Ciudad: Social Circle

Social Circle Mayor and Council: sesión de trabajo, 4 de junio de 2026

6:30 PM · 6 páginas

Estas son las actas tal como las publicó Social Circle Mayor and Council, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Social Circle Mayor and Council.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.

Council took no formal votes on utility bond updates, contracts, and sign and watershed rules, but set most items for June 16 and directed zoning amendments forward.

At this work session, the council heard a utility bond project update from a consulting engineer, who said the project list is about $2.4 million over the available bond money and described options for trimming it. Staff then previewed several items for the June 16, 2026 regular meeting: a bid award to Pro Construction of Georgia LLC for the public works maintenance facility (lowest bid $4,792,803), an engineering agreement with Kimley Horn (not to exceed $50,000) for gas main work tied to a state bridge project, an engineering agreement with Precision Planning ($197,050) for a water tank and pressure zone, a $77,600 change order for the Lakewood Drive water main, a speed ordinance correction for Alcova Drive, and the appointment of a new chief municipal court judge. On two zoning text amendments, council gave direction: sign rules go to Planning and Zoning, and the watershed impervious surface change goes to the Planning Commission with 25% per parcel and variances allowed. No formal votes on these items were taken; the council voted to enter and leave a closed session.

Temas tratados: utility bond project updates; public works maintenance facility bid; Kimley Horn SR 138 bridge agreement; Precision Planning north water tank; Lakewood Drive culvert change order; sign text amendment to UDC; watershed overlay impervious surface ratio; Alcova Drive speed limit correction; chief municipal court judge appointment; school buildings and walk-in coolers.

Puntos del orden del día (15)

Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.

  1. I. CALL TO ORDER
  2. IV. AGENDA ITEMS
  3. 1. Utility Bond Project UpdatesUna presentación
  4. 2. Bid Award: to Pro Construction of Georgia LLC, the Lowest Responsive Bidder for the Public Works Maintenance Facility
  5. 3. Approval of Engineering Services Agreement with Kimley Horn for an Amount Not to Exceed $50,000 for the GDOT SR 138 at Alcovy River Bridge Project
  6. 4. Approval of Engineering Services Agreement with Precision Planning for the Tower Road Water Tank and North Pressure Zone Project in the Amount of $197,050.
  7. 5. Approval of Change Order in the Amount of $77,600 with AM Construction for the Lakewood Drive Water Main Project
  8. 6. Text Amendment to the UDC Concerning Definitions and Types of Signs Within the City Limits.
  9. 7. Text Amendment to the UDC Concerning Impervious Surface Ratio with the Watershed Protection Overlay District
  10. 8. Correction to the City Speed Ordinance to Address a Scrivener Error Concerning Alcova Drive
  11. 9. Appointment of Chief Judge of the Social Circle Municipal Court and Approval of 2-Year Contract
  12. V. EXECUTIVE SESSION
  13. V. EXECUTIVE SESSION
  14. 1. Motion to go into Executive Session for Personnel, Real Estate and Litigation.Una moción
  15. 2. Motion to come out of Executive Session and return to Regular Session.Una moción
  16. VI. COMMENTS AFTER EXECUTIVE SESSION
  17. VII. ADJOURNUna moción

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Las actas

Tal como se publicó en socialcirclecityga.iqm2.com, leído el 13 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.

CITY OF SOCIAL CIRCLE

JUNE 4, 2026

6:30 PM City Community Room 138 East Hightower Trail Mayor and Council Work Session Minutes Persons with hearing or speech disabilities who need to contact the City of Social Circle may place their call through The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).

WORK SESSION 6:30 PM

I. CALL TO ORDER

Attendee Name Organization Title Status Arrived David Keener City of Social Circle Mayor Present Traysa Cody Price City of Social Circle Mayor Pro tempore (1) Present Tyson Jackson City of Social Circle Council Member (2) Present Adam Conavay City of Social Circle Council Member (3) Present Steve Shelton City of Social Circle Council Member (4) Present Eric Taylor City of Social Circle City Manager Present Susan Roper City of Social Circle City Clerk Present Tony Powell City of Social Circle City Attorney Absent Jay Crowley City of Social Circle City Attorney Present

II. PLEDGE OF ALLEGIANCE

III. INVOCATION

IV. AGENDA ITEMS

1. Utility Bond Project Updates

City Manager Taylor introduced Kenny Green from Turnipseed Engineering to go over where we are with our Utility Bond Projects. We've gone through the project list. As you know, some things we've added, on some projects we have some real numbers. So Kenny's here to kind of go over kind of where we are, what we're recommending and what we're focusing on now with that money.

Kenny Green, Turnipseed Engineers stated that a big colorful spreadsheet has been created that you can refer to, and this is kind of normal on multi project bonds, is you have to continually go through and reevaluate. Do you have your priorities right? Because the money will run out and you have to re-prioritize. So what you see in front of you is a list, and it says bond projects. There are a couple that are not bond projects. If you look in that far right, the second to the last column, that is the bond money that's allocated for each project. All these other columns are different funding sources, so there's CDBG, GEFA, some water and sewer funds, nothing in there for CRC funds, but if you add all those up, you're going to come up with right at $62 million. That is right about the amount you have in bond money to spend, you've got $61 point something, so it's close. And then after we made this list, we realized that Oak Drive needed to be added in there, and that's another $1.4 million, so that puts us over the amount you have in bonds by about 2.4 million.. There are two ways to handle that. You're putting out projects one after the other, and you can wait and see how those projects come in and cut the last priority, or you can go ahead and, and when we say cut, it doesn't mean the jobs, the projects won't be done, it's just they move below the bond list, so we'd have to look for future funding. If great things happen to Social Circle and you get a lot of more money in, you can move them back up. It's just a matter of you only have so much money to spend.

If you wanted to go ahead and get this to match the bond money, there are two projects that you could potentially do that with. If you look down the third from the bottom is gas 26 gas system

The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).

improvements. That's not a real project, that is money that was allocated when we did the bond issue, because we needed some gas involvement, because the way the bonds were structured, it wasn't water and sewer, it was sold as a combined utility, so that you could loop in the gas department and all that, so we put an imaginary project in there, a fund for $1.2 million in miscellaneous, so we could drop that out, so if we're at 2.4 or you can leave it in the other. The only other thing you could reduce is most of the other ones are just these miscellaneous water projects, and you could direct that engineer to, find 1.2 million in savings, or you can just go with what you have, which is $63.4 and you've got $61.1 in bond money that's eligible to spend. If you notice the third column from the right says bond interest, so I use that to allow us to have some money for the public works that Eric was talking about earlier, the bids that Robbie presented, we've got to cut a million out of those, we have those and we need to make sure they're acceptable to use. So it's not just paving, we had to delete two buildings in order to do that, so but then in order to get some money for the Public Works Administration, which really should be about a $6 million project to do the size building you want to do, is we just kind of reduce that to three and a half million, which means probably what we'll have to do is have some of the building unfinished, go with some gravel instead of some paving, do some paving later. There's some other changes that we've got, but in order to pay for that, I factored in two and a half million dollars in interest from the bond, so that $60 some million dollars in bonds you've had in the bank, it's drawn interest at a rate of about $200,000 a month, and you've got about 2 million accumulated, so 200,000 times 12, another year you get about 300 or you've got more than two and a half million available. So that's where I factor that in.

Now, the projects that were on the list that are no longer on the list are the main one is the complete redo of the water treatment plant, but since we didn't want to go without doing some things that are important to the city, you know, we want to continue to address the red water, brown water, and you've made great improvements in that, but we did add in, if you notice, in the blue.... (Kenny explained the color coding on the spreadsheet, green is sewer, blue is water, and yellow is gas.) So, you look in the blue, the first project there is water plant intake. So, you've had a lot of problems with the intake, that's the cost of replacing that. In the second one, we broke out part of the $8 million for the water plant improvements, and said, Well, let's do the parts that we get the most bang for the buck, which is the chemical and mixing upgrades, and we pulled out 2 million and put that in there, and then there were a couple of water projects that we were going to spend some of the bond money on, like galvanized line replacement. We took that out because you've already got a program to replace a little bit of that every year. And we had the bonds funding a couple of miscellaneous water lines, and I can change the whole list if you'd like, but these are the ones that rose to the top.

After much discussion and questions Mayor and Council thanked Mr. Green for his report.

RESULT: COMPLETED

2. Bid Award: to Pro Construction of Georgia LLC, the Lowest Responsive Bidder for the Public Works Maintenance Facility

Robbie Groves, Public Works Director reported that the city recently advertised bids for the new public works maintenance facility. The bids were opened on April 23 2026. We received a total of 12 bids. The highest bid came in at 5,782,000. The lowest bid, which was Pro Construction, came in at $4,792,803. The city's consulting engineer reviewed the bids and determined that Pro Construction of Georgia LLC submitted the lowest responsive bid and responsible bid. The firm has demonstrated adequate experience, technical expertise, and financial capability necessary to successfully complete the project. Staff and the project engineers recommend that Mayor and Council award the construction content contract for the Public Work Maintenance Facility staff further requests the authorization to work with the engineer and the contractor to identify value engineering opportunities and cost-saving measures that may help reduce overall project costs while maintaining the project's intended scope and quality,

City Manager Taylor stated to sum this up, when we went out to bond, remember the intention at the time we went out to bond was to have the public works facility combined with the sewer plant, and we did put in about $6 million into the project funds to allow for the replacement of the public

The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).

works yard. Okay, which is what this is for. What we're looking to do, as you guys know, we have since pivoted and that has increased the cost since we're not even putting up also an administration building on the same site. This bid is not for this. We're still working through that. So, what we're looking to do on this is award the bid to the low bidder, and since we think there's some opportunities for further cost savings in there, some things like without committing to anything, but maybe you don't pave the whole lot, maybe you don't build out the areas that you don't need just yet, to give us the opportunity to kind of spread this money a little bit further. So we'll still be going with the low bidder, but we'll also be looking to work with them to look for cost savings to lower the cost.

RESULT: SCHEDULED FOR Next: 6/16/2026 6:30 PM

3. Approval of Engineering Services Agreement with Kimley Horn for an Amount Not to Exceed $50,000 for the GDOT SR 138 at Alcovy River Bridge Project

Robbie Groves, Public Works Director reported that the Georgia Department of Transportation is advancing plans for the relocation and replacement of the Highway 138 bridge in Monroe. Reviews indicate that the project may impact portions of the city's gas main, so because of this we had to get an engineer, and basically, if we don't relocate our gas main, it will be 30 feet deep. Then we would never be able to dig next to it, because it will be too close to the bridge footers. So we have Kimley Horn actively working with G Dot on it, and this is basically an agreement of services not to exceed $50,000 and they're working with them to try to see how much gdot is going to pay for the relocation of our gas main. Hopefully we only have to pay 10% which, because they're the ones forcing us to move it. Staff requests that Mayor and Council approve the engineering service agreement with Kimley Horn and Associates, and authorize the City Manager to execute the agreement for engineering assistance related to the project in the amount not to exceed $50,000.

RESULT: SCHEDULED FOR Next: 6/16/2026 6:30 PM

4. Approval of Engineering Services Agreement with Precision Planning for the Tower Road Water Tank and North Pressure Zone Project in the Amount of $197,050.

Robbie Groves, Public Works Director reported that an engineering service agreement for the North Tank and pressure zone improvements at the North Water Tank is needed. The City is evaluating, continues to evaluate and improve its water distribution system to ensure reliable service and adequate water pressure for existing and future customers.. This will address efficiency in the north portion of the service area, improve overall system operations. The City has received a proposal from Precision Planning to provide engineering services for the North Tank Pressure Zone Improvement Area. This consists of construction of a 1 million gallon tank, North Cherokee construction of a new booster pump station to fill the new elevated tank at a higher elevation, installation of three pressure reducing valves and installation of five terminal valves to isolate north and south pressure zones. These improvements will establish a dedicated north pressure zone, increase water service pressure, and improve system reliability to customers located along North Cherokee and surrounding areas, particularly north of Oak Drive, where higher elevations have created pressure challenges. Precision Planning has submitted a proposal to provide engineering service design services for the project in the amount of $197,050. Funding for these services will be provided through the bond project. Staff recommends that the Mayor and Council approve the engineering services agreement with Precision Planning for the North Tank pressure zone improvements in the amount of $197,050 and authorized the City Manager to execute all necessary contract documents.

RESULT: SCHEDULED FOR Next: 6/16/2026 6:30 PM

5. Approval of Change Order in the Amount of $77,600 with AM Construction for the Lakewood Drive Water Main Project

The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).

Robbie Groves, Public Works Director reported that this item is for the approval of change order number two for Lakewood Drive water main replacement project, the 48 inch culvert replacement.

The Lakewood Drive water main project is currently under construction, and during all this, with the city was down there reestablishing some ditches and stuff, and they realized that the culvert is in very bad shape. The work for this will include precast concrete head walls at both ends of the culvert, number 57 stone bedding and a concrete trench cap to provide durable and stable installation. The total cost of this change order is $77,600. The proposed amount includes removal of trees necessary to complete the installation. However, if the tree removal is not determined to be necessary, the change order amount will be reduced by $10,200 resulting in a revised cost of $67,400. The replacement of the culvert will address existing erosion issues and improve storm water conveyance through the project area, helping to prevent city infrastructure investment and reduce the potential of future maintenance concerns. Staff recommends that Mayor and Council approve Change Order Number Two with AM Construction Inc. for the Lakewood Drive Water Main Replacement Project in the amount of $77,600 and authorize the City Manager to execute all necessary documents related to this change order.

RESULT: SCHEDULED FOR Next: 6/16/2026 6:30 PM

6. Text Amendment to the UDC Concerning Definitions and Types of Signs Within the City Limits.

Ashley Davis, Community Development Director presented a proposed text amendment to the UDC regarding signage based on recent sign permit applications, as well as inquiries about what types of signs are permitted in the different zoning designations. Staff has identified some areas within the sign ordinance that may need to be amended to provide more clarity and to better assist those wishing to submit sign permit applications. Mainly the definition between a ground and monument sign, that's kind of ambiguous, and the primary section of the UDC that staff is proposing to be amended is section 10.1.5 which regulates the types of signages or the types of signage that's permitted within each zoning designation. Certain types of signage, such as ground signs and monument signs, will be better defined, and in terms of what distinguishes them from each other, so that there is more clarity when determining dimensional requirements and other zoning regulations when applicants are preparing to submit an application for their proposed signage. Additionally, other proposed amendments include distinguishing election signage as its own category from standard informational signage. The types of signage that may be allowed without needing to obtain a permit, and distance requirements for the public from the public right of way. So this is just shoring up some inconsistencies throughout the ordinance. Such as banner signage in commercial districts, making it 16 square feet instead of 12 square feet, that's the only one that's required to be 12 square feet, allowing banner signs under 16 square feet as permitted without a permit for certain property uses. Distinguishing election signs as their own category as well, and staff recommends amending this section to provide more clarity with the current types of signage, while also better distinguishing the different types that are permitted within the city limits, but we wanted to check with you guys before taking this amendment. This will go before Planning and Zoning, and then come back before Mayor and Council. . We wanted to make sure that this is the direction that we want to move before we begin the process.

RESULT: COMPLETED

7. Text Amendment to the UDC Concerning Impervious Surface Ratio with the Watershed Protection Overlay District

Ashley Davis, Community Development Director stated that this amendment is specific to the watershed protection overlay. So, the issue we have, we're trying to amend some ambiguous language referencing the amount of impervious surface allowed within the Watershed Protection Overlay District within the city limits. So there have been several properties within the industrial area of the City that wish to expand their footprint or increase their impervious surface. These properties have also fallen under the Watershed Protection Overlay, or the WPO, which limits the

The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).

impervious surface ratio allowed to 25%. However, based on legal interpretation of the way the current code is written, the ISR could be applied district wide, so 25% of that section of the City, rather than 25% per parcel. Staff is proposing to make the 25% ISR per parcel because it's easier to regulate, and it would keep any one property owner from limiting another property owner's right to develop. So, we just need to establish what the intent of that section is, so staff can move forward with clarifying this section of the UDC, and the way the current code is written. It also prevents any variance from being granted, except for very limited few in relation to stream buffers and setbacks, and water impoundment buffers and setbacks. Staff recommends amending this section of the UDC to provide more clarity on the impervious surface ratio allowed, and also we're seeking direction if Council would like to allow variances from this section of the code. After much discussion Mayor and Council agreed to move the amendment process to the Planning Commission with 25% per parcel and allowing for variances.

RESULT: SCHEDULED FOR Next: 6/23/2026 6:00 PM

8. Correction to the City Speed Ordinance to Address a Scrivener Error Concerning Alcova Drive

Chief Guest reported that this ordinance amendment will correct Line 9 (Alcova Drive) contains an incorrect speed limit. The correct speed limit is 25MPH. The State permit is currently listed at 25MPH and is correct. The typo was made on the city ordinance renewal packet. The State is not requiring us to resubmit, only that the city ordinance is corrected locally.

RESULT: SCHEDULED FOR Next: 6/16/2026 6:30 PM

9. Appointment of Chief Judge of the Social Circle Municipal Court and Approval of 2-Year Contract

Susan Roper, City Clerk reported that Judge Ballard has officially sent notice of resignation for July 31, 2026. Judge Ballard has recommended Alternate Judge Samuel Barth as Chief Judge and staff recommends the same. Mayor and Council agreed to have the matter on the agenda at the regular meeting for consideration.

RESULT: SCHEDULED FOR Next: 6/16/2026 6:30 PM

V. EXECUTIVE SESSION

An Executive Session may be called:

• To discuss pending and/or potential litigation, settlement claims, administrative proceedings or other judicial actions, which is exempt from the Open Meetings Act pursuant to O.C.G.A. Section 50-14- 2(1).

• To authorize negotiations to purchase, dispose of, or lease property; authorize the ordering of an appraisal related to the acquisition or disposal of real estate; enter into a contract to purchase, dispose of, or lease property subject to the acquisition or disposal of real estate; enter into a contract to purchase, dispose of, or lease property subject to approval in a subsequent public vote; or enter into an option to purchase, dispose of, or lease real estate subject to approval in subsequent public vote, which is excluded from the Open Meetings Act pursuant to Section 50-14-3(b)(1)(C).

• Upon the appointment, employment, compensation, hiring, disciplinary action or dismissal, or periodic evaluation or rating of a public officer or employee, which is excluded pursuant to O.C.G.A.

50-14-3(b)(2).

1. Motion to go into Executive Session for Personnel, Real Estate and Litigation.

Council Member Jackson made a motion, seconded by Mayor Pro tempore Price to go into executive session for Personnel, Real Estate and Litigation. Opportunity for discussion. All were in favor.

The Georgia Relay Center at (800) 255-0056 (Text Telephone) or (800) 255-0135 (Voice Telephone).

RESULT: ADOPTED [UNANIMOUS]

MOVER: Tyson Jackson, Council Member (2) SECONDER: Traysa Cody Price, Mayor Pro tempore (1) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Conavay, Council Member (4) Shelton

EXCUSED: Mayor Keener

2. Motion to come out of Executive Session and return to Regular Session.

Council Member Shelton made a motion, seconded by Council Member Jackson to come out of Executive Session and return to regular session. Opportunity for discussion. All were in favor.

RESULT: ADOPTED [UNANIMOUS]

MOVER: Steve Shelton, Council Member (4) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Conavay, Council Member (4) Shelton

EXCUSED: Mayor Keener

VI. COMMENTS AFTER EXECUTIVE SESSION

City Manager Taylor reported that we have taken possession of both schools. Both have big walk in coolers which we can't turn off. He suggests leasing space in the coolers to the restaurants in town that might need the space.

Council Member Jackson asked about playing basketball in the Gym.

VII. ADJOURN

1. Motion to adjourn at 7:51 PM.

Council Member Shelton made a motion, seconded by Council Member Jackson to adjourn at 7:51 PM. Opportunity for discussion. All were in favor.

RESULT: ADOPTED [UNANIMOUS]

MOVER: Steve Shelton, Council Member (4) SECONDER: Tyson Jackson, Council Member (2) AYES: Mayor Pro tempore (1) Price, Council Member (2) Jackson, Council Member (3) Conavay, Council Member (4) Shelton

EXCUSED: Mayor Keener

Legible por máquinas https://georgiacommons.org/meetings/2026-06-04/social-circle-mayor-and-council-work-session.md · https://georgiacommons.org/meetings/local/index.md · MCP https://mcp.georgiacommons.org/mcp