Whitfield County · Código de ordenanzas
Chapter 5 - BUILDINGS, CONSTRUCTION AND RELATED ACTIVITIES / Article I - BUILDING ORDINANCE / Division 1 - GENERAL PROVISIONS, ENFORCEMENT, ADMINISTRATION, AND PENALTIES
Sec. 5-13. Utilities; requirements for connection.
Sobre este texto
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Utilities (including but not limited to, gas, water, electricity and sewerage) shall not be connected to any building, dwelling, structure, accessory structure, or manufactured home without first having obtained the written approval of the Whitfield County Engineer or his or her designee and after having first obtained a permit as provided herein.
Historia
(Ord. of 9-24-01, § 1-12; Ord. of 1-12-04, § 1)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.