Ir al contenido
Georgia Commons
Menú

Condado: Bartow County

Bartow County Commissioner: reunión, 1 de julio de 2026

6 páginas

Estas son las actas tal como las publicó Bartow County Commissioner, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Bartow County Commissioner.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.

Sole commissioner approved the 96-lot Euharlee Road rezoning, a 40-unit Grassdale Road townhome rezoning, and an event center permit.

At this public meeting the sole commissioner approved a rezoning of 55.05 acres at 264 Euharlee Road from A-1 to R-1 for a 96-lot subdivision, with five conditions offered by the applicant, after hearing from the applicant, a supporting neighbor and an opposing neighbor. He also approved a 40-unit townhome rezoning at 17 Grassdale Road with an 8-foot privacy fence condition, a conditional use permit for an event center with cottages at 424 Barnsley Gardens Road, and county code text amendments except section 16.1.5, which he will revisit at the next meeting. Routine items included alcohol licenses, four board reappointments, grant applications and acceptance, a Kingston tax services agreement, a Verizon cell tower lease buyout, surplus property sales and a hazard mitigation plan update.

Temas tratados: rezoning of 264 Euharlee Road; rezoning of 17 Grassdale Road; event center at 424 Barnsley Gardens Road; zoning code text amendments; alcohol licenses; board reappointments; CHINS grant application; Kingston property tax agreement; firefighter tanker truck grant; surplus county property; hazard mitigation plan update.

Decisiones que constan en las actas (14)

Después de cada decisión va la oración de las actas que la registra, copiada palabra por palabra, en inglés.

  1. Rezoning of 55.05 acres at 264 Euharlee Road from A-1 to R-1 for a 96-lot subdivision, with five conditions

    Aprobado

    Las actas: “Commissioner Taylor approved the application with the conditions as presented.”

    Leer este punto en las actas

  2. Rezoning of 4.19 acres at 17 Grassdale Road from A-1 to R-3 for a 40-unit townhome development, with privacy fence condition

    Aprobado

    Las actas: “Commissioner Taylor approved the application with the condition that an 8-foot privacy fence be installed on the east property line of the development.”

    Leer este punto en las actas

  3. Conditional use permit for an event center with cottages on 62 acres at 424 Barnsley Gardens Road

    Aprobado

    Las actas: “Commissioner Taylor approved the application as presented.”

    Leer este punto en las actas

  4. County Code Appendix A text amendments (PUD standards, public notice, home occupations, solid waste facilities), except section 16.1.5

    Aprobado

    Las actas: “After a brief discussion with the Zoning Administrator, Commissioner Taylor approved the text amendment with the exception of section 16.1.5 of the amendment.”

    Leer este punto en las actas

  5. Intergovernmental agreement with the City of Kingston for ad valorem property tax services

    Aprobado

    Las actas: “Commissioner Taylor approved and authorized an Intergovernmental Agreement with the City of Kingston to provide ad valorem property tax services for the City.”

    Leer este punto en las actas

  6. Joint resolution supporting the Comprehensive Safety Action Plan and a Commitment to Zero Policy on roadway fatalities

    Aprobado

    Las actas: “A Joint Resolution with the participating municipalities supporting the Comprehensive Safety Action Plan and Establishing a Commitment to Zero Policy to reduce roadway fatalities and serious injuries throughout Bartow County was approved and executed as presented.”

    Leer este punto en las actas

  7. Grant application for $100,000 CHINS Program funding for Bartow County Advocates for Children

    Aprobado

    Las actas: “Commissioner Taylor authorized the Grant Writing Department to make an application to the Georgia Criminal Justice Coordination Council (CJCC) FY2027 Children in Need of Services (CHINS) Program to receive a $100,000 grant to allow the Bartow County Advocates for Children, Inc. to implement certain programs and strategies to address and prevent at-risk youth from entering into the Juvenile Justice System.”

    Leer este punto en las actas

  8. Acceptance of $141,301.00 2027 Transit Trust Fund Grant

    Aprobado

    Las actas: “Commissioner Taylor accepted a 2027 Transit Trust Fund Grant in the amount of $141,301.00 on behalf of the County to further support County Transit Services.”

    Leer este punto en las actas

  9. Federal grant application for up to $2 million for a new tanker truck through the Assistance to Firefighters program

    Aprobado

    Las actas: “Commissioner Taylor also authorized a grant application to be submitted to the Federal Emergency Management Agency to receive up to $2 million in grant funding from the 2025 Assistance to Firefighters (AFG) Grant Program.”

    Leer este punto en las actas

  10. Verizon cell tower lease buyout agreement

    Aprobado

    Las actas: “A Verizon Cell Tower Lease Buyout Agreement was approved and executed as presented.”

    Leer este punto en las actas

  11. Countywide FEMA Emergency Management Services Hazard Mitigation Plan Update

    Aprobado

    Las actas: “The Countywide FEMA Emergency Management Services Hazard Mitigation Plan Update was approved as presented.”

    Leer este punto en las actas

  12. Surplus county property from the Sheriff's Office and Solid Waste to be sold on GovDeals or disposed of

    Aprobado

    Las actas: “The following items were deemed Surplus County Property and were authorized to be sold on GovDeals Internet Auction Service or otherwise disposed of in accordance with the law:”

    Leer este punto en las actas

  13. Four change of management alcohol licenses for Barnsley Resort and a special event license for a Summer Festival

    Aprobado

    Las actas: “Four Change of Management licenses for Barnsley Resort were approved as presented.”

    Leer este punto en las actas

  14. Reappointments to the Development Authority, Family & Children Services Board, Library Board and Zoning Appeals/Variance Board

    Aprobado

    Las actas: “Ms. Jessica Weaver was re-appointed to serve on the Bartow County Development Authority.”

    Leer este punto en las actas

Puntos del orden del día (4)

Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.

  1. MINUTES
  2. MINUTES
  3. APPOINTMENTSAprobado
  4. ZONING APPLICATIONSUna votación

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Las actas

Tal como se publicó en www.bartowcountyga.gov, leído el 25 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.

MINUTES

PUBLIC MEETING

BARTOW COUNTY COMMISSIONER

June 3, 2026 - 10:00 a.m.

MINUTES

• Commissioner Taylor opened the Public Meeting with the approval of the May 13th Public Meeting minutes as written.

ALCOHOL LICENSES

• Four Change of Management licenses for Barnsley Resort were approved as presented.

• Special Event License # AL26-00004 for a Summer Festival; License Holder, Estatal Charro Georgia was also approved as presented.

APPOINTMENTS

• Ms. Jessica Weaver was re-appointed to serve on the Bartow County Development Authority.

• Ms. Kim Lewis was re-appointed to serve another term on the Dept. of Family & Children Services Board.

• Ms. Kate Clayton was re-appointed to serve another term on the Library Board.

• Mr. Tharis Word was re-appointed to serve on the Zoning Appeals/Variance Board.

COURTS

• Commissioner Taylor authorized the Grant Writing Department to make an application to the Georgia Criminal Justice Coordination Council (CJCC) FY2027 Children in Need of Services (CHINS) Program to receive a $100,000 grant to allow the Bartow County Advocates for Children, Inc. to implement certain programs and strategies to address and prevent at-risk youth from entering into the Juvenile Justice System.

ENGINEERING - MPO – ROADS

• A Joint Resolution with the participating municipalities supporting the Comprehensive Safety Action Plan and Establishing a Commitment to Zero Policy to reduce roadway fatalities and serious injuries throughout Bartow County was approved and executed as presented.

FINANCE

• Commissioner Taylor approved and authorized an Intergovernmental Agreement with the City of Kingston to provide ad valorem property tax services for the City.

PROPERTY

• A Verizon Cell Tower Lease Buyout Agreement was approved and executed as presented.

• The following items were deemed Surplus County Property and were authorized to be sold on GovDeals Internet Auction Service or otherwise disposed of in accordance with the law:

o Misc. items and equipment from the Sheriff’s Office o Landfill Compactor from Solid Waste

PUBLIC SERVICES

• Commissioner Taylor accepted a 2027 Transit Trust Fund Grant in the amount of $141,301.00 on behalf of the County to further support County Transit Services.

• Commissioner Taylor also authorized a grant application to be submitted to the Federal Emergency Management Agency to receive up to $2 million in grant funding from the 2025 Assistance to Firefighters (AFG) Grant Program. If awarded, the funds will be used to purchase a new tanker truck in order to better respond to areas where water is not readily available. Grant acceptance will require a 10% local match.

• The Countywide FEMA Emergency Management Services Hazard Mitigation Plan Update was approved as presented.

ZONING APPLICATIONS

• The following Zoning Applications were presented by the Bartow County Community Development Office for Commissioner Taylor’s ruling:

o RZ-26-00006; an application by The Revive Land Group requesting to rezone 55.05 acres located at 264 Euharlee Road from A-1 to R-1 for a 96-lot subdivision. This application was first presented to Commissioner Taylor on April 1st as an R-8 request to develop 131 single family homes. The Planning Commission denied the original application. But after hearing from the applicant and concerned residents, the Commissioner sent the application back to the Planning Commission to review the revisions proposed by the applicant. The Planning Commission voted and approved the revised plan with a 3-2 vote. The applicant has submitted several self-imposed conditions to the development. These conditions include the following:

1. Prior to approval of a final plat, the developer is to enter into private development agreements with the Westgate Subdivision property owners that abut the site’s western property line to install stormwater measures on their lots, not to exceed $20,000 in total.

2. The developer shall remove the dead pine trees along the western border of the site, abutting the Westgate Subdivision.

3. The developer shall install bat boxes along the site’s property line that abuts lots 13- 18 of the Westgate Subdivision.

4. The developer shall install at least two enhanced erosion control measures as outlined in the Georgia State Stormwater Manual.

5. The developer shall install a left-hand turn lane and a right turn deceleration lane into the development.

The first speaker was the applicant, Mr. Neville Allison, 3500 Lenox Road, Atlanta. Mr.

Allison presented Commissioner Taylor with the following revisions to the application:

“The original site plan proposal was for an R-8 development with 131 single family homes.

We heard from a very crowded room of neighbors that in spite of the proposed zoning being in line with developments surrounding the property, the R-8 was just too intense at this point for Euharlee Road. There’s a lot of existing traffic on Euharlee Road. Bartow County has experienced a lot of growth. We went back to the drawing board and looked closer at the surrounding subdivisions. The subdivision most affected would be the Westgate Subdivision.

We’ve had three separate voluntary meetings with that neighborhood, including meeting with the entire group, walking behind some of the homes looking at existing erosion control issues that subdivision is experiencing and presenting the revised conservation proposal. We are not under the illusion that we can please everyone, but a testament to the changes we’ve made are that not only has the opposition to the development shrunk, and several of the neighbors now support the development. He presented PowerPoint slides of the proposed revisions. The Westgate Subdivision is zoned R-1. That’s the density being proposed. Ladd’s and River Landing is zoned PUD, which is 2.5 units per acre. Our new proposal is for R-1 with 96 lots at

1.74 units per acre. That’s approximately 40% less than the subdivisions to the east of this development. All properties on the north side of Euharlee Road within three miles are zoned

R-1 or higher. R-1 is what our request is. You would have to go three miles to the west to find property on the north side of Euharlee Road with frontage that is zoned A-1 Agriculture. If approved, this will be the lowest density subdivision development on Euharlee Road in 30 years. A majority of the concerns heard from those that attended the Planning Commission meeting was concerns about overall growth in the County. They want to slow down the growth.

We have 50% open space on the site. The original plan had lots with a 20-foot buffer on the north side of Westgate. Now we are proposing to increase that by having this conservation area of 600 ft. on the north side. R-1 Conservation Plans are achieved by doing a density plan under the existing R-1 category. We did that and came up with 98 lots that will fit in an R-1 Conservation Plan. That allows you to drop the lot size down, keeping the density the same and conserving 50% of the land as open space. (He presented a summary of the revisions.) We had a 30% reduction in the number of lots and an increase in our lot width to 60-foot-wide lots, which allowed us to increase our product width from 30 feet to 40 feet, providing a larger home and more attractive streetscape. Our original plan had approximately 26 homes backing up to the Westgate Subdivision. Our revised plan now has 10 homes backing up to Westgate Subdivision, a 62% reduction in the number of homes that touch our neighbor. The zoning conditions previously presented were not imposed on the developers by the staff. The developer/applicant presented these as self-imposed conditions that are above and beyond the County’s code to not only have a subdivision that fits within the conservation plan but also to have a positive impact on the neighbors. The first condition: There were some significant erosion control issues in the Westgate Subdivision, due to the way Westgate was developed.

This issue is not coming from our site, nor will it be coming from this site once the site is developed. We don’t want to turn our backs on our neighbors and having their support is important to us. So we came up with the solution that “we can’t fix your erosion control with our development, but what we can do is, if you give us permission to come on your site, we can identify the most critical intrusion points and stormwater measures that need to be implemented and put that on your property.” The second condition: There’s existing pine trees along the property line that would be a buffer that we’re not grading in, but we want to get in there and remove the dead pine trees that are there since some of them are falling onto the Westgate properties and they are unsightly as well. The third condition: There was concerns about natural habitats that our subdivision would be removing from the woods. Maintaining 50% of the site as open/natural space accomplishes that, but we’re going to go ahead and take the advice we heard and install bat boxes along the Westgate property line. The fourth condition: They do not have any erosion control issues on the property but as a good measure, we’re going to go ahead and install enhanced erosion control measures just to make sure we’re not contributing to additional runoff. The fifth condition: The other major issue we continued to hear was regarding the traffic on Euharlee Road. A lot of that has to do, not necessarily with development, but with the railroad tracks. We’re going to install a left-hand turn lane so that when folks are coming home and want to turn into our subdivision, they can move out of the traffic lane and allow traffic to continue moving. Same with our right-hand turn lane; traffic can move out of the traffic lane and into the deceleration lane. Regarding the growth that Bartow County has experienced. The County has done an amazing job with economic growth.

You’ve added about 7,000 jobs in the last five years and that’s resulted in about 10,000 new folks moving into the area. But during that time, you’ve only added about 3,000 new homes.

That shows that your population of job growth is vastly exceeding your new home growth. This causes an increase in home prices. When you don’t have enough supply, it becomes more expensive. This is evidenced by the average home prices over the last five years, which has gone from about $260,000 to $390,000; a 42% increase. This is more than in the Atlanta area, which is tracking about 36%. As for the development itself, we’ve added 40-foot elevation and super attractive architecture which allows us to mix up the streetscape so it still looks cohesive but not monotonous. Speaker No. 2: Karl Lutjens; reserved his time to answer questions at the end. Speaker No. 3: Ms. Mila Conley, 15 Willowbrook Court, in the Westgate Subdivision. She

spoke in favor of this development. “I was not for the R-8 density, but after listening to what they said and how they listened to all our concerns and made all these changes. They went above and beyond to accommodate everything we said. They changed the zoning and are keeping all the nature with the open spaces. This works in everybody’s favor and accommodates progress. Speaker No. 4: Mr. Terry Ayer, 34 Westgate Drive [Westgate Subdivision]. His property backs up to the proposed subdivision. He commented that “there would probably be a lot more people here if the Commissioner had his meeting not at 10:00 because a lot of people are working. Also, the Committee meetings were supposed to have seven people there, but they only had five. The first time this came up, they voted it down. The developer went and hurried up and changed it all and the next thing you know, it’s got a whole different thing, and you send them back and there’s still only five people there. The first time, they voted it down and it made it to you but then they changed their whole plan. So, I’m in opposition. There’s a lot of people frustrated because they think it would be a lot better if you would have your meeting after 6:00 like the Committee meeting so everybody could attend.

And you have said you would listen to the people so I thought this might be something you could do. Also, you put on a moratorium on Euharlee Road and said no more building. I think that moratorium should have been a year and not six months for them to study that road. In April they had an accident down there and it backed up and they couldn’t get the ambulance or anything in and they had to flight that person out to the hospital. So, it needs to have another lane. They’re going to start building and you already said no building. I think the road needs to come first. We went over all the things of nature and flood control. It’s also in the flight pattern of Cartersville airplanes taking off. If somebody crashes, it’s going to land right there. The development will probably come, and I don’t hold the guy for having to sell the property. I still think that road needs to be there. I can sit on that road forever while the cars go by. We have buses going through there. We talked about police. You’re going to have to get more police.

You’re going to have to do schools, which you’ve already talked about the schools taking the people. Realistically, this is a small subdivision. Down the street you got another one. And they say the schools are big enough for that one too. You add them all up, that’s a lot more people.

More fire…the fire department came in our subdivision one time and they had like 11 fire trucks in there. If they had a fire up there, we can’t get out. That subdivision’s going to be 2/3 bigger than ours. And they only have one way out too. I know that road needs to be fixed. If you put round-a-bouts on that road and somebody has an accident, you’re not going to get no people out. You’d rather have a light than a roundabout. And they’re going to build a new city food down there. The road just needs to be worked on. I think the infrastructure should always be first in any kind of these things before you start building. I know it’s revenue for the city and road’s not revenue. It costs the city to fix the road. Also, we got drainage that the city does not work on ditches along Euharlee, so all the water comes down and goes in that one guys backyard. They built a culvert across so it would go into the lake, but they built the culvert too high, so the water just puddles in that last neighborhood. I think moving [the meeting] so more people can come. You’ve already said that you listen to the people and I give you credit for that. I pray God shows you the right way to go.”

County Administrator Peter Olson addressed the group stating that part of what we’ve already identified as a need on that road is a turn lane and that’s already in the works, to add a middle lane. And there is a roundabout going in at Stiles. I know you don’t think they’re safer, but data shows they’re a lot safer than red lights. So those are two traffic improvements we’re already addressing. Roundabouts are designed to slow the traffic.

Mr. Allison mentioned that they have a letter from the school system stating that the three schools are under capacity for the development. As for the time of the meeting, that actually cuts both ways. We actually had other neighbors in Westgate that spoke in favor at the Planning Commission hearing that weren’t able to make it today. Commissioner Taylor responded to comments made, stating that “the County reaches out to the school system before any residential application ever comes before the Planning Commission or the Commissioner. If

the schools weigh in negatively on that project, it carries more weight than anything else. The school population in Bartow County is just now getting back to the 2013 population numbers.

So, the schools are not overcrowded. I know there’s 2-3 schools that are filling up faster than others. Both parties have spoken. I appreciate the work that the developer and the landowners have done on this. Fifty percent of the land is going to be conservation. I can’t think of anywhere else that has happened. The developer has cut his density way back to close to the same density that your neighborhood has.” Commissioner Taylor approved the application with the conditions as presented.

o RZ-26-00010; an application of the Bartow County Zoning Staff requesting text amendments to the County Code, Appendix A. The text amendments include PUD standards, public notice requirements, home occupations for people that try to operate certain businesses from their home that might be a nuisance to neighbors. There are also some amendments to the application requirements, requiring project meetings with the engineering department for certain projects.

The amendments also include revisions to the solid waste handling facility requirements. The Planning Commission recommended approval with a 5-0 vote. However, Attorney Leslie Simmons commented on the proposed text amendments, specifically related to the conditional use section (Item X, Section 16.1.5). Ms. Simmons stated that the wording is a bit confusing.

She presented a rezoning application that will be presented to the Commissioner later in this meeting as an example. She feels this is a kneejerk reaction to one causal incident without the effects of other conditional use properties. This will increase the number of applications getting filed. Currently the zoning office only accepts five applications a month and we’re getting bumped when there’s more than five applications getting filed. The other uses could be adequately addressed by engineering. She doesn’t see why it would have to go back before the Planning Commission. The application she will be presenting today is for an event center and two cottages. They revised the plan because she doesn’t want to build those cottages today. She doesn’t think that if the applicant wishes to build two cottages or five cottages on 60 acres, she should have to bring the application back before the Planning Commission. The initial application was for two cottages. The revised application has zero cottages. With these text amendments, they resubmitted the site plan to include five cottages. She doesn’t think everyone needs to come back every time they want to add a patio to the plan. She thinks it could be misinterpreted. After a brief discussion with the Zoning Administrator, Commissioner Taylor approved the text amendment with the exception of section 16.1.5 of the amendment. He will consider revisions to this section at the next meeting.

o RZ-26-00016; an application by J&A Construction & Homebuilders, LLC requesting to rezone

4.19 acres located at 17 Grassdale Road from A-1 to R-3 in order to construct a 40-unit townhome development. The Planning Commission recommended approval with a 3-2 vote.

Speaking on behalf of the applicant, Attorney Harry White, 100 West Cherokee Avenue, Cartersville stated that “this is a request to rezone a 4.2-acre tract on Grassdale Road to construct approximately 40 townhomes. These would be double garaged, 3-4 bedrooms and less than $300,000 purchase price. Pricing of houses is an issue. The reason we don’t see more housing and more home ownership is because they are so high and not affordable. Chris Daniel does a good job. He does quality work and this will be an asset to this area. Grassdale Road has been improved and has access to Highway 41 and 293. Speaker No. 2: Jim McFarland, 43 Cotton Bend, Cartersville. His property is directly behind this property. He is actually neutral to the rezoning. Ronald (property owner) honored and took care of his mother all these years and didn’t attempt to sell it until after she had passed. He thanked J & A Construction and Chris Daniels for their careful and thoughtful site plan and listening to their concerns. His concern is the traffic around the intersection of Grassdale Road and Cassville Road. There’s a couple hundred houses already being built in a 1-mile radius and you average two cars per housing unit. That’s about 400 more cars on the road from Goodyear to the intersection of Grassdale Road and Cassville Road. He hopes the County will consider the traffic situation in this area.

He wants to make sure that the total number of units stays at 40. “Mr. White stated approximately. This is quite subjective. Also, the site plan shows a 25’ buffer between our property line and the curving toward the mail kiosk.” He wants to confirm that they will not be able to do any work in that buffer zone. Commissioner Taylor stated that sometimes they have to run utilities, etc. in the buffer zones. Mr. McFarland also stated that his property line is only about 10’ from his sunroom. Mr. Daniels has stated that they will install a privacy fence along the property line, and he hopes they will do that. Commissioner Taylor stated that will be part of the conditions imposed if the development is approved. Commissioner Taylor approved the application with the condition that an 8-foot privacy fence be installed on the east property line of the development.

o RZ-26-00018; a Conditional Use Permit application by Asbury Grove Farms, LLC requesting to utilize 62 acres located at 424 Barnsley Gardens Road for an event center with small cottages.

The Planning Commission recommended approval with a 5-0 vote. Representing the applicant, Attorney Leslie Simmons provided the following information and the latest site plan that included five cottages. The applicant doesn’t know when she will build the cottages. The event center itself will be the initial project. She plans to build a groom’s suite, a bridal suite and wedding party cottages later. This will not be an air b-n-b situation. It would only be limited to overnight use for the wedding event. She currently does not live on the property but plans to build a house on the property later as her residence. Commissioner Taylor approved the application as presented.

There was no further business to address. The meeting adjourned at 10:50 a.m.

Signature on File Kathy Gill, County Clerk

APPROVED:

Signature on File Steve Taylor, Sole Commissioner July 1, 2026 Date