Wilkes County · Código de ordenanzas
Part - CODE OF ORDINANCES / Chapter 24 - PLANNING / Article VIII - SPECIAL OVERLAY DISTRICTS
Sec. 24-137. Groundwater recharge area protection district.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Intent.
(1) In order to provide for the health, safety, and welfare of the public and a healthy economic climate within the county and surrounding communities, it is essential that the quality of public drinking water be ensured. For this reason, it is necessary to protect the subsurface water resources that are contained within aquifers, which are permeable rock strata occupying vast regions of the subsurface. These aquifers are replenished by infiltration of surface water runoff in zones of the surface known as groundwater recharge areas. Groundwater is susceptible to contamination when unrestricted development occurs within significant groundwater recharge areas. It is, therefore, necessary to manage land use within groundwater recharge areas in order to ensure that pollution threats are minimized.
(2) The objectives of this section are to:
a. Protect groundwater quality by restricting land uses that generate, use or store dangerous pollutants in recharge areas;
b. Protect groundwater quality by limiting density of development; and
c. Protect groundwater quality by ensuring that any development that occurs within the recharge area shall have no adverse effect on groundwater quality.
(b) Establishment of district. A groundwater recharge area district is hereby established which shall correspond to all lands within the jurisdiction of the county that are mapped as significant recharge areas by the state department of natural resources in Hydrologic Atlas 18, 1989 edition.
(c) Pollution susceptibility. All recharge areas within the county have a medium pollution susceptibility, as indicated by the state pollution susceptibility map prepared by the state department of natural resources.
(d) Permit requirements and enforcement. The county will approve no redistricting request or subdivision plan unless the request or plan is in compliance with the groundwater protection standards listed in subsection (e) of this section.
(1) Enforcement.The county, its agent, officers, and employees shall have authority to enter upon privately owned land for the purpose of performing their duties under this article and may take or cause to be made such examinations, surveys or sampling as the county deems necessary:
a. The county commission shall have authority to enforce this article; issue permits hereunder; and address violations or threatened violations hereof by issuance of violation notices, administrative orders and civil and criminal actions. All costs, fees and expenses in connection with such actions may be recovered as damages against the violator.
b. Any person who commits, takes part in, or assists in any violation of any provision of this section shall be fined not more than $500.00 for each offense. Each violation shall be a separate offense and, in the case of a continuing violation, each day's continuance shall be deemed to be a separate and distinct offense.
c. The county commission shall have the authority to issue cease and desist orders in the event of any violation of this article. Cease and desist orders may be appealed to a court of competent jurisdiction as identified in chapter 8.
d. When a building or other structure has been constructed in violation of this section, the violator shall be required to remove the structure.
e. When removal of vegetative cover, excavation or fill has taken place in violation of this section, the violator shall be required to restore the affected land to its original contours and to restore vegetation as far as practicable.
(2) Permit review and site plan requirement. With the exception of certain exempted activities identified in subsection (d)(4) of this section, applications for a development permit within the groundwater recharge area district shall include a site plan. The following information is required for all site plans:
a. A map, drawn to a scale of one inch equals 50 feet or other approved scale, showing all planned improvements including the width, depth, and length of all existing and proposed structures, roads, watercourses and drainage ways, water lines, wastewater and stormwater facilities, and utility installations shall be provided by the applicant.
b. Location, dimensions and areas of all impervious surfaces, both existing and proposed, on the site.
c. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.
d. Elevation of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet.
e. Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.
f. Calculations of the amount of cut and fill proposed and cross-sectional drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scale and vertical scale must be shown on cross-sectional drawings.
(3) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform to the specifications of said site plan.
Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill or removal of the overall appearance of the development as proposed, can be amended only with the approval of the county commission.
Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions are exempted from this requirement.
(4) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans:
a. Single-family detached homes constructed within a subdivision of fewer than five parcels.
b. Repairs to a facility that is part of a previously approved and permitted development.
c. Construction of minor structures, such as sheds or additions to single-family residences.
(5) Review procedures. The application shall be made to the county commission and will be reviewed within 45 days. The review period shall include the preparation of findings (approval, approval with conditions, or disapproval) by the county commission. The applicant will receive written notification of the findings of the county commission. If the review process is not completed within 45 days, the application is considered to be approved. Decisions of the county commission may be appealed to the county superior court.
(6) Public notice and public hearing. Public notice of permit applications, through publication in local newspapers, is required. A public hearing on the application, to be held before the county may be scheduled if requested by a citizen. Public announcement of the hearing shall be printed in a legal organ of general circulation at least 15 days but not more than 45 days prior to the hearing. A record of the proceedings shall be made and kept on file by the county. Any person may testify at the hearing. Decisions of the county may be appealed to a court of competent jurisdiction as identified in subsection
(f) of this section.
(7) Duration of permit validity.
a. If construction described in the development permit has not commenced within six months from the date of issuance, the permit shall expire.
b. If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire six months after the date that work ceased.
c. Written notice of pending expiration of the development permit shall be issued by the building inspector.
(e) Groundwater protection standards.
(1) Waste disposal facilities. Waste disposal facilities are prohibited within significant groundwater recharge areas.
(2) Requirements for agricultural compounds. New agricultural impoundment sites are prohibited within significant groundwater recharge areas.
(3) Hazardous waste disposal facilities. No land disposal of hazardous waste shall be permitted within any significant groundwater recharge area.
(4) Hazardous waste handling and storage. New facilities that handle hazardous materials of the types listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and in amounts of 10,000 pounds or more on any one day, shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements and local fire code requirements.
(5) Aboveground chemical and petroleum storage tanks. For all significant groundwater recharge areas, new aboveground chemical or petroleum storage tanks having a minimum of 660 gallons must have secondary containment for 110 percent of tank volume or 110 percent of the largest tanks in a cluster of tanks.
(6) Minimum lot sizes for new homes. New homes served by septic tank/drain field systems shall be on lots having minimum size limitations as follows, based on application of the DHR Manual (hereinafter DHR Table MT-1). The minimums set forth in Table MT-1 may be increased further based on consideration of other factors (set forth in sections A—F) of the DHR Manual:
a. 150 percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a high pollution susceptibility area.
b. 125 percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a medium pollution susceptibility area.
c. 110 percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a low pollution susceptibility area.
(7) Minimum lot sizes for new manufactured home parks. New manufactured home parks served by septic tank/drain field systems shall be on lots having minimum size limitations as follows, based on application of the DHR Manual (hereinafter DHR Table MT-2). The minimums set forth in Table MT-2 may be increased further based on consideration of other factors (set forth in sections A—F) of the DHR Manual:
a. 150 percent of the subdivision minimum lot size calculated based on application of DHR Table MT-2 if they are within a high pollution susceptibility area.
b. 125 percent of the subdivision minimum lot size calculated based on application of DHR Table MT-2 if they are within a medium pollution susceptibility area.
c. 110 percent of the subdivision minimum lot size calculated based on application of DHR Table MT-2 if they are within a low pollution susceptibility area.
(8) Approval by health department required. No construction may proceed on a building or manufactured home to be served by septic tanks unless the county health department first approves the proposed septic tank installations as meeting the requirements of the state department of human resources of on-site sewage management (hereinafter DHR Manual), and subsections (e)(6) and (7) of this section.
(f) Judicial review.
(1) Jurisdiction. All final decisions of the county concerning denial, approval or conditional approval of a permit shall be reviewable in the appropriate county superior court.
(2) Alternative actions. Based on those proceedings and the decision of the court, the county commission may, within the time specified by the court, elect to:
a. Institute negotiated purchase or condemnation proceedings to acquire an easement of fee interest in the applicant's land.
b. Approve the permit application with lesser restrictions or conditions (i.e., grant a variance).
c. Institute other appropriate actions ordered by the court that fall within the jurisdiction of the county commission.
(g) Assessment relief. Assessors and boards of assessors shall consider the requirements of these regulations in determining the fair market value of land.
Historia
(Ord. No. 031704, § VIII, § 8.1, 3-17-2004)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.