Ir al contenido
Georgia Commons
Menú

Condado: Chatham County

Chatham County Board of Commissioners: reunión ordinaria, 14 de agosto de 2026

9:30 AM · 47 páginas

Estas son las actas tal como las publicó Chatham County Board of Commissioners, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Chatham County Board of Commissioners.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.

Commissioners rezoned 8804 Whitefield Avenue, approved budget amendments and a broad Action Calendar, and kept a $1.1 million public safety facility change order tabled.

The commission opened with a proclamation for NICU Awareness Month and a Live Oak Public Library presentation on the design of the replacement Oglethorpe Library, with a grand opening expected around mid-2028. A change order of $1,137,873 for the Multi-Agency Public Safety Facility stayed on the table until staff provide more reports. The board appointed a member to the library board, approved a set of budget amendments and transfers, and approved the Action Calendar in one vote, covering minutes, claims, grant agreements, an amended agreement with the City of Savannah for the Early Childhood Learning Center, a surplus right-of-way quitclaim, and bid awards. It also rezoned 8804 Whitefield Avenue to a planned development for nonconforming uses with an environmental overlay. A closed session on personnel, litigation, and land acquisition followed.

Temas tratados: NICU Awareness Month proclamation; replacement Oglethorpe Library design; Live Oak Public Library board appointment; budget amendments and transfers; Multi-Agency Public Safety Facility change order; Early Childhood Learning Center agreement; rezoning of 8804 Whitefield Avenue; Action Calendar and bid awards; Little Neck Road right-of-way quitclaim; executive session.

Decisiones que constan en las actas (6)

Después de cada decisión va la oración de las actas que la registra, copiada palabra por palabra, en inglés.

  1. Rezoning of 8804 Whitefield Avenue to planned development for nonconforming uses (PDN) with environmental overlay

    Aprobadounanimous

    Las actas: “c. Commissioner Noha moved the Board for approval of the rezoning of 8804 Whitefield Avenue to PDN/EO.”

    Leer este punto en las actas

  2. Budget amendments and transfers across the General, Opioid Settlement, Special Service District, and Capital Improvement funds

    Aprobadounanimous

    Las actas: “Commissioner Buford seconded the motion and it carried unanimously. [NOTE:”
  3. Action Calendar: July 31 minutes, claims of $11,065,454, grant MOUs, UGA Extension MOU, Early Childhood Learning Center agreement, solar MOU, quitclaim, and bid awards

    Aprobadounanimous

    Las actas: “Commissioner Hussey moved the Board for approval of the Action Calendar, Items 1 through 8 and under Item 8, Items A through N.”

    Leer este punto en las actas

  4. Appointment of Brittany Salley to the Live Oak Public Library Board

    Aprobadounanimous

    Las actas: “Commissioner Noha moved for Board approval of the appointment of Brittany Salley to the Live Oak Public Library Board.”

    Leer este punto en las actas

  5. Change Order No. 1 of $1,137,873 to the Multi-Agency Public Safety Facility construction contract with Reeves Young *Technique Joint Venture

    Aplazado

    Las actas: “Chairman Ellis said, the item that’s Tabled, will remain on the table, all right, until the staff gets back with us with the reports that we need from them.”

    Leer este punto en las actas

  6. Authorization for the Chairman to sign an affidavit that the executive session complied with the Open Meetings Act

    Aprobadounanimous

    Las actas: “Commissioner Noha moved the Board for approval to authorize the Chairman to execute an Affidavit that the Executive Session was held in compliance with the Open Meetings Act.”

    Leer este punto en las actas

Puntos del orden del día (21)

Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.

  1. 1. CALL TO ORDER
  2. 2. INSPIRATION AND INVOCATION
  3. 3. PLEDGE OF ALLEGIANCE
  4. 4. ROLL CALL
  5. 5. PROCLAMATIONS AND SPECIAL PRESENTATIONSUna presentación
  6. 6. CHAIRMAN’S ITEMS
  7. 7. COMMISSIONER'S ITEMS
  8. 8. TABLED/RECONSIDERED ITEMSAplazado
  9. 9. ITEMS FOR INDIVIDUAL ACTIONUna votación
  10. 10. ACTION CALENDARUna votación
  11. 10. ACTION CALENDAR
  12. A. Summary Change
  13. B. Deductive Summary
  14. C. Annual software
  15. D. One (1) year contract
  16. E. Purchase to remove
  17. F. Renewal of annual
  18. G. Renewal of annual
  19. H. Annual contracts with
  20. 11. FIRST READINGS
  21. 12. SECOND READINGSUna votación
  22. 13. INFORMATION ITEMSAprobado

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Las actas

Tal como se publicó en chathamcountyga.iqm2.com, leído el 25 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.

MINUTES OF THE REGULAR MEETING OF THE BOARD OF COMMISSIONERS OF

CHATHAM COUNTY, GEORGIA, HELD ON FRIDAY, AUGUST 14, 2026, IN THE

COMMISSION MEETING ROOM ON THE SECOND FLOOR OF THE CHATHAM

COUNTY COURTHOUSE, LEGISLATIVE AND ADMINISTRATIVE BUILDING, 124

BULL STREET, SAVANNAH, GEORGIA.

1. CALL TO ORDER

Chairman Chester Ellis had the meeting called to order at 9:37 a.m. on Friday, August 14, 2026.

Chairman Ellis said, thank you, You may be seated at this time. While you’re – while you’re being seated, let me ask you to check your electronic devices, including the Commissioners, so that it don’t go off, all right? Today, I got – I got double power. I got the high sheriff, and I got the – the chief deputy, who here, along with the major and the rest of them. So – and y’all know, if your telephone go out to Coleman’s Bed and Breakfast, it’s going to be trouble getting it out from there, all right? It just – you just can’t walk and pick it up. They don’t play that, all right? So, I’m – I – I don’t want you to lose your electronic devices. So, please, ma’am, please, sir, check them. Make sure that they don’t go off because silence is commanded during these proceedings, okay?

============

2. INSPIRATION AND INVOCATION

Chairman Ellis said, today we have a young man that – coming to us to bring us our inspiration; our invocation. One that I have watched grow up, all right? His – his uncle and I were the best of friends when we were high school mates graduating together, and I stayed in Woodville more than I stayed in west Savannah, running around there where they grew up at, and – and –

Chairman Ellis said, Pastor Ed – Anthony Edwards come to us, he’s the pastor of – the senior pastor of the Beulah Baptist Church located on Anderson Street right at the railroad track, after you pass East Broad, all right? He comes to us having been married for quite a time, and – and – and – and they have blessed with a daughter and – and – and he’s a man I know that knows the Gospel, preach the Gospel, and believe in the salvation that the Lord Jesus Christ has given us. So, with that, Pastor Edwards, I’m going to ask you to come to the mike. The mike is yours, and when you get through with your inspiration, you get ready for your invocation, if you will ask us, then we will – let us know, so that we could stand with you as you pray, and then after then we will be led by – the Pledge by Commissioner Noha, all right? The – that mike is yours.

Pastor Anthony Lee Edwards of Beulah Baptist Church said, good morning, everyone.

Chairman Ellis said, good morning.

Members of the Commission and Members of the Audience collectively said, good morning.

Pastor Edwards said, greetings in the matchless name of our Lord, Jesus Christ. I’m honored to be invited here to share words of inspiration; to encourage you as County Commissioners as you start this session today to govern the business of our county. As you gather today to govern, I want to remind you of three important things. First of all, I want to remind you to govern because it’s your great responsibility. There’s an authority higher than you and that authority is God. So, please, as you come together today to govern, number one, govern because it’s your responsibility.

Pastor Edwards said, secondly, I would like to remind you to govern and govern righteously. We are to do the right thing because it’s simply the right thing to do. ‘Cause at the end of the day, we all will have to give an account to God when this life is over. I ask that you govern because it’s your responsibility. I ask that you govern righteously. But last but not least I ask that you govern reasonably. Govern fairly, without partiality, knowing that the constituents of the county is dependent upon your decisions. With that being said, I ask that we stand as we pray this morning.

Pastor Edwards said, let us pray.

Pastor Edwards gave the following invocation:

Father, as we have gathered in this secluded place this morning, first of all, Father, we gather to say thank You. Thank You for another opportunity to be able to acknowledge you, knowing that life comes from You and You alone. God, we thank You for the freedom that You’ve given us to be able to gather to have – handle the business of the county. Oh, Lord, we acknowledge your presence and Your power.

We are asking that You pour out Your wisdom upon this Chairman and all of these Commissioners.

We’re asking for knowledge; wisdom, that the County of Chatham could be better as they gather to deal with the business of the county. Lord, thank You once again for this opportunity to acknowledge You, for we believe in Proverbs Chapter 3, verse 5 and 6, acknowledge the Lord, trust in Him. Acknowledge Him in all thy ways, and I believe without a doubt, you will direct our path. Have Your way today. These and all blessings we ask in the matchless name of Jesus Christ we pray. Amen.

Members of the Board and Audience collectively said, Amen.

============

3. PLEDGE OF ALLEGIANCE

Chairman Ellis said, Commissioner Noha.

Commissioner Noha led in the Pledge of Allegiance to Flag of the United States of America.

Chairman Ellis said, thank you; you may be seated.

============

WORDS OF APPRECIATION

Chairman Ellis said, and to Pastor Edwards, we thank you for taking time out of your busy schedule to come be with us. We can’t pay you, but we appreciate your coming and sharing your words with us, and – and instructing us in how the Lord has led you. Continued blessing and keeping, all right, in all your endeavors, and thank you so much for being here.

Pastor Edwards said, thank you, sir.

Chairman Ellis said, all right.

============

4. ROLL CALL

Chairman Ellis said, roll call.

The Clerk called the roll.

Present: Chester A. Ellis, Chairman Malinda Scott Hodge, District Two, Vice Chair Dean Kicklighter, District Seven, Chairman Pro Tem Anthony “Wayne” Noha, District One Bobby Lockett, District Three Brian M. Hussey, District Four Tanya Milton, District Five Aaron Whitely, District Six Marsha Buford, District Eight Also Present: Michael A. Kaigler, County Manager

R. Jonathan Hart, County Attorney Janice E. Bocook, County Clerk ============

5. PROCLAMATIONS AND SPECIAL PRESENTATIONS

1. PROCLAMATION DECLARING SEPTEMBER 2026 AS NICU AWARENESS MONTH

AND SATURDAY, SEPTEMBER 26, 2026, AS NICU WARRIOR RUN DAY. SIANA

BARNES, CHELSEY AND SHELDON BARNES WILL BE PRESENT TO ACCEPT.

Chairman Ellis said, all right. With that, let me call those who are here to represent the neonatal care – intensive care unit, as we do the proclamation. We ask you to come to the mike, and anybody you want to bring with you, now, you can bring them with you, all right?

Ms. Chelsey Barnes said, I’ll just bring them all.

Chairman Ellis said, yeah, because – all right. I’m going to read a portion of this, all right, and – and – and then I’ll turn the mike over to you, all right?

Ms. Barnes said, yes, sir.

Chairman Ellis said, we’ll let everybody get up here.

Ms. Barnes said, yes, sir.

Chairman Ellis said, let me congratulate you, first. I’m going to start with that, all right?

Ms. Barnes said, thank you, sir.

Chairman Ellis said, and I’m going to tell you why I’m congratulating you, you got the Sheriff to come to our meeting.

(Laughter).

Chairman Ellis read a portion of the following proclamation:

WHEREAS, every year thousands of infants are born prematurely or require specialized medical care in a Neonatal Intensive Care Unit (NICU), and these children demonstrate extraordinary strength and resilience from the very beginning of life; and

WHEREAS, the journey of a NICU family is often filled with uncertainty, hope, courage, and unwavering love, while the dedicated physicians, nurses, respiratory therapists, and healthcare professionals who care for these infants provide life-saving treatment and compassionate support; and

WHEREAS, increasing awareness of prematurity and NICU experiences encourages education, strengthens community support, and helps ensure that families have access to resources, encouragement, and support throughout and beyond their child’s NICU journey; and

WHEREAS, the Coastal Georgia NICU Warrior Run is a community event created to celebrate NICU graduates, honor babies whose journeys continue, remember babies gone too soon, support NICU families, raise awareness and supports local NICU initiatives throughout the Coastal Georgia community;

WHEREAS, Chatham County is proud and honored to recognize the courage of NICU warriors, the strength of their families, and the healthcare professionals whose dedication and compassion change lives every day.

NOW, THEREFORE, I, Chester A. Ellis, Chairman, on behalf of the Chatham County Board of Commissioners, do hereby proclaim September 2026 as:

NICU AWARENESS MONTH

and Saturday, September 26 as:

NICU WARRIOR RUN DAY

in Chatham County and encourage all residents to recognize the strength and resilience of NICU warriors, honor the families and healthcare professionals who support them, and participate in efforts that promote awareness, education, compassion, and hope throughout our community.

IN WITNESS WHEREOF, I have hereunto set my hand and caused the Seal of Chatham County, Georgia to be affixed this the 14th day of August 2026.

______________________________ Chester A. Ellis, Chairman Chatham County Commission

ATTEST:

______________________________ Gail F. Gordon, Executive Assistant to the Chairman Chairman Ellis said, and, now, let me just share a personal story with you.

Ms. Barnes said, yes, sir.

Chairman Ellis said, my older two grands are twins, a girl and a boy, and they had to go from birth to neonatal care, all right, and intensive care, that unit, so I know what you all do in there. They were small in size, even though you won’t recognize that now, ‘cause the boy is six-four (laughter). He wear a size fifteen shoe, all right? But to know where those humble beginnings that he came from and the work you all do, and – and – and – and the program that you all put on, all right, especially, now – I’m going to – I’m going to put up front, too, y’all got a warrior run day.

Ms. Barnes said, yes, sir.

Chairman Ellis said, I don’t run. I stopped running behind – behind the sheriff when he was in high school, and I canceled that.

Ms. Barnes said, yes, sir.

Chairman Ellis said, ‘cause they tore up my knee, all right? But, I do encourage the citizens of Chatham County to be a part and to know how important your efforts are –

Ms. Barnes said, yes, sir.

Chairman Ellis said, – all right? With that having been said, the mike is yours.

Ms. Barnes said, yes, sir. I want to say thank you so much to you, our distinguished guests, the Board of Commissioners. It’s like – we – we really appreciate you guys. Like, it – we don’t take it lightly. I think our biggest thing was five years ago Siana [Barnes] was a – a NIC-U baby.

Chairman Ellis said, mm-hmm.

Ms. Barnes said, and, so, she was in NIC-U. I was in I-C-U at Candler, and my husband was in I-C-U at Memorial.

Chairman Ellis said, wow.

Ms. Barnes said, and, so, our family put up a big fight, and to go through that, especially going through it yourself, every single thing matters, the breaths, the moments, like, to – you know, today, Siana is tumbling; she’s cheering; she’s – plays basketball; she’s running. Those are the things that we want the community to see, the fight that these tiniest warriors put behind. So, we started out as a Nik – a Nike run on the Nike run app with our family, and today it’s so much big – bigger. We’ve partnered with Endurance Race Services; we’ve partnered with St. Joseph’s/Candler; we’ve partnered with How to Run. We’ve partnered with so many different organizations, and we just want everybody to come out. It’s not about the run; it’s not about the walk; it’s about us providing a family so that we can lean on each other during these times.

Ms. Barnes said, and this proclamation isn’t for me; it’s not for my family; it’s not for our sheriff (laughter), ‘cause he’s in the building to support, and that means so much to us. This is what it’s all about, us all coming together. But it’s for every NIC-U baby out here. This proclamation is for them. And, so, we just – we want to just say thank you for you all taking the time to hear us; for you all taking the time to even put this proclamation together. It means the world to us. So, we would love to have everybody to support in any way, even if it’s just a prayer, a phone call, you hopping on our Facebook page and you encouraging other NIC-U families. They’re going through times where financially – they just need somebody to say, hey, it’s going to be okay. Look at the other side. Like, your storycan bless someone else.

So, we just want to say thank you, and it’s a honor to stand here before you all today.

Chairman Ellis said, mm. Thank you.

Ms. Barnes said, yes, sir.

Chairman Ellis said, Commissioners. Let – let – let us do this, let’s start on the end and move our way down. Yes, sir.

Commissioner Noha said, I just want to thank you for your efforts; for your work. My niece was a NIC-U baby for three months. She was born at a – one pound and didn’t think that she would ever come out, and she’s thriving; just got married. So, thank you.

Ms. Barnes said, that is such a blessing.

Commissioner Hodge said, yeah. Thank you for what you’re doing, bringing attention to something that is life-saving work. These are babies that years ago, they would not even have survived some of those conditions, so this is a – a worthy organization to support. Thank you so much for what you do.

Ms. Barnes said, thank you.

Commissioner Lockett said, thank you for your passion. I’ve had members of my family to experience that – those same thing, and it’s quite a struggle, but it was a good struggle, and the victory is yours. Thank you.

Ms. Barnes said, thank you.

Commissioner Hussey said, thank y’all for being here this morning. I, too, I have a twenty-year-old healthy son, who spent his first days –

Chairman Ellis said, mm-hmm. Take your time.

Commissioner Hussey said, sorry. I thank you. Y’all are heroes.

Ms. Barnes said, thank you.

Chairman Ellis said, all right.

Commissioner Milton said, and you – and you started it, so – yeah.

Chairman Ellis said, where my box at?

Commissioner Milton said, but, I, too, thank you -- Ms. Barnes said, yes, ma’am.

Commissioner Milton said, – for what you do. My god-daughter was – she was not even four pounds, but she stayed in the hospital for almost forty days, and, now, like the Chairman said, you wouldn’t know it now, because she’s seventeen years old and probably a hundred sixty pounds. So, what you do is really important for life – Ms. Barnes said, yes, ma’am.

Commissioner Milton said, – for many families. So, I – I support it.

Ms. Barnes said, thank you.

Commissioner Milton said, and I might run.

Ms. Barnes said, yeah. We’ll look for you.

Commissioner Whitely said, well, I won’t commit to running, but, no, on a serious tip, I mean, to hear all the stories, and I – I share a story. My son was a NIC-U baby, and I remember having to take my wife up there every day and stay in the car with the girls while she went to breast feed him, and – and, so, just what you said about words of encouragement, some words of affirmation to families who are going through this are – are power – are very powerful, and considering that it is – children being neonatal intensive care units is a very common thing, and it’s a scary, common thing, and, so, I just appreciate you guys bringing awareness to it. You know, sharing, you know, the – the experiences, as well, and I’m glad to see that your family have – all of you have made it out of the I-C-U -- Ms. Barnes said, yes, sir.

Commissioner Whitely said, – and are now chipping in to our society. So, thank you for what you do.

Commissioner Kicklighter said, thank you, and I’ve not, thank God, personally had to experience anything close to what y’all were describing and what – what my fellow Commissioners are describing, and, so, I can only just try to imagine

the hardships and everything, and I just want to say thank you for being awesome. It’s people like y’all that make – makes life a better place for everyone. So, thank y’all.

Ms. Barnes said, thank you.

Commissioner Buford said, good morning, and thank you – good morning, and thank you for being here this morning, and thank you for the work and the labor of love that you do. Such a labor, and words can never express all that you do. Had a lot of experiences with you and, the NIC unit, and like my colleagues, I get full thinking of how wonderful it is to see individuals come up out of the NIC unit, and then go on as if nothing ever happened. But, your love is just so awesome; the passion is awesome. But, thank you, again, for all you’re doing. Continue to work. No, I cannot run, but –

Commissioner Kicklighter said, y’all – y’all need to have a sit in. (Laughter).

Chairman Ellis said, or a roll in.

Commissioner Buford said, I cannot run.

Chairman Ellis said, a roll in for – Commissioner Buford said, let’s sit – let’s sit – let’s sit and talk about this and pray, okay?

Ms. Barnes said, yes, ma’am.

Commissioner Buford said, thank you.

Ms. Barnes said, thank you.

Chairman Ellis said, a – again, let me say, I can’t – I can’t thank you all enough for the job you do.

Ms. Barnes said, yes, sir.

Chairman Ellis said, and – and I think that one of the things that – one of the things that is fresh in my mind even though it’s twenty-three years ago –

Ms. Barnes said, yes, sir.

Chairman Ellis said, – all right, is that a young girl who was less than a – less than a pound, and the nurses feeding her, holding her in her hand. So, those nurses and those doctors in those – in – in – in the unit, too, are – are – they have so much compassion and so much care, you know, and – and I – like I said to one of them I know who – personally I know, Lisa, I said, Lisa, I saw you feeding Davita, and I was – I was praying the whole while, please don’t drop her. Please don’t drop her, but the way they – the way they take care of – of them, and then having to know that your family went through what you went through –

Ms. Barnes said, yes, sir.

Chairman Ellis said, – what you went through, we’re – we’re glad that you’re here, and that – we encourage all of Chatham County –

Ms. Barnes said, yes, sir.

Chairman Ellis said, – to come out and to be a part of Saturday, September the 26th – Ms. Barnes said, yes, sir.

Chairman Ellis said, – all right, so that we can get to know, because from those humble beginnings, all right, many things are – are done and many things are – are – are accomplished –

Ms. Barnes said, yes, sir.

Chairman Ellis said, – when we all work together, and when we all see our paths are not different from each other, it’s just that the journey is different. But, then, we all intersect and be on the same page. Again, we say thank you. Now, do the – is the photographer here? All right. Now, what we want you to do is pick up the proclamation there before you, and then make sure you – make sure your daughter’s out front, but turn around and face the clock, if all you will, and hold the proclamation up so that she can get the picture for our archives.

[NOTE: Photographs of the group were taken with their proclamation.]

Chairman Ellis said, got it? All right. With that, we thank you all – Ms. Barnes said, thank you.

Chairman Ellis said, and – and – and, Mr. Sheriff.

Chatham County Sheriff Richard Coleman said, yes, sir.

Chairman Ellis said, you want to take the mike and say hello?

Chatham County Sheriff Coleman said, absolutely.

Chairman Ellis said, as our constitutional officer. Yeah, I got you in the building now. Yes.

Chatham County Sheriff Coleman said, good morning.

Chairman Ellis said, good morning.

Chatham County Sheriff Coleman said, good morning, Mr. Chairman, fellow Commissioners, Mr. Kaigler, our County Manager, Mr. Hart, greetings to each and every one of you. Let me just start by saying, I can’t think of any other place I would rather be right now (laughter) –

Commissioner Lockett said, (inaudible).

Chatham County Sheriff Coleman said, yeah, then my Commission Board. It’s always a pleasure to come before you and greet you. I am the Sheriff of Chatham County. I am here to help; to serve you; and to in – and the needs of this city – of our citizens. Commissioner Chair just said it best, you know, we all have different paths, but the journey’s the same. It’s the same, and – and – and we work collectively to – to have a better place for Chatham County, you know.

That’s what it’s all about, the citizens of this county and our ability to serve them and make life better for them. So, as always, I’m your Sheriff, I’m happy to serve you. If you need me or my office, we are here for you. I have a motto, and I say it everywhere I go, that no one person can do these things by themselves, but it’s together, and together we can.

Thank you, Mr. Commissioner. God bless you all.

Chairman Ellis said, and, so, thank you for being here with us today. And, now, the Sheriff’s Department is in partner with – with them as well?

Chatham County Sheriff Coleman said, yes, sir. Yes, sir.

Chairman Ellis said, that’s – okay. All right. I just want to – Chatham County Sheriff Coleman said, so I – Chairman Ellis said, – sure, ‘cause I know – I know in our blueprint, and when we did the budget – Chatham County Sheriff Coleman said, yes.

Chairman Ellis said, – I know we were included in it. So, thank you for working, and – and – he’s one of our constitutional officers, and I don’t see – I don’t – I don’t see another. We thank – we thank you, all right?

Chatham County Sheriff Coleman said, thank you, Mr. Chairman.

Chairman Ellis said, we thank – we thank our partner from – from – from one of our municipalities who’s always here to see. We thank you for being here again this morning, all right? With that, we are – thank you, sir.

Chatham County Sheriff Coleman said, thank you.

Chairman Ellis said, appreciate it.

Commissioner Kicklighter said, thank you, Sheriff.

Chairman Ellis said, all right.

============

2. LIVE OAK LIBRARY UPDATE BY EXECUTIVE DIRECTOR LOLA DEWITT.

Chairman Ellis said, getting ready to move on. Let’s – let’s call the Director of the Library, all right? Thank you all.

Ms. Barnes said, thank you.

Chairman Ellis said, and continued blessings for what you’re doing and how you’re doing it.

Mr. Barnes said, thank you.

Live Oak Public Library Executive Director Lola DeWitt said, good morning.

Chairman Ellis said, good morning.

Members of the Board and Members of the Audience collectively said, good morning.

Ms. DeWitt said, so, today, we’re going to share the concept design for the replacement Oglethorpe Library. So – Chairman Ellis said, oh.

Ms. DeWitt said, Patrick – Chairman Ellis said, okay.

Ms. DeWitt said, – Shay from G-M Shay is here with me. But, before I do that, I have like a little library commercial.

So, August 31st , we are going to expand library hours across the system. This is based on the feedback that we received from our strategic plan. That was the number one thing that people wanted, more library hours. That also is in align with one of our values, is access. So, we’re going to provide that starting August 31st . Another thing I wanted

to let you know, is this afternoon, the Carnegie Library Heritage Center is going to be celebrating it’s one hundred and twelfth anniversary. There is going to be some programming and events surrounding that, so if you have time to stop by, that’s from two to six, please stop by.

Ms. DeWitt said, and then, lastly, September is library card sign-up month. That is a national initiative across libraries across the country. We are celebrating that, one way by having porch parties. We did that last year. This year, there will be two in Chatham County; one at the Bull Street Library on September 5

th , featuring the fabulous Equinox band, and on September 12th at the Southwest Chatham Library featuring the J.D. Music Group, which will be an R and B concert. So, there will be food trucks and a great party. So, we hope that you’ll come out. If you do not have a library card, we encourage you to sign up for a library card and all of your friends and family to sign up for one. So, comm

– commercial’s over. I’m going to turn it over to Mr. Shay.

Mr. Patrick Shay, Principal at Gunn Meyerhoff Shay said, good morning, Commissioners.

Chairman Ellis said, good morning.

Members of the Board collectively said, good morning.

Mr. Shay said, I think there may be some slides.

Ms. DeWitt said, yes.

Chairman Ellis said, you want – Mr. Shay said, but what I want to do is tell you that we’re – we’re underway. We’re – we – my team is actually in the process of doing the construction documents right now. We are going to get to market before the end of this year because we’re very afraid of price increases that are going on right now due to a lot of uncertainty in construction markets and so forth. We’re on target. We feel like we’re on budget. We’ve been very frugal and very careful, as – as we – as we go along. But, we’ll skip to the pretty pictures, ‘cause they’re more fun to look at then it is to listen to me.

Chairman Ellis said, do we – do we have those?

County Manager Michael Kaigler said, yes, we should have them.

Chairman Ellis said, all right.

Mr. Shay said, what do I have to do, Michael [Kaigler]?

Chairman Ellis said, let – let them – let them come out the back. Come on. There she go, all right? They should be able to pull them up.

Mr. Shay said, do you just like make that happen?

Chairman Ellis said, here he – here he comes.

Mr. Shay said, there we go. Smart people help me.

Chatham County Public Information Office Assistant Director Will Peebles said, do y’all have it on a disc or anything?

Chairman Ellis said, yeah. ‘Cause I don’t see it.

Mr. Shay said, I thought we sent it over. We sent it over, I thought. But I can also give it to you on a Zip drive.

Ms. DeWitt said, I have it on a flash drive, too.

Chatham County Public Information Office Assistant Director Peebles said, yeah. Show me the flash drive.

Chairman Ellis said, he’s got a – he’s got a jump drive.

Mr. Michael Sommers said, he has one right here.

Chatham County Public Information Office Assistant Director Peebles said, oh, there you go.

Mr. Shay said, there you go.

Chatham County Public Information Office Assistant Director Peebles said, it ain’t hard.

Mr. Shay said, so, the site for the library is actually near the corner of Eisenhower on Waters Avenue. You all had the foresight to buy a big tract of land over there that was once part of a – a strip shopping center. Some of those buildings have since been demolished. There we go. So, one of the things that Lola [DeWitt] and her team, including Michael Sommers, who’s been a great director, asked us to make sure that as people drove by on Eisenhower Drive, because it is set back from the edge of the road – it’s kind of across the – Eisenhower Drive from the – the county’s complex where the --

Chairman Ellis said, mm-hmm.

Mr. Shay said, – tag office is and – and so forth there – that we do something that was highly visible and very approachable and attractive. So, we’ve kind of designed something that as people drive by, especially at night, but in the daytime as well, they’re going to look over there, they’re going to say, oooh, what is that? Oooh, maybe that’s that new library we’ve heard about. So, it – it’s going to be some place that people feel is very inviting. Here’s another view. It’s a little more zoomed in. One of the things that’s going to be very unique about this building, is that it’s not going to be built with structural steel or structural concrete, it’s going to be done with mass timber. And mass timber is a – a – a – an old technology that’s become much more mainstream right now where lumber is taken, and it’s glued and laminated up together.

Mr. Shay said, so, the beams and the columns and the slabs are all going to be out of Georgia wood that’s been – been laminated, and it’s actually inherently fireproof. If you have a question about that, I can tell you. But the idea is that when you approach this building, whether you look from the outside or from the inside, it’s going to be all about wood, and to the maximum extent possible, it’s going to be about wood that’s harvested in Georgia. We know we have a lot of – of people that are in the timber and lumber business right now that are struggling because of the changes with the closure of the paper plants. And, so, this is going to provide some help for them. But it’s a relatively new technology.

Mr. Shay said, now, not far from here over on Oglethorpe Square, there’s a hotel that’s all – just about finished, and it was built entirely out of mass timber, this same system, and from the time that it went from just a slab to where it was completely under roof, only took six and a half weeks for that whole process, and it was erected by four people. So, rather than having concrete trucks come in the middle of the night and wake everybody up in the neighborhood, this system was all pre-cut in a factory and assembled like a kid of parts. It’s not three-D printed, but it’s the closest thing to it. So – and it is very, very attractive. We all know, you’re surrounded by beautiful wood paneling that makes everything look better.

Mr. Shay said, there’s the main entrance. Oh, yeah, fair enough, Michael (Sommers) reminds me, we were also able to win a twenty-five-thousand-dollar grant from the Georgia Forestry Foundation specifically for this project by using this mass timber, and they’re going to be featuring it all over the country, really. As a matter of fact, I’ll be giving a – a tour to a congressional delegation here in another couple of weeks, and I – I’ve shown it to a – a – a – a – a Wall Street Journal reporter as well. Those – it’s going to be a – a – something that’s a real statement. This is the main entrance. Another great feature in this project is there’s a central courtyard. If – if you all have been out to the Chatham County Health Department headquarters, named after Dr. Faye, there’s a central courtyard that’s in that, and people use that to circulate around, and it brings daylight into the center of the building. We decided to use something very similar on this particular project. There you can see from the roof.

Mr. Shay said, thanks to you and – and a program that you’re undertaking, we worked with Jackie Jackson and – and

– and with your solar provider, Cherry Street, so there will be a relatively large amount of solar on the roof, and that’s going to be something that is going to be similar that you’re instituting all across the county. It’s going to help the – the library with their electric bills, and – and make this a – a – a wonderfully sustainable place deep into the future.

Mr. Shay said, you can also see on this that in addition to that central courtyard that’s in the middle, we also have some other courtyards that are going to be very attractive. One of the other entrances that you’re going to be able to see this library from is coming in off of Waters Avenue. It’s pretty hard to make a left-hand turn on Eisenhower to get back up into the site because of the traffic that’s on there. Waters Avenue, the traffic is a little bit slower. A lot of people will turn in off of Waters Avenue, and we wanted that to be a very attractive view. And it’s going to be the side that as the community facilities.

Mr. Shay said, this isn’t a typical, old-fashioned library, like the ones that I grew up with, that’s just a – an archive for books, it will be a great archive for books. It’s going to be a great place to be able to get a book and – and check it out and – and bring it back later, but it’s also going to be a community center. It’s also going to be a place that invites people to come in for events that could be in the evening when the library, itself, is closed. This is the side, and this is the view of the community gardens that face the – that part of the community.

Mr. Shay said, to give you an idea of how much wood there’s going to be on the inside of the building, you can see here, we have wood slabs for the ceilings; we have wood beams and wood columns, and you can see the courtyard is off the right; the entrance is off to the left; and the – the place is just going to be a real showcase for the wood that’s manufactured and harvested in Georgia. There’s your central courtyard. It’s going to be a great place. I don’t know, someday, I bet there’s going to be a wedding there. I bet somebody’s going to get married in that courtyard, and then they’ll be able to go into the community rooms and have their wedding reception. They’ll be able to use this as a place where the library really becomes the center of the community.

Mr. Shay said, southside needs this. There are a lot of great churches that are there, but not everybody goes to church, unfortunately. But, you know, they need to have someplace else where they can go to be able to have these

– these kind of events. You’ll also be able to do Town Hall meetings, Mr. Chairman, and it’s going to be a great facility for public gatherings. These are the reading rooms. This is the adult reading room. A lot of daylight, but it’s north light, so, we’re going to have a – a – a lot of natural light in the space. It’s going to have great acoustics too. So, our – our theme for the overall project that we worked with Lola [DeWitt] and her team to develop is oasis. So this is going to be that third place, that calm place where you can go and kind of get away from all the other things that are distractions and be able to enjoy a good book or – or have a good conversation.

Mr. Shay said, this is a – a – a view of the children’s reading area, and this is also going to be a great place for our young people to be able to come. I know there’s a lot of emphasis now, as there well should be, on youth literacy.

There – we’re trying to make sure that our young people are – are able to learn how to read and keep up with what’s going on in – in their education and the rest of the world. There’s also going to be a great maker space. This is another great feature of this particular library. It’s different then – then – then your typical library. So, there’s going to be a room where you can go and maybe there will be a three-D printer that you can use there or maybe that would be the place where you could do an art project or, you know, be able to set up functions of teaching – cooking demonstrations.

There could be any number of things, but there’s going to be that maker space that’s in the center, and you can see it also overlooks the central courtyard. Everything has a chance, when it’s on the inside to also spill over into an outdoor space so that you can have both indoor and outdoor aspects of the same events.

Mr. Shay said, this is the north-facing entrance. So, this will be the entrance that’s on the community side. This is – this entrance would, for example, be facing Planet Fitness. It will also be very attractive, and as I said before, it’s going to be set up so that the library functions where the book archive is could be closed down at night, but the rest of the community center could be opened. Could have art exhibits and – and other things. We didn’t put any art on this, but this is a – what it looks like you come through that entrance, be able to have displays or demonstrations. Also, if you’re using the community rooms for a sort of convention kind of atmosphere, this would be a great place for the pre-function and be able to have where people gather before they go into the main rooms.

Mr. Shay said, these are your community rooms. I want you to imagine yourself being able to come here for movie night or be able to come here for that wedding reception or – or for that public hearing that you want to have that – that

– that helps our – our community to understand how good their government is, and it also is bathed in that wonderful natural north light. We call it God’s light for a reason.

Mr. Shay said, this is the floor plan, and I can dwell on that, but what I’d rather do is let myself and Lola [DeWitt] and Michael [Sommers], if necessary, answer any questions you might want to have, and I – and I can explain to you how the building is laid out if that’s particularly important to you or how it’s going to be furnished or any other aspect. We’re

– we’re well on track. It’s going to be a – a wonderful place, and I think it’s going to be the kind of place that you and

– and your kids and grandkids will be very proud of.

Chairman Ellis said, all right. Commissioner Milton. Go.

Commissioner Milton said, thank you, Mr. Chairman. What – what’s your opening date?

Mr. Shay said, yeah, you’re ready. Okay. I love it. I love it.

Ms. DeWitt said, that’s a good one, ‘cause I – I try it all the time, and they don’t budge (laughter). So, thank you for that.

Mr. Shay said, so, here’s the schedule overall. We’re going to finish up construction documents and get it out to bids by the end of this year. Assuming that the bid opening goes well, it will probably take about fifteen months to build.

So, I would say, it will be about the middle of the year in 2028, not 2027. So, about the middle of the year in 2028 is when we can look forward to a grand opening.

Commissioner Milton said, and will you be taking art donations?

Mr. Shay said, absolutely. Absolutely. I think that, you know, art is something that we want to make sure is thought of throughout the – the facility. There’s the opportunity to display it, and there’s an opportunity to showcase it. There’s an opportunity for gallery showings, and there’s also a – a place or two for a permanent collection. You need to speak with Lola [DeWitt] about that, ‘cause she’s –

Commissioner Milton said, well, you – Mr. Shay said, she’s the art critic.

Commissioner Milton said, – probably remember Artie the Artist, right?

Mr. Shay said, oh, I sure do.

Commissioner Milton said, so, I’ve got to get his stuff out of storage.

Mr. Shay said, nice.

Commissioner Milton said, it will be ten years in March.

Mr. Shay said, oh. Grand.

Commissioner Milton said, and – and that will be a great home for it.

Mr. Shay said, oh – Commissioner Milton said, some of it.

Mr. Shay said, – man, I’m telling you. That would be wonderful.

Commissioner Milton said, so, we just need to find a place to store it until you ready to open.

Mr. Shay said, a great concept. That’s wonderful.

Commissioner Milton said, good deal.

Mr. Shay said, any other questions?

Commissioner Milton said, thank you.

Chairman Ellis said, do we have anybody else? You go.

Commissioner Noha said, this is – Chairman Ellis said, Commissioner Noha, go.

Commissioner Noha said, thank you. It’s a beautiful building. I’m building a cabin right now. It’s a – completely out of wood.

Mr. Shay said, yeah.

Commissioner Noha said, so, I think it’s going to be a great addition to District 1 (laughter).

Mr. Shay said, well, I’ – I’m proud that it is.

Chairman Ellis said, claiming ownership, hey? Anyone – Commissioner Hodge.

Commissioner Hodge said, thank you, Chairman. I just want to acknowledge how thoughtful this design is. It – it is incredible to me, especially in a day and time where literacy is so important, and we’re seeing libraries that are closing nationwide, and for us to take on a project like this. This is – this is extremely thoughtful how it serves the entire community. It’s meeting modern needs in a space such as this. It’s – it’s making a library so much more relevant than what it has been in the past, because, you know, times have changed so much. So, this is – I’m – I’m so impressed with this. I’ve – I’ve been impressed with the library services in general, but this is just really impressive.

Mr. Shay said, this – this – this is your visionary.

Commissioner Hodge said, yes.

Mr. Shay said, I’m just holding the pencil.

Commissioner Hodge said, yes.

Mr. Shay said, the – all this – Commissioner Hodge said, I’m – I’m – I’m – Mr. Shay said, she had the good ideas.

Commissioner Hodge said, I’m – I’m aware. This is impressive.

Ms. DeWitt said, will you talk about the outdoor space, and how we’re doing that to – to save money and to make it – Mr. Shay said, oh, yeah, fair enough. So, the – the budget was actually established a little over two years ago, maybe getting close to three years. So, at the time that we originally did our first design for the building, it was a bit larger than what it is right now because inflation has slowly, kind of shrunk the building a little bit. Interior spaces cost on the order of about five hundred dollars a square foot to build this well, but outdoor spaces, even if they are done very well, are maybe a hundred dollars a square foot. So, that’s one of the reasons that you see these – inter-relationship of indoor and outdoor space. Our outdoor spaces in Savannah are probably usable about three hundred days a year, and this is a way that we can stretch the dollars and also leverage up the experience. People love it. The I – image of a live oak tree, and a – and a – and a child sitting underneath of it and reading a book, has been a great inspiration to us.

Chairman Ellis said, okay? Anybody else? Yes, sir.

Commissioner Hussey said, okay. Sounds like a great collaborative effort, but, honestly, I’ve never known Mr. Shay to do anything halfway, and – and thank y’all for your efforts and – and the other question, is this the location that the movie theater used to be at?

Chairman Ellis said, yes.

Commissioner Hussey said, is that the – that’s where it’s going to sit, right there?

Mr. Shay said, it’s not sitting on exactly the site where the movie theater was, but it’s on the same piece of property.

Commissioner Hussey said, okay.

Mr. Shay said, actually, this is sort of sitting in the middle of what right now is a giant asphalt parking lot.

Commissioner Hussey said, right.

Mr. Shay said, so, the building is going to replace some of the parking spaces.

Commissioner Hussey said, good.

Mr. Shay said, they are way over-parked.

Commissioner Hussey said, yep.

Mr. Shay said, you’ll still be over-parked considerably once the building is – is there in a leave over on the order of about a hundred parking space if the county decides to develop the remainder of the property.

Commissioner Hussey said, I understand. I understand. I promise y’all don’t want any of my artwork.

Chairman Ellis said, it’s – it’s right next to – it’s right next to the National Guard Armory. That’s where the property is.

Mr. Shay said, yes.

Chairman Ellis said, anybody else? All right.

Ms. DeWitt said, so, I did also want to let you know that we will be having two town halls. So, one will be for the public, so that they’ll be able to discuss and give their feedback on the design. We are displaying some of the design at the Oglethorpe Mall location starting on Monday so that if people cannot attend one of the town halls, they’ll be able to write down whatever feedback or input they want to share. And they’ll be having another meeting with the vendors of that strip mall because we want to assure them that the – the coming of this library is going to be a benefit to them and – and – and not a detriment. So, we’ll be holding that town hall as well.

Chairman Ellis said, okay. Anything else? Yes, go ahead, Commissioner Kicklighter.

Commissioner Kicklighter said, absolutely beautiful.

Mr. Shay said, thank you.

Commissioner Kicklighter said, I mean, a great job. I’m just curious, how many square feet will be under roof, heated and cooled?

Mr. Shay said, seventeen thousand.

Commissioner Kicklighter said, ah, nice.

Mr. Shay said, seventeen thousand and about another four thousand of outdoor space. So, we’ll still be just a little over twenty thousand square feet. It’s just not all going to be under roof.

Commissioner Kicklighter said, wonderful. Do you know, by chance, when we built the one at the Savannah Mall, how many square feet’s in that? Do you remember?

Ms. DeWitt said, how many square feet at Southwest Chatham?

Mr. Shay said, I don’t recall when that was built. I – I – I know the – I know the building quite well.

Commissioner Kicklighter said, yeah.

Mr. Shay said, it’s – it’s much smaller than this.

Commissioner Kicklighter said, that’s what – that’s what – Mr. Shay said, not – Mr. Sommers said, the current one. He said the current one.

Ms. DeWitt said, he’s talking about -- Mr. Shay said, the Oglethorpe Mall branch that’s there now.

Mr. Sommers said, it’s about seven – it’s about seven thousand.

Mr. Shay said, yeah.

Commissioner Kicklighter said, okay. Wonderful.

Mr. Shay said, so, this is going to be – Commissioner Kicklighter said, it’s going to be massive then.

Mr. Shay said, yeah. This – this is going to be a game-changer, Dean.

Commissioner Kicklighter said, very nice.

Mr. Shay said, yeah.

Commissioner Kicklighter said, thank y’all.

Mr. Shay said, yeah. Thank you.

Ms. DeWitt said, thank you.

Chairman Ellis said, all right. I’m like – like Commissioner Milton, I’m waiting on it to come out the ground, all right?

Mr. Shay said, I’m working every day, I promise you. (Inaudible).

Chairman Ellis said, yeah, I’m – I’m looking forward to – Mr. Shay said, okay.

Chairman Ellis said, and thank you so much.

Mr. Shay said, thank you.

Chairman Ellis said, appreciate it.

[NOTE: While presenting, Mr. Shay showed the Board photographs of the new library concept design.]

===========

6. CHAIRMAN’S ITEMS

Chairman Ellis said, all right. We don’t have any Chairman’s Items – =========

7. COMMISSIONER'S ITEMS

Chairman Ellis said, – nor Commissioner’s Items..

=========

8. TABLED/RECONSIDERED ITEMS

Unless action is contemplated at today's meeting, staff report and file material has not been duplicated in your agenda packet. The files are available from the Clerk. Those on which staff is requesting action are indicated by asterisk (*).

1. BOARD APPROVAL OF CHANGE ORDER NO. 1 TO THE CONSTRUCTION

CONTRACT WITH REEVES YOUNG *TECHNIQUE JOINT VENTURE IN THE AMOUNT

OF $1,137,873, FOR ADDITIONAL WORK ASSOCIATED WITH THE CONSTRUCTION

OF THE MULTI-AGENCY PUBLIC SAFETY FACILITY. (NOTE: ITEM WAS TABLED

AT THE JULY 31, 2026, COMMISSION MEETING.)

Chairman Ellis said, the item that’s Tabled, will remain on the table, all right, until the staff gets back with us with the reports that we need from them.

ACTION OF THE BOARD:

Item left on the Table.

AGENDA ITEM: 11.20-K

AGENDA DATE: July 31, 2026

AGENDA ITEM: 8.1

AGENDA DATE: August 14, 2026 TO: Purchasing Department FROM: Dennis Jones, Director, CEMA

ISSUE:

Request Board approval of Change Order No. 1 to the construction contract with Reeves Young *Technique

Joint Venture in the amount of $1,137,873, for additional work associated with the construction of the Multi-Agency Public Safety Facility.

BACKGROUND:

The Chatham County Multi-Agency Public Safety Facility (MAPSF) is currently being constructed at 654 Gulfstream Road adjacent to the Savannah International Airport. The new facility will house Chatham County’s Emergency Operations Center, Chatham County’s E-911 Dispatch Center, a Non-Emergency Call Center (NECC), Administrative Offices for CEMA and 911, and the Savannah Airport Commission’s Department of Public Safety.

FACTS AND FINDINGS:

1. On May 23, 2026, the Board approved a contract with Reeves Young *Technique Joint Venture for construction of the Multi-Agency Public Safety Facility.

2. The proposed change order consists of various individual change items summarized on the attached Change Order Matrix (attached to the original staff report in the Clerk of Commission’s meeting file), totaling $1,137,873. The attached Change Order Matrix summarizes each proposed change item and its associated cost. The change items generally include:

a. Unforseen site conditions;

b. Utility, structural, architectural, mechanical, electrical, plumbing, technology, and sitework revisions;

c. Owner-requested modifications to improve facility functionality and operational requirements; and

d. One deductive change reducing the overall contract amount.

3. Contract Summary:

Original Contract (05/23/2025) $78,862,493 Change Order No. 1 (Pending) $ 1,137,873 Revised Contract Amount $80,000,366

4. Chatham County’s Program Manager, AECOM *HJ Russell Joint Venture, completed a detailed review of each Proposed Change Order (PCO). The review resulted in recommendations to approve justified costs, conditionally approve items requiring additional documentation, defer requested schedule extensions pending critical path schedule analysis, and require revision of resubmittal of select items requiring additional pricing documentation.

5. County staff concurs with the Program Manager’s recommendations and finds the proposed contract modification, as recommended, to be fair, reasonable, and necessary to complete the project.

BLUEPRINT ALIGNMENT:

Quality of Life – Goal 4: To provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

CIP – CEMA Building Project 3502214-Z-541300 (3503920-541300)

ALTERNATIVES:

1. Board approval of Change Order No. 1 to the construction contract with Reeves Young *Technique Joint Venture in the amount of $1,137,873, for additional work associated with the construction of the Multi-Agency Public Safety Facility.

2. Provide staff with other directions.

POLICY ANALYSIS:

It is consistent with Board policy to approve change orders necessary for the completion of construction projects.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

==========

9. ITEMS FOR INDIVIDUAL ACTION

(Unless the Board directs otherwise, adoption of an Action Item will mean approval of the respective County staff report and its recommended action.)

Chairman Ellis said, we go to Items for Individual Action.

1. VOTE ON THE FOLLOWING BOARD APPOINTMENTS:

A. APPOINT BRITTANY SALLEY TO THE LIVE OAK PUBLIC LIBRARY BOARD.

Chairman Ellis said, appointment of Brittany Salley to the Library – the Live Oak Public Library Board. There’s a motion?

Commissioner Noha said, motion.

Commissioner Hodge said, second.

Chairman Ellis said, properly motioned and second that Ms. Salley be appointed to the library board. Are you ready for the question? Please cast your votes. All right.

ACTION OF THE BOARD:

Commissioner Noha moved for Board approval of the appointment of Brittany Salley to the Live Oak Public Library Board. Commissioner Hodge seconded the motion and it carried unanimously.

==========

2. TO REQUEST BOARD APPROVAL OF THE FOLLOWING BUDGET AMENDMENTS

AND TRANSFERS: 1) IN THE GENERAL FUND, A) TRANSFER $10,000 FROM

BLUEPRINT GRANT CONTINGENCY TO PARK PLACE OUTREACH-EMERGENCY

SHELTER POSITIVE DEVELOPMENT & PREVENTION PROGRAM, B) TRANSFER

$62,500 FROM BLUEPRINT GRANT CONTINGENCY TO CHATHAM SAVANNAH

AUTHORITY FOR THE HOMELESS-PROJECT HOPE WATER, C) APPROPRIATE

FUND BALANCE $62,500 TO INCREASE CHATHAM SAVANNAH AUTHORITY FOR

THE HOMELESS-PROJECT HOPE WATER, D) TRANSFER $46,240 FROM VOTER

REGISTRATION PROFESSIONAL SERVICES TO TEMPORARY EMPLOYEE

SALARIES; 2) IN THE NATIONAL OPIOID SETTLEMENT FUND, INCREASE REVENUE

AND EXPENDITURES $179,552; 3) IN THE SPECIAL SERVICE DISTRICT FUND,

APPROPRIATE FUND BALANCE $165,000 TO INCREASE FIRE DEPARTMENT

UNIFORMS; 4) IN THE CAPITAL IMPROVEMENT PROGRAM FUND, A) TRANSFER

$248,000 FROM CIP CONTINGENCY TO INCREASE THE FIRE DEPARTMENT

VEHICLES PROJECT, B) INCREASE REVENUE AND EXPENDITURES $276,565 TO

ESTABLISH THE EARLY CHILDHOOD LEARNING CENTER PROJECT.

Chairman Ellis said, all right. To request Board approval of the following budget amendments and transfers: one, in the General Fund, a) transfer ten thousand dollars from Blueprint Grant Contingencies [sic] to Park Place Outreach-Emergency Shelter Position [sic] Development and Prevention Program, b) transfer sixty-two thousand five hundred dollars from Blueprint Grant Contingency to Chatham Savannah Authority for the Homeless-Project Hope Water, c) appropriate Funds Balance sixty-two thousand five hundred dollars to increase Chatham Savannah Authority for the Homeless-Project Hope Water, d) transfer forty-six thousand two hundred and forty dollars from Voter Registration Professional Service to Temporary Employment [sic] Salaries; two, in the National Opioid Settlement Fund, increase revenue and expenditures one hundred and seventy-nine thousand five hundred and fifty-two dollars; three, in the Special Service District Fund, appropriate Fund Balance of a hundred and sixty-five thousand dollars to Increase Fire Department Uniform; four, in the Capital Improvement Project [sic] Fund, a) transfer two hundred and forty-eight thousand dollars from C-I-P Contingency to increase the Fire Department Vehicle Project, b) increase revenue and expenditures two hundred and seventy-six thousand five hundred and sixty-five dollars to establish the Early Childhood Learning Center Project. Is there a motion?

Commissioner Noha said, motion.

Commissioner Buford said, second.

Commissioner Hussey said, second.

Chairman Ellis said, properly motioned and second that the request be granted. Are you ready for question? Please cast your votes.

Commissioner Noha said, re – reset.

Chairman Ellis said, got to clear the votes.

Clerk said, oh, I’m sorry.

Chairman Ellis said, yeah, you got to – all right. Now. Now, cast your votes. Waiting on Three. All right.

ACTION OF THE BOARD:

Commissioner Noha moved Board for approval of the following budget amendments and transfers: 1) in the General Fund, a) transfer $10,000 from Blueprint Grant Contingency to Park Place Outreach-Emergency Shelter Positive Development & Prevention Program, b) transfer $62,500 from Blueprint Grant Contingency to Chatham Savannah Authority for the Homeless-Project Hope Water, c) appropriate Fund Balance $62,500 to increase Chatham Savannah Authority for the Homeless-Project Hope Water, d) transfer $46,240 from Voter Registration Professional Services to Temporary Employee Salaries; 2) in the National Opioid Settlement Fund, increase revenue and expenditures $179,552; 3) in the Special Service District Fund, appropriate Fund Balance $165,000 to Increase Fire Department Uniforms; 4) in the Capital Improvement Program Fund, a) transfer $248,000 from CIP Contingency to increase the Fire Department Vehicles Project, b) increase revenue and expenditures $276,565 to establish the Early Childhood Learning Center Project. Commissioner Buford seconded the motion and it carried unanimously. [NOTE:

Commissioner Whitely was not present for the vote.]

AGENDA ITEM: 9.2

AGENDA DATE: August 14, 2026 TO: Board of Commissioners THRU: Michael A. Kaigler, County Manager FROM: Amy Davis, Finance Director

ISSUE:

To request Board approval of the following budget amendments and transfers: 1) in the General Fund, a) transfer $10,000 from Blueprint Grant Contingency to Park Place Outreach-Emergency Shelter Positive Development & Prevention Program, b) transfer $62,500 from Blueprint Grant Contingency to Chatham Savannah Authority for the Homeless-Project Hope Water, c) appropriate Fund Balance $62,500 to increase Chatham Savannah Authority for the Homeless-Project Hope Water, d) transfer $46,240 from Voter Registration Professional Services to Temporary Employee Salaries; 2) in the National Opioid Settlement Fund, increase revenue and expenditures $179,552; 3) in the SpecialService District Fund, appropriate Fund Balance $165,000 to Increase Fire Department Uniforms; 4) in the Capital Improvement Program Fund, a) transfer $248,000 from CIP Contingency to increase the Fire Department Vehicles Project, b) increase revenue and expenditures $276,565 to establish the Early Childhood Learning Center Project.

FACTS AND FINDINGS:

1. FY27 Blueprint Implementation Grant awards were approved through the annual budget process.

Contingency funds are set aside to cover unanticipated costs that occur during the year. The Director of Policy & Intergovernmental Affairs requests Board approval to make the following adjustments. Correspondence attached (to the original staff report in the Clerk of Commission’s meeting file.)

a. Transfer $10,000 from Blueprint Contingency to Park Place Outreach-Emergency Shelter Positive Development & Prevention Program.

b. Transfer $62,500 from Blueprint Contingency and Appropriate Fund Balance $62,500 to increase the Chatham Savannah Authority for the Homeless-Project Hope Water $125,000. During the FY27 budget process $100,000 was previously awarded for a total project allocation of $225,000.

2. Voter registration is in need of temporary employee assistance. The Assistant Director of Voter Registration requests Board approval to transfer $26,240 from Operating to Salary & Benefits within the General Fund. Correspondence attached (to the original staff report in the Clerk of Commission’s meeting file.)

3. The Board has accepted funds resulting from the lawsuit holding the opioid industry accountable for the public health pandemic. Chatham County has been awarded an additional $179,552.

These funds will be used to fight the opioid crisis within Chatham County through education to individuals, family members, and health professionals; and increase awareness of the negative impact of opioids. The Director of Policy & Intergovernmental Affairs requests Board approval to increase revenues $179,552 in the National Opioid Settlement Fund. Correspondence attached (to the original staff report in the Clerk of Commission’s meeting file.)

4. The Board approved 23 new positions within the Fire Department for the FY27 budget.

Associated with these positions additional funding is required for uniforms and two vehicles with equipment that were not included in the FY27 budget. The Finance Director requests Board approval to appropriate Fund balance $165,000 within the SSD Fund to increase Fire Department uniforms and transfer $248,000 within the CIP Fund from the CIP Contingency project to the Fire Department Vehicle project.

5. Pending Board approval of the amended IGA with the City of Savannah on August 14, 2026, the City will provide $276,565 to Chatham County to cover costs of furniture, fixtures, and equipment at the Early Childhood Learning Center. The Director of Policy & Intergovernmental Affairs request Board approval to increase revenues and expenditures $276,565 within the Capital Improvement Program Fund to establish the Early Childhood Learning Center project.

Correspondence attached (to the original staff report in the Clerk of Commission’s meeting file.)

BLUEPRINT ALIGNMENT:

Quality of Life – transparency in government.

FUNDING:

Funds are available in the General, Special Service District, and Capital Improvement Funds. Funds will be added to the National Opioid Settlement Funds. Funds will be added to the Capital Improvement Program.

ALTERNATIVES:

1. That the Board approve the following budget amendment:

GENERAL FUND

a. Transfer $10,000 from Other Community Services Contingency (1005560-579000) to Park Place Outreach-Emergency Shelter Positive Development & Prevention Program (1005560-573000).

b. Transfer $62,500 from Other Community Services Contingency (1005560-579000) to Chatham Savanna Authority for the Homeless-Project Hope Water (1005560-573000).

c. Appropriate Fund Balance $62,500 to increase Chatham Savannah Authority for the Homeless-Project Hope Water (1005560-573000).

d. Transfer $46,240 from Voter Registration Professional Services (1001401-521200) to Temporary Employees (1001401-511200).

NATIONAL OPIOID SETTLEMENT FUND

e. Increase revenues (2130351925) and expenditures (2133222-523900) $179,552.

SPECIAL SERVICE DISTRICT FUND

f. Appropriate Fund Balance $165,000 to increase Fire Department uniforms (2703500- 531710).

CAPITAL IMPROVEMENT PROGRAM FUND

g. Transfer $248,000 from CIP Contingency(3509000-Z-579000) to increase Fire Department Vehicles (3502627-8-542200).

h. Increase revenues (3502722-CIP-337000) and expenditures (3502722-Z-573000) $276,565 to establish the Early Childhood Learning Center project.

2. Amend or deny the request.

POLICY ANALYSIS:

State law grants the Board authority to amend the budget during the year as it deems necessary.

RECOMMENDATION:

That the Board approve Alternative 1.

==========

10. ACTION CALENDAR

The Board can entertain one motion to adopt the below-listed calendar. Such motion would mean adoption of staff's recommendation. Any Board Member may choose to pull an item from the calendar and it would be considered separately.

Chairman Ellis said, the Action Calendar. May I have a motion to accept the Action Calendar in its entirety?

Commissioner Hussey said, so moved.

Commissioner Buford said, second.

Commissioner Hodge said, so moved, Chairman.

Chairman Ellis said, properly motioned and second that we accept the Action Calendar in its entirety. Are you – any unreadiness? Any questions? Hearing none, all right, please cast your votes. You need to –

Clerk said, I already did.

Chairman Ellis said, okay.

ACTION OF THE BOARD:

Commissioner Hussey moved the Board for approval of the Action Calendar, Items 1 through 8 and under Item 8, Items A through N. Commissioner Buford seconded the motion and it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

=========

[NOTE: ACTION OF THE BOARD IS SHOWN ON EACH ITEM AS THOUGH AN INDIVIDUAL

MOTION WAS MADE THEREON.]

==========

1. APPROVAL OF THE MINUTES OF THE REGULAR MEETING OF JULY 31, 2026, AS

DISTRIBUTED.

ACTION OF THE BOARD:

Commissioner Hussey moved the Board to approve the minutes of the regular meeting held on July 31, 2026, as distributed. Commissioner Buford seconded the motion and it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

==========

2. CLAIMS VS. CHATHAM COUNTY FOR THE PERIOD OF JULY 23, 2026 THROUGH

AUGUST 4, 2026.

ACTION OF THE BOARD:

Commissioner Hussey moved the Board to authorize the Finance Director to pay the claims against the County for the period July 23, 2026, through August 4, 2026, in the amount of $11,065,454. Commissioner Buford seconded the motion and it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

==========

3. REQUEST APPROVAL OF FY27 BLUEPRINT IMPLEMENTATION GRANT MOUS

BETWEEN CHATHAM COUNTY AND VARIOUS COMMUNITY-BASED

ORGANIZATIONS.

ACTION OF THE BOARD:

Commissioner Hussey moved the Board for approval of Memorandums of Understanding between Chatham County and various Community-based organizations for Fiscal Year 2027 blueprint implementation grants. Commissioner Buford seconded the motion and it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

AGENDA ITEM: 10.3

AGENDA DATE: August 14, 2026 TO: Board of Commissioners THRU: Michael A. Kaigler, County Manager FROM: Tara Jennings, Director of Policy & Intergovernmental Affairs

ISSUE:

Request approval of FY27 Blueprint Implementation Grant MOUs between Chatham County and various community-based organizations.

BACKGROUND:

During the Fiscal Year 2027 budget process, program requests were submitted byseveral outside social service agencies and County departments/units. The proposed FY27 budget includes recommendations for various local, community-based organizations who desire to provide direct services to Chatham County residents.

FACTS AND FINDINGS:

1. During the Fiscal Year 2027 budget process, program requests were submitted byseveral outside social service agencies and County departments/units.

a. Intent to Apply solicitation package was active as of January 20, 2026.

b. Invitation to Full Applications was dispersed February 17, 2026.

c. Proposal and application request were due via portal March 13, 2026.

d. There were 56 applications reviewed and evaluated by a committee.

e. Interviews were conducted during March 31-April 2, 2026, for new programs, expanding/revising applications to answer programmatic and financial questions.

f. Evaluation and recommendations were provided to the County Manager who then made recommendations to the Board in the proposed FY27 budget.

g. Public hearing was conducted on June 12, 2026, where some organizations made presentations to the Board.

2. Funding for the program is included in the proposed Chatham County Fiscal Year 2027 budget for consideration.

3. Memorandums of Understanding (MOUs) have been developed to define deliverables, payment processes and performance metrics.

4. MOUs for consideration today include:

a. Chatham Savannah Authority for the Homeless (pending budget transfer)

b. Consumer Credit Counseling Service of Rochester

c. Curtis V. Cooper Primary Healthcare

d. EmployAbility

e. Family Promise of the Coastal Empire

f. Frank Callen Boys and Girls Club

g. Heads Up Guidance Services

h. Horizons Savannah

I. Park Place Outreach

j. People of Action Caring for Kids

k. Step Up Savannah

l. Summer Bonanza

m. Tharros Place

n. The Salvation Army

o. West Broad Street YMCA

5. Staff will continue to prepare files for the remaining programs as approved under the FY26 Blueprint grant process.

BLUEPRINT ALIGNMENT:

Blueprint Grant applications were evaluated bystaff. Recommendations were based on the program’s alignment with the Chatham County Blueprint and the priorities expressed by the Board of Commissioners.

FUNDING:

While Blueprint funds will be used to execute contracts for such programming, in cases when grant funds align better staff have indicated such within the contract on Attachment B. Funding is provided in the FY27 budget and identified on Attachment B of each Agreement.

ALTERNATIVES:

1. Approve the Memorandum of Understanding for FY27 Blueprint funding.

2. Provide other direction.

POLICY ANALYSIS:

It is consistent with Board policy to support safe, cost effective, and environmentally responsible operations, while diversifying funding streams.

RECOMMENDATION:

Approve Alternative 1.

==========

4. REQUEST BOARD APPROVAL OF A MEMORANDUM OF UNDERSTANDING (MOU)

WITH THE BOARD OF REGENTS ON BEHALF OF THE UNIVERSITY OF GEORGIA

COOPERATIVE EXTENSION SERVICES IN THE AMOUNT OF $213,507, AND THE

COASTAL GEORGIA BOTANICAL GARDENS IN THE AMOUNT OF $241,043, FOR

THE FY2027 FOR SALARIES AND BENEFITS.

ACTION OF THE BOARD:

Commissioner Hussey moved the Board for approval of a Memorandum of Understanding with the Board of Regents on behalf of the University of Georgia Cooperative Extension Services in the amount of $213,507 and the Coastal Georgia Botanical Gardens in the amount of $241,043, for salaries and benefits for Fiscal Year 2027. Commissioner Buford seconded the motion and it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

AGENDA ITEM: 10.4

AGENDA DATE: August 14, 2026 TO: Board of Commissioners THRU: Michael A. Kaigler, County Manager FROM: Amy Davis, Finance Director

ISSUE:

Request Board approval of a Memorandum of Understanding (MOU) with the Board of Regents on behalf of the University of Georgia Cooperative Extension Services in the amount of $213,507 and the Coastal Georgia Botanical Gardens in the amount of $241,043 for FY2027 for salaries and benefits.

BACKGROUND:

With the adoption of the FY2027 budget, funds were approved for the operation of the County Cooperative Extension Services and the Coastal Georgia Botanical Gardens.

FACTS AND FINDINGS:

1. Chatham County and the Board of Regents have a continuing commitment for the operations of the Cooperative Extension Service and the Coastal Georgia Botanical Gardens.

2. The adopted FY2027 General Fund M&O budget includes $213,507 for salaries and benefits for the Chatham County Extension Office.

3. The adopted FY2027 General Fund M&O budget includes an appropriate of $241,043 for salaries and benefits for staff at the Coastal Georgia Botanical Gardens. Quarterly invoices are submitted by the University of Georgia for salaries and benefits. Funds in the amount of $67,200 were also approved for maintenance and supplies of the Children’s Garden paid directly by the County.

4. A Memorandum of Understanding (MOU) is attached (to the original staff report in the Clerk of Commission’s meeting file).

BLUEPRINT ALIGNMENT:

Quality of Life – transparency in government.

FUNDING:

FY27 funds are available in the General Fund M&O 1005550 523900 $213,507 and 1006171 523900 $241,043.

ALTERNATIVES:

1. Board approve a Memorandum of Understanding (MOU) with the Board of Regents on behalf of the University of Georgia Cooperative Extension Services in the amount of $213,507 and the Coastal Georgia Botanical Gardens in the amount of $241,043 for FY2027 for salaries and benefits.

2. Provide other direction.

POLICY ANALYSIS:

Approval is consistent with Board action requiring a contract renewal of the Memorandum of Understanding with agencies providing services.

RECOMMENDATION:

That the Board approve Alternative 1.

==========

5. REQUEST BOARD APPROVAL OF AN AMENDMENT TO THE

INTERGOVERNMENTAL AGREEMENT (IGA) WITH CITY OF SAVANNAH FOR THE

EARLY CHILDHOOD LEARNING CENTER (ECLC). [DISTRICT 3.]

ACTION OF THE BOARD:

Commissioner Hussey moved the Board for approval of an Amendment to the Intergovernmental Agreement with the City of Savannah for the Early Childhood Learning Center. Commissioner Buford seconded the motion and it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

AGENDA ITEM: 10.5

AGENDA DATE: August14, 2026 TO: Board of Commissioners THRU: Michael A. Kaigler, County Manager FROM: Tara Jennings, Director of Policy & Intergovernmental Affairs

ISSUE:

Request Board approval of an Amendment to the Intergovernmental Agreement with the City of Savannah for the Early Childhood Learning Center (ECLC). [District 3.]

BACKGROUND:

Chatham County residents approved use of SPLOST funds for the purpose of construction of an Early Learning center during November 2018. Per the referendum, Chatham County and the City of Savannah each budgeted $3.125 million for the ECLC. The Early Childhood Learning Center is part of a larger national initiative known as Purpose Built. Purpose Built communities partner with a lead dedicated nonprofit organization that serves as the “community quarterback” to facilitate holistic community revitalization by facilitating high-quality cradle-through-college education, mixed income housing and community health/wellness initiatives. East Savannah United, Inc. (ESU) is serving as the lead organization and community quarterback for the Purpose-Built initiative in East Savannah.

The initial IGA was approved by the Board of Commissioners on December 17, 2021.

FACTS AND FINDINGS:

1. While the majority of the construction for the ECLC is complete, there are a few additional items needed for licensing and operation.

2. Both the County and City have provided additional funds to support the construction contract and have worked collectively with the Housing Authority of Savannah, East Savannah United (ESU) and other stakeholders to ensure the facility meets all fire marshal, state childcare licensing, and local permitting requirements.

3. Recognizing the gap in funding (for playground equipment, safety fall zones, and classroom furniture), staff submitted a funding request via the Congressional Direct Spending (CDS) in early 2025. The County was notified of the award in January 2026, to cover expenses in the amount of $1.678M via the CDS process by way of HUD. An award letter from HUD was received on May 9, 2026.

4. Per a HUD workshop in late June, staff learned that the agreement for funding may not be released until September with special notes that all HUD funded programs are no required to complete an environmental assessment (EA). Based on the estimated timeline, the EA could add an additional six months to the project completion date, or the County could work with HUD for an exception ruling.

5. The intent is to have the childcare facility open, aligning with SCCPSS first day of school, so the HUD funding delay has a significant impact.

6. In discussions with the City of Savannah, it was agreed that the County will pay $276,565 to ESU to purchase FFE via quote from Lakeshore Learning Materials. The City of Savannah has agreed to reimburse the County $276,565 for expenses associated with the FFE.

7. In the meantime, ESU will establish a temporary play space for licensing requirements so that the facilities opening can move forward. The County will continue to work with HUD for compliance and access to HUD funds for purchase of the intended playground equipment and the scheduling of installation as deemed appropriate.

8. ESU will work with the operator and defined stakeholders to ensure all orders are installed to meet childcare licensing requirements.

BLUEPRINT ALIGNMENT:

Education: From earlychildhood education through post-secondary achievement, Chatham County’s innovative

and inclusive educational systems are a model of academic excellence that enable students to have the knowledge, skills, and ability to succeed at chosen pathways.

FUNDING:

CIP Account #3502722 (pending approval on the omnibus)

ALTERNATIVES:

1. Board approves amended IGA with City of Savannah for the Early Childhood Learning Center as presented.

2. Provide staff with other direction.

POLICY ANALYSIS:

The Board is to review and approve all agreements.

RECOMMENDATION:

Approve Alternative 1.

==========

6. REQUEST BOARD APPROVAL REQUEST BOARD APPROVAL OF A MEMORANDUM

OF UNDERSTANDING (MOU) WITH THE CHATHAM COUNTY HEALTH

DEPARTMENT TO PROVIDE FOR MONTHLY REIMBURSEMENT TO CHATHAM

COUNTY FOR COSTS INCURRED AND PAID TO CHERRY STREET ENERGY, LLC,

FOR SOLAR ENERGY PRODUCTION AT THE LEASED HEALTH DEPARTMENT

EISENHOWER FACILITY.

ACTION OF THE BOARD:

Commissioner Hussey moved the Board for approval of a Memorandum of Understanding with the Chatham County Health Department for monthly reimbursement to Chatham County for costs incurred for solar energy production at the Health Department’s Eisenhower facility. Commissioner Buford seconded the motion and it carried unanimously.

[NOTE: Commissioner Whitely was not present for the vote.]

AGENDA ITEM: 10.6

AGENDA DATE: August 14, 2026 TO: Board of Commissioners THRU: Michael A. Kaigler, County Manager FROM: R. Jonathan Hart, County Attorney

ISSUE:

Request Board approval of a Memorandum of Understanding (MOU) with the Chatham County Health Department to provide for monthly reimbursement to Chatham County for costs incurred and paid to Cherry Street Energy, LLC, for solar energy production at the leased Health Department Eisenhower facility.

BACKGROUND:

Chatham County formally established a new Resilience Program in 2022. This program has been working throughout the County’s departments to reduce the vulnerability of our facilities and its residents to climate change, reduce its carbon footprint, and build greater resilience against the risks to our government and the public.

With the approval of the Board, Chatham County staff initiated a Request for Proposal (RFP) process in December of 2023, to ultimately enter into a renewable energy utility contract for a solar energy procurement agreement (SEPA). This contract was awarded to Cherry Street Energy, LLC. Implementation of the program allows Chatham County to be a utility customer with a long-term, flat, competitive rate, resulting in substantial savings in electricity costs.

In phase 2 of this project, the county selected additional County-owned facilities to install rooftop solar, including the Chatham County Board of Health facility located at 1395 Eisenhower Drive. This project was completed and began producing solar energy in March 2026.

FACTS AND FINDINGS:

1. The renewable energy contract is between Chatham County Board of Commissioners and Cherry Street Energy, LLC.

2. The Board of Health Facility located at 1395 Eisenhower Drive began producing solar energy in March 2026.

3. As the owner of the Board of Health facility located at 1395 Eisenhower Drive, the Board of Commissioners is invoiced monthly by Cherry Street Energy, LLC, for solar energy production pursuant to a contract between the Board of Commissioners and Cherry Street Energy, LLC.

4. The Board of Commissioners will pay Cherry Street invoices on behalf of the Board of Health and then invoice the Board of Health monthly for payments.

5. An MOU between the Board of Commissioners and the Board of Health is required for the Board of Health to remit payment to the Board of Commissioners.

BLUEPRINT ALIGNMENT:

The Resilience Program is intended to strengthen all four identified priority areas; however, the Natural Resource Goal under the Quality-of-Life priority area best aligns with this project.

Quality of Life - Natural Resource Goal 1:

Conserve and protect our natural resources from the impacts of climate change, to plan for the conservation and protection of our natural resources, and to ensure that planning considers land use and development impacts to our community’s natural resources and built environment.

FUNDING:

The Board of Health will remunerate the Board of Commissioners each month for solar production invoices paid on its behalf to Cherry Street Energy, LLC.

ALTERNATIVES:

1. Board approval of MOU with Health Department related to reimbursement of solar energy invoices.

2. Board does not approve MOU with Health Department related to reimbursement of solar energy invoices.

POLICY ANALYSIS:

It is consistent with the Board’s direction to approve programs that will promote public health, safety, and welfare; diversify funding streams; and provide superior stewardship.

RECOMMENDATION:

Alternative No. 1.

==========

7. BOARD APPROVE A REQUEST FROM PROPERTY OWNER, HOPETON SOUTH

LAND TRUST, LLC, FOR THE COUNTY TO DECLARE AS SURPLUS AND TO

QUITCLAIM THE RIGHT-OF-WAY PROPERTY LOCATED AT 100 LITTLE NECK

ROAD, AND MAINTAIN A DRAINAGE EASEMENT. (PIN: 21007 02003) [DISTRICT

5.]

ACTION OF THE BOARD:

Commissioner Hussey moved the Board for approval of a request from Hopeton South Land Trust, LLC, for the county to declare as surplus and quitclaim the right of way property located at 100 Little Neck Road and to maintain a drainage easement. Commissioner Buford seconded the motion and it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

AGENDA ITEM: 10.7

AGENDA DATE: August 14, 2026 TO: Board of Commissioners

THRU: Michael A. Kaigler, County Manager FROM: Suzanne Cooler, County Engineer

ISSUE:

Board approve a request from property owner, Hopeton South Land Trust, LLC, for the County to declare as surplus and to quitclaim the right-of-way property located at 100 Little Neck Road, and maintain a drainage easement (PIN. 21007 02003) [District 5.]

BACKGROUND:

The petitioner owns property that was annexed into the City of Savannah to be developed. The existing County-owned canal provides drainage for property along Little Neck Road to a nearby tributary. The canal area lies within Unincorporated Chatham County.

FACTS AND FINDINGS:

1. The location of the request is shown on the attached map (attached to the original staff report in the Clerk of Commission’s meeting file). The petitioner, HOPETON SOUTH LAND TRUST, LLC, requests quitclaim of the canal R/W. The petitioner owns the adjacent property on both sides.

2. The requested canal is currently owned by Chatham County and bisects property located within the City of Savannah. Staff evaluated the canal right of way and determined this canal would be best quit claimed to the property owner to then be annexed into the City of Savannah. Staff also recommends that Chatham County retain a drainage easement to retain the ability to correct drainage issues from Little Neck Road drainage area should it be necessary.

3. The petitioner was notified of the quitclaim consideration requirement and advised as to the date and time of this meeting.

4. If approved, the petitioner will complete the process at the time of recording of the combined plat with drainage easement requirements. The petitioner must pay the County the fair market value for the acquired right of way. The necessary deed, plat, and recording fees are to be paid by the petitioner. The fair market value is to be determined by a professional appraisal or the tax assessor’s current appraised value as determined for adjacent property with consideration of the remaining drainage easement. The appraiser is selected by the petitioner and must be certified as a professional appraiser by the State of Georgia. Staff will review the submitted appraisal, deed and plat for completeness and reasonableness before the deed is sent to the County Clerk for processing. The fair market value payment check is sent to Finance for deposit.

BLUEPRINT ALIGNMENT:

aligns with Quality of Life, Goal 4: Provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

No funds required.

ALTERNATIVES:

1. Board approve a request from Hopeton South Land Trust, LLC, for the County to declare as surplus and to quitclaim the right-of-way and maintain a drainage easement.

2. Do not approve the request.

POLICY ANALYSIS:

The Board must declare County property surplus and approve all quitclaim actions.

RECOMMENDATION:

That the Board adopt Alternative No. 1.

==========

8. REQUEST BOARD APPROVAL TO AWARD BIDS AS FOLLOWS: (Please note that new purchase thresholds of $10,000 or more have been enacted; however, contracts and change orders of a lesser amount still will appear).

ACTION OF THE BOARD:

Commissioner Hussey moved for approval to award bids as follows: (Please note that new purchase thresholds of $25,000 or more have been enacted; however, contracts and change orders of a lesser amount still will appear.)

CommissionerBuford seconded the motion and it carried unanimously. [NOTE: Commissioner Whitelywas not present for the vote.]

ITEM DEPT. SOURCE AMOUNT FUNDING

A. Summary Change

Order to the construction contract to provide water and sewer upgrades at L.

Scott Stell Park, to recognize revised scope of work and additional contract time Engineering Sandhill A.L.S.

Construction, Inc.

(MBE)

Port Wentworth, GA No Website

$108,945 SPLOST (2020-2026) –

Existing Park Upgrades

B. Deductive Summary

Change Order to the construction contract for installation of a temporary traffic signal at the intersection of State Route 204 and Old River Road, to reflect final quantities Engineering Platinum Paving and Concrete, LLC Savannah, GA www.platinumpavingga.

com ($10,540) General Fund/M&O – Public Works

C. Annual software

subscription renewal for high resolution aerial imagery services Engineering Nearmap USA, Inc.

Lehi, UT www.nearmap.com $58,314 SSD – Engineering

D. One (1) year contract

with renewal options for four (4) additional one

(1) year terms to provide drug treatment and case management services for the Savannah-Chatham County Drug Court with Veterans Division Court Administrator Recovery Place, Inc.

(WBE)

Savannah, GA www.recoveryplace.org $600 per client, per month (Years 1-2) •CJCC Grant – Adult Drug Court •DBHDD Grant

E. Purchase to remove

and replace sewer line piping at the Chatham County Records Center Facilities Maintenance and Operations Pinholster Construction,

LLC DBA PINCO

Savannah, GA No Website $73,380 CIP – Record Center Complex Main Waste

F. Renewal of annual

software assurance maintenance agreement for telephone communications I.C.S. Mitel Business Systems, Inc.

Mesa, AZ www.mitel.com $39,172 General Fund/M&O –

I.C.S.

G. Renewal of annual

maintenance agreement for telephone communication switches and equipment I.C.S. Integrated Network Solutions Garden City, GA www.phonesav.com $51,098 General Fund/M&O –

I.C.S.

H. Annual contracts with

renewal options for four

(4) additional one (1) year terms to provide decedent removal and transport services for the Chatham County Coroner’s Office Purchasing and Contracting •New England Trauma Services, LLC, DBA Trauma Services of Georgia Acworth, GA www.traumaservices.co m •Hymon and Sons Remain Removal & Transport, LP

(MBE)

Savannah, GA No Website Various amounts per staff report General Fund/M&O - Coroner

I. Amendment No. 4 to the professional engineering design services contract for the Interstate 16 at State Route 17 Interchange Improvement project, to recognize revised scope of work and additional contract time Engineering Vanasse Hangen Brustlin, Inc.

Atlanta, GA www.vhb.com

$229,000 •SPLOST (1998- 2003) –

I-16/Little Neck/Jimmy DeLoach Interchange

•SPLOST (2020- 2026) –

I-16/Little Neck/Jimmy DeLoach Interchange

ITEM DEPT. SOURCE AMOUNT FUNDING

J. Change Order No. 1 to the annual contract to provide waste and recycling services for the Chatham County Detention Center, to reflect a price increase Sheriff’s Atlantic Waste Services, Inc.

Pooler, GA www.atlanticwaste.com Various amounts per staff report General Fund/M&O – Detention Center

K. Change Order No. 1 to the annual contract to provide water treatment services for the cooling towers, chillers and boilers closed loop systems at the Detention Center, to reflect a price increase Sheriff’s Superior Water Services Marietta, GA www.superiorwatr.com Various amounts per staff report General Fund/M&O – Detention Center

L. Administrative correction to the professional services contract to provide a County Green Space Plan, to reflect correct contract amount Engineering Kimley-Horn and Associates, Inc.

Savannah, GA www.kimley-horn.com

$168,000 SPLOST (2014-2020) -

Greenspace

M. Renew the license agreement to continue use of the SSG Anthony Davis Memorial Model Airfield County Attorney Tri-County RC Flyers Savannah, GA https://www.modelaircra ft.org/

N/A N/A

N. Agreement to provide usage of Chatham County Coroner’s Office parking lot area County Attorney Coastal Regional Commission Savannah, GA https://www.coastalrc.ga .gov/ $3,000 per year Revenue Generating AGENDA ITEM: 10.8 A thru N AGENDA DATE: August 14, 2026 TO: Chairman and Members of the Board THRU: Michael A. Kaigler, County Manager FROM: Jean Fleming, Purchasing Director

ITEM A

FROM: Suzanne Cooler, County Engineer

ISSUE:

Request Board approval of a Summary Change Order in the amount of $108,945, to the construction contract with Sandhill ALS Construction, Inc., for the Scott Stell Park Water and Sewer Upgrade project and add an additional 200 days to the construction time. [District 6.]

BACKGROUND:

L. Scott Stell Park, located in the western portion of the County, is in need of utility upgrades to address aging water and sanitary sewer infrastructure. Phase 1 included improvements at the entrance and the administrative area and is complete. Phase 2 includes installing three (3) new airnasium structures for basketball, pickleball, and tennis. These improvements are underway. This project will install a new water and sewer line, that ties into the City of Savannah’s system, to provide a reliable, long-term solution to serve L. Scott Stell Park.

FACTS AND FINDINGS:

1. The Board approved a construction contract with Sandhill ALS Construction, Inc., at their meeting on May 9, 2025.

2. The Board approved Change Order No. 1 at their meeting on August 22, 2025, to increase the size of the water service from 1-IN to 2-IN to ensure the lateral has capacity to serve future upgrades anticipated by Parks and Recreation.

3. All work at the site is complete. The park is now served with reliable water and sanitary sewer infrastructure to replace the existing wells and failing septic tanks on-site. The wells will continue to be used to provide irrigation at the park.

4. Several items were not included in the original contract that were required to be completed to activate the new water and sewer service. These include installing electrical panels and connecting electrical service to each of the four (4) grinder pumps, connecting the new water and sewer service to the existing office building, installing a black flow preventer on the water line, and permanent grassing to stabilize all disturbed areas. In addition, there were additional quantities of 1.5-IN sewer force main and 2-IN water main required to provide future stubs-out and connections to accommodate future improvements at the park and to complete the project.

5. Staff reviewed the costs associated with the summary change order and found the cost to be fair and reasonable and in line with industry standards.

6. Two hundred (200) additional days to the contract was needed to account for additional work, including increasing the size of the water line to 2-IN, scheduling and completing electrical service for each grinder pump and scheduling the pump manufacturer to come on-site and complete final inspections for the project.

7. Contract History:

Original Contract (05/09/2025) $514,730 Change Order No. 1 (08/22//2025) $124,765 Summary Change Order (pending) $108,945 Revised Contract Amount $748,440

8. The completed water and sanitary sewer improvements have been accepted by the County and are now to be maintained by the Parks and Recreation and Public Works staff.

9. This project was 100% completed by Sandhill ALS Construction, Inc., a local MBE contractor in Chatham County.

BLUEPRINT ALIGNMENT:

Goal 4: Provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

Strategy 1: Create clearer process of use of SPLOST funding in regard to neighborhood improvements, infrastructure, parks, and community centers.

FUNDING:

SPLOST VII(2020-2026) – Existing Park Upgrades (3274985 – 541300 – 3276083-7)

ALTERNATIVES:

1. Board approval of a Summary Change Order in the amount of $108,945, to the construction contract with Sandhill ALS Construction, Inc., for the Scott Stell Park Water and Sewer Upgrade project and add an additional 200 days to the construction time.

2. Provide staff other direction.

POLICY ANALYSIS:

It is consistent with Board policy to approve change orders necessary for the completion of projects.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM B

FROM: Suzanne Cooler, County Engineer

ISSUE:

Request Board approval of a Deductive Summary Change Order in the amount of $10,540 with Platinum Paving and Concrete, LLC, for installation of a temporary traffic signal at the intersection of State Route 204 and Old River Road. [District 7]

BACKGROUND:

The Georgia Department of Transportation completed an intersection control evaluation (ICE) for the intersection of State Route 204 and Old River Road. The results of the study show that improvements are needed. GDOT is planning to convert this intersection into a roundabout in the future but does not have funding for this project.

Based on this, GDOT has approved installation of a temporary traffic signal to improve the safety and operation of the intersection until such time that a roundabout can be designed and constructed.

FACTS AND FINDINGS:

1. GDOT requested the County’s assistance to partner on installation of a temporary traffic signal at the intersection of State Route 204 and Old River Road. GDOT provided the traffic signal design, the traffic signal equipment for the project and installed the timber signal poles.

2. The Board approved a contract with Platinum Paving and Concrete, LLC, at their meeting on March 13, 2026, to install the signal equipment and all other improvements associated with the project. The project is complete, and the traffic signal is operational.

3. Contract History:

Original Contract (03/13/2026) $245,956 Summary Change Order (pending) $(10,540) Revised Contract Amount $235,416

4. GDOT has accepted the traffic signal for ownership and maintenance. The County is responsible for paying for the energy costs of the traffic signal.

BLUEPRINT ALIGNMENT:

Project aligns with Goal 4, Strategy 1 regarding use of County funding for infrastructure improvements.

FUNDING:

No funding is required for the deductive summary change order.

ALTERNATIVES:

1. Board approval of a Deductive Summary Change Order in the amount of $10,540 with Platinum Paving and Concrete, LLC, for installation of a temporary traffic signal at the intersection of State Route 204 and Old River Road.

2. Provide staff other direction.

POLICY ANALYSIS:

It is consistent with Board policy to approve change orders necessary for the completion of projects.

RECOMMENDATION:

Staff recommends approval of Alternative No. 1.

ITEM C

FROM: Suzanne Cooler, County Engineer

ISSUE:

Request Board approval of a $48,314 sole source purchase from Nearmap USA, Inc., to renew high resolution, county-wide imagery services. (All Districts)

BACKGROUND:

Nearmap is a high resolution, seamless orthometric and oblique imagery service. The imagery is used by Engineering, Assessors, and other County departments. Nearmap provides post-disaster flights of the County to aid in damage assessments.

FACTS AND FINDINGS:

1. Chatham County has obtained high resolution, county-wide imagery from Nearmap annually since 2016.

The imagery assists with project planning, enforcement actions, property assessments and more.

2. In addition to the once per year imagery, Nearmap provides aerial imagery post-disasters, such as the recent Hurricane Helene. This post-disaster imagery assists with damage assessment.

3. Nearmap’s patented HyperCamera system, HyperVision software, and AI-driven analysis provide real-time insights that are critical to County functions. No other vendor in the market offers the combination of high-resolution imagery, frequent updates, AI-enhanced analysis, and seamless GIS integration.

4. Staff believes the cost of $48,314 to be fair and reasonable.

BLUEPRINT ALIGNMENT:

Quality of Life - Goal 4: To provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

SSD – Engineering (2701575 - 522330)

ALTERNATIVES:

1. Board approval of a $48,314 sole source purchase from Nearmap USA, Inc., to renew high resolution, county-wide imagery services.

2. Provide staff with other direction.

POLICY ANALYSIS:

It is consistent with Board policy to approve of sole source purchases when necessary.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM D

FROM: Crystal Cooper, Superior Court Administrator

ISSUE:

Request Board approval to award a one-year (1) contract with renewal options forfour (4) additional one (1) year terms to Recovery Place, Inc., to provide drug treatment and case management services to the Savannah-Chatham County Drug Court with Veterans Division Program.

BACKGROUND:

A substance use disorder treatment service provider is required to provide drug treatment and case management services in an intensive outpatient environment to all clients who meet the minimum criteria established by our grantors and the policies and procedures of the Drug Court with Veterans Division.

FACTS AND FINDINGS:

1. A Request for Proposal (RFP) to provide required services was issued and publicly advertised by the County Purchasing Department. Proposals were received from four (4) vendors and scored by an evaluation committee (see attached scoring matrix (attached to the original staff report in the Clerk of Commission’s meeting file)).

2. Recovery Place, Inc., received the highest evaluation score.

3. The proposed cost is $600 monthly per participant for the first two (2) years, $630 monthly per participant for years three (3) and four (4), and $650 monthly per participant for year five (5).

4. Grant funds have been awarded to cover the costs associated with this contract and the contract will be limited by the amount of funding available from grants.

BLUEPRINT ALIGNMENT:

The Drug court with Veterans Division Program’s missions and goals align directly with Quality of Life under Public Safety, Health, and Education and tangentially with the areas of Housing Under Homelessness.

FUNDING:

•DBHDD Grant (2502100 – 523900 – 2502306-2) - $194,750 •CJCC Grant – Adult Drug Court (2502100 – 523900 – 2402309-2) - $62,050 DATE Funds-available as needed

ALTERNATIVES:

1. Board approval to award a one-year (1) contract with renewal options for four (4) additional one (1) year terms to Recovery Place, Inc., to provide drug treatment and case management services to the Savannah-Chatham County Drug Court with Veterans Division Program.

2. Provide staff other direction.

POLICY ANALYSIS:

It has been the Board’s policy to award essential service contracts to a vendor that provides required services.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM E

FROM: Anthony Stephens, Director, Facilities Maintenance and Operations

ISSUE:

Request Board approval to award a $73,380 one-time contract to Pinholster Construction, LLC, to remove and replace the sewer piping lines at the Chatham County Records Center.

BACKGROUND:

Facilities Maintenance investigated reoccurring issues with the restrooms located at the Chatham county Records Center, 4225 Augusta Rd., Garden City, GA 31408. Once the issue was identified, immediate action was needed to take place for Records Center to stay in operation.

FACTS AND FINDINGS:

1. The project involves excavating the area, removing and replacing damage piping and fittings, and backfilling/restoring the excavation point.

2. An Invitation to Bid was publicly advertised and opened on June 9, 2026. Responses are follows:

Pinholster Construction, LLC $73,380 Garden City, Ga Consolidated Plumbing & Mechanical $118,000 Savannah, Ga

3. Staff believes the $73,380 bid from Pinholster Construction, LLC, is fair and reasonable.

BLUEPRINT ALIGNMENT:

Quality of Life – Goal 4: Provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

CIP – Record Center Complex Main Waste (3552603-9-541300)

ALTERNATIVES:

1. Board approval to award a $73,380 one-time contract to Pinholster Construction, LLC, to remove and replace the sewer piping lines at the Chatham County Records Center.

2. Provide staff other directions.

POLICY ANALYSIS:

It is consistent with Board policy to award contracts to the low, responsive, and responsible bidder.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM F

FROM: Andrew Cree, Director, ICS

ISSUE:

Request Board approval of a $39,172 sole source renewal of an annual software assurance maintenance agreement for Chatham County telephone communications with Mitel Business Systems, Inc.

BACKGROUND:

The County utilizes a centralized phone system for telephone communications. This system provides telephone services across all County campuses, providing voicemail and user management. This annual maintenance agreement is required to support the telephone switches, and voicemail installed throughout various County facilities.

FACTS AND FINDINGS:

1. Mitel Business Systems, Inc., is the manufacturer of the County’s phone system and requires software assurance to obtain upgrades and patches of their system. The County requires a supported platform that provides upgrades and patches to vulnerabilities.

2. Mitel Business Systems, Inc., is the manufacturer and sole proprietor of their software. To maintain the operational efficiency and reliability of the Mitel System, Chatham County’s Information and Communication Services department entered into a software assurance agreement with Mitel.

3. With an excellent partnership with Mitel’s service provider, Integrated Network Solutions, Inc., and applying all applicable discounts and contract pricing, the County receives the best value for supplied services.

4. Staff believes the total costs of $39,172, to be fair and reasonable.

BLUEPRINT ALIGNMENT:

Quality of Life - Goal 4: To provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

General Fund/M&O – I.C.S.

(1001535 - 522200)

ALTERNATIVES:

1. Board approval of a $39,172 sole source renewal of an annual software assurance maintenance agreement for Chatham County telephone communications with Mitel Business Systems, Inc.

2. Provide staff other direction.

POLICY ANALYSIS:

It is consistent with Board policy to provide the necessary maintenance agreement on County equipment.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM G

FROM: Andrew Cree, Director, ICS

ISSUE:

Request Board approval of a $51,098 sole source annual renewal agreement with Integrated Network Solutions, Inc., for maintenance of telephone communication switches and equipment throughout Chatham County for the I.C.S. Department.

BACKGROUND:

Integrated Network Solutions, Inc., has supported the County’s Mitel phone system as a service provider for over twenty (20) years. They have been instrumental in building and configuring the existing system and have proven highly reliable due to their support. Without this support agreement, the County could not maintain the phone system and keep it functional.

FACTS AND FINDINGS:

1. Integrated Network Solutions, Inc., has fully trained staff for the maintenance of our system. They guarantee 24/7 service to make any necessary repairs or troubleshooting to the County system, and they are the only authorized Mitel service provider that is located within a reasonable distance of County operations.

2. The equipment to be covered includes the Active Voice Mail System and the County’s thirteen (13) PBX/MX switches, which provides telephone service for County employees. The PBXs are located at the Judicial Courthouse, Administrative Courthouse, Sheriff’s Complex, Police Annex, Pete Liakakis Government Building, Public Works, Citizen’s Service Center on Eisenhower Drive, C.N.T., Records Center, Mosquito Control, Bull Street Library, Whitefield Precinct, and Islands Precinct.

3. With an excellent partnership with Integrated Network Solutions, Inc., and applying all applicable discounts and contract pricing, the County receives the best value for supplied services.

4. Staff believes the total costs of $51,098 to be fair and reasonable.

BLUEPRINT ALIGNMENT:

Quality of Life - Goal 4: To provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

General Fund/M&O – I.C.S.

(1001535 - 522200)

ALTERNATIVES:

1. Board approval of a $51,098 sole source annual renewal agreement with Integrated Network Solutions, Inc., for maintenance of telephone communication switches and equipment throughout Chatham County for the I.C.S. Department.

2. Provide staff with other directions.

POLICY ANALYSIS:

It is consistent with Board policy to provide the necessary maintenance agreement on County equipment.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM H

FROM: Jean Fleming, Purchasing Director

ISSUE:

RequestBoard approval to award annual contracts with renewal options for four (4) additional one (1) year terms to New England Trauma Services, LLC, D.B.A. Trauma Services of Georgia, and Hymon and Sons Remain Removal & Transport, L.P., to provide decedent removal and transport services for the Chatham County Coroner’s Office.

BACKGROUND:

These services were previously provided as standalone agreements. As costs for transport were increasing, the Coroner’s Office decided to have a principal and a secondary annual contract to provide those services a ta fixed price in order to save costs.

FACTS AND FINDINGS:

1. The transportation and removal services are to be done from and to various locations including private residences, hospitals and healthcare facilities, nursing homes and assisted living facilities, public locations and accident scenes, and to the Georgia Bureau of Investigation (GBI) Medical Examiner’s Office.

2. A Request for Proposals was publicly advertised and opened onJuly7, 2026. Proposals were submitted by three (3) qualified transport companies, and all were evaluated through a quality-based selection process. New England Trauma Services, LLC, D.B.A. Trauma Services of Georgia and Hymonand Sons Remain Removal & Transport, LP, were the highest rated from the list of proposers and are recommended to receive contract awards. (See attached matrix (attached to the original staff report in the Clerk of Commission’s meeting file)).

3. New England Trauma Services, LLC, DBA Trauma Services of Georgia has a fixed transport cost of $335 for local services and $795 for service to and from the GBI office in Atlanta.

4. Hymon and Sons Remain Removal & Transport, LP, (MBE) has a fixed transport cost of $325 for local services and $325 plus $2.50 per mile for services to and from the GBI office in Atlanta.

BLUEPRINT ALIGNMENT:

Quality of Life/Goal 4–to provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

General Fund/M&O - Coroner (1003700 – 523900)

ALTERNATIVES:

1. Board approval to award annual contracts with renewal options for four (4) additional one (1) year terms to New England Trauma Services, LLC, D.B.A. Trauma Services of Georgia, and Hymon and Sons Remain Removal & Transport, L.P., to provide decedent removal and transport services for the Chatham County Coroner’s Office.

2. Provide staff other direction.

POLICY ANALYSIS:

It is consistent with Board policy to award professional services contracts to the highest scoring firms.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM I

FROM: Suzanne Cooler, County Engineer

ISSUE:

Request Board approval of Amendment No. 4 to the professional engineering design services contract with Vanasse Hangen Brustlin, Inc., (VHB) in the amount of $229,000 for the Interstate 16 at State Route 17 Interchange Improvement Project and add an additional 12 months to the professional engineering services contract. [District 7].

BACKGROUND:

The County sponsored a traffic study at the existing interchange of I-16 and S.R. 17/Little Neck Road through the Coastal Region Metropolitan Planning Organization (CORE MPO) in 2019. The results of the study recommended improvements to the interchange. VHB was selected by the CORE MPO to perform the study.

The results from the study were used to apply for and fund preliminary engineering for the improvement project.

FACTS AND FINDINGS:

1. At their meeting on August 13, 2021, the Board awarded a professional engineering design services contract to VHB for concept development, environmental studies, updated traffic studies and counts, database preparation and public involvement leading to approval of the Concept Report. The concept report was approved May 19, 2023.

2. The Board approved Contract Amendment No. 1 to include completing preliminary plans, right of way plans and approval of a NEPA environmental document on September 23, 2022.

3. Contract Amendment No. 2 was approved by the Board at their meeting on February 16, 2024, to provide additional environmental documentation and to perform additional Preliminary Plan tasks. GDOT also

required a Value Engineering (VE) study to be completed for the project which was also included in Amendment 2. An additional ten (1) months of contract time was also approved.

4. Contract Amendment No. 3 was approved by the Board at their meeting on February 7, 2025, to provide for final plan development for the project. Due to the unknown nature of scope before the concept report and environmental document are approved, staff negotiated scope and fee in stages as the project develop. This amendment provided for completing final plans and preparing the project for bid by GDOT.

The current schedule has the project being let for contract in May/June 2027, but GDOT has not identified funding for construction.

5. Contract Amendment No. 4 is required to complete additional work not included in the original contracts and requested to be completed by GDOT. A summary of the additional work includes:

• Perform additional seismic design calculations

• Perform additional bridge layout calculations and plan production updates and revise bridge barrier as directed by GDOT

• Perform additional special design wall calculations and plan revisions based on the revised calculations. Includes adding rigid inclusions

• Perform additional coordination with GDOT for the widening of Interstate 16, including plan revisions to raise the State Route 17 profile above Interstate 16.

• Special Studies funds to be authorized by the County if additional scope is requested by GDOT prior to Let.

6. Staff was originally awarded federal funds in the amount of $1.9 million through the CORE MPO to offset local design costs. Additional federal funds in the amount of $1,173,863 were awarded for Professional Engineering (PE) costs to offset contract Amendment No. 3. Total federal funds awarded for PE to date are $3,093,863. These funds require a 20% local match. The federal funds will cover $1,410,211 for contract Amendment No. 3 and local SPLOST funds will cover the remaining $352,553. Contract Amendment No. 4 will be paid for using SPLOST and these funds will not be reimbursed.

7. This is a federal-aid contract with an established DBE goal of 16%. Based on the most recent invoice from VHB, 11.5% ($378,344.86) of project expenditures to date have gone to DBE firms.

8. Staff reviewed and negotiated the cost proposal for this contract amendment and found the cost to be fair and reasonable.

9. Contract History:

Original Contract (8/13/2021) $ 799,510 Contract Amendment No. 1 (9/23/2022) $ 639,308 Contract Amendment No. 2 (02/16/2024) $ 332,238 Contract Amendment No. 3 (02/07/2025) $1,762,764 Contract Amendment No. 4 (pending) $ 229,000 Pending Contract Amount $3,762,820

BLUEPRINT ALIGNMENT:

Quality of Life - Goal 4: To provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

•SPLOST III(1998-2003) – I-16/Little Neck/Jimmy DeLoach Interchange (3224220 – 521200 - 3225121-3) - $44,663 •SPLOST VII(2020-2026) – I-16/Little Neck/JD Interchange (3274220 – 521200 - 3275121-3) - $184,337

ALTERNATIVES:

1. Board approval of Amendment No. 4 to the professional engineering design services contract with Vanasse Hangen Brustlin, Inc., (VHB) in the amount of $229,000 for the Interstate 16 at State Route 17 Interchange Improvement Project and add an additional 12 months to the professional engineering services contract.

2. Provide staff with other directions.

POLICY ANALYSIS:

It is consistent with Board policy to approve contract amendments necessary for the completion of professional engineering services contracts.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM J

FROM: Richard S. Coleman, Sheriff

ISSUE:

Request Board approval of Change Order No. 1 to the annual contract with Atlantic Waste Services, Inc., for waste and recycling services at the Chatham County Detention Center.

BACKGROUND:

The Board awarded an annual contract to Atlantic Waste Services, Inc., for waste and recycling services at the Chatham County Detention Center at their meeting on December 2, 2022.

FACTS AND FINDINGS:

1. The purpose of this change order is to increase pricing. The price increase is due to rising operating cost such as fuel, labor, and disposal.

2. Price changes are detailed below:

Item No.

Description UOM Current Unit Price New Unit Price % Percentage Increase 1 Compactor 1 Removal Biweekly of Solid Waste for Disposal Per Haul $195 $202 3.8% 2 Compactor 2 Removal Bimonthly of Cardboard for Recycling Per Haul $195 $202 3.8% 3 30 Yard Open Top Roll Off Dumpster Removal “On Call” for Construction/Demolition Debris Per Haul $185 $192 3.8% 4 Quarterly Service of Compactors and Power Units Ea $100 $100 5 Solid Waste Disposal Rate Per Ton Per Ton $60 $62.28 3.8% 6 Recycle Cardboard Waste Disposal Rate Per Ton Per Ton $0 $0 7 Construction/Demolition Debris Disposal Rate per Ton Per Ton $52 $54 3.8%

3. Staff has reviewed the requested increase and finds it to be fair and reasonable.

BLUEPRINT ALIGNMENT:

Quality of Life – Goal 4: Provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

General Fund/M&O - Detention Center (1003326 - 522110)

ALTERNATIVES:

1. Board approval of Change Order No. 1 to the annual contract with Atlantic Waste Services, Inc., for waste and recycling services at the Chatham County Detention Center.

2. Provide staff other direction.

POLICY ANALYSIS:

It is consistent with Board policy to approve contracts and change orders that offer the best value to the County.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM K

FROM: Richard S. Coleman, Sheriff

ISSUE:

Request Board approval of Change Order No. 1 to the annual contract with Superior Water Services for water treatment services for the cooling towers, chillers, and boilers at the Chatham County Detention Center.

BACKGROUND:

The Board awarded an annual contract to Superior Water Services for water treatment services for cooling towers, chillers, and boilers at the Chatham County Detention Center on July 28, 2023.

FACTS AND FINDINGS:

1. The purpose of this change order is to increase pricing. The price increase is due to cost increases related to environmental regulations, specialized chemical packaging, and hazardous material transportation safety standards.

2. Price changes are detailed below:

Item No. Description Qty. UOM Current Unit Price New Unit Price % Percentage Increase 1 Tower Tech Cooling Towers *Monthly Inspections 12 Ea $550 $582.70 5.95% 2 Boiler Closed Loop System *Monthly Inspection 12 Ea $200 $211.89 5.95% 3 Chilled Water Closed Loop System *Monthly Inspection 12 Ea $100 $105.95 5.95% 4 Boiler Condensate Drain System *Monthly Inspection 12 Ea $75 $79.46 5.95% Total Cost $11,100 $11,1760

3. Staff has reviewed the requested increase and finds it to be fair and reasonable.

BLUEPRINT ALIGNMENT:

Quality of Life – Goal 4: Provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

General Fund/M&I- Detention Center (1003326 - 522200)

ALTERNATIVES:

1. Board approval of Change Order No. 1 to the annual contract with Superior Water Services for water treatment services for the cooling towers, chillers, and boilers at the Chatham County Detention Center.

2. Provide staff with other directions.

POLICY ANALYSIS:

It is consistent with Board policy to approve contracts and change orders that offer the best value to the County.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM L

FROM: Suzanne Cooler, County Engineer

ISSUE:

Request Board approval to recognize an administrative correction to the professional services contract with Kimley-Horn and Associates, Inc., correcting the contract amount from $64,000 to $168,000 for the completion of a County Green Space Plan (Districts 1, 3, 4, 6, 7).

BACKGROUND:

Chatham County maintains a diverse portfolio of natural, recreational, and cultural resources. The Green Space Plan will ensure the responsible long-term stewardship of these public assets. The contact will develop comprehensive, site-specific management plans for nine (9) County-owned green spaces and conservation area

(see attached map of areas (attached to the original staff report in the Clerk of Commission’s meeting file). This project will generate nine (9) distinct management plans for the following locations:

! Al Bungard Conservation Area ! Blue Sky Preserve ! Frank O Williams Lake ! Great Ogeechee Lakes ! Green Island ! McQueen’s Trail ! Pennyworth Island ! Tom Triplett Park ! Whitemarsh Preserve

FACTS AND FINDINGS:

1. At their meeting on May 22, 2026, the Board awarded a professional services contract with Kimley-Horn and Associates, Inc., for site analysis, public engagement, strategic and capital planning for several of the County-owned greenspace and conservation areas. The primary objective of these plans is to successfully balance ecological conservation and habitat restoration with public access and recreation.

The resulting documents will serve as the primary operational and guiding frameworks for each site.

2. Staff inadvertently omitted the correct total contract amount while preparing the original agenda item.

Although the scope of services has not changed, the total contract cost of $168,000 was not reflected in the original contract award, which incorrectly identified the amount as $64,000. Staff subsequently completed negotiations for the scope of services and associated fee and determined the resulting cost proposal to be fair and reasonable.

BLUEPRINT ALIGNMENT:

Quality of Life – Chatham County citizens achieve a superior quality of life with a safe, active, and healthy environment.

FUNDING:

SPLOST (2014-2020) – Greenspace (3254981 – 573000 - 3257041-2)

ALTERNATIVES:

1. Board approval to recognize an administrative correction to the professional services contract with Kimley-Horn and Associates, Inc., correcting the contract amount from $64,000 to $168,000 for the completion of a County Green Space Plan (Districts 1, 3, 4, 6, 7).

2. Provide staff with other direction.

POLICY ANALYSIS:

It is consistent with Board policy to amend contracts requiring changes to name, terms, and conditions.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM M

FROM: R. Jonathan Hart, County Attorney

ISSUE:

Request Board approval to renew a license agreement with the Tri-County R/C Flyers to continue with the utilization of the SSG Anthony Davis Memorial Model Airfield.

BACKGROUND:

The Tri-County R/C Flyers utilizes the SSG Anthony David Memorial Model Airfield located at 1010 Carl Griffin Drive, Savannah, Georgia. This facility is utilized for nationally recognized model airplane organizations as well as for a secondary aviation landing site for Chatham County Aviation.

FACTS AND FINDINGS:

1. The County signed the original license agreement in 2009 and renewed in 2016.

2. This new agreement will be for a term not to exceed ten (10) years dating from September 1, 2026, to August 31, 2036.

3. The license agreement is attached (to the original staff report in the Clerk of Commission’s meeting file), which sets out the terms and conditions for the Tri-County R/C Flyers to continue to use the model airstrip.

4. It should be noted that the Flyers built, maintain, and improve the model airstrip for radio-controlled aircraft.

5. The airstrip is open to those members who are nationally certified and recognized by the Tri-County R/C Flyers.

BLUEPRINT ALIGNMENT:

Quality of Life – Goal 4: Provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

N/A

ALTERNATIVES:

1. Board approval to renew a license agreement with the Tri-County R/C Flyers to continue with the utilization of the SSG Anthony Davis Memorial Model Airfield.

2. Provide staff with other directions.

POLICY ANALYSIS:

It is consistent with Board policy to renew license agreements.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

ITEM N

FROM: R. Jonathan Hart, County Attorney

ISSUE:

RequestBoard approval of a revenue-generating Parking Lot Agreement between Chatham Countyand Coastal Regional Commission for the use of the parking area located at the Chatham County Coroner’s Office.

BACKGROUND:

Coastal Regional Commission seeks additional parking space and has requested to use the spaces located at the Coroner’s Office to park ten (10) buses.

FACTS AND FINDINGS:

1. Chatham County is the owner of the parking area located at the Chatham County Coroner’s Office on 4225 Augusta Road, Garden City, Georgia.

2. The Coastal Regional Commission of Georgia has a need for space to be able to park ten (10) of their buses.

3. The Coastal Regional Commission of Georgia has agreed to make the Parking Lot available for use by the Coastal Regional Commission of Georgia parking for ten (10) buses for an annual lease rate of $3,000 per year.

4. This Parking Lot Use Agreement addresses the Coastal Regional Commission of Georgia’s parking needs by the use of the parking location at 4225 Augusta Road, Garden City, Georgia.

BLUEPRINT ALIGNMENT:

Quality of Life – Goal 4: Provide effective and efficient government services while ensuring that processes and procedures are planned and executed with transparency.

FUNDING:

Revenue Producing

ALTERNATIVES:

1. Board approval of a revenue-generating Parking Lot Agreement between Chatham County and Coastal Regional Commission for the use of the parking area located at the Chatham County Coroner’s Office.

2. Provide staff other direction.

POLICY ANALYSIS:

It is consistent with Board policy to award revenue-generating agreements.

RECOMMENDATION:

Staff recommends approval of Alternative 1.

==========

11. FIRST READINGS

Proposed changes to ordinances must be read or presented in written form at two meetings held not less than one week apart. A vote on the following listed matters will occur at the next regularly scheduled meeting. On first reading, presentation by MPC staff and discussion only by Commissioners will be heard. Comments, discussion and debate from members of the public will be received only at the meeting at which a vote is to be taken on one of the following listed items.

Chairman Ellis said, there are no First Readers.

==========

12. SECOND READINGS

Chairman Ellis said, okay. We go to Second Readers.

1. THE PETITIONER, RICHARD PETERSON, IS PROPOSING TO REZONE 8804

WHITEFIELD AVENUE FROM RESIDENTIAL ONE FAMILY RESIDENTIAL

ENVIRONMENTAL OVERLAY TO BUSINESS LIMITED ENVIRONMENTAL OVERLAY.

MPC FILE NO. Z-0426-000623. PIN# 10497 02020. THE MPC RECOMMENDS

DENIAL WITH AN ALTERNATIVE APPROVAL. [DISTRICT 1.]

Chairman Ellis said, let me read it into the record, and then we will have public hearing. The Petitioner, Richard Peterson, is proposing to rezone 8804 Whitefield Avenue from ResidentialOne FamilyResidentialEnvironment Overlay to Business Limited Environment Overlay, all right? M-P-C File No. Z dash zero-four-two-six dash zero-zero-zero-six-two-three (Z-0426-000623). PIN Number 10497 02020. The – the M-P-C recommends denial with an alternative approval. District 1, all right? Having read that, let me have a motion to open up the public hearing.

Commissioner Noha said, motion.

Commissioner Hodge said, second.

ChairmanEllis said, properly motioned and second that we open up the public hearing. Are you ready forthe question?

Please cast your votes. Okay, the public hearing is now opened.

[NOTE: The public hearing was opened at 10:19 a.m., whereupon the following transpired:]

Chairman Ellis said, is there anyone in the audience who want to speak on this petition? Is there anyone in the audience who would want to speak on this petition? Is there anyone in the audience who would want to speak on this petition? Hearing none –

Commissioner Noha said, motion to close.

Chairman Ellis said, – seeing none, motion.

Commissioner Noha said, motion to close.

Commissioner Hodge said, second.

Chairman Ellis said, properly motioned and second that the public hearing be closed. Are you ready for the question?

Please cast your votes. Three. All right. Good.

[NOTE: The public hearing was closed at 10:20 a.m., whereupon the following transpired:]

Chairman Ellis said, now, with that, we’ll have a presentation from the M-P-C.

County Manager Kaigler said, no – Chairman Ellis said, did – did they need to present?

County Manager Kaigler said, no, y’all already voted.

Chairman Ellis said, all right. All right. So – so, we understand. Now, the – the motion – let me have a motion and second. First we need to recommend the denial, right?

Commissioner Noha said, no.

Chairman Ellis said, and then – Commissioner Noha said, I – County R. Jonathan Attorney Hart said, you can do it all.

Chairman Ellis said, yeah. Right.

County Attorney Hart said, the – the denial is not an established use – denied use.

Chairman Ellis said, okay.

County Attorney Hart said, what you really want to do is you want to say, we need a motion to approve the new zoning which is P-U-D-N E-O, which is –

Chairman Ellis said, okay.

County Attorney Hart said, environmental overlay.

Chairman Ellis said, all right. So, now, you under – you got it, Noha?

Commissioner Noha said, oh, yeah.

Clerk said, it’s P-D-N, not P-U-D.

Chairman Ellis said, all right, then do a motion.

County Attorney Hart said, huh?

Clerk said, P-D-N.

Commissioner Noha said, being that it’s in my District – County Attorney Hart said, yeah.

Chairman Ellis said, yes Commissioner Noha said, – I’ve had no input from the public on this, so apparently they’ve done this for some time and been good neighbors, and I hope that they continue that trajectory, and I will make a motion that we approve a zoning of P-D-N/Environmental Overlay for this piece of property at –

Chairman Ellis said, eighty-eight – Commissioner Noha said, 8804 Whitefield Avenue.

Chairman Ellis said, mm-hmm.

Commissioner Noha said, second.

Chairman Ellis said, all right. It’s properly motioned and second that we approve. Is that – did we – did he cover it all?

County Manager Kaigler said, yeah.

Chairman Ellis said, yeah. Okay. Now, you have a question about it?

Commissioner Kicklighter said, just – just add for the record, it’s actually in the agenda – Chairman Ellis said, right.

Commissioner Kicklighter said, – items – County Manager Kaigler said, yeah.

Commissioner Kicklighter said, and it’s listed as staff’s recommendation.

Chairman Ellis said, as staff recommendation.

Commissioner Kicklighter said, M-P-C staff –

Chairman Ellis said, yes.

Commissioner Kicklighter said, – recommendation.

Chairman Ellis said, okay.

Commissioner Kicklighter said, so.

Chairman Ellis said, all right. So that’s added too. All right? So, now, any un – we got the motion; got the second.

Any unreadiness? Please cast your votes. All right. Thank you. Thank you, sir. See, made it easy by explaining it –

Commissioner Kicklighter said, great job.

Chairman Ellis said, – in the back.

ACTION OF THE BOARD:

a. Commissioner Noha moved the Board to for approval to open the public hearing. Commissioner Hodge seconded the motion and it carrier unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

b. Commissioner Noha moved the Board for approval to close the public hearing. Commissioner Hodge seconded the motion and it carrier unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

c. Commissioner Noha moved the Board for approval of the rezoning of 8804 Whitefield Avenue to PDN/EO. Commissioner Hodge seconded the motionand it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

AGENDA ITEM: 12.1

AGENDA DATE: July 31, 2026

AGENDA ITEM: 12.1

AGENDA DATE: August 14, 2026 TO: Board of Commissioners THRU: Michael A. Kaigler, County Manager FROM: Melanie Wilson, Director, MPC

ISSUE:

The Petitioner, Richard Peterson, is proposing to rezone 8804 Whitefield Ave from Residential One Family Residential Environmental Overlay to Business Limited Environmental Overlay. MPC File No. Z-0426-000623, PIN# 10497 02020. The MPC recommends DENIAL with an alternative approval. [District 1.]

BACKGROUND:

The Petitioner is requesting for approval of the following: a rezoning [Zoning Map Amendment] to accommodate an existing landscape contractor business on a vacant parcel from Residential One Family (R-1) Residential Environmental Overlay (EO) to Business Limited (B-1) Environment Overlay (EO).

The Petitioner is requesting the variance for the purpose of bringing a nonconforming landscaping business into zoning compliance.

The referenced property is located at 8804 Whitefield Avenue, Savannah, Georgia 31406, on parcel ID number 10497 02020.

For the last eleven (11) years, a landscape contractor has been operating on the property. In 2025, the landscape contractor was cited by the County’s Code Enforcement Department for operating the landscaping business on a residential lot. The Petitioner is now requesting the variance so that the existing onsite landscaping contracting company can operate on the property as a legal conforming use.

FACTS AND FINDINGS:

Currently, the property is vacant. The adjacent land uses to the subject parcels are as follows:

Direction Zoning Land Use(s) North Residential One Family (R-1) Environmental Overlay (EO) Single-family Residential South Residential One Family (R-1) Environmental Overlay (EO) Single-family Residential East Residential One Family (R-1) Environmental Overlay (EO) Single-family Residential West Residential One Family (R-1) Environmental Overlay (EO) Single-family Residential INTENT OF EXISTING Residential One Family (R-1) ENVIRONMENTAL OVERLAY (EO) DISTRICT:

Per the County’s Zoning Regulations, the purpose of this district shall be to create an environment where one-family dwellings, and certain nondwelling uses, are permitted to promote stability and the character of low-density residential development with adequate open space. A maximum density of five dwelling units per acre of net residential land area shall be permitted in this district.

The purpose of the Environmental Overlay District is to establish supplemental standards to bolster those currently in the Chatham County Zoning Ordinance to:

a) protect and enhance community character;

b) provide for safe and orderly development; and

c) protect environmental quality, especially the estuarine system that surrounds the community.

INTENT OF PROPOSED Business limited DISTRICT:

Per the County’s Zoning Regulations, the purpose of this district shall be to create and protect areas that’s limited to business and certain industrial-like activities with limited traffic generation potential, are permitted by this District. The Business Limited (BL) District is intended to be applied in areas that would not be appropriate for more intensive commercial districts because of the character of the surrounding land uses and other factors.

COMPREHENSIVE PLAN FUTURE LAND USE ELEMENT:

Per the County’s Plan 2040, the property is within the ‘Residential- Suburban Single Family’ Future Land Use Map designation. This Land Use classification is identified for single-family detached residential dwellings at a density not to exceed five (5) units per gross acre. This category includes non-residential uses that are compatible with the residential character and scale of the neighborhood.

The surrounding area is developed with single-family residential lots. In 2025, the property was cited by Code Enforcement for the presence of a nonconforming landscaping business in a residential zoning district.

Currently, there’s no principal structure located on the property and there’s only a small utility building and fenced outdoor storage area onsite. The surface of the parcel is unimproved and the petitioner has not submitted an official Site Plan showing any improvements to the property.

This designation is not consistent with the Petitioner’s proposed zoning of Business Limited (B-1). Therefore, a Future Land Use Map (FLUM) amendment should be considered to ensure future development consistent with the adopted Comprehensive Plan and its associated goals and policies. Staff is advising the Petitioner to consider a broader amendment of the FLUM to reflect the existing single-family residential development pattern.

The Future Land Use immediately adjacent to the property is featured below:

! north - Residential- Suburban Single Family;

! south - Residential- Suburban Single Family;

! east - Residential- Suburban Single Family; and ! west - Residential- Suburban Single Family.

PUBLIC SERVICES AND FACILITIES

The property is served by the Chatham County Stormwater System. However, there are no public sewer or water services readily available to the Petitioner’s property. Chatham County Transit Route Number 20 runs immediately adjacent to the property on Whitefield Avenue. There are no fire or police stations within 0.25 miles of the property.

1. Will the proposed zoning districts permit uses that would create traffic volumes, noise level, odor, airborne particulate matter, visual blight, reduce light or increased density of development that would adversely impact the livability or quality of life in the surrounding neighborhood?

Staff Comment: The Petitioner’s requested Business Limited (B-1) Zoning District is inconsistent and incompatible with the existing surrounding single-family residential zoning. The intent of the B-1 Zoning District is to create and protect areas with limited business and certain industrial-like activities are permitted within the Zoning District. Conversely, the Residential One (R-1) Zoning District exists to create an environment where one-family dwellings, and certain non-dwellings uses, are permitted to promote the stability and character of low-density residential development.

Therefore, the proposed Business Limited (B-1) Zoning on the property would introduce a higher intensity within the immediate area of the property or generate an increased traffic volume within the area. The Petitioner’s Zoning request will have an adverse impact on the noise levels, odors, airborne particulate matters, visual blights, or reduction of light to the parcels immediately adjacent to the property. The requested use is incompatible with the surrounding low-density, single-family residential character.

2. Will the proposed zoning district permit uses that would adversely impact adjacent and nearby properties by rendering such properties less desirable and therefore, less marketable forthe type of development permitted under the current zoning?

Staff Comment: The proposed zoning allows a mix of uses that are commercial in nature, some described as ‘industrial-like.’ The property and all adjoining properties are presently zoned and subdivided for single-family residential dwelling uses.

The incompatible commercial zoning between the parcels zoned for residential use will have the impact of making adjoining parcels less valuable and desirable for the use where they are presently zoned by the County.

If the Commission is inclined to seek a remedy to permit the continuation of the nonconforming use, the County Zoning Ordinance contains a district explicitly created for existing nonconforming uses in largely residential contexts – PD-N (Planned Development Rezoning for Certain Nonconforming Uses.)

3. Will the proposed zoning district’s permitted uses generate a type or mix of vehicular traffic on a street or highway that is incompatible with the type of land use development along such street or highway?

Staff Comment: Allowance of the proposed use can be expected to result in the expansion of commercial/light industrial use and traffic within the area that’s currently predominantly single-family residential uses.

4. Will the proposed zoning district permit uses that would generate greater traffic volumes at vehicular access points and cross streets than is generated by uses permitted under the current zoning district to the detriment of maintaining acceptable or current volume capacity (V/C) radio for the streets that provide vehicular access to the proposed zoning district and adjacent and nearby properties?

Staff Comment: The proposed use generates traffic at a rate greater than that of a single-family home that’s the ordinarily anticipated use of the property as currently zoned by the County. The existing nonconforming use is unlikely to generate traffic at a volume that would significantly impact the current volume capacity ratio of the streets serving the property.

5. Will the propose zoning districts permit uses or scale of development that would require a greater level of public services such as drainage facilities, utilities, or safety services above thatrequired for uses permitted under the current zoning district such that the provision of these services will create financial burden to the public?

Staff Comment: The proposed uses and those permitted in the requested zoning district do carry implications for demand on services, such as drainage and, potentially, public safety.

Commercial operations typically require provision of a dust-free, typically impervious, parking surface. Additionally, the proposed use is a landscaping business, which is more likely to handle flammable and toxic substances (pesticides, fertilizers, fuels, etc.) in greater volume than would a single-family dwelling or other uses permitted in the current zoning district. Due to the small size of the site, however, these services are unlikely to be required at a level regarded as burdensome to the public.

6. Will the proposed zoning district permit uses or scale of development that would adversely impact the improvement or development of adjacent and nearby properties in accordance with existing zoning regulations and development controls deemed necessary to maintain the stability and livability of the surrounding neighborhood?

Staff Comment: The petitioner’s proposed zoning change does not adversely impact the improvement or development of the adjacent and nearby properties in accordance with the existing zoning regulations. The proposed zoning change will not adversely affect the stability and livability of the surrounding neighborhood.

7. Will the proposed zoning districts permit development that is inconsistent with the comprehensive land use plan?

Staff Comment: The County’s Plan 2040 states that single-family residential (detached & attached) are the recommended primary uses forthe Residential-SuburbanLand Use designation.

The recommended secondary uses include the following:

! small scale commercial and apartment buildings;

! civic and institutional facilities; and ! neighborhood parks.

Based on the recommended housing options with the County’s Plan 2040, the proposed zoning to Business Limited (B-1) is inconsistent with the adopted Comprehensive Land Use Plan.

BLUEPRINT ALIGNMENT:

N/A

FUNDING:

N/A

ALTERNATIVES:

POLICY ANALYSIS:

There’s an existing natural landscape buffer that’s about fifty feet (50') wide that is located in the front of the property along Whitefield Avenue. This buffer serves as a natural screen from the Petitioner’s intended use and the surrounding single-family residential dwelling units. Additionally, there’s a large, cleared landscape area with plenty of mature shade trees that’s about 200 feet immediately adjacent to the driveway that further provides a natural screen and landscape buffer.

The Petitioner seeks to rezone the property from a single-family residential zoning designation to a limited business designation for the purpose of bringing a nonconforming use into zoning compliance.

The Petitioner’s requested zoning district would require the property to be developed in accordance with commercial development standards (paving, lighting, parking, etc.). Currently, the property could only legally be used for primary residential purposes.

RECOMMENDATION:

Based upon the review criteria, the Planning Commission recommends DENIAL of the request to rezone the property from Residential One Family (R-1) Residential Environmental Overlay (EO) to Business Limited (B-1) Environment Overlay (EO).

Alternatively, the Planning Commission recommends APPROVAL to rezone the property to Planned Development PD-N/EO to permit only the present use in the propose configuration without any associated expansion of permissible non-residential uses until such time as adopted policy documents reflect a more cohesive approach to the future development of the area.

==========

13. INFORMATION ITEMS

Chairman Ellis said, all right. With that, we come to you, Mr. Manager.

County Manager Kaigler said, I don’t have any additional information items other than what we discussed in – in the pre-meeting, sir.

Chairman Ellis said, all right.

***************

1. PROGRESS REPORT ON GENERAL FUND CONTINGENCY ACCOUNT - M&O AND

THE SPECIAL SERVICE DISTRICT (SEE ATTACHED).

ACTION OF THE BOARD:

A status report was attached as information.

==========

2. LIST OF PURCHASING ITEMS BETWEEN $2,500 AND $9,999 (See Attached.)

AGENDA ITEM: 13.2

AGENDA DATE: August 14, 2026 List of Purchasing Items between $2,500 and $24,999 That Do Not Require Board Approval

ACTION OF THE BOARD:

A status report was attached as information.

ITEM DEPT. SOURCE AMOUNT FUNDING

RNA extraction kits for mosquitos Mosquito Control Qiagen, LLC $5,886 General Fund/M&O – Mosquito Control

Vector NAMe PCR kits for mosquitoes Mosquito Control Co-Diagnostics, Inc. $9,000 General Fund/M&O – Mosquito Control

Annual subscription for POS, Marketing and Tee Sheet systems in the Pro Shop at Henderson Golf Course Parks and Recreation Foreup Golf Software $5,862 General Fund/M&O – Henderson Golf Course

Purchase and installation of cabling and accessories for 5 Oglethorpe Professional Blvd I.C.S. NetPlanner Systems, Inc.

$2,870 SSD – Engineering Six (6) security carts Voter Registration Uline, Inc. $9,720 General Fund/M&O – Voter Registration

Purchase and installation of carpet flooring for the training facility at the Gun Range Sheriff’s Culver Rug Company, Inc.

$10,389 •General Fund/M&O – Sheriff’s •General Fund/M&O – Detention Center Annual agreement for video evidence management software and support C.N.T. Airship Industries, Inc. $4,950 General Fund/M&O –

C.N.T.

After hours pest control for the food service areas Sheriff’s Astro Pest Control Services of Savannah $3,000 General Fund/M&O – Detention Center Secured access card reader system for the District Attorney’s Office I.C.S. Allied Universal Technology Services $7,405 General Fund/M&O – District Attorney Annual renewal of the Handtevy mobile application and pediatric medication management software Fire Pediatric Emergency Standards, Inc.

$3,693 General Fund/M&O – Internal Audit Emergency HVAC repair services for Unit 1A of the Pete Liakakis Government Building Facilities Maintenance and Operations Trane U.S., Inc. $3,768 General Fund/M&O – Facilities Maintenance

and Operations

ITEM DEPT. SOURCE AMOUNT FUNDING

Purchase and installation of roofing for Juvenile Court Trailer Facilities Maintenance and Operations Coastal Roofing Company, Inc.

$21,646 General Fund/M&O – Facilities Maintenance and Operations Polling locations and voting information commercials Board of Elections IHeart Media Entertainment, Inc.

$10,125 General Fund/M&O – Board of Elections Annual subscription of the background check tool Sheriff’s Interactive Data, LLC $3,410 •General Fund/M&O – Sheriff’s

•General Fund/M&O – Detention Center Purchase of the Co-Analyst Generative AI Investigative Platform C.N.T. Pen-Link, LTD $19,392 General Fund/M&O –

C.N.T.

Purchase and installation of fencing for Ambuc Playground Occupational Safety Veterans Fence & Supply, LLC $19,924 Risk Management – Occupational Safety Purchase and installation of cameras and cabling for L.

Scott Stell Park I.C.S. Remote Technology Security Services, LLC

$24,312 SPLOST (2014-2020) –

Scott Stell Park Annual renewal of fingerprinting crossmatch Livescan software subscription for two (2) precincts of the Chatham County Police Department I.C.S. HID Global Corporation $5,158 SSD - Police ==========

3. COUNTY MANAGER’S UPDATE.

ACTION OF THE BOARD:

A status report was attached as information.

==========

EXECUTIVE SESSION

Chairman Ellis said, so, having none of that, there is a need for us to have a executive session. May I have a motion to do so?

Commissioner Hussey said, so moved.

Commissioner Kicklighter said, motion.

Chairman Ellis said, second.

Commissioner Kicklighter said, to discuss – Chairman Ellis said, to discuss –

County Attorney Hart said, personnel – Chairman Ellis said, – litigation – County Attorney Hart said, litigation – Chairman Ellis said, – personnel and – County Attorney Hart said, – and land acquisition.

Chairman Ellis said, – annex – ann – yeah. Acquisition. All right? Motion; second. Please cast your votes. All right, we are recessing to executive session.

ACTION OF THE BOARD:

Commissioner Hussey moved to recess to executive session to discuss personnel, litigation, and land acquisition.

Chairman Ellis seconded the motion and it carried unanimously. [NOTE: Commissioner Whitely was not present for the vote.]

The Board recessed at approximately 10:23 a.m.

==========

ITEMS FROM EXECUTIVE SESSION

1. REQUEST BOARD APPROVE A MOTION TO AUTHORIZE THE CHAIRMAN TO

EXECUTE AN AFFIDAVIT THAT THE EXECUTIVE SESSION WAS HELD IN

COMPLIANCE WITH THE OPEN MEETINGS ACT.

ACTION OF THE BOARD:

Commissioner Noha moved the Board for approval to authorize the Chairman to execute an Affidavit that the Executive Session was held in compliance with the Open Meetings Act. Commissioner Milton seconded the motionand it carried unanimously.

===========

ADJOURNMENT

There being no further business to discuss, the Chairman adjourned the meeting at 11:08 a.m.

===========

APPROVED: THIS DAY OF AUGUST, 2026.

CHESTER ELLIS, CHAIRMAN, BOARD OF

COMMISSIONERS OF CHATHAM COUNTY, GEORGIA

JANICE E. BOCOOK, CLERK OF COMMISSION

Legible por máquinas https://georgiacommons.org/meetings/2026-08-14/chatham-county-board-of-commissioners.md · https://georgiacommons.org/meetings/local/index.md · MCP https://mcp.georgiacommons.org/mcp