Ir al contenido
Georgia Commons
Menú

Condado: Meriwether County

Meriwether County Board of Commissioners: reunión ordinaria, 27 de octubre de 2026

14 páginas

Estas son las actas tal como las publicó Meriwether County Board of Commissioners, leídas del archivo en su propio sitio web. Georgia Commons es independiente y no está afiliado a Meriwether County Board of Commissioners.

Este registro se publicó como imágenes escaneadas, leídas aquí con OCR: una letra o un número puede estar mal leído. El archivo que publicó el órgano está enlazado abajo.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Este resumen está en inglés. No se ha escrito un resumen en español de estas actas.

Commissioners approved a $375,000 Courthouse fire suppression system and extended the R-1 lot and data center moratoriums by 90 days.

The commissioners approved a Courthouse fire suppression system paid for by SPLOST at no more than $375,000.00, and extended both the R-1 residential lot moratorium and the data center moratorium by 90 days. They adopted the 2026 Transit Development Plan Update, approved the Sheriff's Office speed detection permit renewal and radio authorization, a SmartCOP hosting change, employee retention pay, the ACCG safety discount form, a Penco Restoration agreement renewal pending legal review, and the first responder PTSD program renewal. They made an airport authority appointment and reappointed a Recreation Advisory Board member, and tabled two other appointments to November 9, 2026. A fleet leasing proposal with Enterprise was discussed with no action. No action was taken in executive session.

Temas tratados: Courthouse fire suppression system; R-1 residential lot moratorium extension; data center moratorium extension; 2026 Transit Development Plan Update; SmartCOP hosting modification; employee retention pay; Enterprise fleet leasing proposal; first responder PTSD program; board appointments; speed detection permit renewal.

Decisiones que constan en las actas (15)

Después de cada decisión va la oración de las actas que la registra, copiada palabra por palabra, en inglés.

  1. Courthouse fire suppression system paid for by SPLOST, not to exceed $375,000.00

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the Courthouse Fire Suppression system as outlined, paid for by SPLOST not to exceed $375,000.00.”

    Leer este punto en las actas

  2. 90-day extension of the R-1 residential lot moratorium

    Aprobadounanimous

    Las actas: “A motion was made by Vice Chairman Snelson and seconded by Commissioner Threadgill to Approve the 90-Day Extension of R-1 Residential Lot Moratorium and allow Chairman Collins to sign.”

    Leer este punto en las actas

  3. 90-day extension of the data center moratorium

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to Approve the 90-Day Extension of Data Center Moratorium and allow Chairman Collins to sign.”

    Leer este punto en las actas

  4. Resolution approving the 2026 Meriwether County Transit Development Plan Update

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to approve the adoption of the resolution approving the 2026 Meriwether County Transit Development Plan and authorize Chairman Collins to sign.”

    Leer este punto en las actas

  5. SmartCOP Statement of Work modification for Sheriff's Office hybrid hosting, pending legal review

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the SmartCOP Statement of Work Modification for Meriwether County Sheriff's Office Hybrid Hosting Solution pending legal review and authorize Chairman Collins to sign.”

    Leer este punto en las actas

  6. Employee retention pay for full-time and part-time county employees

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the employee retention pay.”

    Leer este punto en las actas

  7. Renewal of ACCG First Responder PTSD Program agreement

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the Agreement for ACCG First Responder PTSD Program with funding coming from the General Fund and allow Chairman Collins to sign.”

    Leer este punto en las actas

  8. Penco Restoration Emergency Response Agreement renewal, pending legal review

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Chairman Collins to approve the Penco Restoration Emergency Response Agreement Renewal and allow Chairman Collins to sign pending legal review.”

    Leer este punto en las actas

  9. 2026 ACCG Safety Discount Verification Form

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the 2026 ACCG Safety Discount Verification Form and allow Chairman Collins to sign.”

    Leer este punto en las actas

  10. Sheriff's Office speed detection device permit renewal request

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson for the approval of the Sheriff's Office speed detection device permit renewal request and authorize Chairman Collins to sign.”

    Leer este punto en las actas

  11. Radio communication authorization for Sheriff's Office speed detection permit renewal

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to approve the radio communication authorization for the Sheriff's Office speed detection permit renewal and authorize Chairman Collins to sign.”

    Leer este punto en las actas

  12. Appointment to the Meriwether County Airport Authority, District 4, five-year term

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill to appoint Mr. Paul Harman to the Meriwether County Airport Authority Board, District 4, to fill a 5-year term that will begin on November |, 2026 and expire on October 31, 2031.”

    Leer este punto en las actas

  13. Reappointment to the Recreation Advisory Board, District 4, two-year term

    Aprobadounanimous

    Las actas: “A motion was made by Commissioner Threadgill to reappoint Mr. Michael Sharpe to the Meriwether County Recreation Advisory Board for District 4 for a two-year term expiring June 30, 2028.”

    Leer este punto en las actas

  14. Appointment to the Pine Mountain Regional Library Board

    Aplazadounanimous

    Las actas: “A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to table the Appointment to the Pine Mountain Regional Library Board until the November 9, 2026, Regular Meeting at 6:00 p.m.”

    Leer este punto en las actas

  15. Appointment to the Recreation Advisory Board, District 2

    Aplazadounanimous

    Las actas: “A motion was made by Vice Chairman Snelson and seconded by Commissioner Threadgill to table the Appointment to the Meriwether County Recreation Advisory Board until the November 9, 2026, Regular Meeting at 6:00 p.m.”

    Leer este punto en las actas

Puntos del orden del día (3)

Encontrados en las actas por sus encabezados. Cuando se muestra un resultado, se leyó por regla de las propias palabras del punto: es una guía del texto, no parte del registro.

  1. MINUTESUna moción
  2. Vv. PRESENTATIONSUna presentación
  3. VHI. CITIZEN COMMENTUna votación

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Las actas

Tal como se publicó en www.meriwethercountyga.gov, leído el 25 de noviembre de 2026. Nada de lo que sigue lo escribió Georgia Commons. El registro se muestra en inglés, tal como se publicó.

MINUTES

MERIWETHER COUNTY BOARD OF COMMISSIONERS

OCTOBER 27, 2026

6:00 PM

Commissioners Present: Chairman Emmett Collins, Vice Chairman Jennifer Snelson, Commissioner Bryan Threadgill and Commissioner Adam Worsley

Commissioners Absent: Commissioner Gene King

Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, Deputy County Administrator Jeff Fisher, Administrative Assistant Presley Sherrer, and County Attorney Nathan Lee

Staff Absent:

I. CALL TO ORDER

This meeting was Called to Order at 6:00 p.m. by Chairman Emmett Collins

I. INVOCATION

The invocation was given by Deputy County Administrator Jeff Fisher.

Ill. PLEDGE TO THE FLAG

All.

IV. ADOPT AGENDA

A motion was made by Commissioner Bryan Threadgill and seconded by Commissioner Adam Worsley to Adopt the Agenda. All were in favor.

Vv. PRESENTATIONS

VI. FINANCE REPORT

County Administrator Gorton presented the bank balances as of that afternoon and reported that all funds continued to maintain healthy balances. He stated that the County had received its insurance premium tax revenue on October 15, 2026, along with the third-quarter tipping fees and hosting fees, which were reflected in the report. He noted that the SPLOST, TSPLOST, and LOST allocations were expected to be received by the end of the week. Commissioner Worsley questioned whether the months listed on the report should read September, October, and November. County Administrator Gorton clarified that the report contained a typographical error and that September should have been listed across all columns. He explained that he had used a previous report when preparing the information and acknowledged the mistake. County Administrator Gorton then reviewed the SPLOST and TSPLOST commitments, reporting a SPLOST balance of negative $525,291.42 and a TSPLOST balance of negative $226,884.61. He stated that all LRA funds had been accounted for based on the projects listed in the report. He explained that as projects, including Alvaton Road, became due and funds remained available in certain LRA allocations, those funds could be adjusted among eligible projects to cover remaining expenses. County Administrator Gorton further noted that the negative SPLOST and TSPLOST commitment balances were expected to decrease once the upcoming revenue allocations were received.

VIL DEPARTMENT HEADS

VHI. CITIZEN COMMENT

IX. MINUTES

l. Minutes, Monday, October 12, 2026, Regular Meeting at 6:00 p.m.

A motion was made by Vice Chairman Snelson and seconded by Chairman Collins to approve the minutes of the October 12, 2026, Regular Meeting at 6:00 p.m.

Commissioner Worsley stated that he and Commissioner Threadgill had not been present at the previous meeting and initially believed they would need to abstain from voting on the minutes, which would require the item to be tabled. County Attorney Michael Hill clarified that Commissioners were not required to have attended the meeting to vote on approval of the minutes. Commissioner Worsley stated that if the commissioners who were present at the previous meeting agreed that the minutes were accurate, he would support their approval.

County Attorney Hill noted that if both commissioners abstained, the Board would not have a majority to approve the minutes. Commissioner Worsley reiterated that although he had not attended the previous meeting, he was willing to support approval of the minutes based on the confirmation of their accuracy by those who were present. Voting in favor were Chairman Collins, Vice Chairman Snelson, Commissioner Threadgill and Commissioner Worsley.

X. PUBLIC HEARING

XI. APPOINTMENTS

l. Appointment to the Meriwether County Airport Authority — District 4. This is a 5- year term that will begin on November 1, 2026, and expire on October 31, 2031

County Clerk Allyson Stephens stated that the Board of Commissioners needed to consider an appointment to the Meriwether County Airport Authority for District 4. She explained that the position was currently held by Mr. Paul Harmon and that the appointment would be for a five-year term beginning November |, 2025, and expiring October 31, 2031. A motion was made by Commissioner Threadgill to appoint Mr. Paul Harman to the Meriwether County Airport Authority Board, District 4, to fill a 5-year term that will begin on November |, 2026 and expire on October 31, 2031. This motion was seconded by Commissioner Worsley. All were in favor.

2. Appointment to the Pine Mountain Regional Library Board to fill an expired term.

This three-year term ends on June 30, 2029.

County Clerk Allyson Stephens stated that the Board of Commissioners needed to consider an appointment to the Pine Mountain Regional Library Board to fill an expired term. She explained that the position was previously held by Ms. Angie Shirah, who was unable to serve another term due to other commitments. County Clerk Stephens stated that the appointment would be for a three-year term expiring June 30, 2029. Chairman Collins stated that he did not have anyone to recommend for the appointment at that time. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to table the Appointment to the Pine Mountain Regional Library Board until the November 9, 2026, Regular Meeting at 6:00 p.m. All were in favor.

3. Appointment to the Meriwether County Recreation Advisory Board to fill an expired term. District 2. This is a two-year term ending on June 30, 2028

County Clerk Stephens stated that the Board of Commissioners needed to consider an appointment to the Recreation Advisory Board for District 2 to fill an expired term. She explained that the previous term had been established for one year to allow the Board to establish staggered terms for its members. County Clerk Stephens stated that the position was currently held by Mr. Shannon Snyder, who was unable to serve another term due to other commitments. She noted that the new appointment would be for a two-year term expiring June 30, 2028. A motion was made by Vice Chairman Snelson and seconded by Commissioner Threadgill to table the Appointment to the Meriwether County Recreation Advisory Board until the November 9, 2026, Regular Meeting at 6:00 p.m. All were in favor.

4. Appointment to the Meriwether County Recreation Advisory Board to fill an expired term. District 4. This is a 2-year appointment that will end on June 30, 2028.

County Clerk Stephens stated that the Board of Commissioners needed to consider an appointment to the Meriwether County Recreation Advisory Board for District 4 to fill an expired term. She explained that the previous appointment had been for a one-year term to allow the Board to establish staggered terms for its members. County Clerk Stephens stated that the position was currently held by Mr. Michael Sharpe and that the new appointment would be for a two-year term expiring June 30, 2028. Commissioner Threadgill stated that the appointment was for his district. A motion was made by Commissioner Threadgill to reappoint Mr. Michael Sharpe to the Meriwether County Recreation Advisory Board for District 4 for a two-year term expiring June 30, 2028. All were in favor.

XII. UNFINISHED BUSINESS

l. Courthouse Fire Suppression Discussion and Decision — This was tabled at the October 12, 2026, Regular Meeting.

County Administrator Gorton stated that Travis Evans with River City Contracting was present to discuss the proposed fire suppression system for the Courthouse. He explained that the item had been tabled at the previous meeting because Commissioner Worsley and Commissioner Threadgill were absent, and the Board wanted their input before deciding whether to move forward with installing a fire suppression system or continue using the existing system. Mr.

Evans provided an update on the findings and options discussed at the previous meeting. He explained that the Board had requested additional water flow testing and evaluation of the existing system. Following the previous meeting, testing was conducted at a fire hydrant behind the Courthouse near the AJ's Grab N Go, Pizza & Wings location, where the flow measured approximately 440 gallons per minute, which was insufficient for the proposed system. Initially, it appeared that both a pump and a water holding tank would be necessary. Mr. Evans stated that he coordinated with Justin from Greenville Public Works to conduct additional flow tests beginning near Stovall Street and working back toward the Courthouse. The testing showed a flow of more than 900 gallons per minute near Stovall Street, approximately 800 gallons per minute at the next hydrant, followed by 600 gallons per minute and approximately 400 gallons per minute at the top of the hill. He explained that after reviewing the results with Fuller Fire, it was determined that a water holding tank would not be necessary; however, a 400-gallon-per-minute, 50-PSI, 20-horsepower pump would be required and could be installed in the Courthouse basement if the Board chose to proceed. Mr. Evans further explained that during discussions regarding the design, it was recommended that he contact local Fire Inspector Mitt Smith. He stated that Mr.

Smith had previously been informed by the State that, because State employees occupied the former Super Dollar building, the State Fire Marshal's Office would serve as the inspecting authority rather than the local fire inspector. Mr. Smith expressed concern that the same requirement would apply to the Courthouse because the District Attorney and Superior Court judges were State employees. Mr. Evans explained that if the Board chose to install the fire suppression system, the plans would need to be designed and submitted to the State for review and approval. He estimated that the design process would take approximately four to six weeks, followed by an additional two to four weeks for State review. Mr. Evans stated that construction had slowed somewhat because a decision was needed before proceeding with ceiling installation, which was expected to begin in approximately two weeks. He explained that the existing fire protection system was operational and could remain in place if the Board decided not to install the new system. However, he noted that Fire Chief Stephens favored the additional protection because an automatic fire suppression system could help control a fire before firefighters arrived.

Mr. Evans reported that he had received the final cost proposal shortly before the meeting. He explained that if the project required State approval, the fire suppression system would need to cover the entire Courthouse rather than only one floor. Although the contractor had provided costs broken down by floor, the complete proposal included fire suppression protection for all floors, a 400-gallon-per-minute, 50-PSI pump, a fire alarm system, associated electrical wiring, system design and submission to the State, and the anticipated cost associated with approximately two months of construction delays. Mr. Evans stated that the total estimated cost for the complete fire suppression system was $373,851.00, including the design and State review process. Commissioner Worsley asked County Administrator Gorton how much had been spent on the Courthouse renovations to date. County Administrator Gorton referred to the amount listed under Phase One of the Courthouse project and stated that the total was $3,157,371.00, which included the exterior and third-floor renovations. Commissioner Worsley confirmed that this was the amount spent to that point, and County Administrator Gorton stated that it was.

Commissioner Threadgill asked whether adding the proposed fire suppression system would bring the total project cost to approximately $3.5 million, and County Administrator Gorton confirmed that it would. Vice Chairman Snelson stated that she felt the County should continue with the renovations as currently planned without adding the new fire suppression system, since the existing system was functioning properly. She noted that the existing lines had been inspected, flushed, and tested and were operating correctly. Commissioner Worsley stated that he wished Fire Chief Stephens had been present to provide his direct input on the matter. County Administrator Gorton explained that he had requested Chief Stephens’ attendance by text message but had not received a response and was unsure whether the Chief had another obligation. Commissioner Worsley then questioned why the County had begun considering a new fire suppression system if the existing system was functioning properly. Mr. Evans clarified that the fire suppression system would be installed in stages and that work on the lower floors would not begin until renovations reached those areas. Chairman Collins asked whether the proposed fire suppression system would connect to the existing fire hose connections located inside the Courthouse. Mr. Evans explained that the existing connections would remain part of the system and would still be available for use by the Fire Department upon arrival. Chairman Collins further clarified that he wanted to know whether installing the new system would allow water to flow from the existing hose connections without requiring a fire truck to be connected to the building. Mr. Evans stated that he believed the connections would be operational without the fire truck once the new system was installed, but he would need to confirm that information.

Chairman Collins stated that if the Board decided to install the new fire suppression system, he wanted all existing fire hose connections inside the Courthouse to be operational without requiring a fire truck to be connected. County Administrator Gorton stated that this might be possible because the proposed pump would supply additional water pressure to the building.

Commissioner Threadgill expressed concern about whether the proposed system would provide sufficient water flow and pressure to operate both the new sprinkler system and the existing fire hose connections. Chairman Collins asked whether the pump would increase the available water flow, and Mr. Evans confirmed that the pump would supplement the existing supply. He explained that approximately 400 gallons per minute would enter the building and that the pump would increase the available flow to approximately 800 gallons per minute. Chairman Collins repeated the figure to confirm his understanding. Commissioner Threadgill expressed concern about the significant amount of money being invested in the Courthouse renovations and stated that it would be unfortunate to spend that much money only to have the building damaged or destroyed by a fire. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the Courthouse Fire Suppression system as outlined, paid for by SPLOST not to exceed $375,000.00. All were in favor.

XIII. NEW BUSINESS

1. Consider Adoption of Resolution Approving the 2026 Meriwether County Transit Development Plan Update

County Clerk Stephens stated that Meriwether County, in partnership with the Three Rivers Regional Commission, had prepared the draft 2026 Transit Development Plan Update as part of the five-year planning cycle. She explained that the plan reviewed the County's current transit services, identified transportation needs, and provided recommendations for future improvements. County Clerk Stephens noted that the draft plan had been provided to the Board of Commissioners for review prior to the meeting and that Ms. Stephanie Wagner with the Three Rivers Regional Commission was present to answer any questions. She stated that the Board was being asked to adopt the 2026 Transit Development Plan Update and authorize Chairman Collins to sign the resolution approving the plan. Ms. Stephanie Wagner with the Three Rivers Regional Commission provided an overview of the 2026 Transit Development Plan Update and expressed appreciation for Meriwether County's collaboration throughout the planning process. She explained that the plan was developed using internal research, stakeholder meetings, and feedback collected through a public survey completed by County residents. Ms. Wagner stated that the plan was prepared in accordance with the Georgia Department of Transportation's Regional Transit Development Plan Guidebook and was designed to support the State Transit Development Plan completed in 2020 and the Regional Transit Development Plan completed in 2024. She explained that the overall goal of these plans was to ensure that Georgia residents, whether they drive or not, have access to transportation options that support their quality of life, daily needs, and economic opportunities. Ms. Wagner reported that Meriwether County currently operates a rural, on-demand transit system that provided approximately 6,500 trips covering more than 70,000 miles during Fiscal Year 2025. She explained that the plan included an assessment of existing conditions and transportation needs, with particular attention given to residents who were more likely to depend on public transportation, including senior citizens, individuals with disabilities, low-income residents, households with limited access to vehicles, and individuals seeking employment or workforce training opportunities. Ms. Wagner noted that Meriwether County's population was aging and that the number of residents over the age of 65 was expected to increase over the next 20 years. She also stated that the County had a higher percentage of residents with disabilities than the regional and state averages, further demonstrating the importance of maintaining accessible transportation services. She explained that educational attainment and poverty levels were also considered when evaluating transportation needs, particularly for residents who could benefit from transportation to job training and employment opportunities. Ms. Wagner stated that stakeholder feedback identified several areas for potential improvement, including increasing public awareness of the County's transit services. She acknowledged that the County and its senior centers had done a good job promoting the system but encouraged additional outreach, particularly within the municipalities, to ensure residents were aware that transportation services were available. She noted that the Three Rivers Regional Commission had informational flyers available for distribution. Ms.

Wagner emphasized the continued importance of transit services for the County's four senior centers, explaining that many participants relied on transportation to access meals, social activities, and other services that contributed to their quality of life. She also discussed the possibility of expanding service hours in the future, noting that the current system operated from 8:00 a.m. to 5:00 p.m., which could present challenges for residents who needed transportation to work early in the morning, after regular business hours, or on weekends. Additional concerns identified through stakeholder feedback included service reliability, driver availability, employee turnover, and the difficulty of efficiently providing transportation throughout Meriwether

County's large geographic area. Ms. Wagner explained that these challenges were common among rural transit systems and had been included in the plan for future consideration. She stated that the findings demonstrated a continued need for public transportation in Meriwether County over the next 20 years and recommended maintaining support for the existing system while prioritizing residents who depended on transit services. She further explained that future improvements could include evaluating the size and composition of the vehicle fleet, using different-sized vehicles based on transportation needs, exploring electric vehicles if practical and cost-effective, and continuing to incorporate technology to improve service efficiency. Ms.

Wagner concluded by stating that the plan was being presented for the Board's consideration and adoption and again expressed appreciation for the opportunity to work with Meriwether County.

A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to approve the adoption of the resolution approving the 2026 Meriwether County Transit Development Plan and authorize Chairman Collins to sign. All were in favor.

2. Consider Approval of FCC Radio Communications Authorization for Sheeriff's Office Speed Detection Permit Renewal and Authorization for Chairman’ Signature County Clerk Stephens stated that the Meriwether County Sheriff's Office was in the process of renewing its speed detection device permit with the Georgia Department of Public Safety. She explained that, as part of the renewal process, the County was required to provide written authorization allowing the Sheriff's Office to use the County’s FCC-licensed radio communication system. County Clerk Stephens stated that the authorization letter identified Meriwether County as the FCC license holder under call sign KUJ576. She noted that Sergeant Justin Krauss was present to answer any questions. County Clerk Stephens stated that the Board was being asked to approve the authorization letter and authorize Chairman Collins to sign it for submission to the Georgia Department of Public Safety. County Clerk Stephens asked whether any members of the Board had questions regarding the authorization letter. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to approve the radio communication authorization for the Sheriff's Office speed detection permit renewal and authorize Chairman Collins to sign. All were in favor.

3. Consider Approval of Sheriff's Office Speed Detection Device Permit Renewal Request and Authorization for Chairman's Signature

County Clerk Stephens stated that the Meriwether County Sheriff's Office was requesting renewal of its speed detection device permit with the Georgia Department of Public Safety. She explained that, as part of the renewal process, the County was required to submit a formal renewal request signed by Chairman Collins. The renewal would allow the Sheriff's Office to continue using approved speed detection devices for traffic enforcement in accordance with applicable State requirements. County Clerk Stephens stated that the Board was being asked to approve the renewal request and authorize Chairman Collins to sign the letter for submission to the Georgia Department of Public Safety. She clarified that no changes were being made to the current list of approved roads at this time. She noted that additional roads might be requested in the future, but any proposed additions would be brought back before the Board for consideration. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson for the approval of the Sheriff's Office speed detection device permit renewal request and authorize Chairman Collins to sign. All were in favor.

4. Consider Approval of SmartCOP Statement of Work Modification for Meriwether County Sheriff's Office Hybrid Hosted Solution

County Administrator Gorton stated that the Meriwether County Sheriff's Office was requesting approval of a modification to the original Statement of Work with SmartCOP for its Computer-

Aided Dispatch (CAD), Records Management System (RMS), mobile, and jail management systems. He explained that under the original agreement, the County was responsible for maintaining the primary local servers, with SmartCOP providing cloud backup. The proposed modification would reverse that arrangement, making SmartCOP's Amazon Web Services (AWS) cloud system the primary hosting location while the County maintains a secondary local backup system. County Administrator Gorton stated that the modification would not result in any additional costs or changes to the project timeline. He explained that the Board was being asked to approve the Statement of Work modification, pending legal review, and authorize Chairman Collins to sign the agreement. County Administrator Gorton further explained that the revised arrangement required increased internet bandwidth, including approximately one gigabit of upload capacity and 500 megabits of download capacity, compared to the lower bandwidth requirements under the original agreement. He stated that the County was capable of meeting the revised requirements. County Administrator Gorton asked Sergeant Justin Krause to confirm that SmartCOP would host the primary operating system in the cloud. Sergeant Krause confirmed that SmartCOP would serve as the primary host and that the County would maintain a local backup system at the 911 Center. He explained that this arrangement would allow the system to remain operational if the internet connection was interrupted. County Administrator Gorton clarified that the modification primarily addressed the hosting arrangement and the internet bandwidth necessary to support the cloud-based system. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the SmartCOP Statement of Work Modification for Meriwether County Sheriff's Office Hybrid Hosting Solution pending legal review and authorize Chairman Collins to sign. All were in favor.

5. Consider Approval of Employee Retention Pay

County Administrator Gorton stated that the Board of Commissioners had approved annual retention payments for County employees during each of his three years with the County. He explained that, in previous years, full-time employees had received a net payment of $150.00, while part-time employees received a net payment of $75.00. He stated that funding was available in the Human Resources employee benefits line item and could be transferred through a budget amendment if necessary. County Administrator Gorton reported that the County currently had 188 full-time employees and 48 part-time employees, with an estimated total cost of $38,255.40. He explained that this amount included both the employer and employee portions of FICA taxes, as well as the 5% retirement contribution. He stated that the payments would be distributed during the County's employee luncheon on November 12, 2026. Commissioner Threadgill referred to the payment as a holiday bonus. County Administrator Gorton clarified that the payment was classified as an employee retention incentive rather than a bonus.

Commissioner Threadgill stated that the County had referred to the payment as a bonus throughout his 14 years of service. County Administrator Gorton explained that, based on legal guidance and State law, the payment was designated as a retention incentive. Commissioner Threadgill acknowledged the terminology but reiterated that it had traditionally been considered a holiday bonus. Commissioner Worsley asked whether the payment was intended for the holiday season or specifically for Thanksgiving. County Administrator Gorton clarified that the annual holiday payment Commissioner Threadgill was referring to was the employee retention payment. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the employee retention pay. All were in favor.

6. Confirmation of the 2026 ACCG Safety Discount Verification Form

County Administrator Gorton stated that the County was required to complete the ACCG Safety Discount Verification Form annually to document compliance with the safety requirements necessary to receive a 15% discount on its insurance premiums. He explained that the 2026 form

identified Human Resources Director Valerie Chambers as the Human Resources representative, himself as the Safety Coordinator, and County Clerk Stephens as the custodian of insurance records. Commissioner Threadgill asked whether Chairman Collins was required to sign the form, and County Administrator Gorton confirmed that his signature was necessary.

Commissioner Worsley questioned why some of the supporting documentation contained dates from previous years and asked whether those documents were being provided as examples or were intended to satisfy the current requirements. County Administrator Gorton explained that changes involving ACCG, GMA, and the safety program had resulted in adjustments to the documentation and compliance process. He stated that, for the current year, previously completed safety documentation would be accepted while updated forms and training programs were being developed. He further explained that the County was required to complete one safety action course, which he believed had been completed by Administrative Assistant Presley Sherrer. County Administrator Gorton stated that ACCG would verify the County's compliance and approve the 15% insurance premium discount, with updated forms and safety training requirements expected for future years. County Clerk Stephens explained that the ACCG Safety Discount Verification Form was the same form presented to the Board for approval each year.

She stated that Local Government Risk Management had separated from ACCG and that ACCG was now handling the program internally in conjunction with the Georgia Municipal Association (GMA), which serves municipalities. She explained that the transition had caused delays in distributing the updated forms, and the County was subsequently notified that the documentation needed to be submitted immediately to avoid losing the insurance premium discount. County Clerk Stephens stated that the form had already been completed, submitted, and approved, and the Board was now being asked to formally confirm its approval. Commissioner Worsley asked whether the County was in compliance and whether the documentation was acceptable for submission. County Administrator Gorton confirmed that compliance had been verified. County Clerk Stephens further explained that she had previously submitted the 2026 documentation, but because of the program transition, the County was required to complete the process again. She assured the Board that the documentation was current and that all requirements had been satisfied. County Administrator Gorton added that ACCG had confirmed the County would remain eligible for the discount despite some supporting documents being approximately a year and a half old. He stated that ACCG was aware that several other counties were experiencing similar circumstances and had confirmed that the documentation would be accepted.

Commissioner Worsley asked whether that confirmation had been documented, and County Clerk Stephens stated that she had received the confirmation by email. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the 2026 ACCG Safety Discount Verification Form and allow Chairman Collins to sign. All were in favor.

7. Approval of Penco Restoration Emergency Response Agreement Renewal

County Administrator Gorton stated that the Board was being asked to renew the previously approved Emergency Response Plan Agreement with Penco Restoration, which would allow Meriwether County to obtain professional services following a disaster or emergency. He explained that Penco would provide damage mitigation and restoration services to return affected properties to a safe and habitable condition. County Administrator Gorton stated that the previous agreement was for a one-year term and was due to expire. He noted that staff recommended approval of the renewal and authorization for Chairman Collins to sign the agreement. Commissioner Worsley asked whether the County Attorneys had reviewed the agreement to verify that it contained the same terms as the previous year's contract. County Administrator Gorton initially stated that the agreement was the same as the previous contract but clarified that he had not yet submitted it for legal review. Commissioner Worsley reiterated that his concern was whether legal counsel had confirmed that the terms remained unchanged.

County Administrator Gorton acknowledged that legal review had not yet been completed and stated that the agreement would be submitted for review and comparison with the previous contract. A motion was made by Commissioner Threadgill and seconded by Chairman Collins to approve the Penco Restoration Emergency Response Agreement Renewal and allow Chairman Collins to sign pending legal review. All were in favor.

8. Consider Approval of 90-Day Extension of R-1 Residential Lot Moratorium

County Administrator Gorton stated that on August 25, 2026, the Board of Commissioners adopted a temporary moratorium on the acceptance and approval of rezoning, subdivision plans, and lot split applications that would create new R-1 residential lots containing less than two acres in unincorporated Meriwether County. He explained that the current moratorium was scheduled to expire on November 23, 2026, and that additional time was needed for the County to review the minimum lot size requirements and consider potential amendments to the R-1 zoning regulations. County Administrator Gorton stated that the proposed resolution would extend the moratorium for an additional 90 days, through February 21, 2027, unless the Board took action to terminate it earlier or adopted amendments to the R-1 minimum lot area regulations. He explained that the Board was being asked to approve the resolution extending the R-1 residential lot moratorium for an additional 90 days and authorize Chairman Collins to sign the resolution. A motion was made by Vice Chairman Snelson and seconded by Commissioner Threadgill to Approve the 90-Day Extension of R-1 Residential Lot Moratorium and allow Chairman Collins to sign. All were in favor.

9. Consider Approval of 90-Day Extension of Data Center Moratorium

County Administrator Gorton stated that on February 24, 2026, the Board of Commissioners adopted a temporary moratorium on applications and public hearings related to data center development in unincorporated Meriwether County. He explained that the moratorium had previously been extended and was currently scheduled to expire on November 21, 2026. County Administrator Gorton stated that additional time was needed for the County to finalize proposed amendments to the Zoning Ordinance regulating data center development. He explained that the proposed resolution would extend the moratorium for an additional 90 days, through February 19, 2027, unless the Board adopted the proposed regulations or took action to terminate the moratorium earlier. He noted that this was intended to be the final extension, allowing the County sufficient time to complete the necessary ordinance amendments before the expiration date. County Administrator Gorton stated that the Board was being asked to approve the resolution extending the data center moratorium for an additional 90 days and authorize Chairman Collins to sign the resolution. He further explained that, at the November 9, 2026, meeting, staff would bring proposed dates before the Board to schedule a work session to discuss the ordinance amendments and potentially schedule a public hearing. He noted that a 30- day advertisement period would be required before the public hearing and that the goal was to complete the process before the extended moratorium expired. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to Approve the 90-Day Extension of Data Center Moratorium and allow Chairman Collins to sign. All were in favor.

10. Update and Discussion — Enterprise Fleet Management for Public Works County Administrator Gorton stated that he had met with Ray Simpson with Enterprise to discuss a vehicle leasing program and that the preliminary figures appeared favorable for the County. He explained that the proposal involved replacing five trucks through a 60-month lease at an estimated annual cost of $59,320.00, with payments made monthly. Enterprise had conservatively estimated approximately $23,000.00 in annual savings on fuel, repairs, and

maintenance. County Administrator Gorton clarified that these savings would reduce the County's overall operating expenses but would not reduce the annual lease payments. He stated that additional information was still needed to refine the estimates. Based on the information received, the proposal would replace the County's existing two-wheel-drive F-150 trucks and one two-door F-250 truck with comparable new four-wheel-drive XL crew cab trucks with four doors. He explained that the lease would not include annual mileage restrictions and that the County could exit the agreement at any time by paying off the remaining lease balance. These provisions would be outlined in the contract. County Administrator Gorton stated that he would like Mr. Simpson to attend a future Board meeting to explain the program and answer questions.

He further explained that, for approximately $59,000.00 annually, which was comparable to the purchase price of one new truck, the County could obtain five vehicles immediately rather than purchasing them individually. Commissioner Threadgill asked whether the cost was approximately $60,000.00 per month for 60 months. County Administrator Gorton clarified that the amount was approximately $60,000.00 per year for five years, with monthly payments.

Commissioner Worsley confirmed that the payments would be approximately $5,000.00 per month for 60 months, and County Administrator Gorton agreed. County Administrator Gorton explained that if the County decided after the first year that it no longer wanted to participate in the Enterprise program, it could pay off the remaining balance and retain the vehicles. He stated that he had not yet compared financing rates with local banks because he was waiting for Enterprise's final figures. Once those figures were available, he intended to obtain financing information from banks to determine whether purchasing the vehicles through conventional financing would be more cost-effective. County Administrator Gorton noted that the average age of the County's vehicle fleet was approximately 2010 and that Public Works still had severai vehicles dating back to 1999. Commissioner Worsley asked how Enterprise had calculated the projected fuel and maintenance savings. County Administrator Gorton explained that the estimates were based on conservative projections comparing the fuel efficiency and maintenance expenses of the County's older vehicles with newer 2027 models. He stated that the newer vehicles were expected to provide improved fuel efficiency, with Enterprise estimating a potential increase of approximately 15 miles per gallon. He further explained that the County could either allow Enterprise to sell the older vehicles and receive the proceeds or sell the vehicles through GovDeals and retain the revenue. County Administrator Gorton emphasized that the leasing program was simply an option for the Board to consider rather than spending approximately $300,000.00 at one time to purchase five new trucks. He suggested that the County could try the program on a limited basis to determine whether it would be beneficial.

Chairman Collins stated that he would like to see a comparison of the cost of leasing the vehicles versus purchasing them through County financing, including the estimated payments under each option. County Administrator Gorton agreed to obtain those figures. Chairman Collins explained that leasing could provide tax advantages for private businesses, but those advantages would not apply to the County. County Administrator Gorton agreed. Commissioner Worsley then asked why the County needed five new vehicles and whether additional vehicles were necessary.

County Administrator Gorton explained that the County had added several positions, including three maintenance employees, additional Code Enforcement personnel, and other staff members, creating a shortage of available trucks. He stated that he believed the Sheriff's Office had two trucks that could potentially be transferred to other departments, but the County would still need to purchase at least three additional vehicles to meet its current operational needs. Chairman Collins asked whether the County had recently acquired five or six vehicles. County

Administrator Gorton confirmed that it had and stated that, with two additional vehicles purchased for Code Enforcement, the County would have acquired approximately eight vehicles within a year. He explained that there were currently two vacant Code Enforcement positions and that, even if the County received two surplus trucks from the Sheriff's Office, there would still be a shortage of vehicles for the three additional maintenance employees. Chairman Collins noted that one maintenance truck had already been budgeted but had not yet been purchased.

County Administrator Gorton confirmed this and explained that the County would still need to purchase two additional trucks at an estimated cost of $70,000.00 to $80,000.00. Chairman Collins pointed out that the previously budgeted truck had been included in the budget for approximately six months. County Administrator Gorton stated that he needed to work with Deputy County Administrator Fisher to locate a truck for Lee and complete the purchase using the designated SPLOST allocation. Commissioner Threadgill asked what assurance Enterprise could provide that the proposed trucks would be available, considering the delays the County had experienced in obtaining vehicles. County Administrator Gorton explained that he had not yet received a contract for legal review but that Mr. Simpson had indicated Enterprise obtained vehicles directly from the manufacturer, with an estimated delivery time of five to six months.

Commissioner Threadgill asked whether Mr. Simpson could attend a Board meeting to discuss the program, and County Administrator Gorton confirmed that he could. Commissioner Threadgill stated that he would like for Mr. Simpson to make a presentation to the Board.

Commissioner Worsley then asked whether the plan was to provide the five new trucks to Public Works and transfer the department's existing trucks to employees in the newly created positions.

County Administrator Gorton explained that the County could either reassign the existing vehicles or seli them, depending on its needs. Commissioner Worsley expressed concern that if the County purchased new trucks for Public Works and sold the older vehicles, the additional employees would still be without transportation, potentially requiring the County to purchase even more vehicles. County Administrator Gorton clarified that Enterprise's standard fleet management model involved selling older vehicies as they were replaced, but he had explained to Mr. Simpson that the County needed to retain vehicles for its growing workforce. He stated that Enterprise had indicated the County could keep its existing vehicles while obtaining five new trucks through the leasing program. Commissioner Worsley asked who County Administrator Gorton was referring to, and County Administrator Gorton clarified that he was referring to Enterprise. Commissioner Worsley questioned what involvement Enterprise would have with the County's existing vehicles. County Administrator Gorton explained that Enterprise could sell the vehicles on the County's behalf, with the County receiving the proceeds, or the County could sell the vehicles itself or retain them for use in other departments. Commissioner Threadgill asked about the truck Chairman Collins had previously mentioned that had been budgeted but not yet purchased. County Administrator Gorton explained that the truck was intended for Lee in the Maintenance Department and would be equipped with a service body. He stated that approximately $35,000.00 had been committed for the vehicle in the SPLOST allocations. Commissioner Threadgill asked whether the County would still need to purchase that truck separately if it moved forward with the Enterprise leasing program or whether one of the proposed vehicles could meet that need. County Administrator Gorton stated that he believed the F-250 included in the Enterprise proposal could be equipped with a service body, as Enterprise offered vehicles with those modifications. Commissioner Threadgill explained that if the leasing program could provide the necessary vehicle, the County might be able to eliminate the previously planned purchase and use the allocated funds elsewhere. County Administrator

Gorton agreed to review the options and stated that just because funds had been allocated for a vehicle did not mean the County was required to spend them if a better alternative was available.

Commissioner Threadgill emphasized that the Board needed to determine whether the Enterprise program could meet the County's needs before spending the previously allocated funds. County Administrator Gorton explained that the proposed vehicle lease could be funded through the General Fund or a SPLOST allocation. He noted that if SPLOST funds were used, the County would need to ensure that the lease was paid in full before the applicable 2026 SPLOST funding period expired. Commissioner Worsley asked whether TSPLOST funds could be used to purchase vehicles for Public Works. County Administrator Gorton clarified that TSPLOST funds could not be used for regular pickup trucks used to transport employees but could be used for vehicles specifically intended to pull or transport road equipment. He explained that TSPLOST funds were restricted to certain transportation-related purposes. Commissioner Worsley stated that if the County did not need a truck for towing equipment, there might not be a need to include an F-250 in the proposal, since an F-150 could serve the purpose of transporting employees. County Administrator Gorton noted that an F-250 might still be necessary if it was equipped with a service body. Commissioner Threadgill recommended having Mr. Simpson with Enterprise attend a Board meeting to explain the leasing program and provide additional information. He also requested that staff review the funds already allocated for the maintenance truck to determine whether the County could avoid that separate purchase and potentially save approximately $70,000.00. County Administrator Gorton agreed to determine whether a service body truck was included in the Enterprise proposal! and, if not, obtain the additional cost and bring that information back before the Board. Commissioner Worsley then clarified that the County's vehicle needs totaled six trucks, including one for Lee in Maintenance, two for Code Enforcement, and three for the additional maintenance employees. County Administrator Gorton confirmed that six vehicles were needed and stated that he would also obtain financing information from local banks to compare interest rates and purchasing costs with the proposed Enterprise leasing program. Commissioner Threadgill asked whether the item needed to be tabled or if it was being presented for informational purposes only. County Administrator Gorton clarified that the discussion was simply an update on one of the vehicle acquisition options being considered and that no action was being requested from the Board at that time. He stated that he would review the November 9, 2026, meeting agenda to determine whether there was sufficient time for Mr. Simpson with Enterprise to make a presentation. He noted that if the agenda allowed, he would try to schedule the presentation before Thanksgiving so the Board could further evaluate the proposal and determine how to proceed.

Lt. Renewal of Agreement for ACCG First Responder PTSD Program

County Administrator Gorton presented the annual renewal of the First Responder PTSD Program through ACCG IRMA. He explained that the program provides PTSD benefits required under House Bill 451 for employee and volunteer first responders, effective January 1, 2025. He stated that the annual renewal cost was $20,198.00, with a semiannual payment of $10,999.00 due upon approval. Coverage includes a lump-sum benefit for a PTSD diagnosis, with a lifetime limit of $3,000.00 per first responder. Disability benefits for employee first responders are equal to 60% of their pre-disability first responder earnings, up to $5,000.00 per month, while volunteer first responders are eligible for disability benefits of up to $1,500.00 per month.

County Administrator Gorton stated that staff recommended approval of the renewal agreement, authorization for the Chairman to sign, and payment from the General Government Department budget line item. He confirmed that the expense was included in the Fiscal Year 2026-2027 budget. Commissioner Worsley asked whether this was the same program the County had approved the previous year, and Commissioner Threadgill confirmed that it was. County Clerk Stephens clarified that the invoice was issued semiannually. County Administrator Gorton explained that the renewal included a new contract and agreement, which required the item to be

brought back before the Board for approval. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the Agreement for ACCG First Responder PTSD Program with funding coming from the General Fund and allow Chairman Collins to sign.

All were in favor.

XIV. REPORT FROM COUNTY ADMINISTRATOR

County Administrator Gorton provided an update on his recent activities and ongoing County projects. He reported meeting with Enterprise regarding the proposed Public Works fleet leasing program and with Motive to discuss GPS tracking and camera systems for County vehicles. He also attended a department head meeting, a GMA meeting concerning disaster recovery, and a redevelopment plan meeting. He stated that he had been working with Administration to plan the employee Thanksgiving luncheon scheduled for November 12, 2026. County Administrator Gorton reported that he was preparing budget amendments to present to the Board for final approval tn order to finalize the County's financial records for the upcoming audit. He also met with River City Contracting regarding progress on the Courthouse project and parking lot improvements. He stated that the Administration Building parking lot had been completed, including striping, and that Building A’s parking lot was scheduled for completion on November 7, 2026, with striping scheduled for November 9, 2026. County Administrator Gorton reported that the County would be hosting Youth Leadership the following morning in coordination with the 4-H Office. He also stated that Deputy County Administrator Jeff Fisher and Sergeant Justin Krause had been working together on a Rural Violent Crime Reduction Grant application and were in the process of submitting it. He further reported that the County had not yet received a response regarding its previously submitted tire grant application for Fiscal Year 2026 or 2027.

XV. REPORT FROM COUNTY COMMISSIONERS

Chairman Emmett Collins: Chairman Collins expressed his appreciation to County employees and staff for their hard work and dedication. He also reported that the County had successfully

held its first annual car show at Lake Meriwether, with 87 participants. He stated that the event raised $2,500.00 for the Recreation Scholarship Fund.

Vice Chairman Jennifer Snelson: Nothing to Report

Commissioner Gene King:

Commissioner Bryan Threadgill: Nothing to Report

Commissioner Adam Worsley: Commissioner Worsley stated that an important election was taking place across the state and encouraged everyone to get out and vote to make their voices

heard. He also expressed his appreciation to everyone for their continued hard work and dedication.

XVI. REPORT FROM COUNTY ATTORNEY

Nothing to Report

XVII. FUTURE MEETINGS & NOTICES

Chairman Collins announced the Future Meetings and Notices.

XVIII. EXECUTIVE SESSION

A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to go into Executive Session for the purposes of Litigation, Personnel, Real Estate, Tax Matters, and Cybersecurity at 6:48 p.m. All were in favor. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to go out of the Executive Session at 7:19 p.m. All were in favor. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to go back into the Regular Session at 7:21 p.m. All were in favor. There was no action taken in the Executive Session.

XIX. ADJOURNMENT

With no further business, Commissioner Threadgill moved to Adjourn the meeting at 7:21 p.m., and Commissioner Worsley seconded. All were in favor.

Approved by:

Attest:

Date: