Ciudad: Social Circle
Social Circle Mayor and Council: reunión ordinaria, 22 de enero de 2025
5:00 PM · 18 páginas
Estas son las actas tal como las publicó Social Circle Mayor and Council, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Social Circle Mayor and Council.
Registros de esta reunión
Cada enlace abre el sitio web o el portal de reuniones del propio órgano.
- ActasMayor and Council - Regular Meeting (socialcirclecityga.iqm2.com) · se muestra en esta página
- Paquete de actasMinutes Packet (socialcirclecityga.iqm2.com)
Resumen
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.
Council approved annexation, land use change, rezoning and special use for a proposed data center campus, with annexation passing 3-2.
The council took up a proposed data center campus and approved its pieces. After public hearings with several residents speaking about noise, water, power, and traffic, it approved annexation of two parcels (C1520001 and C1720041) 3-2, then, by unanimous votes of the four members voting, the Future Land Use Map amendment, a rezoning from agricultural to light industrial (reverting to agricultural if not used as a data center), and a special use for a data center. The Planning Commission had recommended denial and staff recommended approval. The council also moved the HB581 homestead exemption opt-out hearing to February 6, 2025, made annual appointments, approved a consent agenda including three engineering contracts, and voted to terminate the Isonova gas contract and have the city manager renegotiate it.
Temas tratados: data center campus annexation; Future Land Use Map amendment; rezoning from AG to LI; data center special use; HB581 homestead exemption hearing; consent agenda engineering contracts; board and authority appointments; Isonova gas contract termination; noise, water and power concerns.
Decisiones que constan en las actas (10)
Después de cada decisión va la oración de las actas que la registra, copiada palabra por palabra, en inglés.
Annexation of parcels C1520001 and C1720041 for proposed data center campus
3-2
Las actas: “Council Member Shelton made a motion, seconded by Mayor Pro tempore Price to approve the annexation of parcels C1520001 and C1720041.”
Future Land Use Map amendment for parcels C1520001 and C1720041 to light industrial
unanimous
Las actas: “Mayor Pro tempore Price made a motion, seconded by Council Member Shelton to approve the amendment to the Future Land Use Map for parcels C1520001 and C1720041.”
Rezoning of parcels C1520001 and C1720041 from AG to LI, reverting to AG if not a data center
unanimous
Las actas: “Council Member Shelton made a motion, seconded by Council Member Jackson to approve the Rezone for parcels C1520001, C1720041 from AG to LI with the restriction that if not used as a data center then the parcels revert back to AG.”
Special use for a data center on parcels 1 through 4
unanimous
Las actas: “Mayor Pro tempore Price made a motion, seconded by Council Member Shelton to approve the Special Use for parcels 1,2,3,4 for a Data Center.”
Termination of Isonova gas rates contract and authorization for city manager to renegotiate
unanimous
Las actas: “Council Member Boyd made a motion to Terminate the contract with Isonova for Gas Rates and Authorize the City Manager to renegotiate.”
Consent agenda including minutes, engineering contracts, purchasing card policy, qualifying fees resolution, and land transfer to the Board of Education
unanimous
Las actas: “IX. CONSENT AGENDA”
Appointment of Mayor Pro tempore
unanimous
Las actas: “Council Member Shelton made a motion, seconded by Council Member Boyd to appoint Traysa Price as Mayor Pro tempore.”
Appointment of municipal court judge and alternate with two year contract
unanimous
Las actas: “Council Member Boyd made a motion, seconded by Council Member Shelton to appoint Robbie Ballard as Municipal Court Judge and Sam Barth as Alternate Municipal Court Judge and approve authorization for a two year contract.”
Appointment of City Clerk and City Attorney
unanimous
Las actas: “Council Member Boyd made a motion, seconded by Council Member Shelton to appoint Susan Roper as City Clerk.”
Hearing on opting out of HB581 floating homestead exemption moved to February 6, 2025
unanimous
Las actas: “Council Member Boyd made a motion, seconded by Council Member Shelton to table this matter to February 6, 2025 11AM which will be the first Public Hearing on HB581.”
Puntos del orden del día (37)
Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.
- I. CALL TO ORDER
- II. PLEDGE OF ALLEGIANCE
- III. INVOCATION
- IV. PRESENTATIONS
- 1. Employee Introduction and Recognition
- 2. Downtown Rundown
- V. CITIZENS REQUESTS
- VI. COUNCIL REQUESTS
- VII. AGENDA APPROVAL
- VIII. PUBLIC HEARINGS
- IX. CONSENT AGENDA
- IX. CONSENT AGENDA
- 1. Minutes of Mayor and Council Regular Meeting December 17, 2024 6:30 PM
- 2. Executive Session Minutes December 17, 2024
- 3. Minutes of Mayor and Council Work Session January 2, 2025 6:30 PM
- 4. Executive Session Minutes January 2, 2025
- 5. Approval of Engineering Services Contract with Precision Planning in the Amount of $34,725 for Cannon Drive Water Main Replacement Project and Authorize…
- 6. Approval of Engineering Services Contract with Precision Planning in the Amount of $25,060 for the North Cherokee Pressure Control Valve Project and…
- 7. Approval of City Purchasing Card Policy
- 8. Resolution to Name the Qualifying Officer and Set Qualifying Fees for the 2025 Election Cycle
- X. UNFINISHED BUSINESS
- XI. NEW BUSINESS
- 1. Mayor Pro Tempore Appointment
- 2. City Clerk Appointment
- 3. City Attorney Appointment
- 4. Municipal Judge Appointment and Authorization of Two Year Contract Council Member Boyd made a motion, seconded by Council Member Shelton to appoint Robbie…
- 5. Board Appointments
- 6. Motion to re-appoint Debbie Smith and Lurie Maddox to the Downtown Development Authority of Social Circle.
- 7. Motion to re-appoint James Williams, Lynn Mills and Debbie Conner-Smith to the Historic Preservation Commission.
- 8. Motion to re-appoint Susan Farrow, Donna Jean Lightfoot and Angela Cobb Kelley to the Main Street Commission.
- 9. Motion to re-appoint Crenan Mills to the Social Circle Development Authority.
- 10. Motion to re-appoint Barbara Sams, Edith Foreman and Rose Marie Sells to the Tree Board.
- 11. Approval to Transfer Approximately 4.6 Acres from Parcel SC170077 , 345 Vine Circle to the Social Circle Board of Education and Authorize the City Manager…
- 12. Approval of Engineering Services Contract with Precision Planning in the Amount of $46,380 for Lakewood Water Main Replacement Project and Authorize the…
- XII. EXECUTIVE SESSION
- XII. EXECUTIVE SESSION
- 1. Motion to go into Executive Session for the purpose of Real Estate, Litigation and Personnel.
- 2. Motion to come out of Executive Session and return to Regular Session.
- XIII. REGULAR SESSION EXTENDED
- 1. Motion to amend the agenda to add Termination of Contract with Isonova for Gas Rates and Renegotiate Contract.
- 2. Termination of Contract with Isonova for Gas Rates and Authorization for City Manager to Renegotiate
- XIV. ADJOURN
Las actas
Tal como se publicó en socialcirclecityga.iqm2.com, leído el 19 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.
CITY OF SOCIAL CIRCLE
JANUARY 22, 2025
5:00 PM City Community Room 138 East Hightower Trail Mayor and Council Regular Meeting Minutes Persons with hearing or speech disabilities who need to contact the City of Social Circle may place their call through The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
REGULAR MEETING 5:00 PM
I. CALL TO ORDER
Attendee Name Organization Title Status Arrived Departed David Keener City of Social
Circle Mayor Present 5:05 PM 7:12 PM Traysa Cody Price City of Social Circle Mayor Pro tempore (1) Present 5:09 PM 7:12 PM Tyson Jackson City of Social Circle Council Member (2) Present 5:05 PM 7:12 PM Nathan Boyd City of Social Circle Council Member (3) Present 5:05 PM 7:12 PM Steve Shelton City of Social Circle Council Member (4) Present 5:05 PM 7:12 PM Eric Taylor City of Social Circle City Manager Present 5:05 PM 7:12 PM Susan Roper City of Social Circle City Clerk Present 5:05 PM 7:12 PM Tony Powell City of Social Circle City Attorney Present 5:31 PM 7:12 PM Jay Crowley City of Social Circle City Attorney Absent
II. PLEDGE OF ALLEGIANCE
Mayor Keener led the Pledge of Allegiance.
III. INVOCATION
Council Member Jackson gave the Invocation.
ANNOUNCEMENTS
Council Meeting January 21, 2025, 6:30 PM Community Room Tree Board Meeting January 23, 2025, 6PM - Community Room Planning Commission January 28, 2025, 6PM - Community Room HB581 Public Hearing February 6, 2025, 11:00 AM - Community Room Council Work Session February 6, 2025, 6:30 PM - Community Room HB581 Public Hearing February 6, 2025, 6:30 PM - Community Room Historic Preservation Meeting February 11, 2025, 6PM -Community Room Downtown Development Authority Meeting February 13, 2025, 9AM - Community Room Council Meeting February 18, 2025, 6:30 PM - Community Room HB581 Public Hearing February 18, 2025, 6:30 PM - Community Room
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
IV. PRESENTATIONS
1. Employee Introduction and Recognition
None.
2. Downtown Rundown
CHOCOLATE CRAWL-Our annual Valentines event, the chocolate crawl, will take place on Thursday, February 13th from 6-8pm in Downtown. Participants will visit the businesses participating and collect chocolate treats. Thorn and Thistle will be selling fresh flowers during the event and she is also offering free delivery within the city limits for flowers on Valentine’s day.
Coffee and Conversations-Please join us for coffee and conversations at the welcome center on Tuesday, January 28th at 9am. This is a monthly networking event that is held on the last Tuesday of the month. This month, local realtor, Katie Miles with Lantern Realty will be our host. Please join us at the welcome center on the 28th at 9am. Bring business cards to enter our drawing for a bread and butter gift card!
V. CITIZENS REQUESTS
None.
VI. COUNCIL REQUESTS
Council Member Jackson asked about the pavilion at Burks Field. City Manager Taylor reported that he was waiting on the Engineering report.
Mayor Keener thanked all City Staff and Employees for storm response.
VII. AGENDA APPROVAL
1. Motion to amend the agenda to remove Item #5 (Lakewood Water Line) from the consent agenda and add it to New Business.
Council Member Shelton made a motion, seconded by Council Member Jackson to amend the agenda to remove Item #5 under Consent (Lakewood Water Line) to Item #7 under New Business.
Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Steve Shelton, Council Member (4) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
VIII. PUBLIC HEARINGS
1. Potentially Opting Out of HB-581 (Statewide Floating Homestead Exemption) City Manager Taylor reported that the Walton Tribune did not advertise our ad correctly but Covington News did. Therefore the scheduled Public Hearing dates had to be changed. The first Public Hearing will be on Thursday, Februay 6, 2025 at 11AM. Council Member Boyd made a motion, seconded by Council Member Shelton to table this matter to February 6, 2025 11AM which will be the first Public Hearing on HB581. Opportunity for discussion. All were in favor.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
RESULT: SCHEDULED FOR Next: 2/6/2025 11:00 AM
2. ANX-2024-001 - 1705 Amber Stapp Studdard Road, 1599 Amber Stapp Studdard Road, & 0 Partee Trail, Also Known as Tax Parcels C1520001, C1720041, & C1720027B00;
Request to Annex Parcels into City as Part of Proposed Data Center Campus.
Community Development Director Ashley Davis reported that all of the public hearings for all items would be completed before a vote is taken.
This is a request for Annexation for the purpose of rezone and special use that would allow for the development an Industrial Data Center Campus in the Light Industrial Zone. This request is also being done in conjunction with the Future Land Use Map (FLUM) Amendment, a request to rezone from Agricultural (AG) to Light Industrial (LI), and a request for Special Use that, if approved, would permit a Data Center in LI zoning as well.
This application triggered a DRI study by NEGRC and that final report should be in your packet.
The developers conducted a Traffic Study (Exhibit B) that identified the impacts that the proposed development would have on traffic flow in the area. According to this study, the proposed campus would have one access point along Social Circle Parkway, and another access point on Amber Stapp Studdard Road that would be for emergency use only. The study indicated that the Data Center would generate approximately 227 new external trips during A.M. peak hours and approximately 191 during P.M. peaks hours, with around 1,769 new two-way trips being generated during a 24-hour period. This request also triggered the need for a Community Meeting that the applicant held on December 4, 2024. The developers addressed concerns regarding stormwater runoff, noise, and impacts on utility capacity within the area. In addressing the stormwater runoff, the developers indicated that their plans would meet, if not exceed, the standards set by the Georgia Environmental Protection Division (GA EPD). They also added, concerning the noise, that they anticipate no more than 30dBs at the nearest residential structure at any point throughout the day. With regard to the impacts on utilities within the area, they stated that they would work with the City and electric providers to ensure that their operations did not negatively impact residents within the area. They also mentioned that the cooling method used for the computers in their buildings would be that of either water or air technologies, but it would be dependent upon the utility availability at that time.
At their meeting on December 19, 2024 the Planning Commission recommended denial. Staff recommends approval.
Applicant Ryan King attended the meeting online. He stated that he works for Sailfish Investors and partners with Scott Green who is the Civil Engineer on the project. I apologize for not being there in person. I was available yesterday but had a prior commitment for today. I appreciate the opportunity to present by video. Ashley did a great job describing what we are trying to build and what we are looking to do with the annexation portion of it. We have four (4) total sites and of those four sites. There are five total parcels. Once parcel (#5) is going to stay in Walton County and staying AG. Parcels 1 and 2 are already in the City of Social Circle so those will not need to be annexed. We are really talking about parcels 3 & 4 to bring into the City with parcels 1 and 2 because the City can provide us with the necessary utilities (water and sewer) that we would need for this development. Overall we are developing a four million, 1.9 million square foot data center campus that would receive its power from the power lines (230 volt) available on the Northeast corner of the site. As Ashley said the main access point is on Social Circle Parkway with an
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
emergency only access on Amber Stapp Studdard Road. We are Grateful for City support and any feedback that you may have.
Civil Engineer for the project Scott Green reported that he met with the City Manager as Ashley spoke to earlier about facilities for the project. We met also with the City's engineering consultant together to talk about the possible water and sewer needs for the project. They feel like the uses and loads we have anticipated for the project will fit within the City's near term plans.
Mayor Keener asked if there were questions from Council for the applicant.
Mayor Keener opened a Public Hearing for Annexation 2024-001 giving 10 minutes for each side.
Mayor Keener reported that no one signed up in favor but several signed up to speak against.
Michael Carter, 138 Amber Stapp Studdard Road. He stated he was not opposed, more in between. What is good and what is bad. I would like to thank City for allowing to speak. Ryan and Scott have been very helpful to answer questions. He said he had a couple of concerns 1.Noise. Currently I have gone through as much as I can to see the codes and they don't necessarily have a code that talks about noise. The decible limits and things like that. Also Construction time. What time can construction go on. I am on Amber Stapp Studdard Road. I am right near where the warehouses are going. They are pouring concrete at night and it is all night long, all the time. it starts early in the morning and goes until late at night. Now we are talking about building something else next to my property and my neighbors property. What are we going to do about the noise and the construction time? I feel like that is more of a City question than a Ryan and Scott question. They have said they would respect us and the neighbors and everything and I really appreciate that, but it also works if there is stuff on paper. The second thing that I am concerned about is the surface ratio. The UDC allows 25% and I believe the original application that they are over that. 26%, 27%, I don't have the numbers in front of me, I just know it is over 25% so what is the development going to look like at the end of that and how are we going to shrink that to match that with what the city allows? Those are just two of my biggest concerns as well as the third and final one being the traffic. We are putting a brand new school in right there.
Seeing this traffic study we are adding more and more motorists and stuff in the area. What are we going to do about protection of the kids that are going there. That is adding more vehicles, more tractor trailers. We are in the heavy industrial aspect right there so what are we going to do to protect the traffic pattern and school buses and teachers and all coming through there? That is all I have to say. I do appreciate you guys allowing me to speak and Ryan and Scott I appreciate you guys as well. Like I said I am just in between, just trying to see where we are going to go with this and I appreciate your time.
Wesley Studdard, 5174 Hawkins Academy Road, At the Planning Commission meeting we were not given a lot of information about the details of what is going to be partaking. How many gallons? Is it going to be City water to that place and sewage? The City is already struggling with water and sewage and we are going to add this million square feet building to it. Are yall privey to information? The amount of water that is going to be needed to cool those computers?
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
City Manager Taylor reported that after meeting with the City Engineer we are very confident that we have enough water capacity and is noted on the DRI report as well. A main concern for us is also noted on the DRI report which is sewer capacity. That is being addressed with the new sewer plant.
Wesley Studdard - Is that water that is cooling going to be circulated?
City Manager Taylor - I don't believe they have decided on a cooling system yet. That is a conversation for the engineer.
Wesley Studdard - We are trying to pass through something in this town and we don't have hardly no information given to the public about what is going in. How it can affect us being annexed into the City. I just feel that is kind of shady and I noticed somebody might have signed a ND, non disclosure. Anything that deals with ND is kind of shady.
Council Member Shelton stated that no one signed a Non Disclosure.
Wesley Studdard - OK. I just hear rumors that somebody signed a Non Disclosure. That's all I have. Thank you.
Valarie Walthart - my concerns have been addressed.
Mayor asked if there was anyone present to speak for. None.
Ashley Davis said the applicant has 7:20 minutes to answer questions.
Applicant Ryan King stated that on the sound. In the City of Social Circle's code there is a 90 decibel limit for crypto mining centers. This will not be a crypto bitcoin type data center. It will be an AI/cloud data center, for what is called a hyperscale _______________ but we are still willing to stick within the bounds of that in 90 decibel sound limits and stick within that limit which we talked about this at the community meeting was the sound level 90 decibels means it is about 30 decibels at 5000 feet. So that is where we get the 30 decibels figure and how the sound value will peter out based on feet from nearest residence. In terms of hours of construction, again we are going to work within the restrictions that Social Circle has. We don't intend on building the ________ all night developing the data centers and we are willing to work with the community if there are any push back on the hours that we ultimately do build it. On the traffic side I would say you would be hard pressed to find a lower traffic use than a data center. It is fairly employee light business model. So there is not a ton of traffic in and out in the morning and afternoon and there certainly are not any tractor trailers that you would see with a traditional industrial development because this is in an industrial character area. Parts of it are zoned industrial so you know this is an area that ultimately will become industrial in the long run. I would make the case that a data center truck traffic, normal traffic noise is a much better use. On the impervious surface we will stick within the 25% when we get a final site plan approved with the City which is pending results. In that stage of the process we will work with the City to be sure we are not crossing that 25% threshold. To be clear we are not asking for any sort of variance in that regard.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
Scott Green stated we are going through the rezoning process with the City. We are also talking to utility providers about how power will be service for the project and where the fiber will be coming from on top of the water and sewer usage. As you build the design and we are at that foundational moment where
we are understanding what kind of utilities the City has and to answer Mr. Studdard's question on the water and sewer use, some municipalities have a lot of water that they need to use. Some don't. So the cooling technology in these data centers is multi faceted.(Attorney Powell arrived at 5:31 PM) There are several ways to cool the chips within the data centers. Whether that is with air.
Another couple of technologies related to water there is a adiamatic system for larger water user and then there is a closed loop water system that is a very very small water user. When you fill the system up, the only time it needs new water injected into the system is if you have to take a coil down for maintenance. We can work with Social Circle on when we do those initial fills at night so it is not when everybody is taking a shower or during peak uses. I see that in a lot of municipalities and when we get to that stage we will work with the City on that. To add to Mr. Taylors statement, we worked with Turnipseed, the City's engineer in terms of the sewer usage and sewer treatment plant that the City is going for. There are some other sewer extension and main projects that are going to be around our site that we can incorporate into development at our site. We will ultimately go back and be City infrastructure one day.
Ryan King The last point I will make about the NDA conversation. I have not entered into any NDA with the Mayor and Council etc nor have the Mayor and Council etc entered into any NDA with me.
Don't know where that rumor came from but it is not true.
Mayor Closed the Public Hearing.
RESULT: ADOPTED [3 TO 2]
MOVER: Steve Shelton, Council Member (4) SECONDER: Traysa Cody Price, Mayor Pro tempore (1) AYES: Mayor Keener, Mayor Pro tempore (1) Price, Council Member (4) Shelton NAYS: Council Member (2) Jackson, Council Member (3) Boyd
3. FLUM-2024-001 - 1705 Amber Stapp Studdard Road, 1599 Amber Stapp Studdard Road, & 0 Partee Trail, Also Known as Tax Parcels C1520001, C1720041, & C1720027B00;
Request to Amend the Future Land Use Map to Designate These Tax Parcels as Industrial Character Areas.
Community Development Director Ashley Davis stated that this item is for a Future Land Use Amendment. This is basically a housekeeping item if the annexation request passes. We would just need to add in the two parcels labeled 3 and 4 on the map attached to the packet on our Future Land Use Map they would be designated as Light Industrial Character Area which matches with parcels 1 and 2.
Mayor Keener asked if Council had any questions.
Scott Green speaking for the applicant stated that parcel 5 is owned by the same land owner currently and will be purchased by Ryan King as part of the overall project. In talking with Walton County, the county and some of the neighbors there, we decided to keep that property in the county and keep it as AG. Not make it part of this application we are submitting. I just wanted to bring that up.
Mayor Keener opened a public hearing.
There was no one present to speak for or against so Mayor Keener closed the public hearing.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
RESULT: ADOPTED [UNANIMOUS]
MOVER: Traysa Cody Price, Mayor Pro tempore (1) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
4. REZ-2024-009 - 1677 Amber Stapp Studdard Road, 1705 Amber Stapp Studdard Road, 1599 Amber Stapp Studdard Road, & 0 Partee Trail, Also Known as Tax Parcels C15200010DP, C1520001, C1720041, & C1720027B00; Request to Rezone from AG to LI for Data Center.
Community Development Director Ashley Davis reported that this item is to rezone parcels 1,2,3 &4 on the attached map from AG to Light Industrial and as Mr. Green mentioned parcel 5 is no longer part of that request. The only reason it is included on the agenda is because it was part of the original application but that has since been changed. As shown on the proposed site plan the data center campus would be developed on approximately 344 acres and would have four buildings totaling at about 447,000 square feet each which comes out to be a little over 1.7 million square feet total. The site plan also shows the development having around 30% impervious surface just based off of this concept plan that we have. Which again is a concept plan not a final site plan. The area is located within our watershed protection overlay disrict. In section 5.3.4.c of the UDC says that the maximum impervious surface percentage that is allowed in this overlay district is 25% and there can not be a variance asked on that. So the applicant would have to meet that 25% by the time it gets to the site development stage if approved. There is water availability currently along E Hightower Trail and Social Circle Parkway but not in the immediate vicinity of the proposed site. Regarding sewer there is no gravity sewer in the area currently but as discussed before there are projects in the future that will lend itself to sewer coming to this site.
Council Member Boyd asked if the applicant would be responsible for putting in sewer.
Community Development Director Ashley Davis said that the way City Code reads is that if you are within 300' of existing water or sewer you have to connect. So if at the time of development we have already run a sewer line within 300' they would have to connect. Should the project be approve we could enter into an agreement like we did with PNK to have some public/private partnerships.
Mayor Keener opened a public hearing giving both sides 10 minutes to speak.
Applicant Ryan King stated that Ashley did a good job of describing it. He said he would emphasize that of the four parcels we are discussing, parcel 1 is already zoned correctly as Light Industrial, Parcel 2 in the Industrial Character Area so the long term future land use is deemed to be a potential Industrial site. And then 3 & 4, all we are trying to do is bring those in line with parcels 1 & 2 for industrial use and grow the size of the campus and most importantly get access to the power lines that are on the northeast corner of the site.
Mayor Pro tempore Price asked as far as the construction of the facility is there any kind of structure schedule like what hours?
Scott Green stated that the City has hours of operation that we would be within. Concrete boards, particularly early in the morning and especially in the summer heat, how concrete reacts with heat and how it cures so those boards are typically are poured in the morning and would be within the city's hours.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
Mayor Keener asked if there was anyone present to speak in favor. None.
Mayor Keener asked if there was anyone present to speak against.
Joe Cheney -551 Social Circle Road - I am wondering during this construction process, where does the water going to go? Runoff, and then after it is built. We are talking about 1.7 million square feet, where is this water going to go? I am pretty sure if I am looking at the map correctly, and I haven't done a lot of research. Is it going to go towards Means Creek? Which Means Creek runs into Hard Labor Creek Reservoir. Does anybody know that? We have warehouses around here, I mean what kind of retention ponds? I mean we have got something sitting over in Rutledge right now which is part of Social Circle, Rutledge, Morgan County, I don't know where it sits but we have got a problem over there. Where is this water going? Anybody here, Ryan?
Ryan King stated that Scott Green could answer that but applicant is not supposed to talk right now.
Community Development Director Ashley Davis agreed that applicant can answer questions in rebuttal.
Joe Cheney - I would like to know where the water is going to go.
Michael Davis - 101 Gabriel Way, been a resident many years. These data centers do use a lot of electricity and I have heard power but I haven't heard how much power this thing is actually going to draw? Again it seems that electricity is a driving force behind this piece of property because the line goes across that northeast corner or northwest corner. I would like to know the answers to that because I mean these data centers draw a lot of energy. And we know about power when it goes out, especially in the weather is cold, you have an issue. If they could answer that about the power usage it would be very important.
Applicant Response - Scott Green stated that he is a Civil Engineer with a professional license here in the State of Georgia. Whether it's water and sewer, I know your question was about storm water but there are different sets of regulations we have to follow no matter what type of infrastructure we design.
Relative to Storm water currently right now as the site sits the water does drain into Means Creek.
If we design the site we wouldn't change the flow of that water to all of the sudden head south. The topography is going to dictate where the water goes. In terms of the runoff rate, how that water runs off the site right now, if your house is near Means Creek, or anybody's house is near that creek the water drains off at a certain rate in different storm water events. As Civil Engineers we have to design based on State regulations. They will upgrade regulations based on previous model storm water events, 2 year event, 5 year event and 25 and 100 year event. In those regulations we have to ensure that our post development (after site is developed) that rate of water is flowing off the site at the same rate as before. So you ask when you are creating all of this impervious surface how do you do that? So we will abide by the 25% rule and watershed here with the City but no matter what the impervious surface is as an engineer, the engineer would have to design storm water retention facilities that if any of us have been to a Walmart or any type of development, those development have storm water retention facilities so during construction the sediment is kept on site in accordance with the Georgia Blue Book Storm Water Manual and in post development those retention basins provide water quality and water quantity controls and velocity controls to make sure that downstream receiving water body is receiving the water at the same flow rate as during pre development. When is all that done? So as I describe the building block of this process, zoning, talking with the power company, that next step if this project should be approved we would move into a site plan with the City. Where we would work with the City on storm water EPD to design the site in accordance with those standards. So when it goes into construction we would meet those standards, during construction and post construction. That is a detail site plan step. The answer to Mr. Michaels question about power. So Georgia is a customer of choice state. This goes back, pre dates data centers, not sure when the regulation came into play. If you are load over 900kw, any manufacturer, any project that you typically see, those customers can chose between GA Power,
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
EMC's or MEAG and Dalton Electric to be their service provider. That has been in place for many years now. So one of the first things you do when you are finding a data center site is you go talk to the power company. If the folks with the power company were standing right here they would say the same thing, I have hear them say it many times, many different folks. When we propose a load for our data center, currently we are proposing a 800 mega watt load. When we propose that load to the power company they model it. So Social Circle doesn't have a power grid, Walton County doesn't have a power grid, State of Georgia doesn't have a power grid. Everything east of the rockies is all connected from a power standpoint. Transmission lines, _________ lines we see, distribution lines. And they put that in a model and something was formed in the 70's, NERC. North American Energy Regulatory Commission I believe. What the power companies have told me is that regulating body is a self regulating model providing the southern company energy, all the major power providers and one of the foundations of that model is any load that comes up, whether a new house, a data center, manufacturing plant can't adversely effect the neighbors. Whoever the other customers on the grid and I have heard that from GA Power, EMC there is a set of standards that they have to follow that is outside of the projects control as it is an overall controlling factor that they have. So it takes the power company 12-16 weeks to perform their preliminary evaluations. We do what we call load ramps so we ask that power company we say you know when could you bring this type of load to a site? if they say 2028 or 2030 we would start to build that load then and we would give that load ramp to them and they would put in their model. So I know I am kind of being long on my explanation but there is a great deal of work that the power company is doing to ensure that all of their customers are serviced with power. No matter whether it is this project or the new Publix in Covington or anybody's house that is all evaluated by the power company's and they come back to us and say this is when we will provide this level of power. And it may be in a phased approach. That is kind of the answer there Mr. Michael.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Steve Shelton, Council Member (4) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
5. SU-2024-001 - 1677 Amber Stapp Studdard Road, 1705 Amber Stapp Studdard Road, 1599 Amber Stapp Studdard Road, 0 Partee Trail & 0 Social Circle Parkway, Also Known as Tax Parcels C15200010DP, C1520001, C1720041, C1720027B00 & SC220009A00;
Request to Develop Property Under LI as an Industrial Campus for a Data Center.
Community Development Director Ashley Davis stated that this request talks about the specific use for a Data Center. In our UDC we require our Special Use for any Data Center to operate in a Light Industrial Zone. So this request is for parcels that are labeled 1 through 4 on the map attached to the packet. Like I mentioned before parcel 5 is being left out but the Special Use request is on 1,2,3,4 because parcel #1 is already zoned Light Industrial. We have already talked about the site plan that was proposed and the regulations that are in place that they would have to tweak their concept plan when we go into the official site plan development. In the staff analysis we specifically address any issues that there may be in regards to special uses. Specific Use standards provided in Article 3 and the specific use standards for a data center are covered under section 3.4.6.A and this outlines a data center as being a telecommunication equipment used for remote storage, processing, and distribution of data. The proposed development/concept appears to fall within the parameters outlined in this definition outlined in this section of the UDC. So there isn't anything special. The main thing that staff wants you to know about the concept plan vs the site development plan is that this is in the WPO and that impervious ration would have to be addressed.
The applicant has stated that they are willing to come into compliance with.
Applicant stated they have nothing further.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
Mayor Keener opened a public hearing giving both sides 10 minutes.
John Almand - 4920 Partee Trail - I was here at the last meeting and just asked some questions.
Pretty much to voice some concerns. I said at that meeting and as far as I knew and had been able to find out, I am not against the data center. I live on Partee Trail which dead ends into that property. I know that anytime these situations come up it can get kind of contentious often times when we are talking about growth. Residents feel like they are not being heard sometimes and don't have enough information. There are several concerns I have and we have talked about those during the meeting and talked about those with these gentlemen. They seem like they are willing to hear our concerns and willing to do the right thing. I am back tonight to, I don't want to be redundant, but I want to reiterate some of the things that I was concerned about and some of those things have already been said again tonight. I want to briefly go over and would like if yall consider passing this, approving this that you document these stipulations that we have talked about and they have talked about so that they will be on record. My list was, and once again you have heard most of these things already tonight. Access off the bypass to that facility. No access off of Amber Stapp Studdard Road except for the emergency exit. I would like to see them go above and beyond on the wetland mitigation because there are some wetlands that are close to that power line in there. I don't want to see that disturbed so I hope that will be taken care of properly. Not to disturb any of the waters or lakes that are already there. Noise control. I am probably 1500' from where they are talking about putting the data center so as long as that noise level is kept down I won't have any concerns. Lighting, I don't know if we talked about that or not. Lighting on the property if it would be required to be directed down and away from surrounding areas. Especially near houses. The of course anything that changed if there is a way that I know that they have to go through yall's planning development process and changes have to be approved. if there is some way that can, if there was a major change to the site that it could be made public. Sensitive residents in that area. That is my concerns. If they can meet the concerns and continue to do what they said they would do then I won't have an issue. I do think there were some issues brought up by the planning commission that probably need to be addressed and I hope that yall will address those. But as for me and what I understand and what I know that is my thoughts. These guys have already said that they left that parcel out that was at the end of our street and I want to say I appreciate everybody that was involved in getting that done. That parcel of land was left over from a previous owner and kind of got included in that but they did take that out. All of us down that way appreciate it.
Michael Carter - No Christy Studdard 5174 Hawkins Academy Road - we also have a farm at 1030 Amber Stapp Studdard Road as well. As I stated at the last meeting I was at last month, we are the people that moved out there to farm and live out there and we are agriculture people. We have lots of land ourselves in conservation so understand what that means personally. What I would like to address today and I wrote it down so I would stay on task and not waste anyone's time, but want to say that I don't disagree with that data centers create a small amount of jobs. Which is very few because we all talk about the low traffic impact so that means that not a lot of jobs. Lets be honest and they are specialized jobs. These aren't jobs you can come straight out of high school and graduate and go straight in. We all need to understand that. It is a specialized job. So I feel like that sort of diminishes the pro in my opinion. But they don't create a lot of jobs but they create a monstrosity of a building which will be obsolete in 10-20 years depending on what article you read. This is including replacements every 5 years. What is the plan for the data center when it is obsolete?
Then you will have a massive building, this massive parcel zoned industrial and already annexed into the City limits. What then? I am almost 40 years old, in 20 years, I have lived that already twice. The data center also uses a closed loop cooling system which could also use an antifreeze type cooling agent. That will require them to have a water storage tank or water retention pond of some sort to keep the chemical from contaminating the ground water nearby. I have also asked about this in the last meeting last month and my question went unaddressed. There will also be a great deal of noise pollution coming from the humming of the hard drives and massive generators when they are in use and generators are frequently in service for test. They are not your typical residential generators that we are used to seeing. Noise pollution doesn't just effect homeowners in
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
the proximity of the project but it also effect wildlife, their patterns, where they go, deer hunters, basically our way of life that we live every day. We also have cows and a chicken farm which I know seems not as important as technology and not as cool and up to date I guarantee that everybody that is working at the data center also goes to the grocery store and they depend on what we provide as well in this day in age. So from the research I have done I can not find a data center that operates under 90 decibels. Who will hold the company accountable on the noise pollution and what will the repercussions be if they don't abide by the 30 decibel amount as promised. That I feel like has swayed even some of my neighbors to sort of support this project in fear for what could be there. That is disgusting to me because this is, and I don't mean to be and I don't want to step on anybody's toes, so they shut down and stop listening to what I am saying, but I feel like it has been a situation to where oh it could be worse, it could be this, it could be that. And the area is also referred to as an industrial character area. I would like to point out that the other industrial character being spoken about is industrial projects that were never wanted in the area to begin with. Not to mention Light pollution and power grid, needing access to water and sewage utility that are already maxed out or are simply not available to the area. The list of cons far outweighs the pros in my opinion. Although I am against the annexation and rezoning of the parcel all together, and for special use that I am speaking for, I am opposed to all of it, I just didn't waste your time to sign up for each thing. I signed up for the last one so I could speak at the end. For the sheer size of the parcel is huge compared to the size of the City as a whole. And for the purpose of stopping the bleeding of the industrial corridor into more and more rural Walton County. The rezone to Industrial could also open up a lot of unsavory uses for the land if the data center was to fall through. That is all I have to say.
James Evans - All that I wanted to talk about has already been addressed. The young lady summed a lot of what people have been feeling. What happens if this doesn't take place.
Applicant Response.
Scott Green Mr. Almand from an access standpoint these facilities are very high security facilities. I have been in a data center before. They are one access in and one out for all folks that come in to data centers. Most of the campuses I have seen do have an emergency access. Thankfully we have got that second access. The emergency access will not be a construction access. Everybody that has been on that road knows where the railroad is, you couldn't even get over there with a low boy for construction vehicles anyway, we are not going to do that. From an access standpoint the reason there is one access to data centers, the ones I have been in, just around here, you go through a gated access, to get in the building you have to have a key card to get in. You have to get checked in at the front desk. You have multiple key cards to get to those computers. From a physical security standpoint its one of the most secure facilities I have ever seen. So that is the reason for the one access. But also having that access that is off the bypass would keep all daily traffic on the data center from going down Amber Stapp Studdard Road and those other residential areas. So the need of the facility parallel with what we have heard parallel to site plan characteristics._____________________________(not legible) From a wetland standpoint this is a getting back Mr. Cheney question on storm water as well. We have had wetland consultants go out there and identify the different wetland characteristics on the site. We have those characteristics on our site plan. We will plan around them to the best of our ability. As we go through the permit process with the City all of that will be on our plans. From a lighting standpoint we will meet the City's lighting standards and Ashley may have to help me out on some of the lighting standards but I do believe we have talked about down lighting and the elimination of light pollution as it goes off the property. There are different foot candle calculations that the lighting engineers do that could be reviewed by the city during that site plan process. That is not my forte/specialty on the civil side but I do see that on projects from time to time. I wanted to address Ms. Studdards questions on a job standpoint. I have seen data centers, I am going to use facebook in Newton County because it is close to us. They do work with the school system. I have seen data centers work in the high school systems. You don't need a college degree to work in these data centers. There are some technical/technician jobs, highly skilled jobs that can be taught in the career academy at the high school or technical college system. I have seen certain data center companies work with a local and technology, tech schools in different states to program criteria to
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
have those folks in a local community able to work in the data center. There are college degree jobs from engineering all the way up to management of the facility but there are jobs for multiple positions and multiple skill levels in a data center that I have personally seen. I believe we talked about power and we talked about water. Ryan spoke briefly about noise. If you want to touch on that Ryan I believe I have touched on the notes I have taken from Ms. Studdard and Mr. Almand.
Ryan King, I believe the question on noise was how do you enforce us going above that decibel limit? That we are willing to abide by. It is not a crypto DSI, this more a question for City Council and Mayor. I know we are going to abide by those rules. If we violate those rules, I don't know what the exact ramifications are so, fines, anything like that but we are not building this plant or data center campus to go above that 90 decibel level. Another question was on the life of data centers, 10-20 years? You are right. You are right that technology advances very quickly. You mentioned at one point the hard drives life of 3-4 years. There will be no change to the outside of the building.
We are investing billions in these campuses which gives you a good test of we aren't putting hundreds of billions of dollars into data centers if we think they are going to go obsolete soon. We think they will be an important part of the economy going forward. We will be an important part of the Social Circle tax base.
Mayor Keener closed the public hearing.
Council Member Boyd asked would the city need to do anything for fire protection?
Community Development Director Ashley Davis stated that fire will be reviewing the site plan. The will have input on our site plan because it goes through our office and the fire marshals office.
Fire Chief Ken Zaydel stated that all of the Fire Department concerns would be address on the site plan review and building review with special extinquishing system requirements for life safety and building requirements. With the equipment we already have on order we will be well covered on equipment.
Council Member Boyd asked what was the role of Sailfish? Are you building like a spec building and a company is going to come in and take over that building or how will that work? The reason I am asking the question is because we do want to have good community focused company's here in Social Circle that are going to invest in our Schools and things like that. So I just didn't know if yall are going to build the building and hand it off to someone else and they are going to manage and run it or how that operates.
Ryan King - very likely what will happen is we will be developing this campus. Very likely one of AWS, Google, Open AI (big announcement yesterday), Microsoft, etc will be the tenant for all four buildings and will sign a lease with us just like most other data centers in the State of GA. There are options. if a hyperscaler comes to us and says hey we really want to be in these buildings and we want to buy the land, that is an option to, but they of course would have to abide by the same rules, same regulations that we have approval for. But ultimately our desire is to lease to a hyperscaler.
Council Member Boyd asked if electric services need is not there, take until 2030 or whatever, to be able to get the electricity there, we potentially are approving annexation, rezone to LI and if that is outside of yalls time frame could you potentially move on and do something else with the land?
Ryan King - we are willing to commit to the Data Center. We have no desire for anything else. I can't commit that we will be completely satisfied with the amount of power provided by GA Power and the time line for that, but our goal is to move ahead with this project after tonight and get the site plan approved and then ultimately secure the power to build the campus. But there is no scenario where we say now ok we trick you guys and we are going to do a Walmart Warehouse or Amazon Warehouse. That is not going to happen. We are doing a data center.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
Community Development Director Ashley Davis reported that staff recommends approval on all items. The Planning Commission recommended denial. Council Member Boyd asked if it was because they needed more information, Ms. Davis stated that the Chairman had issue with the wording of the Annexation law. The City Attorney stated that the law requires rezone with annex. It is State law.
Council Member Shelton made a motion, seconded by Mayor Pro tempore Price to approve the annexation of parcels C1520001 and C1720041. Opportunity for discussion. Mayor Keener, Mayor Pro tempore Price and Council Member Shelton voted in favor. Council Member Jackson and Council Member Boyd voted against. Motion passed.
Mayor Pro tempore Price made a motion, seconded by Council Member Shelton to approve the amendment to the Future Land Use Map for parcels C1520001 and C1720041. Opportunity for discussion. All were in favor.
Council Member Shelton made a motion, seconded by Council Member Jackson to approve the Rezone for parcels C1520001, C1720041 from AG to LI with the restriction that if not used as a data center then the parcels revert back to AG. Opportunity for discussion. All were in favor.
Mayor Pro tempore Price made a motion, seconded by Council Member Shelton to approve the Special Use for parcels 1,2,3,4 for a Data Center. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Traysa Cody Price, Mayor Pro tempore (1) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
IX. CONSENT AGENDA
RESULT: ADOPTED [UNANIMOUS]
MOVER: Traysa Cody Price, Mayor Pro tempore (1) SECONDER: Nathan Boyd, Council Member (3) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
1. Minutes of Mayor and Council Regular Meeting December 17, 2024 6:30 PM
2. Executive Session Minutes December 17, 2024
3. Minutes of Mayor and Council Work Session January 2, 2025 6:30 PM
4. Executive Session Minutes January 2, 2025
5. Approval of Engineering Services Contract with Precision Planning in the Amount of $34,725 for Cannon Drive Water Main Replacement Project and Authorize the City Manager to Sign All Related Documents.
6. Approval of Engineering Services Contract with Precision Planning in the Amount of $25,060 for the North Cherokee Pressure Control Valve Project and Authorize the City Manager to Sign All Related Documents.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
7. Approval of City Purchasing Card Policy
8. Resolution to Name the Qualifying Officer and Set Qualifying Fees for the 2025 Election Cycle
X. UNFINISHED BUSINESS
None.
XI. NEW BUSINESS
1. Mayor Pro Tempore Appointment
Council Member Shelton made a motion, seconded by Council Member Boyd to appoint Traysa Price as Mayor Pro tempore. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Steve Shelton, Council Member (4) SECONDER: Nathan Boyd, Council Member (3) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
2. City Clerk Appointment
Council Member Boyd made a motion, seconded by Council Member Shelton to appoint Susan Roper as City Clerk. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
3. City Attorney Appointment
Council Member Shelton made a motion, seconded by Council Member Boyd to appoint Powell and Crowley as City Attorney. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Steve Shelton, Council Member (4) SECONDER: Nathan Boyd, Council Member (3) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
4. Municipal Judge Appointment and Authorization of Two Year Contract Council Member Boyd made a motion, seconded by Council Member Shelton to appoint Robbie Ballard as Municipal Court Judge and Sam Barth as Alternate Municipal Court Judge and approve authorization for a two year contract. Opportunity for discussion. All were in favor.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
5. Board Appointments
Council Member Shelton made a motion, seconded by Council Member Boyd to appoint John Gardner to the Planning Commission. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Steve Shelton, Council Member (4) SECONDER: Nathan Boyd, Council Member (3) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
6. Motion to re-appoint Debbie Smith and Lurie Maddox to the Downtown Development Authority of Social Circle.
Council Member Jackson made a motion, seconded by Council Member Shelton to re-appoint Debbie Conner-Smith and Lurie Maddox to the Downtown Development Authority of Social Circle.
Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Tyson Jackson, Council Member (2) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
7. Motion to re-appoint James Williams, Lynn Mills and Debbie Conner-Smith to the Historic Preservation Commission.
Council Member Boyd made a motion, seconded by Council Member Jackson to re-appoint James Williams, Lynn Mills and Debbie Conner-Smith to the Historic Preservation Commission.
Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
8. Motion to re-appoint Susan Farrow, Donna Jean Lightfoot and Angela Cobb Kelley to the Main Street Commission.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
Council Member Shelton made a motion, seconded by Council Member Jackson to re-appoint Susan Farrow, Donna Jean Lightfoot and Angela Cobb Kelley to the Main Street Commission.
Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Steve Shelton, Council Member (4) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
9. Motion to re-appoint Crenan Mills to the Social Circle Development Authority.
Council Member Boyd made a motion, seconded by Council Member Shelton to re-appoint Crenan Mills to the Social Circle Development Authority. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
10. Motion to re-appoint Barbara Sams, Edith Foreman and Rose Marie Sells to the Tree Board.
Council Member Boyd made a motion, seconded by Mayor Pro tempore Price to re-appoint Barbara Sams, Edith Foreman and Rose Marie Sells to the Tree Board. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Traysa Cody Price, Mayor Pro tempore (1) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
11. Approval to Transfer Approximately 4.6 Acres from Parcel SC170077 , 345 Vine Circle to the Social Circle Board of Education and Authorize the City Manager to Execute All Related Documents
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
12. Approval of Engineering Services Contract with Precision Planning in the Amount of $46,380 for Lakewood Water Main Replacement Project and Authorize the City Manager to Sign All Related Documents
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
RESULT: ADOPTED [UNANIMOUS]
MOVER: Steve Shelton, Council Member (4) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
XII. EXECUTIVE SESSION
An Executive Session may be called:
• To discuss pending and/or potential litigation, settlement claims, administrative proceedings or other judicial actions, which is exempt from the Open Meetings Act pursuant to O.C.G.A. Section 50-14- 2(1).
• To authorize negotiations to purchase, dispose of, or lease property; authorize the ordering of an appraisal related to the acquisition or disposal of real estate; enter into a contract to purchase, dispose of, or lease property subject to the acquisition or disposal of real estate; enter into a contract to purchase, dispose of, or lease property subject to approval in a subsequent public vote; or enter into an option to purchase, dispose of, or lease real estate subject to approval in subsequent public vote, which is excluded from the Open Meetings Act pursuant to Section 50-14-3(b)(1)(C).
• Upon the appointment, employment, compensation, hiring, disciplinary action or dismissal, or periodic evaluation or rating of a public officer or employee, which is excluded pursuant to O.C.G.A.
50-14-3(b)(2).
1. Motion to go into Executive Session for the purpose of Real Estate, Litigation and Personnel.
Council Member Boyd made a motion, seconded by Council Member Jackson to go into Executive Session for Real Estate, Litigation and Personnel. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
2. Motion to come out of Executive Session and return to Regular Session.
Council Member Shelton made a motion, seconded by Council Member Jackson to come out of Executive Session and return to Regular Session. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Steve Shelton, Council Member (4) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
XIII. REGULAR SESSION EXTENDED
1. Motion to amend the agenda to add Termination of Contract with Isonova for Gas Rates and Renegotiate Contract.
The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).
Council Member Boyd made a motion, seconded by Council Member Shelton to amend to agenda to add Termination of Contract with Isonova for Gas Rates and Renegotiate Contract. Opportunity for discussion.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
2. Termination of Contract with Isonova for Gas Rates and Authorization for City Manager to Renegotiate
Council Member Boyd made a motion to Terminate the contract with Isonova for Gas Rates and Authorize the City Manager to renegotiate. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Steve Shelton, Council Member (4) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener
XIV. ADJOURN
1. Motion to adjourn at 7:12 PM.
Council Member Boyd made a motion, seconded by Council Member Jackson to adjourn at 7:12 PM. Opportunity for discussion. All were in favor.
RESULT: ADOPTED [UNANIMOUS]
MOVER: Nathan Boyd, Council Member (3) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Boyd, Council Member (4) Shelton
EXCUSED: Mayor Keener