly to submit any application or

plan containing false statements or information.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 6-9-03, § 2-10; Res. of 7-10-06)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:whitfield-county/code/14-30@2026-05-11-afcbd32a13

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Whitfield County Code of Ordinances, Sec. 14-30. Application and construction plan | Georgia Commons