Ir al contenido
Georgia Commons
Menú

Condado: Camden County

Camden County Board of Commissioners: sesión de trabajo, 27 de octubre de 2026

Georgia Commons no tiene actas de esta reunión. Georgia Commons es independiente y no está afiliado a Camden County Board of Commissioners.

This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.

El resumen de una grabación se escribe solo en inglés.

Commissioners reviewed the draft data center ordinance section by section, requested many revisions, and scheduled no vote, with a revised draft to follow.

The Camden County commissioners held a work session reviewing a draft data center ordinance for the unincorporated county, going through it section by section with staff and the county attorney. No public input was taken, and the chair said public hearings will come later. Commissioners asked for many edits: using the special use version, adding data center types to the definitions, setting a 60 foot height limit, raising water, sewer, noise, generator, and financial assurance protections, and removing the cyber security section. They also discussed the proposed technology zoning district and the state cap on fines. No vote on adoption was taken, and staff will send a revised draft and schedule another session.

Temas tratados: data center ordinance; special use permits; water use and wells; wastewater and sewer; noise and generators; financial assurance and bonds; technology zoning district; fire safety and height limit; enforcement fines.

Lo que trató la reunión, según se dijo en la grabación (14)

Cada relato es parte del resumen escrito por IA de la transcripción automática, no del registro. El tiempo abre la transcripción de abajo donde se trata el asunto. El resumen de una grabación se escribe solo en inglés.

  1. Data center ordinance: opening remarks and special use version

    0:04:46

    The chair said there would be no public input that night, that public hearings will come later, and that the ordinance is written for the unincorporated county, not a specific project. Staff said two versions had been sent, with and without special use approval. Commissioners chose the special use version, with one noting it gives the county control because a permit does not pass to a later owner if the project does not happen.

  2. Legislative findings, purpose, intent, applicability and county-wide incentive ban

    0:06:57

    Staff described added legal preamble language, a new purpose and applicability section, and the word county added to the ban on incentives. A commissioner asked that the incentive and tax abatement ban apply county-wide, including incorporated areas, and that the section reference cover 332 through 344. Staff noted a standard for special use review had been restored among the purpose bullets.

  3. Definitions, including types of data centers and exempt facilities

    0:12:00

    A commissioner asked to define specific types of data centers, such as molecular, DNA, biological, and synthetic biology facilities, citing ethical concerns about storage using human tissue, so they can be prohibited or require special use. The chair asked that the wording be emailed to staff. Others asked for data center campus wording in size categories and to add on-site power generation to the mechanical yard definition. Staff will remove a stray sentence from exempt facilities, and a minor data center under 20,000 square feet will come out of the accessory uses list, with the list renumbered.

  4. Special use approval standards and burden of proof

    0:22:06

    Staff explained the section makes applicants prove compliance and lets the board attach conditions. Commissioners asked to drop the word unreasonable before financial burden and to change the board's required findings from shall to may. A question confirmed fire protection language covers internal systems.

  5. Development standards: lot size, height, setbacks, and coverage

    0:24:28

    Staff presented minimum lot sizes of 25, 50, and 75 acres by size, exclusion of road rights of way from contiguous acreage, and a 50% cap on site coverage. A commissioner asked for a 10 acre minimum for small data centers. Members noted the 50% coverage conflicted with 35% in the parking section and asked for consistency. Staff set maximum height at 60 feet after the fire chief said the county has no ladder truck for 75 feet, and setbacks of 100 feet on all sides were requested. The fire chief is to review the changes.

  6. Ingress, egress, roads and bridges, and buffers

    0:33:14

    Staff read language making applicants responsible for road improvements and repair of project damage, with financial assurances to back it. A commissioner asked to name DOT and Federal Highway instead of road authority. A 100 foot buffer for coastal marshlands was described, and a commissioner asked that buffers keep all vegetation undisturbed rather than only mature trees.

  7. Water use, wells, monitoring, and gray water

    0:39:16

    Staff said water is regulated by the state EPD and the ordinance mainly requires information. A commissioner asked to prohibit direct surface water or aquifer connections unless no other source exists, and the attorney proposed catchall language so the county UDC covers anything not addressed, including tie-in to municipal water. Members asked that state monthly water reports be sent to the county, and for baseline testing of wells within one mile. The drought sentence was called redundant. Gray water was discussed but members said the unincorporated area lacks sewer to supply it.

  8. Sewer, wastewater treatment, and bonding

    0:52:27

    A commissioner said the sewer provisions are far too short and demanded detail on containing and treating wastewater, plus performance and surety bonds to indemnify the county. Staff said surety bonds appear later. Others suggested on-site treatment before any discharge to a city system and more specific rules than septic system, and the attorney offered to help with the state code language.

  9. Noise standards and generator testing

    1:01:06

    Staff described added dBA and dBC limits, third-party acoustical testing at the operator's cost, and generator testing limited to weekday daytime hours. Members asked for a baseline ambient noise test, for the nuisance wording to say properties, and for a ban on using emergency generators for sustained normal operation, to go in the power generation section. One commissioner asked for the notice radius to grow from 500 to 1,000 feet and for shall instead of may; the notice period and method were left to be reworked.

  10. Lighting, vibration, odors, heat, hazardous materials, refuse, and cooling

    1:17:12

    Staff covered lighting limits, vibration, odor, heat discharge, hazardous materials, and refuse rules. Commissioners questioned how vibration and odor would be measured, noted the county code lacks an odor definition, and asked for a hazard mitigation plan and safety data sheets. On cooling, a closed loop requirement was discussed and members said the intent of least water use appeared met. Non-combustion on-site power, such as fuel cells, was also described.

  11. Safety, cyber security, emergency response, and decommissioning

    1:29:47

    Commissioners agreed to remove the cyber security section and most of the equipment inventory items as overreach. They asked that emergency response plans require notification to county emergency services and have a compliance element, and that recycling and decommissioning items move to the decommissioning section. They pressed for mandatory financial assurance; the attorney said special use conditions give flexibility, and staff pointed to the 125% financial assurance language.

  12. Battery fire suppression and application requirements

    1:45:34

    Staff read lithium ion battery fire suppression requirements and a risk analysis requirement; a commissioner asked how recommendations would be enforced, and the response was the emergency response plan. Staff split application requirements into special use and development application lists, including DRI review. A commissioner asked that on-site generation be shown in the electrical plan. The chair called a break after nearly two hours.

  13. Development agreement, design standards, financial assurance, and enforcement

    2:00:09

    Staff summarized later sections: a written development agreement described as the county's community benefits requirement, barbed wire allowed, and financial assurance at 125% of decommissioning cost. Line of credit was to be removed, and the attorney will check insurance naming and limits, with updated certificates required. Members raised timing of cost reimbursement, with 120 days suggested. On enforcement, the proposed $10,000 per day fine is limited by state law to $1,000 in magistrate court.

  14. Proposed technology zoning district and next steps

    2:17:49

    Asked why a new technology district is needed, staff said industrial zoning would leave a parcel open to any industrial use if a data center did not happen. Primary data centers would be prohibited in general industrial and need the technology zone with special use. A commissioner asked to require special use for other uses there. Staff will send a revised draft and schedule another work session, and members suggested reading Nassau County's draft.

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Transcripción automática

This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.

1,095 turnos.

Abrir la grabación en www.youtube.com. La grabación se abre en el sitio donde la publicó el órgano. En esta página no se reproduce nada.

  1. 0:04:46

    Data center ordinance. Um, we're gonna move right into the work session. I want, uh, a couple comments I'm gonna make is tonight there's no public input, but there'll be ample opportunity later on when we do the public hearings to have your public input into the data center ordinance. It's just not tonight. Um, and just, I wanna make it clear because of some of the things going around on Facebook and other places is this ordinance is not being written around a specific project in this county.

  2. 0:05:16

    It's written around the unincorporated part of this county, not specific to any particular project, so everybody needs to understand that, okay? Um, having said that, does, do any other commissioners have any initial comments before we turn it over to Cassie?

  3. 0:05:35

    Seeing none.

  4. 0:05:43

    Can you hear me, Commissioner?

  5. 0:05:44

    I can't.

  6. 0:05:45

    Can you hear me now?

  7. 0:05:46

    Oh, yes.

  8. 0:05:46

    Okay. I just-

  9. 0:05:46

    Now I can

  10. 0:05:46

    ... needed to be closer. I gotcha. Um, first off, I wanted to start by saying that I am, uh, I do apologize for any confusion. I sent you two versions of the same ordinance. One is with special use approval and one is without special use approval. Um, they are exactly the same language except for special use. So I do apologize if there was confusion on that

  11. 0:06:09

    I would say we use the special use language

  12. 0:06:12

    I was going to recommend that we do use special use

  13. 0:06:17

    Yeah, just ... I'm not jumping ahead, but special use gives us a level of control. If a developer comes in and wants to do a data center or any other project and gets a special use permit approved, it does not follow through to the next owner if that project does not happen. So we have some controls over that. So-

  14. 0:06:37

    Correct

  15. 0:06:38

    Cassie, how can we distinguish between the two?

  16. 0:06:42

    The one ... I'm sorry. The one with the red text in the beginning is the one with special use.

  17. 0:06:51

    Okay. Thank you. Thank you, Cody.

  18. 0:06:57

    Okay, so what changes have we made? We have added some additional language to incorporate legislative findings, uh, expand on definitions, include more requirements, and clarify areas that were previously open-ended. Uh, we also reorganized some requirements into different sections to improve overall flow and readability.

  19. 0:07:19

    So at the beginning, we added some preamble, um, legal information. Um, some of it was from Jackie, just important information to have in the ordinance. Um, the first change that I have made is I have moved the, uh, "This section shall not apply to telecommunication facilities," et cetera, has been moved to exempt facilities later on. Um, I have also added the word county into, "Data centers are prohibited from receiving any county incentives," since we cannot, uh, control the state and federal.

  20. 0:07:55

    On that section there, um, I would add that, you know, even if they're located in the unincorporated, in the incorporated or unincorporated area, that, uh, the county would not do any incentives or tax abatement. So basically county-wide.

  21. 0:08:24

    Okay. Noted.

  22. 0:08:30

    And while we're on the, basically the, the second page on, under H, "The regulations contained under, in Article 3, Division 5, Section 332," I think that should be 332 through 344, which would cover the whole ordinance.

  23. 0:09:04

    Can you repeat w- uh, the section you said?

  24. 0:09:07

    It's under legislative findings.

  25. 0:09:09

    Okay.

  26. 0:09:09

    Uh, letter H.

  27. 0:09:11

    Legislative findings.

  28. 0:09:12

    Um, where it's got, uh, Division 5, Section 332.

  29. 0:09:17

    Yes.

  30. 0:09:17

    I would put 332 through 344, which would cover the whole ordinance.

  31. 0:09:27

    I could agree with that. I like that.

  32. 0:09:29

    Mm-hmm.

  33. 0:09:29

    Okay.

  34. 0:09:29

    You said 44?

  35. 0:09:31

    Yes.

  36. 0:09:32

    Yeah.

  37. 0:09:36

    Okay.

  38. 0:09:36

    That way it doesn't just stop at purpose, intent, and applicability.

  39. 0:09:39

    Correct. Of course, you know, if we add something, we'll have to go back and-

  40. 0:09:44

    Fix that

  41. 0:09:44

    ... and fix that, so.

  42. 0:09:46

    Good point.

  43. 0:09:49

    Okay, so we also added a new section, purpose, intent, and applicability. Um, I didn't list out everything that I have in this section. I am more than happy to read it if you would like. Um, essentially this section is to include, um, an explanation as to why the ordinance is needed, what is designated to accomplish, and where and when the requirements will apply.

  44. 0:10:12

    Okay. Can you hold on right there just a second?

  45. 0:10:14

    Yes, sir.

  46. 0:10:15

    'Cause in the original copy that I had, there was only seven bullet points. You, you've got eight here now, and I was gonna add one. Let me make sure.

  47. 0:10:53

    While you're doing that, you wanna tell us which one she added?

  48. 0:10:57

    Well, I'm ...

  49. 0:11:05

    I think she added back what I was gonna add, so that's, that's why I wanted to go back and ... Which was basically establishing objective standards for review of special use permit applications. So that's been added back. Sorry. Okay.

  50. 0:11:19

    Yeah, so that was removed in the, um, ordinance without special use.

  51. 0:11:23

    Right.

  52. 0:11:23

    Yes, sir.

  53. 0:11:24

    Okay.

  54. 0:11:32

    Do you have anything else, or am I good to proceed?

  55. 0:11:35

    Um, under applicability, um, I was gonna put in, um ...

  56. 0:11:48

    Well, y- you've added that back in only, too. That was a- about the special use permit.

  57. 0:11:54

    Yes, sir.

  58. 0:11:54

    Sorry. Okay.

  59. 0:12:00

    Um, under Section 333, we added several, um, definitions related to data centers, just to expand upon and, uh, to ensure that there's no, um, confusion as to how to define each one. Um, I did not list each one in, with their definitions, but this is all of the definitions that were added

  60. 0:12:22

    Um, if, if we could real quick. So s- I would like to add some additional definitions.

  61. 0:12:27

    Okay.

  62. 0:12:27

    If you go three from the bottom of the packet that I, I had handed you. Uh, and it was 32 pages of doc- so I mean, I wasn't printing a copy for everybody. Sorry, I'm not made of money. But, um, there were some concerns over the different types of actual data centers. You know, um, so we defined data center here in your ordinance. But I wanna go further to maybe touch on, like, some specific types.

  63. 0:12:50

    I'm sorry, where are you at on this?

  64. 0:12:52

    Uh, the third page from the back.

  65. 0:12:55

    Third page from the back.

  66. 0:12:57

    On the right-hand side for A2.

  67. 0:13:02

    Okay, I see.

  68. 0:13:04

    And so I'd, I'd... You know, conventional electronic data center, I think that's what most people think of when they think of a data center, something with like a rack and server. Um, but, you know, the technology's evolving so quickly, and, uh, the things they're doing is, it's as remarkable as they are, I mean, they do carry with it some ethical concerns. So by, I think, defining certain types of data centers such as, you know, conventional, electronic, you know, what everyone thinks is a data center, and then molecular data storage facility.

  69. 0:13:34

    Moving on to DNA or nucleic acid data storage facility, biological data storage facility, synthetic biology computing facility, uh, alternative media information facility. And I have those definitions there for you 'cause they are kind of all-inclusive. But I think, you know, adding, adding those to... You know, 'cause a data center could be ambiguous for a bunch of different types of things if there are different types of data storage. So if we can define those in our ordinance, and then maybe prohibit some of the, the not so cool ones.

  70. 0:14:07

    You know, th- th- they have technology now where they're using live human brain tissue, uh, to, to store data. And, and they keep it alive using nutrient... They feed it nutrients and, and keep it, the life sustained for, like, it has, like, a shelf life of six months. And, and then they have to replace it with some more synthetic brain. But I, I just, some th- you know, some things that I think that people would have moral, um, objections to, we should have defined and then be able to prohibit those. But you can't do that without defining them, so.

  71. 0:14:38

    Correct. Um, I have no issue with that. Um, you all will tell me what you think is not what you're wanting to prohibit.

  72. 0:14:46

    What is it called?

  73. 0:14:48

    Well, there's different types of... You know, you're thinking of, like, a computer rack, like what we have back here in, in, in the computer room. But, uh, you know, the way the technology is expanding, you can, in ounce of this synthetic brain material, you can hold 215,000 terabytes of data, which is an incredible amount of data. Much more than you can just get on an electronic data server. My concern is having racks of these synthetic brains right here in Camden County. You know, the only way to get that material, uh, you know, you can't just put chemicals together and create it. You have to use live human tissue.

  74. 0:15:21

    A- and so that's where the ethical concerns come from. So by defining them, you know, we can know exactly what we're dealing with and require special use for any of those.

  75. 0:15:30

    Where do you want to define it? Still, are we still under section 333?

  76. 0:15:34

    Yeah, these were definitions I'd like to add.

  77. 0:15:36

    He's just say, asking to expand some of the definitions to other areas.

  78. 0:15:40

    Yeah, data center, I think-

  79. 0:15:42

    So I think... Go ahead, I'm sorry.

  80. 0:15:43

    Oh, yeah, just da- data center as it's defined here, you know, one singular definition for data center, uh, is kind of ambiguous. But there are... You know, people think it's gonna be a rack room, a, a server rack room, but really it could be something completely different. So I think having that defined before we make an approval is important.

  81. 0:16:05

    So Cassie, um, I know it's recorded. You can come back and, you know, take notes and make the changes. But in a case like this, um, I would suggest maybe verbalize or-

  82. 0:16:17

    Yeah, I can read them out for you if you'd like

  83. 0:16:19

    ... No, no. Do it in an email, send it out to everybody so she has the verbiage. So just, it's a matter of just understanding what he's asking for. Does that make sense?

  84. 0:16:28

    Yes, sir.

  85. 0:16:29

    Okay.

  86. 0:16:30

    And you do have those, correct?

  87. 0:16:31

    I do have a copy, and I, I highlighted the ones that you mentioned.

  88. 0:16:34

    Okay, that's fine. Yeah. Just wanna make sure if it's beyond the recording and you need more information, feel free to s- ask us or whatever we need to clarify-

  89. 0:16:43

    Absolutely

  90. 0:16:44

    ... for you. Yeah.

  91. 0:16:48

    Do we have any more questions regarding definitions?

  92. 0:16:51

    Yeah, on, um, since you defined, um, a data center campus as consisting of one or more data centers, I think, um, anywhere, like in, in the major, it should read a data center campus between. And you would have to do that with minor and medium and, and hyperscale as well.

  93. 0:17:16

    Okay.

  94. 0:17:36

    At, at what point through this ordinance, if we wanted to require a master development plan, would it fall? Would it fall before definitions?

  95. 0:17:44

    Um, I have the development plan. It is in the development requirements.

  96. 0:17:48

    Gotcha. Thank you.

  97. 0:17:57

    Anything else on definitions?

  98. 0:18:00

    Um, under mechanical yard, I think after electrical infrastructure, we should put including on-site power generation.

  99. 0:18:38

    Anything else?

  100. 0:18:45

    Um, so we also added exempt facilities into the definitions. Um, I did see on number five, I have, "This section shall not apply." I do intend to remove that. Uh, that was a mistake on my part. But as you can see, we've added, uh, server rooms and computer equipment, um, server rooms or computer equipment accessory to hospitals, schools, colleges, to telecommunications, uh, telecommunication facilities, I'm sorry, equipment rooms and computing systems.

  101. 0:19:17

    Typical things that would be related to data centers.

  102. 0:19:24

    Oh, you said you, you wanna remove section five?

  103. 0:19:27

    Not the whole section, just that first, "This section shall not apply," because it kinda cancels itself out there.

  104. 0:19:35

    Yeah, 'cause it's kinda covered under number three.

  105. 0:19:39

    Yeah. Yeah, I, uh, I just copied and pasted it over here, and I didn't reword it. That was my bad.

  106. 0:19:44

    Okay.

  107. 0:19:48

    Anything on exempt facilities?

  108. 0:19:57

    Well, no, 'cause I'm gonna wanna address it on item C in section 334.

  109. 0:20:01

    Got it. Okay, section 334, uh, accessory uses and structures. We have added, um, data centers with less than 20,000 square feet of gross floor area, uh, administrative offices directly supporting the facility, security facilities and gate houses, electrical substations, switch yards, and on-site electrical distribution systems, backup power, cooling equipment, and mechanical equipment yards, water storage, fire protection facilities, maintenance buildings and equipment storage, employee parking, loading, and delivery areas, storm water management facilities, and other uses determined by the planning and zoning director to be customarily incidental and subordinate to the approved commercial data center.

  110. 0:20:50

    Okay, under, under our definitions, we define a minor data center as 2,000... or, or 20,000 square feet or, or less. So it's not-

  111. 0:21:03

    An accessory use

  112. 0:21:03

    ... it's not an accessory use.

  113. 0:21:05

    And that, that's the point I wanted to touch on as well.

  114. 0:21:07

    I gotcha.

  115. 0:21:07

    That we were removing that. Um-

  116. 0:21:09

    Yeah, we can remove that, or we can remove it from the accessory uses and structures, whichever.

  117. 0:21:14

    I would, I would remove it from this and renumber everything else below that.

  118. 0:21:21

    Okay.

  119. 0:21:22

    I had that note as well, so I think remove that and then renumber the exceptions.

  120. 0:21:27

    I, I think the intent everyone's looking for here is, like, if the hospital, they, they store immense amounts of records. If they have a data center, even if they built an accessory building to host that data, uh, you know, that, that's subordinate to its primary use. A- and so just ensuring that that's not prohibited in any way or has to fall into a T district or...

  121. 0:21:54

    And do you think we meet that w- with the, with this current?

  122. 0:21:58

    I, I, I believe so.

  123. 0:22:06

    Uh, special use approval standards and burden of c- proof. Uh, I did not add all the language that I have in here, um, but we included this section to make sure applicants are responsible prof- for proving their project meets all ordinance standards, uh, to guide the board with clear findings for approval and to allow reasonable conditions to be placed on projects when needed. And again, I'm more than happy to read any of this if you would like.

  124. 0:22:36

    Well, number three, um, I won't read through the whole paragraph, but it says, "Creating an unreasonable financial burden upon the county."

  125. 0:22:46

    Yes.

  126. 0:22:47

    I'm not sure unreasonable is defined. I would say just creating a financial burden, and let, let that be part of the process rather than s- trying to define what unreasonable is.

  127. 0:22:57

    Is that under the required findings?

  128. 0:22:58

    It's on paragraph three, under, uh-

  129. 0:23:01

    Required findings?

  130. 0:23:03

    Yep.

  131. 0:23:04

    Okay. Um, the first sentence in required, for required findings, the Board of Commissioners shall. I think shall needs to be changed to may.

  132. 0:23:19

    Okay.

  133. 0:23:19

    You're talking about for letter A?

  134. 0:23:22

    B.

  135. 0:23:23

    In B. For B.

  136. 0:23:24

    Yeah, it should say may. That's a good point, 'cause shall means yes, we will. May means we have-

  137. 0:23:29

    Yeah

  138. 0:23:29

    ... an opportunity. Yes.

  139. 0:23:30

    Catch.

  140. 0:23:30

    Good catch. Thanks.

  141. 0:23:39

    Any other comments regarding this section?

  142. 0:23:41

    What'd you take out on three? Unreasonable?

  143. 0:23:44

    Unreasonable.

  144. 0:23:52

    Okay.

  145. 0:23:56

    All right, section 336-

  146. 0:23:58

    So just-

  147. 0:23:58

    I'm sorry.

  148. 0:23:58

    Oh, go ahead.

  149. 0:23:59

    Yep, I go back.

  150. 0:24:02

    On number seven, um-

  151. 0:24:04

    Yep

  152. 0:24:04

    ... just for clarification, we're talking about internal fire protections, not external, but we would have to do as a county. Correct?

  153. 0:24:13

    Correct.

  154. 0:24:14

    Okay.

  155. 0:24:28

    Development standards. Um, so we adjusted the minimum lot sizing. Um, The minimum lot size for data centers between 20,000 and 99,999 square feet, uh, shall be 25 contiguous acres under common ownership or unified control. Um, we did 50 for, ah, data centers between 100,499, um, 75 acres for 500,000 square feet or more than 50 megawatts.

  156. 0:25:00

    Um, we have also added public road right-of-way, and parcels separated by a public road or unrelated ownership shall not be counted as contiguous acreage. Land located in another zoning district shall not be used to satisfy this requirement. Um, and then number five is shall not occupy more than 50% of the gross site acreage. I was unsure if you wanted to leave this in or not. I didn't know if it was too restrictive to have a percentage as well as an acreage limit.

  157. 0:25:33

    I don't think-

  158. 0:25:34

    I think for number five-

  159. 0:25:35

    Both. Go ahead, I'm sorry.

  160. 0:25:38

    Since we have a data center less than 25,000 square feet, I think we need to put that in there. And my language would be, the minimum lot size for data centers less than 20,000 square feet of gross floor area shall be 10 contiguous a- acres.

  161. 0:25:59

    Instead of the recommended 25?

  162. 0:26:01

    Well, the, the 25 is for 20,000 to basically 100,000 square feet. We defined a, you know, a smaller data center, but we didn't-

  163. 0:26:13

    Mm-hmm

  164. 0:26:14

    ... add this in there. So if you're gonna have a small one, you need to-

  165. 0:26:19

    Uh, the minor, the little minor data center?

  166. 0:26:21

    Yeah.

  167. 0:26:21

    Yes.

  168. 0:26:22

    Yep.

  169. 0:26:23

    Yeah, I hadn't added it because I had it under accessory uses, but I will add that in.

  170. 0:26:28

    Now, as far as, um,

  171. 0:26:33

    your number five, which if we add that language I just spoke about, this would make it number six. Um, data center campus buildings and accessory buildings shall not occupy more than 50% of the gross site acreage. That's how I would word that.

  172. 0:26:55

    And just to understand number three better, anything over 50 megawatts is gonna require 75 contiguous?

  173. 0:27:01

    Yeah. Yes.

  174. 0:27:02

    Gotcha.

  175. 0:27:05

    Also, number five, we've got 50% of gross site acreage in the parking section, which we hadn't got to yet, is noted as 35%. It's a coordination issue-

  176. 0:27:15

    Okay

  177. 0:27:15

    ... between the maximum coverage. So here it says 50 and parking section it says 35, so let's just clarify that.

  178. 0:27:23

    Yeah, so the parking section I think was just for parking, but I can see where having 30% of-

  179. 0:27:27

    It needs to be all-inclusive.

  180. 0:27:29

    Yes. I gotcha.

  181. 0:27:30

    If you start separating then building and parking, then we're gonna get some confusion. So whether it's 50 or 35, we need to make sure that's consistent. Um-

  182. 0:27:38

    I understand.

  183. 0:27:38

    Yep.

  184. 0:27:43

    So 50 will include the, uh, impervious, like any impervious surface?

  185. 0:27:47

    Yeah, the, uh-

  186. 0:27:48

    Mm, yeah.

  187. 0:27:49

    Okay.

  188. 0:27:49

    Impervious would be buildings, parking, anything that's a solid surface. That gives you the gross site acreage percentage that you can occupy.

  189. 0:28:07

    Um, this is just a rendering that I did with Copilot. Um, I thought it gave a nice picture of what a site could look like. Obviously, it is not to scale and it is not official. But I had fun making it. I thought you might enjoy looking at it.

  190. 0:28:26

    So just a point of clarification on number four.

  191. 0:28:30

    Yes.

  192. 0:28:30

    If that access road was a mile long, that does not, that's not included in your acreage figure.

  193. 0:28:37

    Right.

  194. 0:28:38

    That's why you excluded-

  195. 0:28:39

    I excluded that-

  196. 0:28:40

    ... that in number four

  197. 0:28:40

    ... and I didn't want, you know, I, I don't know if you've ever seen, there's parcels in the county where they'll be separated by a road-

  198. 0:28:46

    Yeah

  199. 0:28:46

    ... so we wouldn't consider that contiguous.

  200. 0:28:48

    Absolutely. Yeah. Uh, I'm with you, it's just a point of clarification.

  201. 0:28:52

    Yes, absolutely.

  202. 0:28:52

    So that's, that's why you put that in there.

  203. 0:28:54

    Yes. That is.

  204. 0:28:56

    Cassie, could you go back to your first drawing? I wanted a second. Thank you.

  205. 0:29:07

    You're welcome.

  206. 0:29:10

    Um, Section 336, again, um, minimum lot width and access. Um, so we've added that the site shall have at least one... Oh, I see where I forgot to take out 1,000. I meant 100 feet of continuous frontage on and direct access to a paved public road. Um, we added this language. All of, not all of our, our industrial sites have a 100-foot, uh, requirement, so that's why we added it to this as well. Um, obviously, we can make that larger, smaller, however you feel is necessary.

  207. 0:29:44

    Well, 100 foot is basically, um, kinda like a flag lot-

  208. 0:29:50

    Yes, I see that

  209. 0:29:51

    ... the way I look at it. So, so I would, I would've left it at 1,000 feet.

  210. 0:29:56

    1,000?

  211. 0:30:01

    I think the intent here was to establish the right of way with getting to the site, right?

  212. 0:30:05

    Yes.

  213. 0:30:05

    Okay. Maybe that's something just to clarify. Right of way to the site versus the actual frontage.

  214. 0:30:12

    Of a parcel?

  215. 0:30:12

    Minimum, yep, frontage of the parcel, yeah.

  216. 0:30:30

    Um, so we also adjusted the minim- or the maximum height. Um, this does not have to stay. We ha- There was some concerns as to whether or not they could bring a data center in with less than 75 feet. However, I have spoken with, uh, Chief Smith, and they do not feel comfortable with anything above 60 since we do not have a ladder truck

  217. 0:30:55

    You could have got yourself a new ladder truck if we made them buy it for you. No, I agree with that.

  218. 0:31:01

    Well, you might be able to do that in, in development agreement, but I, you know, I would say leave it at 60 foot.

  219. 0:31:07

    Yeah.

  220. 0:31:08

    Also, on, um, the minimum front yard setback.

  221. 0:31:12

    Yes.

  222. 0:31:12

    I think that conflicts with, um, a later section where in the later section it's 100 foot, so I think that hu- we- you know, 100 foot on, on the front yard as well.

  223. 0:31:26

    Just make it 100 on all sides?

  224. 0:31:28

    Yes.

  225. 0:31:39

    And that 60 foot, that includes all their screening for their HVAC equipment, everything on top?

  226. 0:31:45

    I'm unsure. Um, Joey, do you know?

  227. 0:31:51

    There's some exemptions-

  228. 0:31:51

    6-

  229. 0:31:51

    ... in the ordinance that pertain to that. Um, so, so if a-

  230. 0:31:56

    So like, the, the building has to be 60 feet, but then their HVAC equipment can go beyond that?

  231. 0:32:00

    Yeah. They're, they're... I'd have to go back and look. Certain, like, towers and, and chimneys and things of that nature are exempt. But I'm not sure about parapet walls or anything of that nature. I'd have to check that.

  232. 0:32:11

    Can we make sure Chief Terry gets to review it before?

  233. 0:32:12

    60 feet I think is occupied space, correct?

  234. 0:32:14

    I'm sorry.

  235. 0:32:16

    Whatever change-

  236. 0:32:17

    But I can-

  237. 0:32:17

    ... we make here, can we make sure Chief Terry gets to review it?

  238. 0:32:19

    Yes, absolutely.

  239. 0:32:25

    So we wanna clarify what 60 feet entails too, right? Is 60 feet occupied space?

  240. 0:32:31

    Typically, yes. That's the reason I say I don't know, I'm not sure if it includes parapet walls or not. So they, I wouldn't think they would be, but there again, I'd have to check with the fire marshal and Chief-

  241. 0:32:40

    That's another thing Chief can look at too once we get it done.

  242. 0:32:43

    Now, he, he went with 60 instead of 75? Change that?

  243. 0:32:47

    60. Change it to 60. Yeah. 75, we don't have ladder trucks. Now, if we're adjacent to the city limits and there's a mut- mutual aid agreement, that's one thing. But we don't, in the north end of the county in the extreme areas, we can't, we don't have a ladder truck capable of going to 75 feet.

  244. 0:33:06

    Might be able to get one one day.

  245. 0:33:14

    Okay, um, moving on to ingress and egress. Uh, we have added, "Driveways and entrances shall be located to minimize disruption to neighboring properties and must comply with GDOT access management regulations. Um, entrance areas are exempt from buffer plantings, but must maintain all sight lanes and safety standards. Uh, the development shall provide emergency access, apparatus circulation, water supply, communications, and site identification acceptable to the fire marshal and other authorities having jurisdiction.

  246. 0:33:49

    Relocation of utilities required by the development shall be the applicant's responsibility unless otherwise provided by written agreement with the affected utility. All necessary easements shall be obtained without reducing required buffers or setbacks unless specifically approved."

  247. 0:34:16

    Any comments on this?

  248. 0:34:21

    Uh, next section, roads and bridges. "Access roads and entrances shall safely accommodate anticipated construction and operational traffic. The applicant shall be responsible for roadway, entrance, turn lane, acceleration lane, deceleration lane, bridge, intersection, signal, or other transportation improvements reasonably necess- necessary as a result of this development. Construction haul routes shall be approved by the county or applicable road authority before land disturbance begins.

  249. 0:34:53

    No certificate of occupancy shall be issued until im- improvements required for the applicable phase are completed or secured in a form allowed by law and acceptable to the county. The applicant shall repair project-related damage to public roads and bridges in accordance with the development agreement."

  250. 0:35:17

    Well, number three, the road authority, I assume you are just talking about DOT and Federal Highway?

  251. 0:35:23

    Yeah.

  252. 0:35:23

    Okay.

  253. 0:35:25

    Should I change that to say DOT instead of road authority? Or-

  254. 0:35:30

    Only three authorities. I'd probably make it more specific.

  255. 0:35:33

    More specific?

  256. 0:35:34

    It's kinda nitpicking, but go ahead and just mention DOT and Federal Highway.

  257. 0:35:46

    How are we able to ensure that they do some of these things, like repair project-related damage to public roads, and what kind of enforcement?

  258. 0:35:53

    We have financial assurances later on in the ordinance that I feel would cover that.

  259. 0:35:57

    Okay.

  260. 0:36:06

    Normally on a project, there's inspections that are done throughout the work. Um, and, and the county's, we, we occasionally stumble upon where a contractor may not have done the things that they... W- we've stumbled upon it. Sometimes we've been made aware or we've discovered ourselves, um, where the count- where a contractor has not done the things that they need to do, and, um, they are required to fix it, and they are made aware. And, um, we can stop work and do things on a certain project as they go along.

  261. 0:36:39

    Yeah.

  262. 0:36:39

    Okay. Moving on to buffers and separation. So we've changed the buffer for marshlands. We've removed wetlands, and we added, "As a 100-foot buffer shall be required for all coastal marshlands as measured horizontally from the coastal marshland upland interface." This language is directly from the state. This is how their ordinance reads. The only difference is instead of 25 feet, we're requiring 100 feet Um, we are also requiring that existing mature trees and native vegetation within the required buffer shall be preserved to the maximum ex- extent practical.

  263. 0:37:15

    We wanna make sure that we're protecting the natural, uh, buffers out there.

  264. 0:37:22

    Instead of a whole bunch of transplanted twigs.

  265. 0:37:24

    E- exactly. Where existing vegetation does not provide an effective year-round visual screen, supplemental evergreen and native planting shall be installed. The landscape plan shall be prepared by a Georgia registered landscape architect or other qualified design professional acceptable to the county, and shall be planted in accordance with Article 4, Division 1, Zoning Buffers. The Board of Commissioners may require earthen berms where necessary to reduce visual equipment lighting or noise impacts.

  266. 0:37:55

    All landscaping, berms, fencing, and screening shall be maintained in good condition throughout the life of the facility at the expense of the data center operator. Dead or diseased plant material shall be replaced during the next appropriate planting season. If this area is sparsely vegetated or disturbed, it shall be replanted in accordance with Article 4, Division 1, Zoning Buffers.

  267. 0:38:19

    Can we go back to paragraph, uh, sentence number four real quick? Um, instead of saying ... Again, this is kinda nitpicking, but instead, instead of saying existing mature trees and native vegetation, I think that should say all vegetation if it's gonna be completely undisturbed. 'Cause what'll happen is-

  268. 0:38:40

    All the unnative-

  269. 0:38:41

    If it's timber company property, a buyer wants to buy a portion of the timber company property, the timber company's gonna come in and take those trees out. We wanna prevent that-

  270. 0:38:49

    Right

  271. 0:38:49

    ... 'cause that's the natural buffer. So rather than saying existing mature, let's just say all vegetation in an undisturbed buffer.

  272. 0:38:57

    I'm good with that.

  273. 0:38:59

    If-

  274. 0:38:59

    Existing vegetation.

  275. 0:39:01

    Yep, exactly. Yep.

  276. 0:39:02

    Exactly.

  277. 0:39:04

    Told you this red pen would come in handy.

  278. 0:39:16

    Uh, we added a section on water. Uh, I'll preface this with all of this is regulated by EPD. I put this in here just for, I guess, clarification's sake, and that way, i- we could require them to provide us with any of this information. We cannot regulate it. Uh, essentially, we have added that wells may be installed in accordance with the EPD Georgia Camden County Environmental Health Regulations. They shall be metered to provide the county with the amount of water used.

  279. 0:39:47

    Sma- a smart water meter device shall measure water usage digitally and automatically transmit data to the user. All wells within a one-mile radius shall be monitored for water quality using EPD methods.

  280. 0:40:03

    Okay, I would like to add something to that. Um,

  281. 0:40:09

    I would like to add a, a new number one that, uh, direct connections to surface water sources or aquifers are prohibited unless no other source is available.

  282. 0:40:24

    Yeah, some of what I read said that you could use a municipality for it. Am I correct?

  283. 0:40:30

    Yeah. This, this is to force them to try the municipalities first, and if they can't do it, then we can permit wells. But, um-

  284. 0:40:42

    But they would meter it in, right? They would keep up with how much water?

  285. 0:40:47

    Yes.

  286. 0:40:47

    That would be-

  287. 0:40:48

    That's, that's how the rest of that ordinance would be. Um, but, you know, we need to kinda direct them to use the city water if possible first.

  288. 0:41:00

    This is being written for all of unincorporated Camden County. How practical is that in the majority of the, like, the north end, for example?

  289. 0:41:09

    Well, if it's outside of ... Right outside of Woodbine or outside of Kingsland or outside of St. Marys, they have the potential to use those city water sources.

  290. 0:41:19

    Yeah, we have-

  291. 0:41:19

    There's a state rule that says-

  292. 0:41:20

    We have that in our existing ordinance already

  293. 0:41:21

    ... I believe it's six, um ... If you're within, I think it's 600 feet of a water source, municipal water source, you have to tie on.

  294. 0:41:29

    It's-

  295. 0:41:29

    So there's some state protection-

  296. 0:41:31

    Okay

  297. 0:41:31

    ... regarding that. Um, doesn't hurt to put it in here, but there's some state protection already. I, I wanna put it in here.

  298. 0:41:37

    Okay. Well, it makes it clear enough. So is it, is it, is ... Maybe talk to the health department. I think it's 600 feet. Well, we have, we have that in our existing ordinance, so there's something that Jackie and I were just discussing that things that aren't covered in this ordinance, uh, may be in our existing ordinance, such as if you're within a certain footage of, uh, city water, you are required, and that goes back to the health department. They're going to require, uh, to tie into city water within a certain distance of the development.

  299. 0:42:10

    So that, we've gotta make some kinda notation to where if it's not covered in this ordinance, that what's never not, what's not covered here needs to be covered in our existing ordinance.

  300. 0:42:19

    Basically, c- uh, Cassie, this'll be in a- in addition to Section 332. I'll, I'll give you some language on this, but in effect it'll say, um, that, um, this, uh, 332 et seq, um, which has been, um, I'm gonna recommend that instead of saying 332 through 34- 30- 4, 344, just say 332 space et seq, S-E-Q. Um, that's gonna cover any, any additions-

  301. 0:42:48

    Because all of-

  302. 0:42:49

    If we, if we make additions, additional ordinances in the future, it's gonna cover this whole section.

  303. 0:42:53

    That's lawyer speak.

  304. 0:42:54

    Lawyer speak. We'll cover ya. All right. Um, in Section 332, what we would add is that, um-

  305. 0:43:02

    332?

  306. 0:43:03

    It's ... Yeah, I'm going back to 332 'cause this is gonna be a catchall. This is gonna be catchall language to refer back that anything not otherwise covered by this section, um-

  307. 0:43:15

    Is it A?

  308. 0:43:16

    No, 330- 332, the first section

  309. 0:43:18

    It was way back at the beginning more

  310. 0:43:20

    Way back at the beginning. We're gonna add this, and this is gonna cover the concern here. Any, um,

  311. 0:43:29

    anything not, uh, otherwise covered by, uh, section, uh, division five data centers shall be governed by the Camden County UDC except otherwise amended.

  312. 0:43:44

    I'm gonna do it that's slightly cleaner for you, but I'll, uh, we'll get that language right. But basically that anything, um, if we haven't carved it out specifically by the data center ordinance, we're still covered by what's in our UDC. So that's where we talk about the tie-in to, uh, municipal water if we're within that- that, um, setback area.

  313. 0:44:05

    So anything not covered by A3D5 must comply with anything remaining in the county's UDC?

  314. 0:44:10

    Anything not otherwise referenced-

  315. 0:44:12

    Okay

  316. 0:44:12

    ... in section five will be re- will be covered by the rest of our UDC. Division five.

  317. 0:44:34

    We've also added, uh, key requirements for well testing, uh, located as far as possible from known or potential-

  318. 0:44:41

    I'm sorry, Kate. Can we go back-

  319. 0:44:42

    I'm sorry

  320. 0:44:42

    ... to number two real quick?

  321. 0:44:43

    Sure.

  322. 0:44:43

    I'm sorry.

  323. 0:44:44

    No, no worries.

  324. 0:44:45

    It says wells will meet, will be metered to provide the county with the amount of water used. Um, I think it should be worded... 'Cause the state's gonna require them to do water testing every month.

  325. 0:45:01

    Correct.

  326. 0:45:01

    We should get those reports, whether it's water or sewer, we should get the state level reports every single month as part of the process. Whether we just file them or not doesn't matter, but, um, if we get them on our own without state, without state, um, guidance, then we really don't have anything. So the state monitors that. Let's use them to force the issue rather than us saying, "Give us your- your monthly, uh, readings," right? Make sense?

  327. 0:45:32

    Yeah.

  328. 0:45:32

    Okay.

  329. 0:45:35

    I may be wrong, but I believe depending on the size of the well, uh, the state requires it to be metered anyway.

  330. 0:45:44

    It does, yeah. Yep, and there's reporting, so that's what I'm saying. All that reporting goes to the state that they're required to do, needs to come to us just as a matter of record keeping.

  331. 0:45:54

    Yeah. I agree. Um, that was-

  332. 0:45:57

    And that'll include if there's any violations on, uh, chemistry or anything else, then that'll be showed up on the- the, uh, state report. So we- we have a record of that, and then we can, we can act based on the state level, uh, requirements they have to send in.

  333. 0:46:11

    Yes, and, uh, most of this under water is regulated by the EPD.

  334. 0:46:15

    Yes.

  335. 0:46:15

    Um, that was my intent, was to just have them provide us with that. Um...

  336. 0:46:20

    Yeah. Makes sense.

  337. 0:46:29

    Cody, on- on number three in that, when you have all wells within one mile radius shall be monitored.

  338. 0:46:35

    Yes.

  339. 0:46:35

    I think we should require them to, uh, establish a baseline before they drill their wells.

  340. 0:46:48

    So that would require them to- to have a baseline reading of- of all private and public wells within one mile radius.

  341. 0:47:08

    And obviously they're gonna, to make that happen, they're gonna have to get consent from those-

  342. 0:47:11

    I think it-

  343. 0:47:12

    ... property owners. And, you know, for some people that don't want anybody coming on their property, if they do get a refusal, at least they have to document that they received a refusal from this property.

  344. 0:47:22

    Yeah.

  345. 0:47:22

    Um...

  346. 0:47:23

    That's a good point.

  347. 0:47:24

    Yeah.

  348. 0:47:25

    If, all right, it says these meters will detect abnormal consumption patterns, set usage alerts or- or thresholds, and allow quick corrective action when overuse is detected. Who's gonna monitor that? The EPD's gonna monitor that?

  349. 0:47:39

    EPD monitors that, yes.

  350. 0:47:41

    All right, if they're gonna monitor it, does that mean that, uh, they will be responsible for contacting whoever owns the data center?

  351. 0:47:50

    Yes, sir.

  352. 0:47:51

    To tell them to take the correction act, corrective action?

  353. 0:47:54

    Yes, sir.

  354. 0:47:55

    And we don't have anything to do with that at all, right?

  355. 0:47:58

    No, the state-

  356. 0:47:59

    State

  357. 0:47:59

    ... EPD monitors that.

  358. 0:48:00

    Yeah, the state monitors that.

  359. 0:48:02

    Okay.

  360. 0:48:03

    And that's why we, we, if we get the records, we'll know what's going on, but we don't monitor that. That's the state level.

  361. 0:48:08

    So we can't go in there and say, "You're using too much water. You've got, need to do something about it."

  362. 0:48:13

    No, EPD would do that.

  363. 0:48:20

    Okay.

  364. 0:48:21

    As, I believe as part of their permitting process, they'll be given a, a, basically a cap. Like Gilman was given a cap. They could draw out, I think Gilman's was what? 26 million gallons a day or something like that.

  365. 0:48:35

    That's a cap rate. Yeah.

  366. 0:48:36

    So-

  367. 0:48:37

    They had a permit for 40.

  368. 0:48:39

    Yeah. Yeah.

  369. 0:48:41

    But it's like a, it's like a closed loop air conditioning system. You can leak out so much Freon without having to change everything out and redo it, and that's basically what this say, this says. But the only way you can tell on a air conditioner is you get hot, then you know you got a leak somewhere or something's going on. I just wondered how- how- how we would know if they had a- a, uh, a water leak somewhere in their system. That's- that's all I was asking.

  370. 0:49:14

    Well, a- a major leak would show up in- in the, um-

  371. 0:49:18

    Water usage

  372. 0:49:19

    And the water usage, you know, if they, they report it monthly or, or, or weekly or, or daily, I don't, I don't know. But, um, you know, those meters, you got the ability to, to do all of that. Yeah, with the new metering systems, you have instant data as long as they're monitoring that. So one thing, d- d- uh, this sentence is, "This will help in determining how much water can be used during a drought season." What, what's the intent of that?

  373. 0:49:52

    That was just the language that it used. Um, I borrowed this from, uh, Brantley County's ordinance, and that's the language they had in there.

  374. 0:50:01

    Okay.

  375. 0:50:01

    But I can remove it.

  376. 0:50:03

    I, I think it's redundant. I would move it because, like, you have a water usage cap. Doesn't matter whether it's wet or dry, drought or not, you still have the cap that you're operating under. So I, again, I'm kind of nitpicking here, but I don't think that sentence is necessary. Yeah, and-

  377. 0:50:18

    And, and if they're getting their water from the city, then you don't have to worry about the aquifer. That becomes a moot point.

  378. 0:50:25

    Well, the, the city gets it from the aquifer, too, but-

  379. 0:50:28

    Right

  380. 0:50:28

    ... you don't have another, another well. And the city will, will monitor theirs 'cause they're gonna wanna get their paycheck.

  381. 0:50:35

    Right.

  382. 0:50:35

    Yep. So.

  383. 0:50:39

    Yeah, you know, the, I- I've seen Douglas County used as the example, um, frequently for the, the, their data center ordinance, the amount of data centers they have. You know, they have a requirement where, where all of those types of facilities are only allowed to use gray water, non-potable water. Is that something that we could entertain?

  384. 0:51:00

    Um- O- only if it's connected to the city. Gray water is treated sewer. In the unincorporated area, we don't have that. We don't have that, um- And we don't need to get into sewer business either, so.

  385. 0:51:13

    Yeah, I, I-

  386. 0:51:14

    But- You know, I'm, you know- Now, if they were located close enough to s- say Kingsland or St. Marys, for example, Woodbine, they don't, wouldn't have enough water. I don't even know if this, the two cities-

  387. 0:51:30

    Move gray water like that?

  388. 0:51:31

    There's-

  389. 0:51:32

    Yep

  390. 0:51:32

    ... you know, the, the gray water from Kingsland ends up in St. Marys River. I don't know where St. Marys goes. I think it goes in North River, so. Well, gray water's a good use of, of use, but it's gotta come through a municipal facility inside of Camden County. We don't have that option. Right. Mm-hmm. Great idea. I like it. Yeah. But- But- We're limited 'cause we don't have any sewer in the county. I don't think we, we got enough, might not have... Yeah, it all depends on well we... If it's closed loop, you know, yeah, they could probably fill it up with gray water, but, but getting the gray water there might be more difficult than-

  391. 0:52:13

    Yep

  392. 0:52:13

    ... allowing to fill it up one time with, with city water.

  393. 0:52:27

    Um, this is just more language. These are requirements directly from the EPD that they enforce on well testing.

  394. 0:52:45

    Uh, the applicant shall demonstrate that the proposed water source is legally available and adequate for initial and ultimate build-out without creating unreasonable adverse effects upon groundwater, surface water, existing lawful users, or neighboring wells. If groundwater is proposed, a hydrological study prepared by a qualified professional shall evaluate sustainable yield, drawdown neighboring wells, streams, drought conditions, and cumulative impacts.

  395. 0:53:15

    The applicant shall demonstrate that wastewater can be treated and disposed of in compliance with the applicable law without creating an unreasonable burden upon county infrastructure or surrounding properties.

  396. 0:53:28

    Can they demonstrate that by getting a, a letter from the utility provider?

  397. 0:53:33

    Yes.

  398. 0:53:34

    Okay.

  399. 0:53:44

    I added a section in for sewer. Obviously we don't have sewer, but if a public sanitary sewer system is not available, a sec- a septic system may be installed in accordance with the State of Georgia Camden County Environmental Health Regulations.

  400. 0:53:59

    Septic tank, right?

  401. 0:54:01

    Yes.

  402. 0:54:03

    Hold the phone.

  403. 0:54:04

    Can I- Go ahead. You go ahead. I think we're on the same page here.

  404. 0:54:07

    Yeah. Here's where I am on this. There is not one square foot of Camden County, Georgia, that is not in an environmentally sensitive area. And as an example of that, just this very afternoon I stepped off my school bus, looked right straight down at a s- at a storm sewer in the middle of the parking lot at Sugar Mill Elementary School, and is stamped as part of the casting for the grate.

  405. 0:54:38

    It said, "Do not dispose of anything in this sewer. It is connected to the waste to, to the estuary system." The estuary system at that point is probably a mile as the crow flies, and you would think that what they're addressing is probably cars with leaking transmission fluid or whatever. We have this, this whole body of work here reduced the most important issue, in my opinion, down to two paragraphs.

  406. 0:55:11

    It tagged on at the end of the freshwater system is item number seven, and as a standalone we have sewer that says, "If a sanitary sewer is not available," but we don't really address what we need to address in this, is to be absolutely certain- That we're containing, treating, disposing of properly anything that's related to the data center. As I understand it, some of that water is gonna be treated with chemicals, and those are not things that you can just introduce to a municipal sewer system without g- a great deal of preparation, and if so, a great deal of expense to the municipal sewer system.

  407. 0:55:52

    And for God sakes, it can't be turned loose into any estuary or dumped on the ground. So I wanna see meat in this, in these two sections. This... I'm not fussing, I'm just absolutely demanding that we pay attention to the sewer part more so than we're doing at this point with two short little paragraphs. Those deserve pages and pages by themselves.

  408. 0:56:16

    We don't regulate sewer w- I, I guess I, I'm, I'm not sure what you're asking me.

  409. 0:56:20

    I'm asking that we make certain that we specify what they have to do. And in addition to that, I would like to see whatever development agency comes in with a data center have a bond, a performance bond and a surety bond, and, and back us up, indemnify us for any losses or any additional expenses if they do suffer some type of violation of the EPD or EPA rules and regulations for water. I'm thinking of the plume, underground water, ruining wells like fracking does.

  410. 0:56:55

    And, you know, people say, "Well, that's just a bunch of scare tactics." It's not. There have been demonstrated issues, PP&G over in California. Think about Erin Brockovich. I mean, let's get dramatic about it. We don't wanna see that in Camden County. I wanna see some real meat in this, and I wanna see some bonding, performance and surety bonds that in- indemnify and hold harmless this county and its citizens. I want us protected in this.

  411. 0:57:24

    I will say I did add a sur- sh- ugh, a surety bonds, uh, later on in the ordinance.

  412. 0:57:29

    Very good. This is the first I've seen of this document, so excuse me for not s- not knowing that.

  413. 0:57:34

    So knowing that the municipalities discharge into the waterways, like, we know they have a discharge permit and they do that, can we require onsite water, you know, wastewater treatment? Like, we can require that rather than even allowing them... If they're gonna be an unincorporated falling under our ordinance, not even allowing them to connect to that system.

  414. 0:57:56

    I suppose we could, yes.

  415. 0:57:58

    If the city's discharge permit allows X, it's not unreasonable for us to require a data center to provide X before it goes to the city. Now let's go to septic systems just for a second.

  416. 0:58:14

    Mm-hmm.

  417. 0:58:18

    That's too general.

  418. 0:58:19

    Okay.

  419. 0:58:19

    Septic systems like what I have at my house. If you've got a... If you have a data center in unincorporated part of the county, they need a septic system for their employees, not for, um, operational use necessarily. So they got 50 employees. You can design a septic system for those 50 employees, but we need to put language in there that's specific to the state regulations, and I can help you with that.

  420. 0:58:47

    Okay.

  421. 0:58:47

    Yeah, there needs to be-

  422. 0:58:48

    We just need to be more specific than saying septic system. That's, that's too broad a term. You know, in, in, in my mind, a septic system is what I have at my house.

  423. 0:58:58

    Right.

  424. 0:58:58

    But if you got 50 or 100 employees, it's a whole different system. It's still a septic system, but it's not. It's a onsite treatment system. I'll help you with the codes to add to this if you'd like me to.

  425. 0:59:09

    Onsite wastewater system.

  426. 0:59:10

    Absolutely. It is exactly what it is.

  427. 0:59:12

    Right. There's-

  428. 0:59:12

    There's three or four different options, and let's, let's don't get into that tonight, but I'll help you with what we need in the ordinance if it's okay with the board.

  429. 0:59:18

    Pen's about to fall. Yeah, there, there's, there's two different systems that you need. You need a wastewater treatment-

  430. 0:59:25

    Mm-hmm

  431. 0:59:25

    ... system, and then you need a sanitary sewer type system, which is the septic tank for employee-

  432. 0:59:33

    That's right

  433. 0:59:33

    ... bathroom, stuff like that.

  434. 0:59:35

    Absolutely. Yep.

  435. 0:59:36

    Yeah.

  436. 0:59:37

    But septic system specifically, I'll help you with that.

  437. 0:59:41

    Thank you. Especially-

  438. 0:59:42

    If it's okay with the board. I'm not the engineer. I can't be the engineer, but I, I know where to go to look, okay?

  439. 0:59:47

    You're on point. You're on point.

  440. 0:59:48

    No, that is appreciated. You know, the concern is, like you, uh, someone up here alluded to that the, the municipal system may not have the exact, uh, biologicals or whatever is required to break that stuff down in the water system.

  441. 1:00:00

    Right.

  442. 1:00:01

    And so if, if they're gonna be handling that type of material, they need to be able to address it on site-

  443. 1:00:05

    Absolutely

  444. 1:00:05

    ... and manage it themselves.

  445. 1:00:07

    Well, let's go back to what I said, is if the c- city can handle X, they need to treat it down to X before it goes to the city.

  446. 1:00:13

    And if they're using a spray field system, all you're doing is transferring the problem to a different location and introducing it back into the environment, which is unacceptable.

  447. 1:00:22

    Yes, sir.

  448. 1:00:23

    But you gotta remember, if we require a closed loop system, there, there shouldn't be that much wastewater generated.

  449. 1:00:33

    But you have-

  450. 1:00:35

    That, that closed loop system has to have treated water, and it has to be refurbished at intervals. I don't know what they are, but then you have that waste product at that point. Yeah.

  451. 1:00:46

    Okay.

  452. 1:00:59

    And I am unanimous in my opinion, by the way.

  453. 1:01:06

    So for sound control, we have added in a dBA and a dBC. So essentially, a dBA is measured from what the human ear can perceive, whereas a dBC is where you can't hear it. It's low frequency sound, sorry So I've definitely heard that it seems one of the most prevalent issues that, or concerns that our citizens have is regarding the sound.

  454. 1:01:42

    So I wanted to make sure we address not only what we could hear, but the low-frequency sounds. Excuse me.

  455. 1:01:52

    I've also added, uh, "The data center operator shall be solely responsible for all costs associated with any sound testing or studies conducted prior to, during and following the application. Subsequent sound studies shall not be required within 12 months of the completion of a prior study, except when the planning director finds that conditions warrant an additional study. Pure tones, tonal or narrow-band noise, impulsive noise, repetitive low-frequency noise, and vibration that create an unreasonable nuisance on adjoining property are prohibited."

  456. 1:02:28

    Oh, that should be changed to properties.

  457. 1:02:30

    Properties.

  458. 1:02:32

    Jackie, are you okay with that, that framing around nuisance? We've had some challenges recently.

  459. 1:02:46

    Uh, Cassie, on the, um, on the first sentence, "These standards shall apply to all data centers," um, I think it should read, "These standards should apply to all data center campuses."

  460. 1:03:13

    Mm-hmm.

  461. 1:03:26

    "Noise levels shall be measured using calibrated sound level instrumentation capable of measuring both A-weighted and C-weighted sound levels. Uh, the owner shall complete post-construction acoustical testing, including dBA and dBC measurements, and evaluation of tonal and low-frequency te- sound within 90 days after initial operation of each phase, and at other times reasonably required by the county following a documented complaint or material change."

  462. 1:03:59

    Is that being per- performed by a third party?

  463. 1:04:02

    Yes, it would have to be.

  464. 1:04:04

    Okay. Is that previously where... Does it say that previously on here?

  465. 1:04:09

    Uh, it states...

  466. 1:04:19

    I think it-

  467. 1:04:19

    I think it just says the owner. I mean, I don't know if they're qualified to perform those studies or...

  468. 1:04:27

    Okay, you're right. It does just say owner. I can, um, adjust that language. I believe I addressed it later on.

  469. 1:04:32

    Is it somewhere?

  470. 1:04:33

    It's in number three.

  471. 1:04:40

    Oh, my number three says, "Data center operator shall be solely responsible for all costs associated with any sound testing or studies conducted prior to, during and following the application."

  472. 1:04:52

    You're on number six.

  473. 1:04:52

    You're on-

  474. 1:04:52

    Oh.

  475. 1:04:54

    I just don't see where it says-

  476. 1:04:55

    Yeah

  477. 1:04:55

    ... it has to be an independent third party.

  478. 1:04:58

    Yeah, so we actually do have it, uh, by a qualified acoustical professional or licensed engineer.

  479. 1:05:02

    You're on number six.

  480. 1:05:05

    Six three.

  481. 1:05:05

    Six three.

  482. 1:05:07

    Thank you. Appreciate it. You got, you got blue and black going on.

  483. 1:05:12

    Yeah.

  484. 1:05:21

    Yeah. Updates.

  485. 1:05:22

    Now on-

  486. 1:05:22

    I'm sorry

  487. 1:05:22

    ... on the noise levels, um, should we not have them, um, do, like, a ambient noise test beforehand?

  488. 1:05:33

    Like a baseline?

  489. 1:05:34

    Yeah, baseline on the noise as well as, well as...

  490. 1:05:42

    Yeah, that will set a baseline for sure.

  491. 1:06:06

    Moving into generator testing. Uh, "Emergency generators shall comply with all applicable EPA Tier 4 emission standards, unless a more stringent federal or state standard applies, and shall be used only for emergency operations, utility outages, or routine testing. Routine testing shall occur only between 7:00 AM and 6:00 PM, Monday through Friday, excluding holidays, and shall not exceed eight total hours per calendar month per site, unless a gener- ugh, unless a greater duration is specifically required by a regulatory authority, manufacturer, or demonstrated operational requirement."

  492. 1:06:46

    Cassie?

  493. 1:06:46

    Yes.

  494. 1:06:47

    Let's go back to number one, please, under generator testing.

  495. 1:06:50

    Yes.

  496. 1:06:50

    I think we need to strengthen that to state that under no circumstances shall emergency generators be used for sustained normal operations. Because what I understand is that in some of the installations up in the Alexandria, Virginia area, because of the inability of the grid to support those systems, they continuously run generators, and not just the normal backup generator.

  497. 1:07:20

    They, that is their on-site generating station, and it is hugely noisy.

  498. 1:07:27

    I will say I do have that later on, um, in section J. One, uh, I have it shall not be, shall be non-combustion generation technologies, um, and but I said this requirement does not apply to emergency standby generators. Do you still want me to add that here?

  499. 1:07:44

    I don't think you can have too much of that, so put it in there please.

  500. 1:07:48

    Mm-hmm.

  501. 1:07:48

    Thank you. 'Cause there is a, there is a difference between emergency life safety, um, power needs and then actual operational power needs. So we wanna make sure that the emergency lights turn on, everyone can see their way out of the building, but...

  502. 1:08:09

    Commissioner Goodman, I would recommend, Commissioner Goodman-

  503. 1:08:12

    Yes.

  504. 1:08:12

    I would recommend that since you're concerned about sustained use, and this is specific to generator testing, that your concern about sustained use go into section J since that's about the power consumption and use, um, and let that go in there.

  505. 1:08:26

    Thank you. And did you take a look at that nuisance stuff yet?

  506. 1:08:30

    I'm, I'm working on it.

  507. 1:08:31

    Okay, sorry.

  508. 1:08:32

    No, no, no. That's a, that's a, that's a different can of worms.

  509. 1:08:36

    Jackie, is the language that I have in there already good or should I reword it in section J?

  510. 1:08:45

    I think to address Commissioner Goodman's concern, um, k- with regard to J2 specifically, the backup generator shall only be permitted for emergency use, we can expand that to be emergency use specific to, um, a- as Commissioner Smith mentioned, um, emergency lighting and safety as may be r- required, but then also, um, maybe a, a 2A that backup generators shall not be used for regular, sustained, um, electrical generation or operation.

  511. 1:09:31

    Thank you.

  512. 1:09:42

    Uh, da, da, da. Where we at? Uh, generator testing shall be tested sequentially or in limited groups to minimize cumulative noise unless simultaneous testing is required by a regulatory authority or emergency condition. Generators shall comply with the property line DBA and DBC noise limits established in subsection A during routine testing, maintenance, emergency operation, and all other operations. The planning director or designee may require advance notification of routine testing schedules for facilities located within 500 feet of residentially zoned districts.

  513. 1:10:21

    Emergency operation during utility outa- outages or declared emergencies is not restricted as to hours of operation. However, the property line noise limits established in subsection A shall continue to apply.

  514. 1:10:36

    I think that section six would help out with Mr. Goodman's concern there. Um, but on number five, I think we need to change that from 500 feet to 1,000 feet.

  515. 1:10:49

    Got it.

  516. 1:10:50

    And I'd like to change it to shall instead of may.

  517. 1:10:57

    And where, where is that at?

  518. 1:10:58

    O- on the number five. Planning director designee may require advance notification of routine testing schedules.

  519. 1:11:03

    Oh, okay. Instead of may, shall.

  520. 1:11:06

    Yeah, I mean, so if, if the noise is a concern and people, you know, might s- startle people, we can push out something from the county saying there's planned generator testing or...

  521. 1:11:19

    Um, I would recommend, as we brought up section six on this, that that go back into the J section, um, since that's talking about the, um, the k- the continued use of an emergency, uh, generator.

  522. 1:11:33

    Would, you said six?

  523. 1:11:34

    Oh, not just testing?

  524. 1:11:35

    B6. Emergency operation during utility outl- outages is not restricted. That would be more appropriate under J6 or under, uh, s- J because that's talking about the use of the generator.

  525. 1:11:48

    Okay.

  526. 1:11:48

    Um, but as far as the advance notice, uh, we may want to address, um, what is advance notice, how much time.

  527. 1:11:57

    Ah.

  528. 1:11:57

    Yeah.

  529. 1:12:01

    I mean, I guess whatever's reasonable for us to make any kind of public announcement. I mean, how much time would you need, Sheka?

  530. 1:12:13

    Generally, I mean, generally how long would it take for if there was something that needed to go out, I mean, how much time do you think county staff would need to-

  531. 1:12:21

    I would say a-

  532. 1:12:21

    ... digest that information?

  533. 1:12:26

    I would say at least a couple of weeks just to notify people.

  534. 1:12:30

    Okay, and it's routine generator testing, so that doesn't sound unreasonable.

  535. 1:12:34

    Uh, how about 30 days? Does that seem like too much or...

  536. 1:12:40

    Uh, uh, 'cause we've also not stated in here how they're going to provide notice, so if you're, if you're suggesting by this notice that that's being mailed out to, you know, residences within that area, then I think that it's more-

  537. 1:12:50

    No, no, it sounds like it's just notice to the county, so like-

  538. 1:12:53

    Th- that, that's what I'm wondering. Is this notice to us? Because, um, that's going to residential districts. I do- I wanna understand what, what we're-

  539. 1:13:01

    Yes

  540. 1:13:01

    ... asking.

  541. 1:13:02

    So it would be to us, but you make a point. Um, how would we distribute that to the public? 'Cause obviously that would be the reason for us to w- want that. So we could do letters or we could do a public notice.

  542. 1:13:16

    That was, that sounds the easiest.

  543. 1:13:19

    Public notice.

  544. 1:13:20

    Yeah.

  545. 1:13:20

    Yeah.

  546. 1:13:20

    Stamps are getting more and more expensive.

  547. 1:13:22

    Yeah. Yeah.

  548. 1:13:25

    I, I think that one of the things that we would need to know from the facility itself would be how often, uh, regular testing is required of their generators. Is this a monthly thing? Is this like the, the radio that does the emergency-

  549. 1:13:35

    Apparently it is a monthly thing.

  550. 1:13:36

    Right, so we wanna know, and that may determine the best way to inform the public because if we're then going to be required to send out a mailing every single time, then that becomes burdensome.

  551. 1:13:46

    And, and, and they do have to test those at least once a month, don't they? So I'd, I'd, I'd say maybe like a, a 15-day notice or a 10-day notice. That gi- that gives the county ample opportunity to, to make those public announcements if necessary, if we determine it's, it's necessary to do that.

  552. 1:14:03

    Do we want to put a limit on it, or do we wanna make it a little bit more, uh, in the county's control and say something to the effect of, "May require advance notification," you know-

  553. 1:14:15

    In scheduling with the county?

  554. 1:14:17

    Uh, y- yeah.

  555. 1:14:18

    We get to tell them when they test the generator?

  556. 1:14:19

    We could tell them. I don't know how w- how I would word it, but something to the effect of we would con- we would make the decision on how long they have to give us advance notice for if it depends on how often they test their generators.

  557. 1:14:43

    I think we need to work on it. Most important thing is that the county gets notice, I think.

  558. 1:14:47

    Yeah.

  559. 1:14:48

    I think that's, we're all on the same page.

  560. 1:14:49

    Because once you provide a schedule, you're supposed to be on that same schedule monthly, and any change to that schedule needs to be a notification as well. So I think we need to work on the wording on that a little bit.

  561. 1:15:06

    And this is exclusively for, like, the, the diesel, right? I mean, that's the main concern? Or, like, their-

  562. 1:15:12

    Well-

  563. 1:15:12

    ... their natural gas generators, are, are those emer- used for emergency, or is that for...

  564. 1:15:19

    This is specific to emergency generators.

  565. 1:15:22

    Right. So any-

  566. 1:15:23

    There is such a thing as, there is such a thing as a gas turbine generator, which is like a jet airplane taking off. Big noise.

  567. 1:15:34

    Uh, we had one of those in Anheuser-Busch, and it was all in contained. It was still noisy, but, but it, it was in a room by itself, so. Um, but the, some of the, um, potential on-site power generation fuel cells, they're non-combustion.

  568. 1:15:55

    Right.

  569. 1:15:55

    So if you put enough fuel cells out there, they might not even need too many standard backup generators. So that's something that, uh, the, who are, you know, if they bring in that kind of technology, that's something we'll have to, to look at.

  570. 1:16:17

    And depending on where it goes, uh, you know, if the plan is to use natural gas, I assume that's from a line that's already existing. Um, would they be required to have a, a letter from that utility provider as well, or is that just-

  571. 1:16:29

    Yes.

  572. 1:16:29

    We would require it from any utility provider.

  573. 1:16:31

    Any utility.

  574. 1:16:31

    Yes.

  575. 1:16:32

    Cool.

  576. 1:16:39

    But in that case, the only thing that, you know, if you've got, like, 50 fuel cells powering this thing and you need to take one or two of them down, um, you might not need that many backup generators. And the only way that you would lose everything is if you lost your natural gas line.

  577. 1:17:12

    Moving into exterior illumination. We added, "This does not apply to lighting installed for maintenance or emergency purposes on the roof or in ancillary spaces such as substations, mechanical yards, and electrical yards. Any such maintenance lighting shall only be operated in cases of emergent maintenance needs." We also added that the planning director shall require a photometric lighting plan instead of may.

  578. 1:17:46

    So we're assuming that the, um, the lighting is all site lighting. There's no lighting attached to the buildings that are over 25 feet. Is that the restriction?

  579. 1:17:56

    Oh, yes, yes.

  580. 1:17:56

    Okay.

  581. 1:18:00

    And then we added that language because we understand there's emergency situations.

  582. 1:18:04

    Right, yeah. But in the day-to-day operation, we're limited to 25 feet-

  583. 1:18:09

    Yes

  584. 1:18:09

    ... for the dark sky scenario. Okay.

  585. 1:18:17

    Moving into D, vibration. "Operation shall not create vibration detectable beyond the property boundary except during temporary construction activities."

  586. 1:18:31

    Do we know how we're gonna determine whether it's detectable? Are we gonna have, like, a seismograph or something?

  587. 1:18:36

    I have not added that in there, uh, but I can add some language for that.

  588. 1:18:45

    I guess we just wanna make sure it's actually coming from that and not, like, a semi truck coming down 95.

  589. 1:19:04

    Odors. "Operation shall not create objectional odors detectable beyond the property boundary."

  590. 1:19:11

    So, and, and this, my concern here kind of ties into my same concern with, uh, how we frame nuisance is that what may be objectionable to one person may not be objectionable to another.

  591. 1:19:22

    Yeah. So we would need to define objectionable or remove it altogether.

  592. 1:19:44

    When you guys went the other day, did you detect any odors?

  593. 1:19:48

    I mean, what's-

  594. 1:19:49

    Only from the cars on the street

  595. 1:19:51

    Huh?

  596. 1:19:52

    Only from the cars driving down the street

  597. 1:19:54

    Yeah, but what-

  598. 1:19:54

    There, there was no odor. No.

  599. 1:19:57

    Okay.

  600. 1:19:57

    No. You know-

  601. 1:19:58

    This is a listed-

  602. 1:19:58

    ... since we're listing

  603. 1:19:59

    ... case

  604. 1:20:00

    This was a concern that was brought from the citizens of the county that I wanted to address in our ordinance.

  605. 1:20:07

    Someone actually has smelled odors coming from-

  606. 1:20:10

    Not that they have, but they were concerned that there may be odors

  607. 1:20:13

    Okay.

  608. 1:20:17

    Yeah, I think the main concern's probably air quality, not necessarily, like, an actual odor being produced. But...

  609. 1:20:23

    Or carbon dioxide.

  610. 1:20:25

    Yeah. I've heard from, from several families with small children that have asthma that are concerned about the potential health effects put off by a facility like this.

  611. 1:20:36

    And I will say the EPD does regulate the emissions from the generators.

  612. 1:20:43

    That's basically the only place you would have it, right?

  613. 1:20:47

    Have what?

  614. 1:20:48

    Does, does a data center put off odor? I mean, that's... Uh, shouldn't be any byproduct, I wouldn't think.

  615. 1:20:55

    Well, the only, only odor you might have would be off of the diesel gen- generators, you know, is... But...

  616. 1:21:05

    We can remove this section.

  617. 1:21:07

    No, I'm not asking you to do that. I just had, I hadn't... That's the first time I'd heard that.

  618. 1:21:12

    Mm-hmm.

  619. 1:21:12

    So...

  620. 1:21:16

    I mean, I, I think ultimately there's no such thing as too much protection.

  621. 1:21:19

    That's true. That was my thinking whil- while going through this.

  622. 1:21:24

    And, and Cassie, with this, um, I think that we may need to look at some other issues in our UDC because we do not currently have a definition of odors as a nuisance within our code. So that is certainly something that needs to be looked at if we're going to, y- as we're expanding this.

  623. 1:21:39

    Okay. Do you think adding a definition of odors into this ordinance-

  624. 1:21:47

    It would not be appropriate to be added specifically into this section because I think that it probably needs to be more broadly, um, addressed within the UDC.

  625. 1:21:55

    Understood.

  626. 1:21:55

    Um, so it would be referenced here, but it would be also within, um, I believe it's section eight.

  627. 1:22:04

    There's, there's actually a section in our industrial zoning that refers back to obnoxious odors, so I'll get with you on that.

  628. 1:22:14

    Well, back when the paper mill was running, we always said-

  629. 1:22:19

    Obnoxious

  630. 1:22:19

    ... it smelled like money. But...

  631. 1:22:21

    That's right.

  632. 1:22:25

    We have a lot of complaints from, uh, used to be called Synergy. What's it called now? They sold, I think.

  633. 1:22:33

    No, I don't know.

  634. 1:22:34

    Yeah.

  635. 1:22:40

    Heat discharge. Cooling and mechanical systems shall be designed and operated so the heat discharge does not create hazardous conditions or unreasonably interfere with adjoining property.

  636. 1:22:55

    Should that read properties?

  637. 1:22:57

    Yes.

  638. 1:23:03

    Essentially someone doesn't open up their back porch and get a heat wave from the data center at the adjoining property, right?

  639. 1:23:08

    Yes. That was also a concern that was brought up.

  640. 1:23:17

    Hazardous materials and spill prevention. Fuel lubricants, batteries, coolants, and other regulated materials shall be stored, handled, and disposed of in compliance with the applicable law. Secondary containment and spill prevention measures shall be provided and maintained at data center operator's expense.

  641. 1:23:37

    Uh, are we ensured- I think the state's gonna require for them to pr- provide a hazardous mitigation plan.

  642. 1:23:44

    Yes.

  643. 1:23:44

    We need to include that. I mean, it's... It'll be part of the whole process, but it'd be good to add that language-

  644. 1:23:51

    That we-

  645. 1:23:51

    ... where they have to, they have to submit a hazard mitigation plan to the state, which we'll get copies of. Am I wrong, Chief?

  646. 1:24:02

    Well, and with any kind of hazardous material storage, just wanna make sure, and it might be part of that hazard mitigation plan-

  647. 1:24:07

    Well-

  648. 1:24:07

    ... but that we have a copy of the safety data sheet and we know exactly what's being stored out there. If anything new is introduced, that we're getting updated copies and-

  649. 1:24:15

    Yep.

  650. 1:24:22

    Refuse and inoperable equipment. Waste shall be kept in enclosed or screened containers and removed regularly. Equipment permanently removed from service shall be repaired, removed, or lawfully stored within a reasonable period.

  651. 1:24:39

    A screened container, basically like a big shipping container or... Like, what, what, what kind of refuse are you-

  652. 1:24:45

    That's your regular, like, like when you go to-

  653. 1:24:47

    Garbage? Garbage

  654. 1:24:48

    ... yes. Like when you go to Tasty's, they have a, a screened-in area. Of course, the, the gate's always open, but, um-

  655. 1:24:56

    I guess I, I didn't see it as garbage 'cause it says, "Equipment permanently removed from service shall be repaired, removed, or lawfully st- lawfully stored within a reasonable period." So...

  656. 1:25:05

    Uh, because this refers to waste and inoperable equipment.

  657. 1:25:09

    Gotcha.

  658. 1:25:10

    Essentially, we don't want it all just piling up on the property, creating smells or bad views.

  659. 1:25:18

    An excavator graveyard or something?

  660. 1:25:20

    Yes.

  661. 1:25:27

    Moving into water and cooling systems. We've added air conditioning units and HVAC systems shall be thoroughly screened from view from the public right of way and from adjacent properties by using walls, fencing, roof elements, or landscaping. Uh, number six, the applicant must demonstrate that the selected cooling method uses no evaporative cooling to minimize ongoing water consumption of the site

  662. 1:25:55

    You know, in previous language you had, like, the least water intensive, um, method, uh, possible. I think it was something to that effect, right? And I do know that dry cooling... Is that not something we'd wanna explore? 'Cause I know some, some closed loop systems can still be pretty water intensive. Uh, are, are we sure that this is... We want it to be the least water intensive technology available, correct?

  663. 1:26:21

    Yes.

  664. 1:26:21

    Does, does simply requiring it to be a closed loop system, do you think it meets that requirement?

  665. 1:26:28

    I would think so. Closed loop is, you know, the least water intensive requirement, but-

  666. 1:26:36

    You- the whole thing about a closed loop system is it is closed. I've got a closed loop air conditioner at my house. I don't have to add water to it. It's, it's a one loop and that's it.

  667. 1:26:54

    Okay. I just wanna make sure the intent is being met here. You know, least amount of water resources used possible. Which is why I liked your language from the previous example. But, so I'm just wondering what kind of prompted the change.

  668. 1:27:07

    Um,

  669. 1:27:11

    I cannot remember why I changed that honestly. Uh, but it was one of the changes I made. I can definitely add it back in.

  670. 1:27:22

    Well, we got number two. Open loop evaporative cooling systems shall be prohibited for all liquid cooling and ventilation equipment.

  671. 1:27:35

    All cooling and ventilation systems shall utilize closed loop systems, with the exception of, um, office space air conditioners.

  672. 1:27:47

    So that's almost requiring a water cooled system?

  673. 1:27:51

    Yes, closed loop system. Be it water, glycol, ammonia, or whatever.

  674. 1:28:02

    Yeah, we do have the wording shall u- utilize closed loop systems.

  675. 1:28:19

    I mean, if you, e- everyone here knows what the intent is, it's to limit the effect on our natural water system. So I just wanna make sure, if you feel comfortable with it, then, then I'm comfortable with it.

  676. 1:28:39

    Moving on to electrical power generation. The primary on-site generation permitted with special use approval. Such approval shall require a finding that the proposed generation will not adversely impact surrounding properties, air quality, or infrastructure, and shall be non-combustion generation technologies. This requirement does not apply to emergency standby generators.

  677. 1:29:05

    Which again, if they put in enough fuel cells, that's what, what we're kinda limiting them to for non-combustion generation. Fuel cell technology, if you put in enough fuel cells, they might not need many backup generators.

  678. 1:29:23

    Is that the Bloom Energy, that's what you're talking about?

  679. 1:29:25

    Well, that is a, a fuel cell. Yeah. Um,

  680. 1:29:32

    but there's other companies out there besides Bloom that do that.

  681. 1:29:47

    Moving into section 338, safety and emergency preparedness.

  682. 1:29:52

    Oh, going back, um, to electrical just a minute.

  683. 1:29:55

    Yeah.

  684. 1:29:56

    Um, to kinda tag on what Mr. Goodman was, was, um, speaking about, you know, backup generators shall only be permitted for emergency use only. Um,

  685. 1:30:12

    maybe we can... Well,

  686. 1:30:15

    we might need to look some more at that.

  687. 1:30:21

    That's where I'd already suggested the, the prohibition on sustained regular use, and had also suggested the ch- the shift from, uh, B6 also over to, uh, section J-

  688. 1:30:35

    Yeah

  689. 1:30:35

    ... as well.

  690. 1:30:48

    Okay.

  691. 1:30:55

    So we added a section regarding cyber security. Uh, since this is a data center and essentially full of computers, we felt this might be important information. So they would have to have a facility level a- assessed digital footprint and consequences of cyber events. Function level, identify adversary attack pathways and implement protective measures. S-

  692. 1:31:19

    How do, how do we, how would we enforce-

  693. 1:31:21

    That's a good question

  694. 1:31:22

    ... this?

  695. 1:31:22

    That, yes. So-

  696. 1:31:24

    I think we, I think this is government overreach. I think we need to do away with that section A.

  697. 1:31:30

    Some of it's probably largely proprietary on, on the data center's part as well. They're not gonna be willing to share that information.

  698. 1:31:36

    Yeah.

  699. 1:31:37

    That's fair. I, so w- we-

  700. 1:31:38

    Could be a cyber hacker.

  701. 1:31:41

    So we can remove this entire-

  702. 1:31:43

    Yep

  703. 1:31:43

    ... section.

  704. 1:31:44

    Um, section E is, is basically the f-

  705. 1:31:48

    I would like to see-

  706. 1:31:48

    ... the same

  707. 1:31:48

    ... maybe a risk analysis to the county. I mean, if it's, I don't know, if they be- if they are a target, what does risk look like? How much of, how much larger of a target does our area become because that's here? I mean, I'd be interested in that They're, they're tied r- they're tied right into the main internet trunk that we're all connected to right off the highway in, in theory.

  708. 1:32:10

    Well, I think with the na- Navy base here, we're, we're a number one target, but ...

  709. 1:32:14

    Yeah.

  710. 1:32:16

    But, um, Section E, I think that's a, a little overreach as, as well.

  711. 1:32:22

    E?

  712. 1:32:24

    Yeah.

  713. 1:32:27

    The training for the data center staff?

  714. 1:32:29

    Well-

  715. 1:32:29

    Well-

  716. 1:32:30

    Well, I hope they're trained, but, you know, I think for us to require that, like make an inventory of all equipment, servers, and storage units, and routers, and switches, we don't need that information.

  717. 1:32:43

    No, we don't.

  718. 1:32:50

    Yeah.

  719. 1:32:52

    Okay.

  720. 1:32:52

    Is that, is that not important for our fire response, though, knowing where these things are?

  721. 1:32:57

    Well, yeah. You, you go back into your, um ...

  722. 1:33:03

    They, they need a, um, emergency response plan.

  723. 1:33:06

    Right.

  724. 1:33:07

    And that would be worked out between the, uh, emergency management and then the fire department, and the owners.

  725. 1:33:15

    Yes, which we do have in there.

  726. 1:33:16

    And they'll be able to require a list of whatever he wants to know about, right?

  727. 1:33:20

    Essentially, yes.

  728. 1:33:20

    Cool.

  729. 1:33:21

    And, you know, d- they probably would have their own emergency management plan where if X happens, they respond in a certain way. Like out, out at Union Carbide, they had a emergency response team because it was so far away, you, you can't rely on, on the emergency response from the county depending on what happens, so they had their own teams out there.

  730. 1:33:51

    My, my, my, my, my number one concern though is, so like with these large industrial applications, uh, you probably see them more, more out in Bryan County, if anyone can figure out exactly what I'm talking about. But, uh, you know, they wa- they wanted, they wanted to establish their own fire department and have the fire alarm ring to them rather than ringing out to the public utility. A- a- and they cite that it's because, you know, if there's a false alarm, they don't wanna bother the county or the municipality. But my concern is that I, I wanna ensure that any kind of direct emergent response, whether it's a false alarm or not, is, is being received by the county versus them being able to try to take care of things in-house.

  731. 1:34:32

    Uh, 'cause if there's nothing wrong-

  732. 1:34:34

    Well, we would-

  733. 1:34:34

    ... then we can confirm that, but I don't want them to make that determination.

  734. 1:34:38

    If you remember when we went to Douglasville a while back last week, they had their own emergency response, but the county and the city still are there in case they need them.

  735. 1:34:49

    I just wanna ensure that that's-

  736. 1:34:49

    So there's, there's a, there's a level of communication, and we'll set the same thing here.

  737. 1:34:53

    Yeah.

  738. 1:34:53

    Not saying our guys have to go fight the fire 'cause they've already got the fire going. They got their own people, but we're gonna be there just in case they need us. So I think that's the intent, right?

  739. 1:35:03

    Yeah.

  740. 1:35:05

    I, I've just, I've just seen regularly where there are fire officials for certain jurisdictions that have problems with some of the in-house stuff that tries to get taken care of in these types of sites. So I wanna make sure we always know what's going on.

  741. 1:35:18

    So essentially put something in there stating that they would be required to notify county emergency personnel?

  742. 1:35:26

    Well, y- you got that basically in section F.

  743. 1:35:29

    Mm-hmm.

  744. 1:35:29

    The site-

  745. 1:35:30

    In your response plan?

  746. 1:35:31

    Yeah, emergency response plan. It, it, it's in there. Coordination with Camden County Fire Department, Sheriff's Offices, and EMA.

  747. 1:35:39

    Yeah, but if they, if they never call you when one of those, when one of those triggering, uh, events occur, then ...

  748. 1:35:47

    Well, if it gets out of hand, they'll call.

  749. 1:35:52

    But do the, do, do, does he, w- does it qualify as out of hand when they determine it's out of hand or when we determine it's out of hand, though?

  750. 1:36:09

    Well, that would be, you know,

  751. 1:36:13

    part of the emergency response plan that the, the fire chief and the EMA director would, and the owners would work together on.

  752. 1:36:21

    Through that emergent ... I, this is a question maybe for, for Jackie. Through that emergency response plan, can we require, um, like a mandatory notification, like through 911, or-

  753. 1:36:32

    I, I mean, I think-

  754. 1:36:33

    ... any kind of alarm goes off there?

  755. 1:36:35

    I, I, I do think that, um, you know, we can have certain requirements as part of what an emergency response plan would look like, and that could include certain notification requirements. It c- I think that it could include as well their testing requirements, what they're doing.

  756. 1:36:49

    Oh.

  757. 1:36:50

    Um, uh, but I do think that that needs to be in there. And actually I, I was also speaking with, uh, Mr. Yacobacci as well about, um, and I'm reviewing our code as to when we have a plan and it is not complied with, additionally what remedies we have in here. So that's what I'm looking at as well because, you know, obviously if a, if a water use plan isn't followed or if a building plan isn't followed, we have certain remedies. An emergency response plan is a little bit more fluid than that, so I wanna make sure that if we're going to in- insist upon certain compliance, that we have some sort of a fail-safe when it, if it is not complied with.

  758. 1:37:23

    Um, whether that's ... You know, like when a hotel has a, a fire alarm going off over and over and over, and then the fire department's called, if they're called so many times, we start issuing citations. Um, or-

  759. 1:37:34

    Oh, 'cause sometimes they'll just go right up to the panel that's making noise, and they'll just shut it up.

  760. 1:37:37

    It... Right, and they get it, they get cited for that. Um, so I want, if we're going to do something like this as part of our emergency response plan, then there should be some sort of compliance element as well, and I just wanna make sure we're referencing that, so I've made a note.

  761. 1:37:52

    Well, I, I think Section F covers a lot of that except for any citations or anything like that.

  762. 1:37:59

    I, I agree. And to, to ... Oops. I'm sorry. I agree. And, and to the extent that we had removed Section A, I think a large part of Section E probably gets cut as well to the extent-

  763. 1:38:10

    Yes

  764. 1:38:10

    ... that we're talking about proprietary. But at the end, I do think that, um, under E17, um- Let's see, 16, 17, 18 about the, um, recycling as well as the decommissioning that that pro- we need to have some- somewhere that that's included.

  765. 1:38:30

    But that the rest probably gets struck.

  766. 1:38:40

    So we do address enforcement, um, in section 344. Would it help to refer to that for any violations?

  767. 1:38:49

    I, I do think that referring to that is, is, um, is important. What I wanna make sure about is that our specific emergency response plan is really following the same concept as a building plan or other plan that we would normally have a compliance for under our code. And, and some of this as we're sitting here in this work session, it's that, um, we're also realizing where we're, we're bringing... Everything's getting dragged along with us, whether it's referencing other parts of our code to make sure that we're, we're up at the front of where we need to be.

  768. 1:39:25

    Right. Got it.

  769. 1:39:26

    Uh, getting to what Jackie was saying, 16, 17, and 18 probably needs to go under section 343, decommissioning.

  770. 1:39:38

    Yes. I would agree with that.

  771. 1:40:09

    Moving into... I'm sorry.

  772. 1:40:11

    Sorry. In a previous draft I had seen where, uh, submitting or development of a demi- decommissioning, jumping around a little bit, sorry, of a decommissioning plan didn't necessarily constitute a requirement for fi- for a financial instrument. That might've been a previous draft. I just wanna make sure with the improvement you had on the financial surety language that we took that part out. You know what line I'm talking about?

  773. 1:40:40

    I hope you do.

  774. 1:40:43

    I'm looking.

  775. 1:40:49

    There was a contradiction at one point. And we can come back to that when we get to decommissioning if you want, just I, I remember seeing that and I'll, Imma find it again. So. I just wanna make sure it's absolutely clear there's no if, ands, or buts. There's gonna be financial surety required.

  776. 1:41:04

    I, I-

  777. 1:41:04

    You know, with, with the, the thicalm property that we have, with the mill site property, this community's been burned far too many times where we don't require any kind of financial surety for a large development like this.

  778. 1:41:15

    Well, decommissioning obligations run with the land and remain the responsibility of the property owner and successors until the county confirms satisfactory completion.

  779. 1:41:26

    Right, and in one of these versions-

  780. 1:41:28

    I believe that you're referring to, I'm sorry, section 340, um, section S, decommissioning site reuse plan. I have the wording, "Submission of a decommissioning and site reuse plan shall not by itself impose a financial guarantee or abandonment obligation unless express- expressly required as a condition of the special use permit, development agreement, or legally authorized approval."

  781. 1:41:55

    I, I, I think rather than making it like a, a maybe we should make it an absolute. That, that sounds like there's a potential for it to be ambiguous. A decommissioning plan will require financial surety, is my preference.

  782. 1:42:12

    It, the, the one thing I would state to that, uh, Commissioner Smith, is that to the extent that a, a special use permit is sought for any property, it allows, uh, either the planning and zoning board to impose certain conditions that may be required, and then furthermore, this board to consider whether or not some additional requirement may be necessary. So to mandate at the outset the potential financial liability, it may hamstring us to, to the extent going forward the, when you're seeking that special use permit.

  783. 1:42:45

    So we could say, "Well, our ordinance currently says 100 feet for a setback, but because of your special project I wanted 150 feet. Well, you've submitted your decommissioning project, I want you to submit a million dollars for it in escrow as well, um, for this particular project." I think that it, it's, it's project specific because of the special use. So if we're seeking special use I think that that is, in leaving that a little bit open, gives the board more flexibility to, to protect where we need to protect.

  784. 1:43:21

    J- I'm just having a hard time following.

  785. 1:43:22

    Yeah, you know.

  786. 1:43:22

    I'm sorry. I, absolute protection would be requiring some sort of financial instrument, correct?

  787. 1:43:30

    I think that if you start putting that in there, you're gonna start putting the dollar figures in now. And I think that that can-

  788. 1:43:37

    Well, it was a percentage, right? It was like 125%.

  789. 1:43:40

    Um, I have that in the financial surety. Um, yeah, 125%.

  790. 1:43:48

    Of estimated net cost of decommissioning and restoration without credit for salvage value, unless approved by the county. So I just wanna make sure that th- this section, the financial assurance is, is mandated, not left up to who the commissioners are at the time.

  791. 1:44:05

    I understand.

  792. 1:44:10

    But I think because it says, um, required as a condition of the special use permit, and we're requiring a special use permit for this use, and we have a clause as far as what the decommissioning is-

  793. 1:44:25

    I think that that- that's where it's covered. But I- I certainly defer to the board's direction on this.

  794. 1:44:30

    Well, the first line under financial assurance is, "The applicant shall provide financial assurance in the form approved by the county attorney and board of commissioners."

  795. 1:44:45

    Then it lists all the available forms that we can put them on the hook for, so.

  796. 1:45:00

    So is that just... In- In Section S, is that just some extra language? 'Cause it says it shall not by itself impose a financial guarantee, but later on down the road, you're gonna have a financial guarantee.

  797. 1:45:13

    Yeah, so the, uh, decommissioning with the submission of the decommissioning and site reuse plan, that was already in the ordinance. I went back and added financial assurance later.

  798. 1:45:24

    Okay. Sorry. And again, sorry for jumping around. I just had it stuck up here. I wanted to address it. Thank you.

  799. 1:45:34

    Energy preparedness.

  800. 1:45:47

    Moving into, uh, Section B, international fire code and local fire codes shall be followed for lithium ion battery suppression solutions. And then we go on to list, uh, what that entails. No flames escape from the container during maximum temperature events. No projectiles released during battery disassembly. Structural integrity of the packaging is maintained throughout the thermal event. External temperatures are controlled to ensure nearby materials do not ignite. Gas venting is main- managed to direct toxic emissions safely away from occupied spaces.

  801. 1:46:29

    Fire suppression systems required. A fire, a fire sprinkler system meeting current NFPA standards with enhanced protection measures shall be required. Suppression coverage at each battery bank or rack in addition to the overhead required suppression system. Zoned isolation capability. Early detection integration, smoke, heat, gas detection. Meeting the need for suppression will require a custom design tailored to each data center's unique requirements.

  802. 1:47:06

    They used to use Halon for fire suppression in, in computer floors and stuff like that. I don't know if... They might have phased that out. They might be using something else now, so.

  803. 1:47:19

    A- And I think it'd be important to know exactly what kind of... 'Cause there's different chemical makeups for different batteries. I think if, you know, through the application process, if we could identify each battery or energy storage system-

  804. 1:47:30

    Well, that- that's part of the, um, the emergency response plan.

  805. 1:47:38

    Yep.

  806. 1:47:38

    'Cause they have to list all that.

  807. 1:47:40

    'Cause you can't just sprinkle a, a lithium ion battery.

  808. 1:47:52

    No.

  809. 1:47:52

    A professional consultant shall provide comprehensive lithium ion battery risk analysis services tailored to en- energy storage installations. This shall include hazard identification, thermal runaway modeling considerations, suppression strategy evaluation, infrastructure impact assessment, and ordinance alignment recommendations.

  810. 1:48:18

    Reimbur- Uh, we added this because we have asked for reimbursement costs. So we defined reimbursement costs shall be determined by the Board of Commissioners and shall reflect the reasonable value of time, materials, professional services, and other expenses incurred by the county.

  811. 1:48:36

    Back to D real quick. So they're required to get a, a consultant to provide a comprehensive risk analysis. How can we ensure that they follow all the re- re- recommendations of that risk analysis?

  812. 1:48:52

    Just 'cause they get it and they make us aware doesn't mean that they're required to implement anything to mitigate that.

  813. 1:48:57

    I suppose that would be p- part of the ERP, the emergency response plan.

  814. 1:49:01

    Okay.

  815. 1:49:04

    I understand it's nice to have some of that stuff, but I just wanna make sure we're using it as an enforcement tool.

  816. 1:49:09

    Correct, yes.

  817. 1:49:18

    So we've divided up the application requirements into special use application requirements and development application requirements. Uh, we discovered that not everything we were requiring would be capable to submit to us before special use approval was done, so we separated them into two different sections. So special use application requirements, in addition to what we already require in Section 1207, would be names, addresses, and contact information.

  818. 1:49:49

    A current survey prepared by a Georgia registered land surveyor showing the property boundaries, right of ways, easements. Information sufficient for the county to evaluate effects upon roads, emergency services, public safety ins- inspection services, utilities, and other county facilities. If a proposed data center meets the Department of Community Affairs' thresholds for developments of regional impact, or DRI, the county shall notify the Coastal Regional Commission and comply with the DRI process before final local action.

  819. 1:50:22

    Non-compliance may jeopardize the county's status as a qualified local government and eligibility for state funding. Other information reasonably necessary for the Board of Commissioners or county staff to dep- determine compliance with this division. And technical studies shall be based upon current conditions and shall not be more than one year old at the time an application is determined complete, unless the county accepts an older study upon finding that conditions have not materially changed.

  820. 1:50:57

    Moving into development application requirements. So this will als- this will be in addition to Article 12, Division 4, Development Approval, which does have a heavy list of requirements. We'll also require here names, addresses, and contact information, a current survey by a registered land surveyor, a plan prepared, signed, and sealed by appropriate Georgia licensed professionals showing the full anticipated build-out, including buildings, development phases, roads, entrances, parking, loading, utility, et cetera.

  821. 1:51:34

    A narrative describing the proposed technology and operations, number and size of buildings, anticipated construction schedule, initial phase, ultimate build-out, operating hours, et cetera. A study prepared by a qualified transportation engineer evaluating construction traffic, employee traffic, deliveries, oversized vehicles, intersections, site distance. And a plan prepared by a qualified design professional showing buffers, existing vegetation, supplemental plannings, berms, fencing, screening.

  822. 1:52:14

    We'll also require an electrical infrastructure plan that will need to include the proposed electric utility provider, state estimated electrical demand in megawatts at initial operation, each phase, and ultimate build-out. Describe the proposed method of electrical service. Primary on-site generation permitted with special use approval. Such approval shall require a finding that the proposed generation will not adversely impact surrounding properties, air quality, or infrastructure.

  823. 1:52:46

    Show proposed substations, switch yards, et cetera. Show proposed transmission facilities serving the development to the extent known, and describe known off-site improvements reasonably necessary to serve the facility. Describe construction phasing and anticipated dates of energization. Provide written documentation from the serving utility describing the proposed service arrangement and the status of utility coordination. For each utility provider expected to serve the development, the applicant shall provide written correspondence to the extent reasonably available, identifying existing service availabi- availability and capacity, improvements necessary to serve the development, the anticipated timetable for service, and known off-site improvements required to serve the project.

  824. 1:53:39

    This requirement does not obligate a utility provider to make commitments or guarantee beyond its authority.

  825. 1:53:50

    Applicants shall enter into binding agreement... I'm sorry. Go back.

  826. 1:53:54

    Oh, uh, on... under electrical infrastructure plan-

  827. 1:53:59

    Yes

  828. 1:53:59

    ... um, you need to require them to show the on-site generation, too. So you need to add that kind of to section 5.

  829. 1:54:12

    Also, in the previous, um, section, um, you have, "If a proposed data center meets," uh, you probably need to put a proposed data center campus.

  830. 1:54:37

    Okay, let's, um... We've been going almost two hours. Let's take a five-minute break.

  831. 1:54:44

    Gotta use the little restroom.

  832. 1:54:51

    Yeah, they're back in their seats.

  833. 1:54:54

    Already took mine.

  834. 1:55:04

    Oh, dear.

  835. 1:55:06

    Yeah, what do you want tonight?

  836. 1:55:48

    Y'all are the Three Musketeers.

  837. 1:55:50

    What song do these guys know?

  838. 1:55:51

    Or The Three Stooges, whichever one

  839. 1:56:01

    you want.

  840. 1:56:01

    Three

  841. 1:56:06

    Stooges.

  842. 1:59:33

    That mark come off. Maybe it's not helping. We take a survey.

  843. 1:59:44

    Okay, everybody. We're back in session. Commissioner Turner?

  844. 1:59:51

    They just asked me a question.

  845. 1:59:55

    Ma'am, check your wallet and make sure you still have it.

  846. 2:00:01

    It's here. Is it-

  847. 2:00:01

    You better check your sneakers too.

  848. 2:00:03

    Okay.

  849. 2:00:07

    Okay. Let's move.

  850. 2:00:09

    Okay. So in semblance of time, I'm not gonna read line by line. If there's anything you would like me to read out loud, I absolutely can.

  851. 2:00:15

    Oh, thank you. Hallelujah.

  852. 2:00:22

    I thought you were gonna get to the punchline any second now.

  853. 2:00:24

    No. I can continue to read line by line .

  854. 2:00:29

    I make a motion to leave you and Brother Robbie here, and the rest of us can go home.

  855. 2:00:34

    Well, I mean, I... Something you haven't hit on, but I see in here that you have a study prepared by a qualified acoustical, like we had discussed earlier-

  856. 2:00:41

    Yes

  857. 2:00:41

    ... a professional documenting existing. Um-

  858. 2:00:44

    Yes, and I made sure to add about low-frequency noise because the, the dBA does not register dBC noise levels, so we, they would need to test for both.

  859. 2:00:56

    And we do have... There is a way to measure those currently?

  860. 2:00:58

    Yeah, yes, there is a way, and it is in the, uh, noise requirements. I actually placed that.

  861. 2:01:10

    Uh, storm water management report, environmental impact assessment, which we did define, um, information sufficient for the county to evaluate effects upon roads and emergency services.

  862. 2:01:27

    The applicant and property owner shall enter into a written development agreement with Camden County. The applicant shall sh- submit a construction traffic and management plan. Other information-

  863. 2:01:42

    Go back to the you

  864. 2:01:43

    ... Yeah.

  865. 2:01:43

    Yeah, let's, let's talk about that just for-

  866. 2:01:45

    Yes.

  867. 2:01:45

    Go ahead, Ben.

  868. 2:01:47

    Okay. On, on you, um, in that sentence, "And other obligations of the data center owner or operator that cannot fully, be fully addressed through general application." I had, I'd wanna put the owner or operator in there. Which one? That you.

  869. 2:02:09

    You. And then i- is, is this what's commonly referred to as a community benefits agreement, or is this separate from something similar to that?

  870. 2:02:17

    This would be s- this would be similar to that for, for us.

  871. 2:02:21

    Okay So i- in essence, this is our requirement for a CBA, right?

  872. 2:02:27

    Yes.

  873. 2:02:27

    Okay.

  874. 2:02:33

    So my point was more general. It says applicant and property owner. Just to be clear, that's the property owner at the time of application, not... 'Cause this property could sell three or four times before it gets to the property owner and the applicant.

  875. 2:02:48

    Yes.

  876. 2:02:49

    That's the intent, right?

  877. 2:02:50

    Yes, that is the intent.

  878. 2:02:51

    Okay. Yep.

  879. 2:02:55

    Do you believe that needs to be expanded upon?

  880. 2:02:57

    No, I don't think so. It's just a matter of clarity. Um-

  881. 2:03:00

    I understand

  882. 2:03:00

    ... 'cause-

  883. 2:03:01

    Is it-

  884. 2:03:01

    ... applicant and property owner could be the same person

  885. 2:03:04

    It could also not be

  886. 2:03:05

    ... but it could be, property could sell before... I- i- somebody could, um, rezone the property if we go to the IT prior to selling the property to a data center. So it's an ownership chicken and egg thing.

  887. 2:03:21

    Right.

  888. 2:03:21

    And you-

  889. 2:03:22

    I don't think there's any reason to do anything with that, just, just for clarity.

  890. 2:03:25

    You're just gonna add the phrase, "At time of application"?

  891. 2:03:28

    No, no. It's, it's, it's all, it's all, um... It's, um, it's incidental to the application process. The property owner has to be part of the application process. Applicant can be, can be different than the property owner.

  892. 2:03:43

    W-

  893. 2:03:43

    You could be my agent.

  894. 2:03:44

    With the technology park, we're talking about probably several different uses in, in, in one encompassed campus-

  895. 2:03:50

    Yeah

  896. 2:03:50

    ... right? Encompassing campus.

  897. 2:03:52

    Yeah, but we're, you know, we'll deal with the IT thing later.

  898. 2:03:55

    Well, yeah, yeah.

  899. 2:03:55

    But I understand what you're saying, yeah.

  900. 2:03:56

    Well, yeah, 'cause, I mean, the property owner could... I, I imagine it like the landlord of a strip mall, in essence, right?

  901. 2:04:02

    Yeah.

  902. 2:04:02

    But so, um, you know, the data center's like the flagship in a way, and you got all these ancillary businesses that fill in the rest of it. Well, the owner of the data center may not be the same as the property owner, so are we making sure that we're entering into an agreement with the right person?

  903. 2:04:17

    Yeah. The, the-

  904. 2:04:18

    In these stages

  905. 2:04:19

    ... that'll be part of the whole process.

  906. 2:04:21

    The, the property owner would be responsible for whoever is running the data center.

  907. 2:04:25

    Okay.

  908. 2:04:28

    Okay.

  909. 2:04:29

    Well, you could put in there that the development agreement follows the property,

  910. 2:04:37

    and not necessarily the, or follows the owner of the property. 'Cause we got to have, in another section, where, where something follows the property.

  911. 2:04:49

    Yeah. Decommissioning?

  912. 2:04:52

    Yes, decommissioning.

  913. 2:04:55

    Okay.

  914. 2:04:58

    Mr.-

  915. 2:04:58

    I just wanna make sure we're putting the right guy on the hook, you know?

  916. 2:05:00

    Right.

  917. 2:05:01

    Yeah.

  918. 2:05:02

    Understood.

  919. 2:05:05

    Uh, other information reasonably necessary for the Board of Commissioners or county staff to determine compliance. Technical studies shall be based upon current conditions.

  920. 2:05:19

    Section 341, for architectural and design standards, the only thing we changed was we added barbed wire shall be allowed. There, uh... It's a common for them to use barbed wire, just to protect their equipment, since it is expensive equipment.

  921. 2:05:37

    Okay. And the next one, on number three, I think we need to remove such as masonry or wood.

  922. 2:06:01

    We added a section regarding independent professional review and cost reimbursement. This is just stating that the consultants are, they are, I'm sorry, they're responsible for obtaining and providing cost reimbursement, and the planning commit- I'm sorry, the Board of Commissioners may require additional consultants at the, uh, applicant's expense.

  923. 2:06:36

    This further expands upon that. The applicant shall reimburse Camden County for reasonable actual costs incurred.

  924. 2:06:45

    Financial assurance.

  925. 2:06:49

    So we have added in here, "The applicant shall provide fin- financial assurance in whatever form the county attorney and Board of Commissioners deems acceptable." We have given some examples. We have also defined material change, and any material change would have to be brought back to the commissioners.

  926. 2:07:10

    Uh, and so an irrevocable letter of credit, uh, in, in an instance where one of these developments might go bankrupt to avoid, you know, any responsibility on cleaning up the property, for example, do, would that relieve them of their... Uh, when a line of, with a line of credit, is that tied to the, the individual, or is there, like, a bank backing that line of credit? Uh, I don't know. I'm not familiar with this type of financial instrument.

  927. 2:07:39

    Yeah. The, uh, line of credit, I, I would take that out. That doesn't mean... That means nothing.

  928. 2:07:46

    'Cause, like, a performance bond I understand. Cash escrow, that's money.

  929. 2:07:51

    Yeah.

  930. 2:07:51

    Uh, that's hard money. I can understand that. I just...

  931. 2:07:57

    I can remove my item A there.

  932. 2:07:58

    'Cause we do have D, another form of security determined by the county to provide equivalent protection. So that kind of-

  933. 2:08:05

    Correct

  934. 2:08:05

    ... gives the discretion up to us.

  935. 2:08:07

    Correct.

  936. 2:08:10

    I've also added that the amount shall equal at least 125% of the estimated net cost of decommissioning and restoration.

  937. 2:08:20

    I know that I have a question, but who would determine what 125% is?

  938. 2:08:28

    Probably one of our author- our third-party professional consultants that the- they'd be required to pay for, right?

  939. 2:08:35

    Is that the way that works?

  940. 2:08:36

    Mm-hmm. Yep.

  941. 2:08:40

    Yep.

  942. 2:08:45

    Additional deposits and suspension of review. Uh, if the escrow balance is insufficient, the applicant shall provide additional funds upon written request. Failure to replenish this amount within 30 days may result in suspension of application review permitting process.

  943. 2:09:03

    Liability insurance. There shall be maintained a current general liability insurance of at least $3 million per occurrence and, uh, $3 million in the aggregate, and the county shall receive a copy of this certificate.

  944. 2:09:19

    Accounting and refund. County may... shall maintain an accounting of expenditures, and any unused balance shall be returned after completion of the application review and payment of outstanding costs.

  945. 2:09:32

    Just a moment please. Madam Attorney, in regards to the indemnification by liability insurance, do we need to be named as an additional insured, or do we need to require COI's Certificate of Insurance?

  946. 2:09:47

    I mean, I do, I do think that a certificate of insurance is, is necessary, but I do think that we should be considered being added to the policy as well. It's certainly something that I'm looking at. Uh, there's a couple of things that I've marked in here that I think might need to be, um, beefed up a little bit. Um-

  947. 2:10:03

    Thank you

  948. 2:10:03

    ... including what the limits are for the, um, insurance.

  949. 2:10:12

    And it says the county shall receive a copy of the certificate. I know generally sometimes those are an- updated, those policies are updated annually. I'd like a requirement they must furnish it as soon as they get an updated copy as well.

  950. 2:10:24

    Good point. When I was in business, I had to name those people. They, they had to have their name on the policy itself, so you might wanna check on that.

  951. 2:10:46

    Okay.

  952. 2:10:48

    Uh, the county may require independent peer review of engineering analysis and traffic studies.

  953. 2:10:57

    And then onto decommissioning. So we added the language without explicit county approval, and then the obligations for decommissioning run with the land and remain the responsibility of the property owner. If the responsible party fails to decommission the facility, um, they would be... The county may draw upon financial assurance.

  954. 2:11:21

    Now, remember where we're gonna add, um... This was back on...

  955. 2:11:32

    in section 338, uh, E. We deleted most of that, but 16, 17, and 18, where we're gonna add to decommissioning-

  956. 2:11:44

    Yes, so those-

  957. 2:11:45

    ... to this section

  958. 2:11:45

    ... those items will be moved and be, uh, be added to here.

  959. 2:11:50

    And so that decommissioning obligation runs with the land. Is that gonna be the same for the financial insurance, it runs with the land regardless of whose-

  960. 2:11:59

    Yes.

  961. 2:11:59

    Okay.

  962. 2:12:00

    Yes, it would.

  963. 2:12:03

    All of these studies, uh, who, who's paying for them?

  964. 2:12:08

    The applicant would be required to, uh-

  965. 2:12:11

    Okay

  966. 2:12:11

    ... reimburse the county.

  967. 2:12:13

    Reimburse us, so we would pay for them up front and then-

  968. 2:12:16

    Any, any costs that we incurred, they would reimburse us for. Everything else would be their responsibility.

  969. 2:12:22

    So we're gonna initiate these studies? That's what I'm asking.

  970. 2:12:25

    No, they would initiate the studies. Just anything additional that we do, they would have to reimburse us for.

  971. 2:12:34

    Is there a timeframe in there? 'Cause these, some of these studies are $100,000 a piece. I mean, it's not, that's not cheap. And a lot of them.

  972. 2:12:48

    Mm. I don't believe I added a timeframe, no.

  973. 2:12:50

    Are you talking peer review, the peer review section?

  974. 2:12:53

    He's talking reimbursement.

  975. 2:12:54

    I'm talking, she's saying that they, they would, they would call for these studies. There's what, one, two, three, four, five, six-

  976. 2:13:04

    Oh, the, the peer review, it is normally, we're not redoing the study. We're just reviewing the study.

  977. 2:13:13

    You sure about that?

  978. 2:13:14

    Yeah.

  979. 2:13:14

    Okay.

  980. 2:13:17

    Yeah, we're not, we're not paying for another study. We're just paying somebody to review the study they provided us to make sure we're comfortable with it if we so choose.

  981. 2:13:24

    So we're not paying 100 grand a piece?

  982. 2:13:26

    Oh, no.

  983. 2:13:26

    Okay. Good enough.

  984. 2:13:30

    Well-

  985. 2:13:30

    Real quick, so when it comes to limitation, that, the limitations for the financial assurance, right?

  986. 2:13:35

    Yes.

  987. 2:13:36

    So it says reimbursement shall be limited to reasonable actual costs directly related to the proposed development and shall not include ordinary county operating expenses unrelated to the application. My concern there is, um, there's gonna be a lot of construction going on and with a lot of heavy trucks coming through. So is that considered part of the proposed development, or is maintaining roads an ordinary county operating expense?

  988. 2:14:02

    If the county was to... I- if the, if we were to incur damage upon our roads due to the wear, the, the tear caused by a developer, they would be responsible for restoring the road to a reasonable condition. So that's not our... It would not be our ordinary road maintenance that we would be doing. If they tear up the road, they gotta fix the road.

  989. 2:14:22

    That'd be part of a development agreement.

  990. 2:14:24

    And right, that's part, that is part of the development agreement.

  991. 2:14:26

    Yes. Okay.

  992. 2:14:26

    That's what I was gonna say. I, make sure that's in writing, Cody.

  993. 2:14:29

    It is

  994. 2:14:30

    Those folks up in Virginia said they didn't, they did not. They tore the roads up and left them

  995. 2:14:34

    'Cause I do share Martin's concern about the reimbursement. Uh, you know, having to front money for any kind of, of anything. I mean, if we tell them that we need this study- ... it shouldn't even have to be a question of reimbursement. They should just pay for it.

  996. 2:14:48

    Um.

  997. 2:14:51

    I know that's not this section that we're talking about specifically.

  998. 2:14:53

    Yeah.

  999. 2:14:55

    But I do share that concern, Martin.

  1000. 2:15:03

    Maybe we should put in there the, um,

  1001. 2:15:07

    you know, a time, say, 120 days after we s-

  1002. 2:15:12

    Written request

  1003. 2:15:12

    ... submit them a bill or whatever, they need to pay it, and if they don't pay it within that time, we can add penalties onto it.

  1004. 2:15:21

    Yeah.

  1005. 2:15:23

    And what section would you like... Where are you referring to?

  1006. 2:15:26

    I'd put it right there on the peer reviews.

  1007. 2:15:28

    Oh, under peer review?

  1008. 2:15:31

    Well, that could be, uh-

  1009. 2:15:32

    The peer review's different

  1010. 2:15:33

    ... any, um-

  1011. 2:15:34

    It's different, yeah

  1012. 2:15:35

    ... uh, Cassie, that could be any cost that, um, we incur that, that we demand reimbursement from. So it doesn't have to be on peer review. It should be on everything.

  1013. 2:15:48

    I understand.

  1014. 2:15:48

    Yeah.

  1015. 2:15:48

    Okay.

  1016. 2:15:49

    Yep.

  1017. 2:15:50

    Yeah.

  1018. 2:15:54

    Um, applicant responsibility.

  1019. 2:15:56

    'Cause we couldn't float a $100,000 study for 120 days-

  1020. 2:16:00

    Mm-hmm

  1021. 2:16:00

    ... I don't think. That's a lot of money.

  1022. 2:16:13

    Last section, enforcement and severability. The county may inspect the property and relevant records at any reasonable time. Following notice and an opportunity to be heard, the Board of Commissioners may revoke or modify a special use permit. Violators may be subject to a fine up to $10,000 per day per violation and/or suspension of business operations until compliance is achieved.

  1023. 2:16:44

    I had a question that came up about, you know, with, you know, to... I want it to be 50,000 or more, but I, I, I do think- ... for ordinances, we're capped at, like, $1,000.

  1024. 2:16:56

    We are capped at $1,000.

  1025. 2:16:57

    Yeah.

  1026. 2:16:57

    Per violation, so we would have to change that to 1,000.

  1027. 2:17:01

    Correct. Within the magistrate court, we are, we are limited. Um, and though certainly I'll review if there's been any changes. There's been some changes to the jurisdiction of the magistrate court lately on some other, um, issues.

  1028. 2:17:18

    Now, I think in, in our original draft, I think we did have 1,000.

  1029. 2:17:22

    We did.

  1030. 2:17:22

    We did.

  1031. 2:17:24

    But I mean, for these mega companies, you know, $1,000, that's just the cost of doing business to them.

  1032. 2:17:28

    Yeah.

  1033. 2:17:29

    Yeah.

  1034. 2:17:29

    So I just want the community to know if, if we had our way, it'd be a lot more-

  1035. 2:17:33

    Yeah

  1036. 2:17:33

    ... significant than $1,000 a day.

  1037. 2:17:37

    Unfortunately, we're limited by state law.

  1038. 2:17:40

    Correct.

  1039. 2:17:44

    That's all I have to present, if you don't have any... if you have any questions for me.

  1040. 2:17:49

    S- so that was all about the data center ordinance. I do wanna ask about the technology district. I've gotten several questions about-

  1041. 2:17:55

    Okay

  1042. 2:17:55

    ... why do we need a new district? 'Cause in theory, I mean, if you were to take the technology district out, now that we have all these definitions for data centers and, you could technically just keep that in the industrial general, correct?

  1043. 2:18:12

    Yes, but the issue with leaving it under industrial, if someone comes in, they rezone a parcel for industrial because they wanna put a data center. If for some reason that person sells the property, they decide, "I don't wanna do a data center," then that leaves that parcel open up, open to any industrial use. So they could put, you know, a manufacturing plant, anything like that onto the property. So that way, a technology district kind of gives us a little more, bit more leeway about what we allow in the T district.

  1044. 2:18:45

    And so with, with the T district, data centers, except for, like, the accessory use, we're not talking about primary use data centers. So primary, primary use data centers will be prohibited in general industrial. They're gonna be required to rezone.

  1045. 2:18:59

    They would be required to be in the T zone-

  1046. 2:19:01

    Okay

  1047. 2:19:02

    ... with special use approval.

  1048. 2:19:04

    Awesome. Thank you.

  1049. 2:19:05

    Yes.

  1050. 2:19:09

    A- and, and that, in the T, in the T zone, is that just for data centers? I know there was the, if it's allowed by right in IGIR, it's allowed by right in T-

  1051. 2:19:20

    Yes

  1052. 2:19:20

    ... and then vice versa for the special use.

  1053. 2:19:22

    So if you go through, uh, I've actually listed them all off. Essentially, computer manufacturing, electrical equipment manufacturing, pretty much anything that has to do with technology-related uses is going to be listed there. And if it was allowed by right in industrial, it would be allowed by right in the technology district. It-

  1054. 2:19:43

    No, except for the data center, right?

  1055. 2:19:45

    Yes.

  1056. 2:19:45

    So my, my, my question in this is, so we, we rezone for a data center. Now, that never happens. Well, so, you know, the data center's kind of the whole reason for the T district, right?

  1057. 2:19:58

    Yes.

  1058. 2:19:59

    So they rezone. They have a special use on that, but then everything else doesn't necessarily require, uh, a r- a, a special use. Now, in some of these NA... Am I saying it right, the NAICS?

  1059. 2:20:14

    NAICS, yes.

  1060. 2:20:14

    Some of these NAICS codes, because of, like, the highly specialized, evolving technology that's going on in a T district, some of the things you might get in a T district that fall into some of these categories would be vastly different than you get in a general industrial. We had talked about, you know, potential animal testing and things like that.

  1061. 2:20:32

    Yes.

  1062. 2:20:32

    So, and because, you know, it coincides with the data center, you know, just- It all harmonizes. So could we not, so that we have more control over what specific things are going to be complementary to a data center, can we also require a special use for those in the T district?

  1063. 2:20:49

    We can require a special use for any that you deem need it.

  1064. 2:20:54

    Yeah. And it, it might be part of the, the plan development. I don't know how that all fits into the picture either, 'cause they're gonna have to identify what these components are in the plan development.

  1065. 2:21:04

    They would. Yep.

  1066. 2:21:08

    This is a zoning issue. It, it could be rezoned to technology. Technology doesn't work, they can rezone back to whatever use they want to later on. This, I think this, this zoning district provides sort of some protection for the neighborhood rather than having a straight industrial. I'm a fan of it.

  1067. 2:21:33

    Whatever the neighborhood is.

  1068. 2:21:40

    Anything else?

  1069. 2:21:44

    No.

  1070. 2:21:45

    Thank you for your patience.

  1071. 2:21:48

    Oh, well hold up, hold up. Whoops. This was a great work session. It was awesome. Um, I think there was a lot of work identified.

  1072. 2:21:56

    Yeah.

  1073. 2:21:57

    When, when are we doing this again?

  1074. 2:22:03

    I guess when, when-

  1075. 2:22:04

    I wouldn't know. We would have to schedule that.

  1076. 2:22:08

    When, when would we have another work session or have something presented to us?

  1077. 2:22:11

    Yeah, I'll, I'll, uh, I'll look at our calendar and I'll coordinate everything with Katie and with you all as well.

  1078. 2:22:16

    Okay.

  1079. 2:22:16

    Soon. Very soon.

  1080. 2:22:18

    And then in, in between that time, once you get some of the th- the things that, you know, some of the think critiques that you've received tonight, you'll send us an updated draft with, with-

  1081. 2:22:28

    Yeah, I can do that

  1082. 2:22:28

    ... things discussed tonight? Cool. Thank you.

  1083. 2:22:30

    Would, would you like me to use another color?

  1084. 2:22:31

    What color do you want?

  1085. 2:22:33

    Yeah. So you want pink this time?

  1086. 2:22:35

    Well, you understand what I was trying to get to.

  1087. 2:22:36

    No, I, I understand.

  1088. 2:22:37

    It's like so we can see-

  1089. 2:22:37

    I'm just messing with you

  1090. 2:22:38

    ... the changes as they happen. Yeah.

  1091. 2:22:39

    Yeah.

  1092. 2:22:40

    So whatever color you prefer.

  1093. 2:22:42

    Sweet. I like green. It's my favorite.

  1094. 2:22:44

    Um, Nassau County, our neighbor to the south, has, um, they've released their draft data center ordinance. So I, I think we should take a little time to, to read theirs and, and see what, what they have in, in case we've missed something.

  1095. 2:23:02

    Yeah. I pulled up a little bit of that today. I hadn't read through the whole thing, but you're right. Need to check it out, 'cause they put a lot of effort into it. We have, too. Nobody can say we haven't. But Nassau has, uh, put a lot of effort into it, so it's worth your looking at, for sure. Okay. Anything else? Thank y'all.

Legible por máquinas https://georgiacommons.org/meetings/2026-10-27/camden-county-board-of-commissioners-work-session.md · https://georgiacommons.org/meetings/local/index.md · MCP https://mcp.georgiacommons.org/mcp