Condado: Meriwether County

Meriwether County Board of Commissioners: reunión ordinaria, 24 de marzo de 2026

18 páginas

Estas son las actas tal como las publicó Meriwether County Board of Commissioners, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Meriwether County Board of Commissioners.

Este registro se publicó como imágenes escaneadas, leídas aquí con OCR: una letra o un número puede estar mal leído. El archivo que publicó el órgano está enlazado abajo.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.

Commissioners moved to temporarily close part of Dobson Road, tabled the SmartCop contract and airport match, and approved courthouse roof funding and other items.

The commissioners heard a transit plan update and a finance report, then took up a long agenda. After a public hearing, a commissioner moved to temporarily close part of Dobson Road until the county can bring the bridge and road up to standard, with a county-controlled emergency gate; the minutes say all were in favor. The board tabled the SmartCop contract and the airport apron local match to April 13, 2026. It approved a grant writing contract, an annex roof change order not to exceed $24,500, $150,000 more for the courthouse roof contingency from SPLOST, two courthouse change orders, a transit agreement, elections building handrails, an inmate housing agreement with Manchester, a Microsoft license contract, surplus vehicles, and a baseball field not to exceed $28,000. It set a May 11 public hearing on abandoning Hoss Bowden Road. No action was taken in executive session.

Temas tratados: Dobson Road closure; Transit Development Plan update; SmartCop contract; Airport apron rehabilitation match; Courthouse roof change orders; Hoss Bowden Road abandonment; Elections Building ADA handrails; Manchester inmate housing agreement; Split property tax payments; Lake Meriwether baseball field.

Decisiones que constan en las actas (15)

Después de cada decisión va la oración de las actas que la registra, copiada palabra por palabra, en inglés.

  1. Temporary closure of part of Dobson Road until road and bridge meet county standards, with county-controlled emergency gate

    Aprobadounanimous

    Las actas: “He stated that he would like to make a motion to temporarily close the road until such time as the County could bring the bridge and road up to County standards and to provide a gate controlled by County staff for emergency service access.”

    Leer este punto en las actas

  2. SmartCop contract with revised language and $1.6 million liability coverage

    Aplazadounanimous

    Las actas: “A motion was made by Commissioner Worsley to table the Approval of the SmartCop Contract with Revised Language and $1.6 million Liability Coverage until the Monday, April 13, 2026, Regular Meeting at 6:00 p.m.”

    Leer este punto en las actas

  3. Airport Authority request for local match for airport apron rehabilitation, up to $200,000

    Aplazadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to table the request from the Airport Authority for Local Match for Airport Apron Rehabilitation until the April 13, 2026, Regular Meeting at 6:00 p.m.”

    Leer este punto en las actas

  4. Grant writing proposal from Tara Coe at a flat $35 per hour

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to approve the Grant Writing”

    Leer este punto en las actas

  5. Change Order #3 for annex roof, not to exceed $24,500

    Aprobadounanimous

    Las actas: “A motion was made to approve Change Order #3 for the Annex Roof, not to exceed $24,500.”

    Leer este punto en las actas

  6. Adding $150,000 to courthouse roof and exterior project contingency, funded from SPLOST

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Worsley to put $150,000 into the contingency fund for the Courthouse Roof and Exterior Project to avoid markup and profit, and this be funded from SPLOST.”

    Leer este punto en las actas

  7. Courthouse Change Order #8, recaulking exterior windows

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Worsley to approve Courthouse Change Order #8.”

    Leer este punto en las actas

  8. Courthouse Change Order #11, replacement of bricks on north and west elevations

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to approve Change Order #11 for the Courthouse.”

    Leer este punto en las actas

  9. Section 5311 public transportation agreement with Three Rivers Regional Commission for fiscal year 2026, $25,900

    Aprobado

    Las actas: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve Section 5311 Public Transportation Service Agreement for the Operations of the Three Rivers Regional Transit System - FY26 and allow the Chairman or Vice Chairman to sign.”

    Leer este punto en las actas

  10. Public hearing on abandoning Hoss Bowden Road set for May 11, 2026

    Aprobadounanimous

    Las actas: “A motion was made by Chairman Collins and seconded by Commissioner King to set a Public Hearing to proceed with the abandonment of Hoss Bowden Road for Monday, May 11, 2026, at 6:00 p.m.”

    Leer este punto en las actas

  11. ADA handrails and concrete work at Elections Building, SPLOST funded, not to exceed $20,000

    Aprobadounanimous

    Las actas: “Commissioner Threadgill made a motion to approve the ADA Compliance Handrails along the Concrete Steps for the Elections Building, to be funded from SPLOST, not to exceed $20,000.”

    Leer este punto en las actas

  12. Inmate housing agreement with City of Manchester, pending legal review

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the Inmate Housing Contractual Agreement between Meriwether County and the City of Manchester, pending legal review.”

    Leer este punto en las actas

  13. Contract with Tri-Color for Microsoft licenses, pending legal review

    Aprobadounanimous

    Las actas: “Commissioner Threadgill to approve the Contract with Tri-Color for Microsoft Licenses,pending legal review, and allow the Chairman to sign.”

    Leer este punto en las actas

  14. Work session with Water and Sewerage Authority on April 13, 2026 at 4:30 p.m.

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to set a Work Session with the Water and Sewerage Authority for Monday, April 13, 2026, at 4:30 p.m.”

    Leer este punto en las actas

  15. Lake Meriwether baseball field fencing project, not to exceed $28,000 from Recreation Department account

    Aprobadounanimous

    Las actas: “A motion was made by Vice Chairman Snelson to approve the project at a cost not to exceed $28,000, to be paid from the Recreation Department account.”

    Leer este punto en las actas

Puntos del orden del día (3)

Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.

  1. 1. CALL TO ORDERUna moción
  2. 2. Minutes, March 9, 2026, Regular Meeting at 6:00 p.m.Una votación
  3. 3. Consideration and Approval of Change Order #3 or #4 — Annex Roof —Una votación

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Las actas

Tal como se publicó en www.meriwethercountyga.gov, leído el 25 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.

MINUTES

MERIWETHER COUNTY BOARD OF COMMISSIONERS

MARCH 24, 2026

6:00 PM

Commissioners Present: Chairman Emmett Collins, Vice Chairman Jennifer Snelson, Commissioner Gene King, Commissioner Bryan Threadgill, and Commissioner Adam Worsley.

Commissioners Absent:

Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, Deputy Clerk Hailee Palmer, Finance Director Tammy Lackey, and County Attorney Michael Hill

Staff Absent:

1. CALL TO ORDER

The Meeting was Called to Order by Chairman Emmett Collins at 6:00 p.m.

lI. INVOCATION

The Invocation was given by Commissioner Gene King.

II. PLEDGE TO THE FLAG

All.

IV. ADOPT AGENDA

A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to Adopt the Agenda with the following Amendments: Under Public Hearing, the Agenda was amended to change the period from 4.144 feet of Dobson Road to a comma to read 4,144 feet of Dobson Road. Under New Business — Add #13 — Discussion of Property Taxes, and Under New Business — Add #14 — Lake Meriwether Baseball Field. All were in favor.

Vv. PRESENTATIONS

Meriwether County Transit Development Plan 2026 Update — Stephanie Wagner, Three Rivers Regional Commission

County Clerk Allyson Stephens introduced Ms. Stephanie Wagner, Regional Planner with Three Rivers Regional Commission. Stephanie Wagner, Planner with Three Rivers Regional Commission, presented an overview of the Transit Development Plan (TDP) update for Meriwether County. Ms. Wagner explained that Transit Development Plans analyze current conditions and identify transit needs to guide future planning. She noted that the plans are required to be updated every five years in accordance with Georgia Department of Transportation (GDOT) requirements, with the county’s most recent plan completed in 2020.

She stated that the updated plan would focus specifically on transit and include a 20-year planning horizon to assess long-term needs. The plan would consider populations most likely to rely on transit, including senior citizens, individuals with disabilities, and economically disadvantaged residents, as well as the general public and clients served through human service agencies.

Ms. Wagner referenced previous regional and statewide transit plans and noted the state’s goal of improving access to transit services across Georgia. She also reviewed a map identifying counties with and without transit systems and confirmed that Meriwether County currently operates a rural transit system. She outlined the planning process, which includes establishing a transit vision, gathering public input through surveys and stakeholder engagement, analyzing existing conditions and system performance, conducting a needs assessment, and developing

short-, mid-, and long-term goals. Ms. Wagner provided an overview of the MAR Transit system, which operates as a demand-response service managed by the Three Rivers Regional Commission. She explained that trips are requested 24 hours in advance, cost $3 per trip, and are available Monday through Friday from 8:00 a.m. to 5:00 p.m., primarily within Meriwether County. She reported that the county provided 6,597 transit trips in fiscal year 2025 and clarified that a previously reported figure in the meeting packet contained a typographical error. Ms.

Wagner stated that the project is supported through Section 5304 state funding and that additional information is available on the Three Rivers Regional Commission website. She outlined the anticipated timeline, noting that stakeholder meetings and public outreach would occur over the coming months, with a draft plan expected in June and a presentation for adoption in July. Following the presentation, Commissioner Threadgill expressed appreciation for the transit services and their positive impact on county residents.

VI. FINANCE REPORT

Finance Director Tammy Lackey presented the Finance Report to the Board of Commissioners.

Director Lackey reported the bank balances as of that afternoon. She stated that funds from the 2020 TSPLOST investment account had been transferred to the TSPLOST account at F&M Bank to close the investment account. She advised that SPLOST, LOST, and TSPLOST distributions were expected to be received the following week. Director Lackey further reported that the SPLOST balance reflected a negative $286,000, while the TSPLOST balance was slightly over $1 million. She also stated that a copy of the March credit card statement had been provided to the Board as previously requested. Commissioner Worsley asked if it was a little late to be receiving the SPLOST, TSPLOST, and LOST, as they usually get it around the first meeting of the month, and it is almost the end of March. County Administrator John Gorton provided clarification regarding the timing of state fund distributions. Administrator Gorton explained that funds are typically received on the last business day of each month. He noted that if the last day of the month falls on a Friday, the County generally receives the funds on the preceding day. He further clarified that payments are received one month behind, meaning that, for example, January’s payment is received at the end of February, and February’s payment is received at the end of March. Administrator Gorton stated that a purchase order had been issued for the riding lawnmower and the 911 parking lot project, noting that the County was currently awaiting a $30,000 invoice. He further explained that the remaining balance of $36,656 had been reallocated for striping. Administrator Gorton reported that the mulching head had been discussed with Public Works Director Griffin and would be ordered that week, coming in under $30,000. He also noted a typographical error regarding the 2024 LRA balance and clarified that the correct remaining balance to be paid for the 2024 LRA was $515,409.41. Commissioner Worsley asked if we had just been approved for additional LRA funding. Administrator Gorton stated that the County expected to receive approximately $1,016,000 in funding and noted that a work session would need to be scheduled to address the allocation of those funds. He explained that receipt of the funds was contingent upon meeting audit requirements and ensuring that all Department of Community Affairs (DCA) reports were filed in a timely

manner. He stated that the County was currently working with auditors and anticipated completion by the following week or shortly thereafter, potentially by the first meeting in April.

Administrator Gorton further clarified that the County must remain in compliance with both DCA and the Georgia Department of Audits and Accounts (DOAA) requirements to receive the funds and meet its financial obligations.

VI. DEPARTMENT HEADS

There were no Department Heads to speak.

VII. CITIZEN COMMENT

Chairman Collins read the procedures for Citizen Comment

Dustin Owens, 21158 Roosevelt Highway, Greenville — Mr. Owens addressed the Board of Commissioners regarding the communication of meeting information to the public. Mr. Owens expressed appreciation for the Board’s time and requested consideration for improving how meeting agendas and updates are shared with citizens. He suggested reinstating the use of the County’s official Facebook page to distribute agendas and meeting information in order to better inform the public of meeting dates, purposes, and topics. He also recommended exploring additional electronic communication methods, such as establishing an email notification system or subscription-based list, to provide timely updates to citizens. Mr. Owens noted that while meetings are traditionally advertised in print media, the decline in print usage supports the need for more modern communication methods. He emphasized the importance of ensuring that citizens are adequately informed about meetings to reduce confusion and improve public awareness and participation. Mr. Owens thanked the Board for their time.

Charles Hudson, 585 Waddell Road, Woodbury - Mr. Hudson stated that he had gone to the Building and Zoning Office a few weeks before obtain a business license renewal for his property on Ryder Road. He stated that at that time, he provided zoning staff with several photographs of a property on Brown Road owned by Larry Brown, where Chad Fuller was operating a shop. Mr. Hudson stated that the property was zoned agricultural residential, with portions under a conservation program, and alleged that Mr. Fuller was operating a business on the property. He stated that there were two shop buildings with lifts where oil changes and other automotive work were being performed, and that a towing business was also being operated from the location. He further stated that the activity violated the conservation easement and described the property as containing a junkyard. Mr. Hudson stated that he had shown photographs of the property to zoning staff. Mr. Hudson stated that he had recently observed that some of the materials had been moved from the roadside further up the property and described the area as appearing to be a large junkyard that remained visible from the road. He stated that junkyards are required to be located in industrial areas and must be approved by the Board. He referenced another property south of Woodbury that had already been approved for such use in an industrial area. Mr. Hudson also raised concerns regarding environmental impacts, stating that fluids such as oil and coolant could be improperly disposed of, and questioned the enforcement of county ordinances. He expressed concern that the lack of enforcement could negatively impact property values and create unfair conditions for those complying with zoning regulations. Mr. Hudson stated that he had attempted to contact zoning staff, including calling and leaving a message, but had not received a response. He indicated that he had photographs available if the Board wished to review them. Mr. Hudson concluded his comments and thanked

the Board, and stated they probably didn't care either.

IX. MINUTES

1. Minutes, March 9, 2026, Work Session at 4:00 p.m.

A motion was made by Vice Chairman Snelson and seconded by Commissioner King to approve the Minutes of the March 9, 2026, Work Session at 4:00 p.m. All were in favor.

2. Minutes, March 9, 2026, Regular Meeting at 6:00 p.m.

County Clerk Stephens made the Board aware of a typo in the Minutes and advised that she would get that corrected. Beulah Evans Road was spelled incorrectly. A motion was made by Vice Chairman Snelson and seconded by Commissioner King to approve the Minutes of the March 9, 2026, Regular Meeting at 6:00 p.m.

All were in favor.

X. PUBLIC HEARING

I. Case #PC26-004 - Request from Robert Williams to close approximately 4,144 feet of Dobson Road, beginning at the southern corner of 2171 Dobson Road and extending north to the corner of 969 Dobson Road

A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to enter a Public Hearing at 6:21 p.m. All were in favor. Planning and Zoning Director Cassandra Jones addressed the Board and stated that the item was a continuation from two weeks prior, when the Board had requested responses from the remaining department heads. Ms. Jones stated that the responses had been provided in the meeting packet. She reported that Public Works had responded with no objection to the road closure, noting concerns that the bridge was not safe for traffic. She further stated that 911 had no issue with the closure. She stated that she had spoken with the Col Hadley, who, along with staff, had no objection to the closure as long as access was maintained through a gate system, whether by key code or physical key. Ms. Jones stated that the Fire Department preferred that the road not be closed and had provided a written response outlining their concerns. She stated that the Fire Department acknowledged that while road maintenance could be extensive, the road could serve as a vital route during emergencies and natural disasters. She further stated that although the bridge had a low weight limit, the Fire Department believed it could still be utilized with assistance during emergency response situations. She added that even in the event of bridge failure, the surrounding terrain could still be navigable. Ms. Jones stated that the applicant was present who wished to speak regarding the matter.

Mr. Bob Williams, Property Owner of 2171 Dobson Road, stated that the road in question was a dirt road in very poor condition. He stated that the portion being discussed for closure was the section in the creek bottom leading down to Flat Shoal Creek, describing it as the middle section of approximately a two-mile road. Mr. Williams stated that the road was built on bedrock, with a significant amount of exposed rock, and that, while County crews attempted to maintain it, they could not do so effectively because repairs were washed out with each rainstorm. He stated that the bridge had received the lowest rating from the Department of Transportation and was essentially condemned. He added that although the bridge had a typical seven-ton limit, erosion caused by flooding, including water over-topping the bridge during high creek levels, had

severely impacted its foundation. Mr. Williams stated that there were ongoing issues on the road, including dumping and other after-hours activity, noting that the road was not generally used by the public for normal access but was being used at night, often by individuals from outside the county. He stated that he would like to see the road closed and was willing to work with the County as needed. He also addressed concerns regarding emergency access, stating that in over 35 years, the road had never been used for emergency purposes. He further stated that in a prior incident involving a prescribed burn, fire trucks were unable to cross the bridge and had to access the property from another direction. Mr. Williams stated that there were two residents on the road, including himself, and that under the proposal, access to all properties would remain available from either direction. He added that the County would continue to maintain the portions of the road that could be maintained, while the section unsuitable for maintenance would become his responsibility. Mr. Williams concluded his comments and thanked the Board.

Commissioner King asked County Attorney Hill if, since this was a continuation from a previous Public Hearing, they needed to retract the motion. County Attorney Hill stated that the Board was fine in regard to that motion. County Attorney Hill stated that the normal procedure after Cassandra gives her recommendation is to allow the proponents to speak for up to 20 minutes and allow those in opposition to speak up to 20 minutes. County Attorney Hill stated that it sounds like this was done at the last meeting. The Board verified that no one spoke during the previous Public Hearing. County Attorney Hill stated that the proponent just spoke for 3 minutes and 2 seconds, and he didn't know if they wanted to allow proponents to have a set amount of time to speak, because this is more than the standard rebuttal that's normally given.

County Attorney Hill stated that the Board has the ability to deviate and set time based on a majority vote. County Attorney Hill stated that the County Ordinances do state that the Board will provide equal time for proponents and opponents. Commissioner Threadgill stated that he believed what they were waiting on was just the additional information from the other Department Heads. County Attorney Hill stated his point is to allow equal time, and if there is an opponent, they are given their three minutes. Chairman Collins asked if there was anyone who would like to speak against the road closing. There was no one else in attendance who wished to speak for or against. Public Works Director Brian Griffith was asked by Commissioner Worsley if there was a statement from GDOT saying that the road condition is at a certain level or condemned. Director Griffith stated that they have the last bridge assessment from GDOT. Commissioner Threadgill asked Director Griffith if he could explain it. Director Jones stated that the assessment showed the bridge to be in poor condition. Vice Chairman Snelson stated this was located in the packet on page 45. Commissioner Worsley verified that they didn't condemn it or reduce the tonnage on the bridge, just showed it to be in poor condition. Director Griffith confirmed. Commissioner Worsley asked Director Griffith if he had assessed what the repair costs would be for the bridge. Director Griffith stated he had not, but it would be a replacement. Director Griffith stated that the road conditions were difficult due to the terrain, noting that it was “full of bedrock coming down both hills.” He stated that each time the road was scraped and filled, rainfall would wash the material back down, making it difficult to maintain. He further stated that there was no effective way to address the steep grade without lowering the entire road or blasting through the bedrock. Director Griffith indicated that, under current conditions, it would be difficult to achieve a long-term solution for maintaining the road.

Commissioner Threadgill asked if County Attorney Hill could give the Board the law one more time on the abandonment process and if it needed to be reopened. Director Griffith indicated that, under current conditions, it would be difficult to achieve a long-term solution for

maintaining the road. County Attorney Hill stated, “For the County to abandon a public road, it has to lack use that would result in that having no public purpose to the County, or otherwise be found by this Board to not be in the best interest of the public in order to close the road.” County Attorney Hill stated, before the Board votes to close the Public Hearing, if any written correspondences need to be included in the record, they need to be made part of the Public Hearing record. Chairman Collins asked if the County needed to have any kind of access through the road at any time for future needs, referencing the possibility of a gate and whether the County would need access to the road for any reason. Public Works Director Griffith stated the Fire Department is interested in having gate access. Commissioner Threadgill stated that it sounded like the Sheriff's Office wants to have access to it, just in case of emergencies. Public Works Director Griffith stated that if someone were down at the bridge and an incident happens they want to try to be able to get down to them. Chairman Collins asked Mr. Williams if he was agreeable with that. Mr. Williams stated that he was, and they already have 911 access on their property. Vice Chairman Snelson asked how the road closure would be marked so that individuals traveling the road would be aware and where they would be able to safely turn around if they were unfamiliar with the area. He expressed concern about whether there would be a designated turnaround location or if individuals would be required to back out, particularly if someone traveled down the road without prior knowledge of the closure. Public Works Director Griffith stated that a turnaround would need to be constructed on each side of the road.

He stated that signage would also be posted indicating a dead end and no through traffic on both sides, so individuals would be aware. Commissioner King noted that signage alone may not be sufficient and that turnarounds would still be necessary. Commissioner Threadgill asked if the concern was with the road itself or the bridge. Public Works Director Griffith stated that long-term, it's the road itself. He stated the road is unmaintainable, bridges can be replaced, but the road would have to be deconstructed to be reconstructed. He stated the bridge is expensive but easy; the road is not. Commissioner Threadgill asked Director Griffith, in his opinion, what it would take to get the road in this area, including the bridge, up to standard. Public Works Director Griffith stated that addressing the road conditions would require contracting with a company to dynamite the area approximately 25 feet down on each side to create a level surface that would hold, noting that in its current condition, the area functions like a waterfall.

Commissioner Worsley stated that is if it stays a dirt road, and asked if there was any way to asphalt that section. Director Griffith stated no, that it would just slide on the rock itself. County Attorney Hill asked if the area that Director Griffith was proposing to dynamite would be in the County's right of way or if they would have to take the right of way. Director Griffith stated it would be on the dirt road, on County property. Commissioner Threadgill stated that regardless of the decision made, there would likely be a need for access to the road, particularly in emergencies, as noted by certain departments. Commissioner Worsley agreed with Commissioner Threadgill’s statement. Commissioner Worsley asked if there were any other comments, and if not, did they need to come out of the Public Hearing. No one had any further comments or wished to speak for or against the request. A motion was made by Commissioner King and seconded by Vice Chairman Snelson to come out of the Public Hearing at 6:35 p.m.

All were in favor. Commissioner Worsley stated that if there was no other discussion before the Board, he would like to make a motion, noting that the matter was in his district. He stated that he would like to make a motion to temporarily close the road until such time as the County could bring the bridge and road up to County standards and to provide a gate controlled by County staff for emergency service access. The motion was seconded by Commissioner King.

All were in favor.

XI. APPOINTMENTS

XII. UNFINISHED BUSINESS

1. Approval of SmartCop Contract with Revised Language and $1.6 million Liability Coverage

County Administrator Gorton stated that he would go through the item, but suggested that the Board may want to table it because SmartCop had not yet returned a contract. He stated that their legal representative had been out of the office, but that they had agreed to a $1.6 million liability. He further stated that legal counsel could explain what that referred to, noting that there had been language regarding limited liability that they would not change, but they had agreed to the $1.6 million amount. County Attorney Hill stated that in the contract, there was a limitation of liability clause. He stated that they had originally suggested that it be removed, but that the other party did not want to strike it for obvious reasons. He stated that they believed there had been an agreement at the previous meeting to allow the clause to remain with liability insurance backing it to protect the County and limit it to a certain amount, but that this may have been a misunderstanding or reconsideration on the other party’s part. He stated that the other party subsequently proposed setting a specific liability amount and noted that staff had communicated with their attorney, resulting in a negotiated amount of $1.6 million. County Attorney Hill stated that the limitation would apply to direct damages and would exclude indirect, consequential, incidental, exemplary, or punitive damages. He further stated that the County had requested removal of the term “special damages” and was awaiting a response on that request. He explained that incidental damages are those that do not result directly from an injury but arise from less foreseeable circumstances, and stated that the liability provision would not apply to those, but would apply to direct damages resulting from a breach of contract. A motion was made by Commissioner Worsley to table the Approval of the SmartCop Contract with Revised Language and $1.6 million Liability Coverage until the Monday, April 13, 2026, Regular Meeting at 6:00 p.m. The motion was seconded by Commissioner Threadgill. All were in favor.

2. Approval of Grant Writing Proposal from Ms. Tara Coe — This was tabled at the March 9, 2026, Regular Meeting

County Administrator Gorton stated that the item had been tabled at the March 9, 2026, regular meeting. He stated that he had spoken with Ms. Coe, who had emailed him confirming that she had signed the agreement as proposed by legal for a flat rate of $35 per hour. He stated that she noted in her email that for larger projects, specifically grants in the range of $8 to $10 million, she would need to hire additional staff and would bring back a separate proposed contract at that time. County Administrator Gorton stated that she had agreed to the flat fee with no changes to the proposed contract and that he had received a signed copy. He added that she had planned to attend the meeting virtually but was unsure if she was present online. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to approve the Grant Writing

Proposal from Ms. Tara Coe. All were in favor.

3. Consideration and Approval of Change Order #3 or #4 — Annex Roof —

Courthouse Roof Project — This was Tabled at the March 9, 2026, Regular Meeting.

County Administrator Gorton stated that the item was an either-or decision or could be deferred at present. He stated that the matter related to the annex roof on the small building located off to the side by itself, and noted that the roof currently appeared to be in very good condition. He stated that the item was a change order to make the roof uniform with the courthouse roofing project. He stated that the Board could select option number three for $27,720 or option number four for $45,045, or choose to wait and decide at a later time. County Administrator Gorton stated that he was unsure whether the contractor would return to complete the work once the courthouse roof project was finished and noted that the timeframe for making a decision was uncertain. He stated that the Board could choose option three, option four, or leave the annex roof as it currently was.

Commissioner Threadgill asked if this was the flat one. County Administrator Gorton stated that it is the solo building that you see coming back towards Greenville. Commissioner Threadgill stated that there is a flat one connected first, then there is a small one in the back. County Administrator Gorton stated it is the small one in the back. Travis Evans with River City Contracting stated it is the building in the back with a pitched roof. County Administrator Gorton stated that the purpose of the change was to maintain a uniform appearance with the courthouse roof. Commissioner Worsley asked which proposal would keep it uniform, 3 or 4?

Mr. Evans stated that Change Order #3 would be what would match. County Administrator Gorton confirmed that and stated the cost for that would be $27,720. Mr. Evans stated that it would actually be $24,000 because the one they had included a markup, and it would only be $24,000. Commissioner Worsley asked what Change Order #4 would be. County Administrator Gorton stated that it would be for a 16-ounce standing seam copper roof that would have more of a copper look. Commissioner Threadgill asked if this would match what was on the main roof. County Administrator Gorton stated that it would and would be the dark bronze color.

Commissioner Worsley asked Mr. Evans if he was sure about the $24,000 amount, because they were about to make a motion not to exceed. Mr. Evans stated yes. A motion was made to approve Change Order #3 for the Annex Roof, not to exceed $24,500. Commissioner King seconded the motion. All were in favor.

XIII. NEW BUSINESS

l. Request from Airport Authority for Local Match for Airport Apron Rehabilitation County Administrator Gorton stated that the Airport Authority was present and that a work session had just been held. He stated that the item was for apron rehabilitation at the airport and noted that the estimated cost was approximately $200,000. He stated that the Airport Authority would speak further on the matter. Mike Watson, Airport Authority Chairman, stated that he was requesting the funding in order to obtain approximately $! million from the government to rehabilitate the apron in front of the fuel farm and hangar. He stated that they were requesting a local match not to exceed $200,000, and that the $1 million would come from the FAA. County Administrator Gorton stated that he would request the item be tabled until the next meeting to allow staff time to identify funding. He stated that he would work with the Airport Authority to determine how much funding would be needed prior to the end of the current fiscal year and how much would be needed in the new fiscal year. Commissioner Threadgill asked, before tabling the item, whether ARPA funds could be used, noting that the funds were available and designated for special projects. He stated that if action needed to be taken to move forward, those funds could potentially be utilized rather than reallocating from the existing budget or identifying other funding sources. County Administrator Gorton stated that the ARPA funds were part of the fund balance but had been placed in a separate account and that the Board would need to approve how those funds were spent. He stated that the same account was also being used for the $1 million advance to SPLOST for the courthouse project and noted that approximately $2.6 to $2.7 million remained available that could be spent. Commissioner Worsley asked whether using those funds would still trigger the special audit that had been previously discussed. County Administrator Gorton stated that it would depend on how much work could be completed before the end of the fiscal year. He stated that if approximately $300,000 to $400,000 was expended, it would not trigger a single audit, noting that expenditures would need to remain below $1 million within a fiscal year to avoid triggering the audit requirement. Commissioner Worsley asked Administrator Gorton if the consideration would apply regardless of which fund was approved, and confirmed that staff had requested additional time to research the matter before the Board approved funding from either source. County Administrator Gorton stated that either option would still involve the same funding source, explaining that ARPA funds were now part of the fund balance as a special project. He stated that the funds were still considered general County funds and not solely dedicated ARPA funds.

He further stated that the funding could either come directly from the fund balance or by reducing departmental budgets to secure the $200,000, noting that in either case, the funds would ultimately come from the fund balance. Commissioner Threadgill confirmed that the sooner the Board moves forward, the quicker they are able to get that below where it needs to be. Commissioner Worsley asked Chairman Watson of the Airport Authority if they have a timeline or deadline to get the $1 million dollars from the FAA? Phil Eberly with Lead Edge Design stated that at the point the project reached $750,000 in FAA funding, and they were providing $1 million, it would trigger the special audit. He stated that there was not a way to break the project into smaller pieces to avoid the audit, noting that under FAA criteria, it would automatically be triggered. County Administrator Gorton stated that the threshold had been raised to $1 million. Mr. Eberly stated that the project would meet that amount in FAA funding, meaning the audit would be triggered. He stated that they would not allow the project to be split to avoid the requirement. He added that once the funding was accepted, the audit would be triggered and stated that the sooner the County moved forward, the sooner they could proceed with accepting the funding. Commissioner Threadgill confirmed that doing this would trigger the single audit and asked about costs. County Administrator Gorton stated that single audits typically run approximately $20,000 but are based on what is expended within a fiscal year. He stated that if $200,000 was expended in one year and $900,000 in the next, and no additional federal funds were received, it would not trigger the special audit because the $1 million threshold would not be met within a single fiscal year. He stated that this differed from FAA guidelines, explaining that auditors review expenditures within a fiscal year rather than the total project amount over multiple years. Commissioner Threadgill then asked whether the discussion regarding ARPA funds affected the request to table the item or if the Board still preferred to table it to allow additional time for review. County Administrator Gorton stated that ARPA funds, as part of the fund balance, could be used as a revenue source and that this would be one of the recommendations he would present to the Board, in addition to potentially reducing departmental budgets by two to three percent if needed. He stated that he would bring back a motion to the Board to use the fund balance to cover the $200,000 match. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to table the request from the Airport Authority for Local Match for Airport Apron Rehabilitation until the April 13, 2026, Regular Meeting at 6:00 p.m. All were in favor.

2. Discussion and Consideration to Increase the Contingency Amount for the Courthouse Roof and Exterior Project

County Administrator Gorton stated that due to the recently approved change orders for the courthouse, the contingency fund was now in a negative. He stated that he would allow Travis to explain the reason for the negative balance, noting that there had been an error identified during the initial change order involving the $25,000 and $7,200 amounts, which had been taken from the initial guaranteed price rather than the contingency fund. He stated that the contingency fund was currently negative, approximately $30,000, and requested that $150,000 be added back into the contingency fund. He stated that this would prevent additional markup and overhead costs, noting that upcoming change orders included approximately a 10% markup. County Administrator Gorton stated that funding the contingency at $150,000 through SPLOST would help avoid those additional costs and noted that there was an anticipated $80,000 to $90,000 in additional expenses once work progressed to the other side of the courthouse. He stated that he was confident the funding could be secured through SPLOST, noting that the previously approved $1 million allocation had not yet been fully utilized and that future SPLOST revenues should cover the amount.

County Administrator Gorton stated that he did not foresee using those funds from the General Fund until the County moved forward with the HVAC project or renovations to the third floor.

Commissioner Worsley confirmed that Administrator Gorton would like the Board to put $150,000 into the contingency fund to avoid markup and profit, to be funded from SPLOST.

County Administrator Gorton confirmed that he was correct. A motion was made by Commissioner Worsley to put $150,000 into the contingency fund for the Courthouse Roof and Exterior Project to avoid markup and profit, and this be funded from SPLOST. Commissioner Threadgill seconded the motion. All were in favor. County Administrator Gorton stated that it would require an amendment to the contract and require Commissioner Worsley to sign it because he was the Chairman at the time the original contract was signed.

3. Approval of Courthouse Change Order #8 — Recaulking Exterior Windows County Administrator Gorton stated that River City Contracting had submitted Change Order Number Eight for the recaulking of the exterior windows. He stated that the scope of work included removing the existing caulking around all exterior windows and installing new backer rod and sealant. He stated that the work would apply to all exterior windows across every elevation of the building. He provided a breakdown of the change order, stating $13,848.22 for base work, $1,384.82 for overhead, and $761.55 for profit, for a total of $15,994.59. County Administrator Gorton stated that by reopening the contingency fund, the County could avoid the additional overhead and profit markup. He noted that the Board had been provided with a list of the change orders and the impact they would have on the contingency fund. Travis Evans of River City Contracting addressed the Board and stated that the first document provided was the change order log. He stated that with PCR number one, as previously discussed, $25,000 had been taken off the contract amount rather than from the contingency, reducing the contract directly. He stated that this had affected the contingency log previously presented and that the log had since been updated. He noted that the approach taken was correct, but that he had not been aware of that when the document was initially prepared. Mr. Evans stated that the Board had also previously approved a $7,200 deduction to remove the four inches of base installation, and that an additional document would need to be signed to reflect that reduction in the contract amount. He stated that adding $150,000 to the contingency would avoid additional overhead and profit markup. He explained that some pending change orders included overhead and profit because the contingency had been exceeded, but that the updated contingency log reflected the addition of $150,000 and did not include those markups. Mr. Evans stated that the project was previously over the contingency by $31,746 following approval of three change orders and that additional change orders had since been identified. He stated that Change Order Number Eight involved removing existing caulking and installing new backer rod and sealant around exterior windows, noting that scaffolding was already in place and the work could be completed while on-site. He stated that Change Orders Nine and Ten related to structural roof repairs and additional caulking work, noting that some costs were estimates as final engineering costs would not be determined until completion and inspection. He stated that estimated amounts were intentionally higher to provide contingency coverage. Mr. Evans stated that Change Order Eleven involved replacing 42 damaged or cracked bricks on the north and west elevations and that additional estimates had been included for potential brick repairs on the south and east elevations once scaffolding allowed closer inspection. He referenced the annex roof project previously discussed and stated that estimated costs had been included accordingly. Mr. Evans stated that if all change orders were approved and the contingency was increased by $150,000, the contingency balance would be approximately $34,320 based on current estimates, noting that actual costs could be lower and any remaining funds would be returned at the completion of the project. County Administrator Gorton asked Mr. Evans to clarify that the documents showing markup would no longer apply with the addition of $150,000 to the contingency, stating that the markup would not be included under the updated contingency. Mr. Evans confirmed that the document being referenced did not include markup, while the other document

did include markup as it reflected the original proposal. County Administrator Gorton stated that Change Order #8 would be approximately $13,750 without markup if approved by the Board, noting that with markup it would have been approximately $16,000. Commissioner Worsley stated that, per the agenda, the Board was currently only considering items eight and eleven.

County Administrator Gorton confirmed that items nine and ten were estimates based on work for the north and west elevations and stated that staff would follow up and bring those items back once final numbers were available. Chairman Collins stated that he had a question regarding the last page showing the brick, referencing the area highlighted in green. He stated that just to the left of the highlighted area, there appeared to be a wooden structure at the bottom that also looked to be deteriorating or rotted. Commissioner King stated that he observed the same issue and asked whether the material would be replaced with PVC. Mr. Evans stated that they do not have that in their scope of work. Commissioner Worsley asked if it could be added.

Commissioner King stated that it is in the picture, and he would like to see it added on, since it is obvious. Commissioner King stated that there is brick mold that is rotted, and he would like to see it replaced with PVC brick mold, so it doesn't have to be done again. Mr. Evans stated that they will took into that and make adjustments. County Administrator Gorton stated that the Board was on item number three, Change Order #8, which, according to the handout provided, would be $13,750 for the caulking of all exterior windows. Commissioner Worsley confirmed this would be at every elevation level. Mr. Evans confirmed. A motion was made by Commissioner Worsley to approve Courthouse Change Order #8. The motion was seconded by Commissioner Threadgill. All were in favor.

4, Approval of Courthouse Change Order #11 — Replacement of Bricks on North and West Elevations

County Administrator Gorton stated that Change Order #11, for the replacement of bricks on the north and west elevation, was $2,184. He noted that the packet previously reflected a higher amount of $2,522, but due to the addition of $150,000 to the contingency, the cost was now $2,184. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to approve Change Order #11 for the Courthouse. All were in favor.

5. Approval of Section 5311 Public Transportation Service Agreement for the Operations of the Three Rivers Regional Transit System — FY26

County Administrator Gorton stated that the agreement outlined a partnership between Meriwether County and the Three Rivers Regional Commission to operate a Section 5311 rural public transportation program for the fiscal year beginning July 1, 2025, through June 30, 2026.

He stated that under the agreement, the Three Rivers Regional Commission would manage daily transit operations, including scheduling, compliance, staffing, and maintenance, while the County would provide funding and vehicles. He stated that the service offers demand-response transportation for residents, typically requiring a 24-hour notice, and operates at least five days per week to support public and human service transportation needs. County Administrator Gorton stated that the total cost of the agreement was $25,900, which covered operating and administrative expenses for the transit program, with no additional vehicle matching funds required. He stated that this amount represented the County’s maximum financial obligation for the contract term and noted that it was the same amount approved the previous year.

Commissioner Threadgill asked if this would come out of the General Fund. County Administrator Gorton stated that the funding would come out of Three Rivers. He stated that the amount had not been budgeted, but that a budget amendment would be required for that amount and that staff would bring it back to the Board. He stated that the omission of the $25,900 was an oversight during the budget process.

Commissioner Worsley asked if we needed to take action now or wait until the Board was presented with a budget amendment. County Administrator Gorton stated that the item could be

approved, but it would place that line item over budget until a budget amendment was completed. He stated that he had confirmed the agreement covered through June 30, 2026, and that new contracts would be issued before July 1, 2026, for the next fiscal year. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve Section 5311 Public Transportation Service Agreement for the Operations of the Three Rivers Regional Transit System - FY26 and allow the Chairman or Vice Chairman to sign.

6. Discussion of Hoss Bowden Road

County Clerk Stephens stated that information provided by Building and Zoning indicated that Hoss Bowden Road was believed to have been a county-maintained road at one time, but had not been maintained in many years. She stated that records within that department reflected addresses associated with Hoss Bowden Road, including 29, 33, 251, 299, and 561 Hoss Bowden Road, with the bridge location identified at or near 299 Hoss Bowden Road. She stated that Public Works Director Brian Griffith had advised that during state bridge inspections, the bridge located on this road was identified, and access was difficult due to the condition of the roadway. She stated that he indicated the road had not been maintained over the years, appeared to be a power company easement, and was not included in the County’s maintained road mileage assessments. She further stated that no information on the road had been located by Public Works and that there were no visible mailboxes, with only an overgrown area and what appeared to be a leaning structure observed. She stated that the State had requested the Board consider abandonment of the road. She also noted that historical records reflected the Board of Commissioners approved a petition to change the name of the road from Pony Farm Road to Hoss Bowden Road on February 24, 1999. She stated that pursuant to O.C.G.A. 32-7-2 and Chapter 22, Article 7 of the Meriwether County Code of Ordinances, the Board must determine whether the road serves a public purpose. She stated that if the Board elected to proceed with abandonment, the process would require advertisement and a public hearing prior to final action.

Commissioner Worsley asked whether there was any record indicating that the road was county-maintained or that it had ever been formally abandoned. County Clerk Stephens stated that there was a record indicating the road had been a county-maintained road previously known as Pony Farm Road. She stated that the road name had been changed by petition in 1999 to Hoss Bowden Road. She further stated that there were no longer any residents living on the road and that there did not appear to be any structures that were not dilapidated or overgrown. Planning and Zoning Director Cassandra Jones stated that the bridge was on the DOT list for needing repair and being deficient. A motion was made by Chairman Collins and seconded by Commissioner King to set a Public Hearing to proceed with the abandonment of Hoss Bowden Road for Monday, May 11, 2026, at 6:00 p.m. All were in favor.

7. Elections Building — Approval of ADA Compliance Handrails along Concrete Steps County Administrator Gorton stated that the Elections Building located on Woodbury Highway was requesting approval to utilize SPLOST funds to install handrails and complete associated concrete work to achieve ADA compliance on the front and side of the building. He stated that the Board had been provided with a diagram of the proposed railing. He further stated that staff had obtained multiple quotes for the handrails, ranging from approximately $15,000 to $18,000, with an additional quote of $16,500, and a separate quote of $3,300 for the concrete work.

County Administrator Gorton stated that the quote for the concrete work was the lowest received, He stated that staff were requesting a total not to exceed $20,000 in SPLOST funds to cover both the handrails and concrete work. He stated that staff would recommend the quote from Flint Fabrications. He stated that there were two different styles of railing, including a steel tube style railing for $15,000 and a steel tube style railing with bollards for $16,500.

Commissioner King stated that the proposed railing included an option with bollards to prevent

vehicles from striking the railing and requiring replacement. He stated that the concrete cost appeared reasonable for the project, but that the railing cost seemed high. He stated that he would like to see an additional quote, noting that he believed the County could potentially save approximately $4,000 to $5,000. County Administrator Gorton stated that the other quote he got was from JP Allen Holmes, and they were $18,000 dollars. Commissioner King stated that it is because they are a contractor and have to hire somebody. He stated that whatever the Board wishes, but he thinks that it is high. County Administrator Gorton stated they fought to get the two quotes in as quickly as possible. Commissioner Threadgill made a motion to approve the ADA Compliance Handrails along the Concrete Steps for the Elections Building, to be funded from SPLOST, not to exceed $20,000. Vice Chairman Snelson seconded the motion. All were in favor.

8. Approval of Inmate Housing Contractual Agreement between Meriwether County and the City of Manchester

County Administrator Gorton stated that the item was an Intergovernmental Agreement between the City of Manchester and the Sheriff’s Office for the housing of Manchester inmates at the Meriwether County Jail. He stated that the agreement had been approved by both the Sheriff and the City of Manchester and required Board approval, noting that if approved, the Chairman would need to execute the agreement. He stated that the purpose of the agreement was to update the inmate housing cost to be billed to the City of Manchester. He stated that the packet included a letter from the Sheriff outlining the updated cost, along with the Intergovernmental Agreement already signed by the Sheriff and the City. Commissioner Worsley asked if we were already in a current agreement. County Administrator Gorton stated that the County was currently in an agreement with the City, and that this item was to update the housing cost, which had increased, and that the Sheriff had requested a new Intergovernmental Agreement be executed to reflect that updated cost. Commissioner Worsley asked if Legal had any concerns regarding this. County Attorney Hill stated that County Attorney Lee reviewed it last week and doesn't believe he had any legal issues. County Administrator Gorton stated that County Attorney Lee reviewed it, and he didn't have any proposed changes come back from him. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the Inmate Housing Contractual Agreement between Meriwether County and the City of Manchester, pending legal review. All were in favor.

9. Approval of Contract with Tri-Color for Microsoft Licenses

County Administrator Gorton stated that the contract was up for renewal to maintain Microsoft licensing across the County. He stated that Legal had reviewed the agreement and would advise the Board of any concerns. He noted that this was a budgeted line item within the IT Department and that, upon approval, the Chairman would need to execute the agreement. He stated that there had been an issue identified during legal review that the vendor would not revise, and asked for clarification from legal regarding the specific concern. Commissioner Worsley asked what the cost of the contract was. County Clerk Stephens stated it was $38,011.18. Commissioner Threadgill asked what the cost was last year. County Administrator Gorton advised that it is the same as last year. Commissioner Worsley asked if Legal had reviewed this. County Administrator Gorton stated that Legal had reviewed, and there was one item that needed to be changed. County Administrator Gorton stated that if the contract was not renewed, the County’s Microsoft licensing would expire at the end of the month. He stated that the legal concern was that the agreement involved a third-party vendor selling Microsoft licensing and that certain requested changes had not been accepted. County Attorney Hill stated that if the Board chose to approve the agreement, he would suggest approving it subject to legal review, similar to how the previous agreement had been handled, and noted that legal could clarify the suggested changes identified during review. A motion was made by Commissioner Worsley and seconded by

Commissioner Threadgill to approve the Contract with Tri-Color for Microsoft Licenses,pending legal review, and allow the Chairman to sign. All were in favor.

10. Consideration to set a Work Session date with the Water & Sewerage Authority County Administrator Gorton stated that the Water and Sewerage Authority had requested a work session with the Board of Commissioners, He stated that staff recommended scheduling the work session during a regular meeting time and noted that the first available dates were April 13th at 4:30 p.m. or April 28th at 4:30 p.m., both of which would work with the Water and Sewerage Authority. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to set a Work Session with the Water and Sewerage Authority for Monday, April 13, 2026, at 4:30 p.m. All were in favor.

1, 2026 Contact Form - ACCG Interlocal Risk Management Agency (ACCG-IRMA) Property and Liability Program, and allow the Chair/Vice Chair to sign

County Administrator Gorton stated that the item was the updated 2026 ACCG contact form, which is an annual requirement. He stated that the form designates County official contacts and is tied to the property insurance discount the County receives. He stated that the proposed contacts included County Clerk Allyson Stephens for insurance and claims, himself as Safety Coordinator, and Human Resources Director Valerie Chambers as HR liaison. He stated that staff recommended approval of the designations and authorization for the Chairman to sign the form. He noted that the Chairman would need to execute the document. A motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to approve the 2026 Contact Form for ACCG Interlocal Risk Management Agency (ACCG-IRMA) Property and Liability Program, and allow the Chairman to sign. All were in favor,

12. Surplus Vehicles — Various Departments

County Administrator Gorton stated that staff were requesting approval to declare certain items as surplus and to authorize their disposal in accordance with County procedures. He stated that the items would likely be listed on GovDeals and that staff would coordinate with them to finalize the County’s account in order to place the vehicles out for bid. He noted that the County had previously handled the process in-house, but that GovDeals was easier and less complicated.

Commissioner Worsley asked if any of the vehicles were operable. County Administrator Gorton stated that none of the items were currently in service with any department and confirmed that the vehicles were not operational. He stated that they were currently parked ina fenced area across from the old fuel farm in Greenville. A motion was made by Vice Chairman Snelson to declare the listed items as surplus property and authorize staff to dispose of such property in accordance with County policy and list on GovDeals. The motion was seconded by Commissioner Threadgill. All were in favor.

13. Discussion of Property Taxes

Commissioner Threadgill stated that he had asked for this to be brought up after attending a meeting where he spoke with an individual he believed to be knowledgeable, who made a recommendation regarding tax payments. He stated that currently, taxes are due before Christmas each year and that this can create hardship for some individuals. He stated that the suggestion was to allow taxes to be paid biannually, possibly with payments in June and December, splitting the amount 50% and 50%. He stated that the County has an aging population and that the current system can be a burden on some residents. He stated that he believed the idea of splitting payments into two installments sounded reasonable. He also

mentioned another idea that had been discussed, which was allowing individuals to pay taxes based on their birth month, but stated that the 50/50 split seemed more practical. Commissioner Threadgill stated that he was unsure how the change would affect the County financially, but did not believe it would have a significant impact. County Administrator Gorton stated that he could speak on the matter based on prior experience in a municipality that utilized a split payment system. He stated that the city he previously worked for used a prior year and current fiscal year structure, which created more of a burden for budgeting purposes. He stated that if the County revised its ordinance to allow for a split payment structure, it would not have a financial impact on the budget. He stated that the County would still be able to budget the correct amount and that the change would primarily affect the timing of collections. County Administrator Gorton stated that he believed the option should be considered for the citizens, noting that allowing a 50% and 50% payment structure would give residents more time to prepare and pay their taxes.

He stated that it could potentially result in more timely payments and that staff could research the ordinance, consult with legal, and coordinate with the Tax Commissioner to determine the process for splitting payments on billing notices. He noted that the change would increase mailing and postage costs, but stated that those costs would be minimal. Commissioner Threadgill and Commissioner Worsley both felt it was a good idea. Commissioner Threadgill stated that he would like to bring this back at the April 13, 2026, Regular Meeting.

14. Lake Meriwether Baseball Field

County Administrator Gorton stated that at the previous meeting, he had presented what he believed would be an estimate for the Lake Meriwether baseball field for the 14U program, which was originaily estimated at $15,000 to $20,000 to be funded through recreation funds at United Bank. He stated that he had since received two quotes and was expecting a third contractor to come on-site the following day. He reported that the current low quote was $26,850 and the high quote was $34,449, noting that the scope of work included fencing for the entire perimeter, dugouts, entrances, and related work. He stated that, depending on the third quote and considering the previous estimate of $20,000, he would recommend a not-to-exceed amount of $30,000 from the recreation account. He stated that the account currently had a balance of approximately $57,457, indicating that sufficient funds were available. County Administrator Gorton stated that the lowest quote of $26,850 was from a contractor who had come on site, taken measurements, and reviewed the project in detail, while another quote had been based on submitted drawings. He stated that he would be meeting with a third contractor the following morning and would attempt to obtain a quote as quickly as possible due to the | need to complete the field. He stated that Public Works had completed significant preparation | work on the site, including clearing, landscaping, and preparing the infield for baseball, and that fencing was the remaining component needed to complete the field. He stated that the project would be funded through recreation-generated revenue, including sponsorships, recreation fees, and concession sales, and would not place a burden on taxpayers. During the discussion, the previously approved estimate of up to $20,000 was referenced, and the updated costs were considered. A motion was made by Vice Chairman Snelson to approve the project at a cost not to exceed $28,000, to be paid from the Recreation Department account. This was seconded by Commissioner Worsley. All were in favor.

XIV. REPORT FROM ACCG LEGISLATIVE COORDINATOR

Vice Chairman Snelson provided a legislative update to the Board, stating that the General Assembly had passed crossover day and was nearing the end of the legislative session. She discussed House Bill 283, stating that it would delay the implementation deadline for digital license readers used by law enforcement agencies from July 1, 2027, to July 1, 2032, due to associated costs and implementation challenges. She discussed House Bill 320, stating that it would require solar panels and related facilities to be recycled rather than disposed of in landfills, and that such materials must be transported to a recycling facility within 250 miles.

Vice Chairman Snelson discussed House Bill 946, stating that it would authorize the use of drones for tracking and hunting feral hogs. She noted that the bill had passed the House and was under consideration in the Senate, and that the intent was to expand hunting and trapping regulations to better control the feral hog population. She discussed House Bill 983, stating that it would clarify exemptions related to local burn notices and prescribed burning. She stated that the bill would define conditions under which prescribed burning for forest management purposes would be allowed, including land preparation, hazard reduction, wildlife habitat improvement, and timber management, while still requiring permits. She discussed Senate Bill 384, stating that it would allow motor vehicle owners to renew registrations in five-year increments by paying the equivalent of five years of fees upfront. She discussed Senate Bill 569, stating that it would designate tow trucks as emergency vehicles, requiring motorists to move over for them when stopped on roadways. She discussed Senate Bill 594, stating that it would establish digital identity fraud as a felony offense, including impersonation on social media platforms, with penalties including imprisonment ranging from one to twenty years and fines ranging from $1,000 to $500,000. She also discussed House Bill 483, stating that it would enhance penalties for crimes against code enforcement officers by increasing penalties for assault or battery against them while performing their duties. Vice Chairman Snelson concluded her report and thanked the Board.

XV. REPORT FROM COUNTY ADMINISTRATOR

County Administrator Gorton reported that he had attended Certified Public Official training in Tifton, Georgia, which focused on property appraisal and taxation. He stated that the training was informative, particularly regarding the millage rate process, and noted that it was the same training program attended by commissioners. He stated that he looked forward to completing additional courses in the training module. County Administrator Gorton reported that a department head meeting had been held and that interviews for the Deputy County Administrator and Recreation Director positions were ongoing. He stated that several new candidates had applied and that interviews would be scheduled, including candidates from within Georgia and nearby areas. He stated that staff had visited the Covered Bridge area and restored one of the cameras that had been offline due to an issue with a solar panel. He stated that cameras were now operational at Lake Meriwether, including at the pavilion and the cabin collection box. County Administrator Gorton stated that Mark III was continuing renewal discussions and had submitted a proposal, which was currently under negotiation. He stated that the item would be brought back to the Board in April for consideration, with the goal of beginning enrollment in early May. He stated that progress continued on the ball field project, noting that Public Works had completed significant work clearing the site and preparing the infield. He expressed appreciation to Public Works Director Griffith and his staff for their efforts and stated that the field would be completed soon with the

addition of fencing. County Administrator Gorton concluded his report.

XVI. REPORT FROM COUNTY COMMISSIONERS

Vice Chairman Jennifer Snelson: Vice Chairman Snelson expressed appreciation to the citizens for their participation, noting that there had been several additional meetings and that citizens had attended and provided their input. She stated that she appreciated all input, whether in support of or opposition to items, and thanked those in attendance for their involvement and for making the process important.

Commissioner Gene King: Commissioner King expressed appreciation to Public Works, stating they were doing a great job and noting that the County was receiving more positive calls than complaints regarding road conditions. He stated that this showed progress was being made on county roads. He also reminded the Board that the Cotton Fair in Gay would be held the first weekend in May, noting that it typically brings approximately 30,000 to 35,000 people into the community. Commissioner King encouraged everyone to continue working together and stated that the Board and staff were working well together and making progress.

Commissioner Bryan Threadgill: Commissioner Threadgill expressed appreciation for the public’s attendance, stating that it was encouraging to see citizens present and engaged, noting that in the past meetings were sometimes held with little to no audience. He thanked those in attendance for their involvement.

Commissioner Adam Worsley: Commissioner Worsley stated that it was nice to see the room full and noted that it was encouraging to see citizens interested in what was going on in the County, not just during public hearings. He expressed appreciation to the staff for their work, stating that there was a lot of good work taking place and that employees were working hard. He noted that, as previously mentioned, the County was receiving positive feedback from citizens regarding the work being done. Commissioner Worsley expressed his appreciation.

Chairman Emmett Collins: Chairman Collins expressed appreciation to the staff, workforce, and employees for their efforts and thanked the citizens for attending the meeting. He stated that the Board was there to serve the public and encouraged citizens to reach out if needed, noting that the Board relies on communication from the community. Chairman Collins expressed his thanks and concluded his comments,

XVII. REPORT FROM COUNTY ATTORNEY

County Attorney Michael Hill had nothing to report, but there was a need for Executive Session for all Litigation, Personnel, Real Estate and Tax Matters.

XVIH. FUTURE MEETINGS & NOTICES

Chairman Collins announced the Future Meetings.

XIX. EXECUTIVE SESSION

A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to go into Executive Session for Litigation, Personnel, Real Estate, and Tax Matters by Commissioner Worsley at 7:22 p.m. All were in favor.

A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to come out of the Executive Session at 7:49 p.m. All were in favor.

A motion was made by Commissioner Threadgill and seconded by Commissioner King to go back into the Regular Session at 7:51 p.m. All were in favor.

There was no action taken in the Executive Session.

XX. ADJOURNMENT

A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to Adjourn the Meeting at 7:51 p.m. All were in favor.

Approved by:

Attest:

Date: