Ir al contenido
Georgia Commons
Menú

Condado: Meriwether County

Meriwether County Board of Commissioners: sesión de trabajo, 17 de noviembre de 2025

13 páginas

Estas son las actas tal como las publicó Meriwether County Board of Commissioners, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Meriwether County Board of Commissioners.

Este registro se publicó como imágenes escaneadas, leídas aquí con OCR: una letra o un número puede estar mal leído. El archivo que publicó el órgano está enlazado abajo.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.

Commissioners heard a three-phase courthouse roof, HVAC and interior renovation proposal in a work session and took no action on it.

The Board held a work session to hear a presentation on the proposed courthouse project from the engineering firm, the architect, and the construction manager, River City Contracting. The project has three phases: roof and exterior restoration, third-floor HVAC replacement, and third-floor interior renovation. Presenters described a Guaranteed Maximum Price model, a $150,000 contingency for Phase One, scaffolding at $414,152, roofing at about $530,000, and a 5.75 percent construction management fee. Commissioners asked about warranties, gutters, sealing of masonry, mold risk, and getting multiple HVAC bids. No action was taken because a work session cannot take action; the matter is to return to a later agenda, with pricing requested starting with Phase One. The Board went into a closed session for personnel, took no action there, and adjourned.

Temas tratados: courthouse renovation proposal; roof and exterior restoration; third-floor HVAC replacement; third-floor interior renovation; Guaranteed Maximum Price; scaffolding cost; roof warranty options; masonry tuck-pointing and sealing; construction manager selection and fees; personnel closed session.

Puntos del orden del día (4)

Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.

  1. MINUTES
  2. WORK SESSION
  3. Hl. INVOCATION
  4. Il, PLEDGE TO THE FLAGUna moción

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Las actas

Tal como se publicó en www.meriwethercountyga.gov, leído el 25 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.

MINUTES

MERIWETHER COUNTY BOARD OF COMMISSIONERS

WORK SESSION

NOVEMBER 17, 2025

5:30 PM

Commissioners Present: Vice Chairman Emmett Collins, Commissioner Gene King, Commissioner Jennifer Snelson, and Commissioner Bryan Threadgill

Commissioners Absent: Chairman Adam Worsley

Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, Finance Director Tammy Lackey

Staff Absent:

I. CALL TO ORDER

The Meeting was Called to Order at 5:30 p.m. by Vice Chairman Collins.

Hl. INVOCATION

The Invocation was given by Vice Chairman Emmett Collins.

Il, PLEDGE TO THE FLAG

All.

IV. ADOPT AGENDA

A motion was made to Adopt the Agenda by Commissioner Threadgill and seconded by Commissioner Snelson. All were in favor.

V. NEW BUSINESS

1. County Administrator John Gorton opened the Work Session by informing the Board that Mr. Chris Brazell of EMC Engineering Services was present with his team to discuss the courthouse project proposal. County Administrator Gorton stated he would turn the discussion over to Mr. Brazell to go over the courthouse proposal in detail.

Mr. Chris Brazell, EMC Engineering Services, thanked the Board for calling the Work Session so they could walk through the courthouse project. He stated that a lot had been going on behind the scenes, and they wanted to update the Board on their progress. He explained that their full team was present to discuss, first, the overall project and scope, and that he had the architect from 2WR Architects, Mr. Alex Griggs, with him. He noted that they had plans and specifications prepared and that they would be left at the Administration Office, and that several members of staff and the Board had already seen portions of them. Mr. Brazell added that County Administrator Gorton had been involved in going through the scope of work, and they were there to answer any questions about that scope. Mr. Brazell further noted that the construction manager, River City Contracting, was also present and had already been through the bid documents. EMC and River City held several meetings with River City's team of subcontractors to discuss the scope of work and budget items. Mr. Brazell explained that they had some budget information they wanted to present to the Board and then have a discussion about the next steps needed to move the project into construction. He then introduced Mr. Alex Griggs to discuss where they were on the project in terms of plans and design before turning it over to River City to talk about pricing. Mr. Brazell confirmed with County Administrator Gorton that three phases and proposals had been delivered, and County Administrator Gorton stated he had received all three proposals and set them out for the Board prior to the meeting.

Mr. Alex Griggs, 2WR Architects, presented the documents they had prepared and stated that these were the documents upon which the construction manager had based the pricing. He explained that the drawings covered the scope of work for the roof, exterior improvements, and third-floor improvements. He noted that the current set did not include new HVAC work, but he did have information regarding HVAC that could be provided. Mr. Griggs also presented the specifications, describing them as the project manual, which covers all materials, installation, warranties, and related requirements. He explained that together, the drawings and specifications formed a complete set of the work "as best we can tell it at this time," noting that as with any renovation, there were allowances included in the pricing for unknown conditions that may be encountered during construction. Mr. Griggs stated that River City Contracting had gone through the selection process and had been chosen as the construction manager. River City would manage all contractors and subcontractors on the job and would be charging a construction management fee, similar to the markup typically charged by a general contractor.

Mr. Griggs explained that if there were any questions about the construction management, it was their recommended delivery method and that they used it for approximately 98% of their renovation projects. Under this model, the County selects a construction manager/contractor that the Board feels comfortable with—someone with a strong background, specific experience in similar work, and a track record the architect and owner trust. Mr. Griggs noted that they had worked with River City on multiple successful projects in the past. Mr. Griggs explained that they did not recommend a traditional “hard bid” situation, where the project is put out for general contractors to submit low bids, because in that model the owner cannot be sure who they will end up with or whether that contractor will still be available or responsive months later.

Instead, under the construction manager model, River City would bid out the various portions of the work to qualified subcontractors. He emphasized that this project required specialty subcontractors, particularly for the exterior, plaster work, and stone repair. The construction manager had bid those scopes to multiple specialty firms. Mr. Griggs stated that this was why, on renovation projects in particular, they strongly prefer construction management—because it provides a higher degree of assurance regarding quality of work and avoids contractors “overlooking something just to make money on a change.” Mr. Griggs explained that the construction manager would ultimately provide a Guaranteed Maximum Price (GMP) for the project. He said the GMP was the total amount the County would pay for the defined scope of work, unless the County itself chose to expand the scope—for example, by adding work to the second floor, first floor, or additional HVAC improvements. He stressed that the process is open-book, with allowances clearly identified, and that River City’s cost records would be open to the County for audit and review at any time. Mr. Griggs gave the example of an asbestos allowance: if they carried $50,000 for asbestos abatement and, once construction began, only $5,000 worth of asbestos was found and removed (for example, in piping in a closet), then the remaining $45,000 would be returned to the County under the GMP model. He summarized that the process required “a lot of trust,” but that the architect and County would verify by regularly reviewing the construction manager’s books——“trust but verify.” Mr. Griggs noted that this courthouse project was unique. He explained that 2WR had performed the original building assessment earlier in the year and acknowledged that they had missed a few roof-related items in that initial assessment, which he stated was his fault. He specifically mentioned that the existing lightning protection system on the roof was not included in the original estimate, and they had not anticipated the level of scaffolding that would be required. He explained that a full framework would need to be built over the entire building to safely get contractors to the dome

area for repairs and recoating work. These items had now been included in the updated pricing.

Mr. Griggs then paused and asked if the Board had any questions at that point. Commissioners asked whether they had done similar projects as a team previously. Mr. Griggs and Mr. Brazell responded in the affirmative and referenced their ongoing work at the Harris County Courthouse and its annex building. Mr. Griggs described that project as a multi-phase courthouse renovation that included a full roof replacement, comprehensive HVAC upgrades (new chiller and fan coil systems), and extensive interior renovations—moving departments, redesigning space for better customer access, and planning for a new secure entrance and better courtroom circulation. He explained that the project also used the construction manager model and included allowances for unknowns such as wood rot and potential foundation issues. In that case, he stated, they had carried an allowance of approximately $50,000 for structural/geotechnical work (such as geo-piers), but that work ultimately was not needed, and those funds could be reallocated or returned to the owner. Mr. Griggs remarked that on that job, the early phases came in under budget, and allowances that were not fully used resulted in change orders that returned money to the owner.

He said that while he could not guarantee that outcome on every job, it occurred more often than not on construction management projects, and he would seek permission from Harris County before sharing specific numbers. Commissioner King commented that, while he was not doubting their word, he would like to see examples where an allowance had been carried at one level and then came in considerably lower, with money returned to the county. He asked for assurance that those records would be truly open-book. Mr. Griggs confirmed that they were and repeated that all of River City’s records related to this project would be open for review.

Commissioner King then asked about the roof warranty, explaining that the courthouse roof had been leaking for years and the Board wanted to be sure that, once this work was done, they would not be in a similar situation as with other facilities, where it was difficult to get contractors back to honor their obligations. Mr. Brazell responded that, when they presented pricing, they would include options for different lengths of roof warranties, with each level of warranty associated with a different cost. He emphasized that part of the purpose of this Work Session was to have that interactive discussion, so the Board could understand the pricing scenarios and related warranty options. He explained that EMC and River City had already sat down together to reconcile the scope of work and the cost documents and that they had presented the phasing based on what they originally heard from the Board during the assessment. He added that, after digging deeper into the project, cost would definitely be a factor in how they sequenced the work and that there might be reasons to adjust the phasing to deliver the best final product for the County. During the discussion, Vice Chairman Collins asked who would be allowed to bid on the work and whether local or additional contractors would have an opportunity to participate. Mr. Brazell explained that, under the construction manager process, River City would be responsible for qualifying subcontractors and soliciting bids from them.

They would present to EMC and the County a list of subcontractors they had been talking with, starting with Phase | (roof and exterior work). He noted that there would be opportunities to look at other subcontractors in later phases, but that the goal was to select the most qualified and best-value team, particularly for the specialized scopes of work. Before turning the floor over to River City Contracting, Mr. Griggs reiterated to the Board that the GMP they would eventually receive would be a guaranteed maximum price. He explained that it was not a guarantee that the County would spend that full amount, but it was a guarantee that the County would not pay more than that amount for the agreed scope. Frequently, he said, the final cost ends up being less than the GMP due to unused allowances or favorable bids, but the only guarantee they can make is

that the cost will not exceed the GMP unless the County chooses to expand the scope.

Mr. Brazell then introduced Mr. Patrick Spinks and Mr. Travis Evans of River City Contracting, and invited them to address the Board. Mr. Spinks introduced himself and Mr.

Evans and stated that Mr. Griggs had covered much of the construction management approach, but they were happy to answer questions from their perspective. At approximately 5:45 p.m., Commissioner King briefly exited the Board Room; he returned at approximately 5:47 p.m. Mr.

Spinks stated that River City had looked at the project in three phases. He explained that the roof and exterior were the most critical portions of the project and that getting the building fully “dried in” was urgent. For those scopes, River City had interviewed a list of subcontractors for both the roofing and exterior restoration work to determine who was qualified and capable of handling what he described as a complex job. He reiterated that qualification was not only about being able to do the work today, but also about subcontractors’ track records—how long they had been in business and whether they would still be around to honor warranties in five, six, seven, or eight years. Mr. Spinks acknowledged Commissioner King’s earlier concern that the construction manager must actively supervise and hold subcontractors accountable. He agreed, stating that River City understood that responsibility rests with them. If there was a leak or other issue after the work was completed, and the subcontractor was unwilling or unable to come back, River City would address it and make it right, as that is the kind of contractor they are and the reputation they want to maintain. He stated that River City had been in business for approximately 30 years and that they work regularly with the subcontractors they were proposing for this job, particularly their roofing subcontractor, who has a proven track record.

Mr. Spinks then addressed phasing and cost. He explained that River City had already developed what he described as “good hard numbers” for the roof and exterior restoration and that they could move into a contract for those scopes and get that work started. He noted that the other phases—mechanical (HVAC) and interior renovations—were not as urgent from a weatherproofing standpoint, and there was more time to refine those scopes. However, he pointed out that there were cost implications tied to the project’s duration. River City’s proposal included monthly general conditions (site supervision, temporary facilities, project management, etc.), and if multiple phases could be stacked and executed concurrently, that would result in savings to the County over the long term, because those general conditions would be spread over more work in the same period rather than extended over a longer timeline. Mr. Spinks stated that Mr. Evans had been “neck deep” in the estimating work and subcontractor coordination and would be prepared to walk through the detailed estimates with the Board to whatever level they wanted. Before doing so, Mr. Brazell asked Mr. Spinks to explain why they had arrived at the three-phase structure that was being proposed. Mr. Spinks explained that, when the project was first introduced, it was viewed as two phases: Phase | being the exterior work (roof and exterior restoration) and Phase 2 being the third-floor interior renovations. However, as they discussed the project with EMC and looked more closely at the courthouse conditions, they realized that one critical element had not been fully addressed in that initial concept: the HVAC system serving the third floor. Mr. Spinks referenced their experience in Harris County and stated that, when you go upstairs to the third floor of the Meriwether County Courthouse now, there are obvious humidity issues; it is warm and uncontrolled. He explained that if the County is going to invest in substantial new interior finishes and improvements on the third floor, it makes sense to first ensure that the air and humidity are properly controlled so that those finishes will hold up and the space will remain comfortable and functional. For that reason, they had “inserted” a new Phase 2 focused on HVAC replacement and upgrades. He stated that they believed it made sense

to get to a point where the third floor had controlled conditions—controlled air and controlled humidity—before moving fully into the final interior renovation phase. Mr. Spinks explained that the design for the HVAC work had not yet been completed. He stated that the contractor had been working with a subcontractor familiar with the space who had already examined multiple options and provided preliminary budget numbers for the HVAC component. He emphasized that once engineers are engaged, they may offer alternative approaches, but under the Construction Management (CM) method, the process functions as a team effort among architects, engineers, the contractor, and subcontractors. He noted that when the engineers begin the HVAC design, the subcontractor would be brought tn to explain the basis for the budget so that the design reflects the subcontractor’s method rather than diverging in different directions.

He added that although the HVAC phasing was not included in their original proposal, he believes incorporating it is the best fit for the overall project. Mr. Evans then reviewed the packet materials and stated that Phase One includes a $150,000 construction contingency intended to cover unforeseen conditions typical of restoration and renovation projects. He explained that the purpose of the contingency is to avoid repeatedly returning to the Board for additional funds if unexpected issues arise. Any such issue would be brought before the Board with pricing for approval, and a log would be maintained showing the amount of contingency funds used. Any unused contingency would return to the County at the project’s conclusion. He noted that ten percent is generally recommended for this type of project. Mr. Spinks added that contingencies and allowances function similarly. Mr. Evans then discussed site access and reported that, after a site visit with the project team, scaffolding was determined to be the safest and most efficient method for accessing the building. He stated that bringing lifts around the building would be extremely difficult due to retaining walls and tight perimeter conditions, and lifts would hinder public access. He obtained scaffolding quotes from PCI and Sunbelt Rental, noting that PCI often works with their chosen masonry restoration company. He provided scaffolding layout sheets showing how the building would be scaffolded, beginning at the cupola and working down toward the roof, addressing two elevations at a time while maintaining overhead protection at all entrances. He stated that the scaffolding cost was $414,152, including engineering, labor, delivery, and taxes. Mr. Griggs commented that he was surprised scaffolding was the recommended method, and Commissioner Threadgill echoed the sentiment. Mr. Brazell reminded the Board that the scaffolding cost assumes a six-month rental period and noted that the project team is actively considering ways to expedite the schedule, which could reduce the rental cost. Mr. Spinks added that the number is being treated as an allowance, and if the work is completed sooner, the cost would decrease. Commissioner King questioned responsibility should the project exceed six months, and Mr. Spinks stated they anticipate completing it within that timeframe, pending cooperation from weather. Vice Chairman Collins clarified that six months is the maximum rental allowance included. Mr. Evans continued by noting two additional allowances: $2,500 for miscellaneous trim repair and $5,000 for fabrication and installation of a new roof ladder, explaining that the existing ladder system, which spans two roof levels leading to the cupola, is unsafe. He then stated that the team had sought qualified masonry firms and selected United Restoration Preservation due to their expertise in historic structures. He explained that the first pages of the packet contain estimates, while the next several pages contain clarifications and assumptions detailing what is and is not included in the pricing. He described the documents showing areas of heavy fluoresence on the brick, corner stone (quoin) repairs, terracotta band repairs, and tuck-pointing needs. He explained that the restoration company provided detailed sheets for each elevation, showing exact quantities of

work, including tuck-pointing areas and terracotta repairs. He emphasized that tuck-pointing involves replenishing mortar joints to ensure uniformity and eliminate voids. Mr. Brazell added that repairing the mortar is an important weatherproofing measure to protect the building’s exterior integrity. Mr. Evans confirmed this, and Mr. Griggs offered additional context, explaining that missing mortar joints around the building allow moisture to enter and cause deterioration. He emphasized that the intention is not to repoint the entire structure but only the areas identified as deficient, consistent with historic preservation guidelines. He noted that their team had reviewed appropriate mortar types for the building. Commissioner Threadgill asked whether the restoration team would check for loose areas that appear intact but may later fail.

Mr. Spinks confirmed that a soft-wash process would identify any loose mortar which would fall away during cleaning, allowing the team to address those areas. He added that the restoration company had thoroughly inspected the building, but additional areas could emerge during washing. Commissioner King asked whether the work included applying a sealant after repairs, noting that older mortar can appear solid but absorb water easily. He expressed concern that the project did not include sealing. Mr. Spinks stated that sealing the entire structure could be done, though historical guidelines often prohibit sealing existing brick. Vice Chairman Collins pointed out that the documentation referenced applying a clear silicone water-repellent sea! on horizontal surfaces. Commissioner King acknowledged the clarification. Mr. Spinks responded that they would need to verify whether the sealant application is allowed under preservation standards.

Vice Chairman Collins read from the materials that URP had factored in the use of a specific weather seal product. Mr. Spinks replied that this may relate to the soft-wash process. Mr.

Griggs added that some products are applied only to mortar rather than brick, and historical guidelines generally do not recommend sealing existing masonry. County Clerk Stephens asked about the referenced ProCoat weather seal, and Mr. Spinks responded that such products are often part of the soft-wash cleaning and preparation process. Mr. Evans continued his explanation and stated that the masonry restoration contractor had identified the areas where tuck pointing would be required and that the diagrams in the packet showed examples of each type of issue. He explained that the red markings indicated tuck pointing, the blue indicated terracotta band repair, the orange circles indicated quoin (corner stone) repairs, and the yellow areas represented heavier cleaning due to heavy efflorescence. He noted that for each elevation, especially for tuck pointing, the contractor had provided a square-foot allowance of $40 per square foot. As an example, he stated that for the north elevation, they had identified 150 square feet of tuck pointing, and if that full amount was not required, there would be savings on that elevation. Mr. Evans emphasized that the contractor was very thorough in their investigation and that similar breakdowns had been provided for each elevation. He also reiterated that the underside of the porches included stucco that needed repair and washing. He then referred the Board to sample projects completed by United Restoration Preservation, including the Lawrence County Courthouse in Laurens, South Carolina, the Lucas Administration Building in Hattiesburg, Mississippi, the Andrew Carnegie Building in Atlanta, and the Garden Theater in Charleston, South Carolina. He stated that these examples demonstrated that this firm specializes in historic projects throughout the Southeast and the country and is very well-qualified and considered expert in this type of work. Mr. Evans added that one of the first things the masonry restoration contractor would do, even while scaffolding is being erected, is to perform mock-ups for each type of repair to set expectations early about what the finished work would look like.

He explained that, if the project were released that night, it would take approximately two weeks for the contractor to mobilize, complete the mock-ups, allow them to cure and age for about

three weeks, and then have the Board come back to review them. He noted that this would include tuck pointing, quoin repairs, the soft wash cleaning, and removal of paint flakes on the building so that expectations would be clear in advance. Mr. Evans then summarized that this completed the masonry restoration explanation and moved to the roofing component. Mr. Evans stated that the roofing portion of the work was priced at approximately $530,000 and included applying an Andek (Andek/Endek-type) copper product on the metal roof to seal it, which uses copper flakes and includes two coats of the Andek product and two coats of a clear seal. He further explained that the scope of painting included repainting all the quoins, the terracotta, and the areas of the terracotta band identified in the drawings, as well as the bell tower, the cupola, and the statue above. He noted that the exterior lighting scope in this phase consisted of removing the existing roof-mounted exterior lighting and replacing it with LED fixtures, limited to the exterior lighting portion at this time. In addition, he stated that the existing lightning protection aerials on the roof would be temporarily removed to allow roof repairs and then reinstalled, leaving the grounding in place. Mr. Evans reminded the Board that, as Patrick (Mr.

Spinks) had previously mentioned, the contractor had proposed general conditions of approximately $119,092 for a six-month duration for this phase and a construction management fee of 5.75 percent, which is how they were structuring Phase One. Mr. Spinks then asked if there were any questions on the first phase. County Administrator Gorton asked about the warranty on the roof. Mr. Evans responded that the Andek material carried a ten-year material-only warranty and that there would also be a one-year workmanship warranty. He added that the team was exploring other ways to “skin that roof’ and was working with Alex and the rest of the team on a couple of alternative options that might provide a longer warranty, possibly 20 or 30 years, but that pricing and details would have to be worked out and brought back to the Board.

Commissioner King asked whether the gutter system on the roof was addressed in the proposal.

He stated that he understood there were downspouts on the sides, but that there was also a gutter system on the very top, and he did not see anything in the proposal about restoring, repairing, or making sure that the gutter system was functioning properly. He noted that this system was also causing water problems by not removing water properly. Mr. Griggs commented that this was one of the main problems. Commissioner King reiterated that he did not see anything allowing for gutter repairs. Mr. Evans responded that he had spoken with a contractor, believed to be Sidney Foster, who had done gutter repair a couple of years ago and that he had been told that all of the interior gutters had been reskinned from the roof down, with the County paying about $100,000 for that work approximately three years ago. Mr. Evans added that on the back lower roof, where there is a TPO roof between the annex and the main building, the proposal did include a new gutter system with leaders and downspouts. Mr. Spinks stated that he believed everything at the top was covered. Commissioner King recalled a previous roof visit where it had been explained that the water from one roof ran to another, and then another, and he was concerned about that system. Vice Chairman Collins explained that the water runs off the porches into catch basins and that the drawings show all of the different catch basins with a catch basin on either side of the copper roof. Mr. Spinks added that there is a built-in trough system to handle the water and that the new TPO roof would run through that system, with welded seams and related detailing included. Commissioner King noted that this was not specifically spelled out in the narrative. Mr. Brazel] clarified that this work is shown on the drawings and included in the pricing, even if not explicitly called out in the summary, and that the Board had not had the benefit of reviewing all of the detailed drawings and specifications.

Mr. Spinks confirmed that all of this was part of the overall roof system. Mr. Brazell added that

the roof number also included work on the flat “black roof” on the annex side and that the roof work covered both the main courthouse and surrounding areas. Mr. Griggs explained that this included everything except the small pitched roof over the annex building, which to his knowledge was not leaking. He noted that they did have a price to replace that small pitched roof but that it was not included in the current scope, whereas the flat roof that was leaking was included because it required significantly more work. Mr. Evans asked if there were any further questions on Phase One and then moved on to Phase Two. He stated that, as Patrick had mentioned, Phase Two had been inserted between the exterior work (Phase One) and the Phase Three interior finishes. He explained that Phase Two addressed the interior renovation related to HVAC, particularly on the third floor, and that the team highly recommended that any HVAC changes be made during this phase while ceilings were down and new acoustical ceiling tiles were being installed. He stated that John had put them in contact with Mac Daniel of M&D Mechanical, who is familiar with the building, and that Mr. Daniel had provided a preliminary price for anew HVAC system. Mr. Evans reiterated that, as Mr. Spinks had said earlier, this number would be scrutinized and finalized by an engineer before being implemented, and they strongly recommended that any HVAC changes be completed before Phase Three interior renovations occur. Commissioner King agreed that it would need to be done. Mr. Brazell asked that the impact of Phase Two on Phase Three be explained. Mr. Spinks responded that Phase Three involved many interior finishes such as flooring, painting, and wall work. He explained that warranties and performance of flooring products, carpentry, and millwork can be negatively affected in unconditioned spaces with high humidity, including delamination of flooring and laminate on millwork. He emphasized that from a warranty and quality standpoint, it would be beneficial to address the HVAC system during the renovation rather than after finishes are installed. He added that with the third-floor renovation involving many new ceilings, high humidity could cause ceiling materials to bow and warp, and that if ceilings and finishes were installed first, and HVAC work came later, ceilings would have to be removed, which would be counterproductive. Mr. Brazell stated that during the assessment they recognized that the current mini-split system was not functioning properly and that the preliminary assessment, including work by the mechanical engineer, showed that some existing infrastructure and ductwork in the courthouse could be incorporated into the solution. He emphasized the “team effort” approach, stating that they did not want to discard usable systems but instead wanted to correct problems and bring the system back to where it needed to be. He mentioned that Alex, Patrick, Travis, and he had discussed possible rooftop units on the low roof to help achieve proper environmental control from a central area. Mr. Griggs added that he already had a mechanical engineer involved, who had spoken with Mr. Daniel and reviewed his proposal, and that the approach appeared reasonable for the building. Mr. Evans then turned to Phase Three, explaining that Phase Three would consist of interior renovations of the third floor itself. He stated that, similar to Phase One, the first line item was an approximate 10 percent contingency for unforeseen conditions, to be used only with Board permission and with any savings returned at the end of the project. He noted that Phase Three also included a $20,000 allowance for drywall patch and repair and a $5,000 allowance for miscellaneous trim. He explained that there would be some light demolition, primarily in the restrooms, and that new in-wall blocking would be needed to support new carriers for water closets and lavatory fixtures per the plumbing design. Mr. Evans stated that the scope included new acoustic ceiling tiles across almost the entire third floor, new carpet and ceramic tile (wall and floor tile in the bathrooms), new paint throughout, bathroom accessories, and new interior ADA-compliant signage. He further noted that the project would

include new upholstery for the jury box and five chairs to the right of the judge’s bench, new plumbing fixtures, and upgraded electrical lighting, including recessed cans, new LED fixtures, and a new chandelier. Mr. Spinks commented that from a quality standpoint, the finishes were not over-the-top elaborate but were very nice, with upgraded woodwork and better-grade ACT ceilings using a beveled-edge tile rather than basic standard tile. He stated that the flooring products consisted primarily of carpet and ceramic tile in the bathrooms, and that there were not many new doors being added. He stressed that there is existing plaster on the third floor and that much of the new work would involve drywall and patching. He said that their goal was to leave the space in a condition where the plaster still looks like plaster and the sheetrock looks like sheetrock, so that the space appears updated while retaining a historic character. He stated that when the project is complete, the third floor should look like a space the County can be proud of, possibly appearing as if it had been that way for some time. Mr. Brazel! added that inside the attic space they would be removing certain lights and roof penetrations to eliminate known areas where water is getting into the building, and that this project provided an opportunity to address those issues. Mr. Griggs informed the Board that he had samples of the carpet, tile, and upholstery available if anyone wished to see them. Commissioner King then raised a broader concern and asked, in essence, what would happen if, after all the work and engineering was completed, the building later experienced issues such as mold despite the roof not leaking. He described a scenario in which citizens are pleased with the renovation, praising the fresh paint and improvements, only to face a rainy season and new mold complaints. He asked whether, with so many engineers involved in designing and drawing the systems, the County might later be told “we don’t know what the problem is,” or whether the team would come back to diagnose and resolve any such issues. He emphasized his trust in the team and his belief that it would be a great project but expressed concern about investing tax dollars only to have employees later report health issues and renewed mold problems, and asked who would be responsible at that point. Mr. Spinks responded that, from a mechanical engineering standpoint, the design must address the reality of high humidity in the region, particularly in summer and early fall. He stated that HVAC systems require the introduction of fresh air, which in summer is high-humidity air that must be properly treated. He explained that the engineer must run calculations to determine how much fresh air is introduced and how the system will treat that air relative to the volume of the space being conditioned. He emphasized that the systems themselves have to be designed to avoid creating moisture problems and that a combination of unconditioned spaces and moisture from roof leaks or other sources is what leads to mold issues, which they intend to remove from the equation. Mr. Brazell added that the HVAC numbers currently presented are strictly for the third floor and acknowledged that the other two floors of the courthouse could also contribute to moisture issues, although they did not see significant current problems there.

He stated that once the building is “dried in” and a properly designed HVAC system is installed, humidity should be controlled, and the problem solved, but acknowledged that there are other areas of the building not being addressed in this scope that could become future concerns. He stressed that he and the rest of the team intend to remain engaged with the County, noting that he wanted to be the County’s engineer “forever,” and that Patrick, Alex, and the others were likewise committed to making the project work. He acknowledged that further work might come with additional scope, but he believed they had addressed the primary issues that had been presented. Mr. Spinks added that in the commercial world, there are many more variables than in a residential setting, such as doors opening frequently and larger volumes of people, which is why commercial HVAC design is left to engineers rather than relying on basic “two-ton unit”

residential rules of thumb. He stated that they had provided a budget number for HVAC, but that an engineer would be responsible for designing the final system. Mr. Brazel] noted that they already had a mechanical engineer on the team who assisted with the initial assessment and that the engineer would be responsible for testing and balance and ensuring the system is properly sized and working for the spaces being conditioned. Mr. Griggs commented that he had been struggling with how to answer the question, trying to ensure that nothing had been missed.

Commissioner King clarified that he meant no disrespect in raising his concerns but wanted assurance that if mold problems emerged after completion, someone would return promptly with an engineer to investigate. He stressed that he did not want the County to be left in a position of simply putting out a bid for more work once problems appear. Mr. Griggs responded that, because this is a commercial municipal building, code requires the introduction of fresh air, which must be pre-treated in Georgia. He explained that a special piece of equipment is needed to remove moisture and coo! the air before it is introduced into the building and that his mechanical engineer understands that requirement. He stated that the new system they are proposing should not create problems in the future and that this is effectively guaranteed. He conceded that, as humans, they can occasionally miss an area, such as a closet, but stated that such issues would likely be discovered during the renovation and, if not in the original scope, could be handled through the contingency to eliminate sources of water problems causing mold.

Commissioner King indicated he understood. Mr. Brazell added that one of the benefits of the renovation process is that selective demolition can reveal unforeseen issues, or “red herrings,” that are not visible today. He assured the Board that the team would not simply walk away from such issues if they were not explicitly in the scope of work. Instead, they would come to the County with solutions and build around the problem to solve it. He emphasized that the contractors and design team are incentivized to correct these conditions because their work and warranties for the building depend on getting it right. He stated they would not simply “put some Kilz on it and walk away,” hoping it would go unnoticed. He further explained that construction would be monitored by on-site supervision managing day-to-day work, subcontractor foremen, the County’s inspection team conducting periodic inspections, the architect’s team, and key consultant engineers such as MEP professionals, all of whom would be on site conducting inspections. He emphasized that, although the team members have good working relationships and are focused on the greater good of Meriwether County, there would also be multiple layers of oversight protecting the interests of the citizens. He stated that this structure promotes accountability, transparency, and confidence that plans and specifications are being enforced.

Mr. Evans then referred to the scaffolding diagrams in the packet, which show what the building would look like when scaffolded. He stated that the work would begin on the cupola and proceed downward, and that once the roof is dried, they could continue exterior work while beginning interior renovations, with a goal of completing the work in approximately six months.

He reiterated that the project had been structured as three individual phases, but they hoped to combine and overlap phases to gain savings in general conditions. Mr. Griggs added that there were likely some savings to be realized in the finishes they had selected. He noted that they had not chosen the cheapest or the most basic finishes, but instead selected good-grade commercial products. Mr. Brazell commented that the products were “not Home Depot,” and noted that Chairman Worsley had made clear during the selection process that he did not want to go overboard but believed the citizens deserved a courthouse they could be proud of. He stated that EMC and the project team would stand behind the project and that he believed the citizens would be well pleased with the final result once the County determined the best path forward.

Vice Chairman Collins asked if anyone had anything else. Commissioner King responded that he could not think of anything. County Administrator Gorton then asked for clarification regarding the HVAC system, specifically whether they were going with ductless mini-splits or using the existing duct system. Mr. Spinks replied that the plan was to use some of the existing ductwork and that the approach would be a hybrid system, which is why HVAC was currently treated as an allowance pending final engineering. He explained that when he walked up and saw mini-split wall units, he felt that was not a good fit for this type of space. County Administrator Gorton replied that this was why he had asked, since exposed mini-split ductwork would not suit a nicely finished third floor, and he personally did not like the look of mini-split ducts, though Board members might differ. Vice Chairman Collins asked if the intention was to remove all of the mini-split components on the third floor. Mr. Griggs responded that the existing mini-split equipment would be removed and that his engineer had looked at the existing ductwork and believed it could be reused for fresh air to the spaces, after modification and cleaning, utilizing ducts in the walls and ceilings to supply air to the rooms. Vice Chairman Collins remarked that when he had gone up to the roof, he could see ductwork that had been installed after the courthouse fire in 1987 and that it still looked brand new, suggesting it might be reused. Mr. Griggs agreed that they were inspecting the chases further and that M&D Mechanical had reported that the ductwork appeared to be in good shape. Vice Chairman Collins noted that the system used galvanized hard-pipe ductwork, unlike many newer houses that use flexible duct. Mr. Brazell agreed. Mr. Griggs said that hard pipe would be used in most locations, with very few instances where flexible ducts would be used. Mr. Spinks stated that the mechanical approach being discussed was a hybrid system with ceiling-mounted units, and that there are mini-split-type units that are not wall-mounted but installed as ceiling cassettes or ducted mini-splits. He noted that a complete hybrid system was possible, but that, given the nature of the space, they must introduce outside fresh air and design the system accordingly. Mr.

Griggs noted that the mini-split units would look similar to certain ceiling units already in use.

Vice Chairman Collins recalled that when the mini-splits were installed, they likely used the old system for fresh air but did not properly treat that air, which could have contributed to problems, such as simply blowing moist air into the building. Mr. Griggs agreed, stating that the moisture must be removed, and the air cooled before it is introduced. Vice Chairman Collins remarked that it appeared they had just been blowing moisture into the attic-like third-floor space. Mr.

Brazell agreed that it appeared that way. Mr. Griggs commented that in summer the space felt like a typical hot attic. Vice Chairman Collins concurred. Mr. Brazell then clarified the pricing structure, noting that it was presented as three separate phases, each with its own general conditions. He stated that if the Board chose to combine the phases—such as executing some simultaneously—the general conditions and superintendent costs would not be charged multiple times but would be compressed into a different, more efficient pricing structure. He explained that the team was seeking guidance from the Board regarding how they wanted the final pricing presented and which phases to include, so that they could establish a Guaranteed Maximum Price (GMP) for Phase One and discuss how to add in the other phases. Vice Chairman Collins then asked about the 5.75 percent profit that River City was charging and requested clarification on overhead. Mr. Spinks explained that overhead included project management, supervision, insurances, permits (though there would be no permits on this project), dumpsters, portable toilets, and all other day-to-day costs associated with running the job. Vice Chairman Collins pointed out an additional insurance line item in the documents. Mr. Spinks clarified that this referred to bonding—payment and performance bonds—as well as workers’ compensation,

general liability, builder’s risk, and other insurance coverages, noting that their industry is heavily insurance-burdened. Mr. Brazell added that during the CM/GC selection and qualification process, these fee and overhead numbers were included in the sealed proposals submitted by each firm and were not negotiated after selection. He stated that the selected contractor’s percentages and general conditions were lower than those of the other firms interviewed, meaning the County had obtained not only the most qualified firm but also the best value. Mr. Griggs commented that the County was “getting the best band.” Mr. Brazell further explained that pricing was one of the criteria used in scoring the firms, though not the only factor and not the one carrying the greatest weight; qualifications and experience were also heavily considered. Commissioner Threadgill stated that he did not have anything else. Vice Chairman Collins then asked what the next step would be, noting this was a work session.

Commissioner Threadgill responded that the matter would have to be brought back because no action could be taken in a work session. County Administrator Gorton added that he was looking at the timing. Mr. Spinks stated that the Board could reach out to them at any time with questions and that the team would be glad to answer anything the Board needed. Commissioner King asked when scaffolding would be brought in. Commissioner Snelson commented, “Two weeks after we say go,” and added that he did not say much, but this was his understanding. Mr.

Griggs noted that they were approaching the rainy season. Vice Chairman Collins remarked that the County needed to get started on the roof and that the Board had a meeting scheduled for the following week. Mr. Brazell stated that if the Board wanted to coordinate with County Administrator Gorton to request specific pricing, the team could prepare that information for an upcoming agenda item, starting with Phase One and then working toward Phases Two and Three. County Clerk Stephens stated that she would need that information by Thursday.

Commissioner Snelson asked, regarding the HVAC work, whether they would seek other prices in addition to M&D Mechanical or whether M&D was being used solely because they were familiar with the building. Mr. Spinks replied that they would do whatever the Board wanted, explaining that M&D had been contacted initially due to their familiarity with the courthouse and that they had developed the preliminary number in the absence of engineered drawings. He emphasized that once an engineer completes the design drawings, the work could be bid out in whatever manner the Board preferred, and that M&D would be able to bid along with others.

Commissioner Snelson clarified that she was not discounting M&D’s work but simply wanted multiple bids for comparison. Mr. Brazell explained that for Phase One, which involves highly specialized historic work, qualifications precluded many contractors who might have thought they were capable, and that they had to ensure the selected firms were truly qualified. He noted that references in the proposal package demonstrated that the County was receiving both the best value and the best-qualified firms for the niche masonry and restoration work, which is not suited to typical homebuilders. He added that in other phases, such as painting, there would be more broad coverage from different contractors and that the CM/GC process allows the team to seek pricing from multiple vendors (A, B, C, D) and present those options to the County. He emphasized that the Board would have the final say on which vendors to select and that sometimes the lowest price might not be the best choice for the overall project. He noted that before “buying out” the job, they would present these options and recommendations.

Commissioner King voiced concern about delays, stating that he hoped they would not end up in a situation where bids are still pending months later. Mr. Spinks acknowledged that time was critical. Vice Chairman Collins commented that Phase One seemed to be largely set. Mr. Spinks agreed that, at present, the team was primarily dealing with Phase One and Phase Two, and that

qualified contractors were ready to move on to Phase One, with availability to begin promptly, which he understood to be important to the Board. Commissioner King remarked that he wanted to be able to “hang Christmas,” implying a desire to have the building in good condition by the holiday season. Vice Chairman Collins commented that the remaining question was Phase Three and stated that he believed Phases One and Two were largely determined. Mr. Brazell said they would need permission to move forward on the engineering side, explaining that they wanted to proceed with engineering in anticipation that the project would move ahead. He stated they had already put pressure on their subconsultant to be ready and, with authorization, could advance design and turn around plans quickly. He said that with the team already in place, they could quickly finalize Phase Two pricing, and that Phase Three could follow with more time for decision-making. He asked, in a vacuum, how long Phase Three would take. Mr. Spinks estimated that Phases Two and Three together—the HVAC replacement and the third-floor renovation—would take about three and a half months. Mr. Brazell stated that their recommendation would be to tuck that work into the overall duration of the exterior phase. Vice Chairman Collins suggested that if they started Phase One and then, two or three months into that work, they began Phases Two and Three, the sequencing could work well. Mr. Spinks agreed and said that he would not start Phase Two or Three until the roof was sealed, noting that it would be unwise to begin interior work before the building was dry. Both Mr. Spinks and Mr.

Brazell agreed “absolutely” that the roof needed to be sealed first. Vice Chairman Collins reiterated that he would not undertake Phase Two until the roof was sealed. Mr. Brazell noted that coordinating the phases this way would also allow for savings in general conditions while crews were on site. Mr. Griggs pointed out that if the County waited until a later year to perform the HVAC and interior finishes, the general conditions and overhead costs associated with that work would be in addition to the current prices. Mr. Spinks noted that if the County chose to do Phase One now and Phases Two and Three later, they could still overlap general conditions at that later time, but that the greatest savings to the County would come from overlapping as many phases as possible. He reiterated that they would be happy to update estimates in whatever manner the Board requested. Commissioner Snelson commented that Phases Two and Three seemed like the most “over-lappable” components, and Mr. Spinks agreed “100 percent,” stating that Phase One needed to dry the building before Phases Two and Three started. Mr. Brazell added that they still believed Phases Two and Three could be tucked within the duration of Phase One. Commissioner Threadgill thanked the presenters, and Mr. Brazell and Mr. Griggs each expressed their appreciation to the Board.

VI. EXECUTIVE SESSION

A motion was made to go into Executive Session at 6:41 p.m. for Personnel by Commissioner Threadgill and seconded by Commissioner Snelson. All were in favor.

A motion was made to go out of Executive Session at 6:59 p.m. by Commissioner Threadgill and seconded by Vice Chairman Collins. All were in favor.

A motion was made to go back into Regular Session at 7:00 p.m. by Commissioner Threadgill and seconded by Commissioner Snelson. All were in favor.

No action was taken in Executive Session.

Vil. ADJOURNMENT

With no further business, a motion was made to Adjourn the Meeting at 7:01 p.m. by Commissioner King and seconded by Commissioner Threadgill. All were in favor.