Whitfield County · Código de ordenanzas
Chapter 15 - UNIFIED SUBDIVISION REGULATIONS / Article II - PROCEDURE FOR PLAT SUBMITTAL AND APPROVAL
4.1. Certificate of Approval for Public
Sobre este texto
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Wastewater Collection System I hereby certify that the wastewater collection system serving the public roads on this final plat has been installed (or sufficient surety has been provided to install) in accordance with the requirements of Dalton Utilities.
Dalton Utilities:
Date:
5. Certificate of Approval for On-Site Sewage Management System Each lot shown hereon is suitable for the use of an existing septic system or for the installation of a new individual on-site sewage management systems. Each new system installed will require a permit to be issued before construction begins, dependent upon the location of any structures and any limitations which could adversely affect the performance of an on-site sewage
management system. General approval is hereby granted for one dwelling per lot for this subdivision site (with the exception of lot nos.
, , ).
Date:
Whitfield County Environmental Specialist
6. Certificate of Approval for Recording The Whitfield County Building,
Zoning, and Development Department certifies that this plat complies with the major subdivision provisions of the Whitfield County Subdivision Regulations, [with the
exception of such variances, if any, as are noted upon the plat], and that it has been approved for recording in the Office of the Clerk of the Superior Court of Whitfield County,
Georgia.
Authorized Representative:
Date:
7. Certificate of Approval for Fire Protection I hereby certify that fire hydrants and water mains serving the lots on this final plat have been installed and flow requirements for the fire hydrants have been met in accordance with the requirements of the Whitfield County Building Code for Fire Hydrant and Water Supply Requirements.
Whitfield County Fire Chief:
Date:
8. Certificate of Approval for Road System I hereby certify the all streets and storm drainage structures shown on this final plat have been constructed (or sufficient surety has been provided to construct) in accordance with the requirements of the Whitfield County Codes for Site Design and Roads, Streets, and Sidewalks.
Whitfield County Public Works:
Date:
(3) Reliance upon recorded plat. A developer/ subdivider may rely upon the provisions set forth in any plat approved and recorded pursuant to this chapter to the extent that any such conditions constitute vested rights pursuant to Georgia law.
Historia
(Ord. of 9-24-01, § 2-6; Res. of 5-13-02; Ord. of 12-12-05; Ord of 3-19-07; Ord. of 11-05-07)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.