Whitfield County · Código de ordenanzas
Chapter 14 - SITE DESIGN / Article VI - STORMWATER MANAGEMENT
Sec. 14-79. Maintenance of facilities.
Sobre este texto
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(1) Stormwater detention facilities which are deemed to be an essential and integral part of the Whitfield County stormwater management program may be maintained by Whitfield County. Stormwater management facilities which are built to satisfy this article for non-residential developments, and function for only one owner of a parcel of land in fee simple, will not be
maintained by Whitfield County, and the owner thereof shall meet the requirements of the subsequent provisions of this article. No stormwater detention
facility shall be accepted for maintenance by the county without first being approved by the Whitfield County Board of Commissioners.
In order to facilitate the maintenance of said stormwater detention facilities, a drainage easement shall be provided which will at a minimum encompass the 100-year flood elevation contour
plus ten feet. The ten feet shall be measured horizontally outward from the 100-year flood elevation contour. A 20-foot access easement shall be provided from an existing or proposed right-of-way to the said stormwater detention facility. The access easement shall be improved so as to allow for periodic usage for the purpose of maintenance of the stormwater management facility.
(2) An inspection and maintenance agreement shall be executed for all private on-site stormwater management facilities prior to approval of the final plat or issuance of a certificate of occupancy.
Such agreement shall be in form and content acceptable to the county, and shall provide that all inspection, maintenance and repair procedures of such facilities shall be the responsibility of the property owner. Such agreement shall provide for access to the facility by virtue of a non-exclusive perpetual easement in favor of Whitfield County at reasonable times for regular inspection
by the county administrator, director, public works director, or his or her designee.
a. The agreement shall provide that preventive maintenance inspections of infiltration systems, retention, or detention structures may be made by the county, at its option. The county's inspection schedule shall be established on a frequency that meets the intent of this article and applicable regulatory compliance requirements bestowed on the county.
b. The agreement shall provide that if, after an inspection, the condition of a facility presents an immediate danger to the public health, safety or general welfare because of unsafe conditions or improper maintenance, the county shall have the right, but not the duty, to take such action as may be necessary to protect the public health, safety, general welfare and adjacent properties from damage. If it is determined that such deficient conditions are the result of neglected maintenance, or other action caused by the property owner, then any cost incurred by Whitfield County shall be paid by the property owner as set forth in subsection d. below.
c. The maintenance agreement shall be recorded by the property owner in the land records of Whitfield County prior to approval of the final plat or issuance of a certificate of occupancy.
d. The agreement shall provide that the county shall notify the property owner(s) of the facility of any violation, deficiency or failure to comply with this article. The agreement
shall also provide that upon a failure to correct violations requiring maintenance work, within 30 days after notice thereof, the county may provide for all necessary work to place the facility in proper working condition. The owner(s) of the facility shall be assessed the costs of the work performed by the county pursuant to this subsection and subsection b. above, and there shall be a lien upon all property of the owner
in which said property utilizes, or will utilize such facility in achieving stormwater management, which lien, when filed in Whitfield County real estate records, shall have the same status and priority as liens for nonpayment of ad valorem; taxes. Should such a lien be filed, portions of the
affected property may be released by Whitfield County following the payments by the owner of such portion of the property of such owner's pro-rata share of the lien amount
based upon the acreage to be released with such release amount to be determined by the Whitfield County Board of Commissioners.
(3) In lieu of an inspection and maintenance agreement, the Whitfield County Board of Commissioners may, at their discretion, accept dedication of any existing or future regional stormwater management
facility for perpetual maintenance by Whitfield County, provided such facility meets all the requirements of this article, the LDM, and includes adequate and perpetual access and sufficient area, by easement or otherwise, for inspection and regular structural maintenance by the county.
Historia
(Ord. of 12-01-06, §§ 2, 3)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.