Ciudad: Alpharetta
Alpharetta Design Review Board: reunión, 19 de septiembre de 2025
9:00 a.m. · 5 páginas
Estas son las actas tal como las publicó Alpharetta Design Review Board, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Alpharetta Design Review Board.
Registros de esta reunión
Cada enlace abre el sitio web o el portal de reuniones del propio órgano.
- ActasDesign Review Board Official Minutes 9.19.25 (alpharettaga.api.civicclerk.com) · se muestra en esta página
- Grabación en videoDesign Review Board Sept 2025 (cpmedia.azureedge.net)
Resumen
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.
Design Review Board approved the Georgia Skyline Bank site plan, elevations and landscaping, plus signs and exterior changes at two other properties.
The Design Review Board approved minutes from its August 15, 2025 meeting with two corrections, then took up three applications. A monument sign for Abbey Hall Interiors Shoppe at 54 Roswell St was approved with a landscaping condition. Exterior changes at Alpha Retail, 7855 North Point Pkwy, were approved with conditions on canopies, lighting, landscaping and the dumpster enclosure. For the new Georgia Skyline Bank at 1190 Old Roswell Rd, the board approved the site plan, site lighting, elevations and materials, and landscaping with conditions, and deferred the retaining wall. All votes were unanimous (6-0). An application from Wells Fargo was withdrawn by the applicant.
Temas tratados: Georgia Skyline Bank new construction; Alpha Retail exterior changes; Abbey Hall Interiors monument sign; Georgia Skyline Bank retaining wall deferral; Wells Fargo application withdrawn; August 15, 2025 minutes corrections.
Decisiones que constan en las actas (7)
Después de cada decisión va la oración de las actas que la registra, copiada palabra por palabra, en inglés.
Georgia Skyline Bank, 1190 Old Roswell Rd, elevations and materials
6-0
Las actas: “Chairman Rowen offered a motion to approve DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd elevations and materials as presented with the following conditions”
Georgia Skyline Bank, 1190 Old Roswell Rd, site plan
6-0
Las actas: “Vice Chairman Schwing offered a motion to approve DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd site plan as presented with the following condition”
Georgia Skyline Bank, 1190 Old Roswell Rd, site lighting
6-0
Las actas: “Vice Chairman Schwing offered a motion to approve DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd site lighting as presented”
Georgia Skyline Bank, 1190 Old Roswell Rd, landscaping
6-0
Las actas: “Board Member Sprayberry offered a motion to approve DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd landscaping as presented with the following conditions”
Georgia Skyline Bank, 1190 Old Roswell Rd, retaining wall
6-0
Las actas: “Vice Chairman Schwing offered a motion to defer DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd retaining wall”
Alpha Retail, 7855 North Point Pkwy, exterior changes
6-0
Las actas: “Board Member Rowen offered a motion to approve DRB250034 Alpha Retail 7855 North Point Pkwy review exterior changes as presented with the following conditions”
Abbey Hall Interiors Shoppe, 54 Roswell St, monument sign
6-0
Las actas: “Vice Chairman Schwing offered a motion to approve DRB250031 Abbey Hall Interiors Shoppe 54 Roswell St monument sign as presented with the following condition”
Puntos del orden del día (5)
Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.
- 1. DRB Meeting Minutes 8-15-2025
- 2. Regarding the motion for the Ashton Atlanta Res (Continuum Residential) correct the spelling of perennials
- 3. DRB250031 Abbey Hall Interiors Shoppe 54 Roswell St review signage and exterior changes
- 4. DRB250034 Alpha Retail 7855 North Point Pkwy review exterior changes
- 5. DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd review new construction
Las actas
Tal como se publicó en alpharettaga.api.civicclerk.com, leído el 12 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.
Design Review Board Meeting Official Minutes September 19, 2025 Department of Community Development
ALPHARETTA CITY HALL | 2 PARK PLAZA
|8:30AM This action summary is provided as a convenience and service to the public, media, and staff.
It is not the intent to record proceedings verbatim. Any reproduction of this summary must include this notice. This is not an official record of the Alpharetta Design Review Board Meeting proceedings. Meetings are recorded and available for review at https://www.youtube.com/user/alpharettagov.
I.MEETING ANNOUNCEMENTS
Today’s Design Review Board meeting will commence at 8:30 AM and a break is scheduled at 12:00 PM, if needed. The meeting will resume at 12:30 PM.
II.WORKSHOP
• Chairman Kramer called the workshop to order at 8:30 a.m.
• Chairman Kramer adjourned the workshop at 8:51 a.m.
III. CALL TO ORDER
• Chairman Kramer called the meeting to order at 9:00 a.m.
IV. ROLL CALL
• Design Review Board Members present:
o Richard Kramer (Chairman) o Frank Schwing (Vice Chairman) o Pat Corkill o Richard Owens o Jennifer Sprayberry o Erik Rowen
• Staff Present:
o Bret Schroeder, Code Enforcement Manager o Joel Carnow, GIS Specialist/Special Projects Manager o Erin Cobb, Administrative Office Coordinator
V. PLEDGE TO THE FLAG
VI. ITEMS FROM STAFF
VII. ITEMS FROM BOARD MEMBERS
1. DRB Meeting Minutes 8-15-2025
Vice Chairman Schwing offered a motion to approve meeting minutes from August 15, 2025, with the following changes:
1. Board Member Rowen made the motion for the Ashton Atlanta Res (Continuum Residential) not Board Member Sprayberry
2. Regarding the motion for the Ashton Atlanta Res (Continuum Residential) correct the spelling of perennials
• Board Member Corkill seconded the motion.
• The motion was approved unanimously (6-0)
VIII. PUBLIC HEARING
1. Public hearing Procedure
2. DRB250030 Wells Fargo – Withdrawn by Applicant
3. DRB250031 Abbey Hall Interiors Shoppe 54 Roswell St review signage and exterior changes
• Public Comment:
o No Public Comment After presentation from the Applicant and discussion from the Board:
Vice Chairman Schwing offered a motion to approve DRB250031 Abbey Hall Interiors Shoppe 54 Roswell St monument sign as presented with the following condition
1. The base of the sign will be landscaped with a combination of evergreen and annual flowers
• Board Member Rowen seconded the motion.
• The motion was approved unanimously (6-0)
4. DRB250034 Alpha Retail 7855 North Point Pkwy review exterior changes
• Public Comment:
o No Public Comment
After presentation from the Applicant and discussion from the Board:
Board Member Rowen offered a motion to approve DRB250034 Alpha Retail 7855 North Point Pkwy review exterior changes as presented with the following conditions
1. The applicant will add three aluminum or steel canopies over the primary entrances spanning from the outer edge of the adjacent windows
2. The sconce lights that are currently over the entrances will be removed and patched and the lighting will be relocated as sconces or under canopy lighting to be approved by staff
3. The landscaping around the building will be improved and approved by staff
4. The dumpster enclosure will be repainted to match the buildings’ urbane bronze
• Board Member Owens seconded the motion.
• Board Member Corkill offered a friendly amendment to ensure that the monument’s landscaping with be upgraded, and the applicant will work with staff on those requirements
• Board Members Rowen and Owens accepted the friendly amendment
• The motion was approved unanimously (6-0)
5. DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd review new construction
• Public Comment:
o No Public Comment After presentation from the Applicant and discussion from the Board:
Vice Chairman Schwing offered a motion to approve DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd site plan as presented with the following condition
1. Aligning the parking lot pedestrian walkway with the handicap ramp
• Board Member Rowen seconded the motion.
• The motion was approved unanimously (6-0) Vice Chairman Schwing offered a motion to approve DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd site lighting as presented
• Board Member Owens seconded the motion
• The motion was approved unanimously (6-0)
Chairman Rowen offered a motion to approve DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd elevations and materials as presented with the following conditions
1. The wall pacts on the back of the building will be replaced with decorative sconces to match the character of the building with final approval by staff
2. The downspouts on the front of the building will be eliminated and the downspouts on the sides of the building will be adjusted to accommodate the extra drainage capacity
3. The under-canopy lighting will be revised to an indirect soffit lighting to wash the underside of the efface canopy ceiling in lieu of the fixture SCV
4. The screen walls for the HVAC units will be adjusted to not conflict with the building windows
• Vice Chairman Schwing seconded the motion.
• The motion was approved unanimously (6-0)
Vice Chairman Schwing offered a motion to defer DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd retaining wall
• Board Member Corkill seconded the motion.
• The motion was approved unanimously (6-0) Board Member Sprayberry offered a motion to approve DRB250033 Georgia Skyline Bank 1190 Old Roswell Rd landscaping as presented with the following conditions
1. Fill in the landscape at the corner of Mansell Road & Old Roswell Road at the roadside of the bio detention pond
2. Consider respacing the Princeton elms along Mansell Road to be more symmetrical with the willow oaks along Old Roswell Road
3. Consider adding more evergreen at the top of the wall in addition to the other plants that are spilling over, possibly consider more juniper or a different evergreen plant to spill over the wall
• Board Member Owens seconded the motion.
• Vice Chairman Schwing offered a friendly amendment that the landscaping will be irrigated
• Board Members Sprayberry & Owens accepted the friendly amendment
• The motion was approved unanimously (6-0)
VIII. ADJOURNMENT
With there being no further items to consider or discuss, Chairman Kramer
adjourned the meeting at 10:53 AM.