Condado: Walton County

Walton County Board of Commissioners: reunión ordinaria, 10 de noviembre de 2026

Georgia Commons no tiene actas de esta reunión. Georgia Commons es independiente y no está afiliado a Walton County Board of Commissioners.

This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.

Copiar para un LLM, Ver en Markdown y Enviar a una IA usan la versión en Markdown, en inglés: el resumen que escribió Georgia Commons, bajo un encabezado que lo indica, y luego el registro tal como se publicó. Ver texto sin formato es solo el registro.

Registros de esta reunión

Cada enlace abre el sitio web o el portal de reuniones del propio órgano.

Resumen

Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.

El resumen de una grabación se escribe solo en inglés.

Commissioners advance a new administration building plan, drop the old jail repurposing, approve water rate changes, and back a sales tax study.

The commission opened with a retirement recognition for a 24-year EMS employee and a Poppy Day proclamation for Veterans Day. It then heard a preliminary plan for a roughly $40 million administration building at Hammond Drive and voted unanimously to move forward and hold a work session. It voted to drop repurposing the old jail and have the development authority market it. It agreed to have staff start talks with cities on a floating local option sales tax, to be brought back in December. After a water rate study, it approved no residential increase, commercial and connection fee increases, and a higher wholesale rate. It approved a GIS services contract, a district attorney's evidence software renewal, and the consent agenda.

Temas tratados: administration building plan; old jail sale; floating local option sales tax; water rate study; wholesale water rate; connection fees; GIS services contract; district attorney evidence software; airport regulation law; consent agenda grants.

Lo que trató la reunión, según se dijo en la grabación (10)

Cada relato es parte del resumen escrito por IA de la transcripción automática, no del registro. El tiempo abre la transcripción de abajo donde se trata el asunto. El resumen de una grabación se escribe solo en inglés.

  1. Retirement recognition for a 24-year EMS employee

    0:04:53

    A county staff member and others honored an emergency medical technician retiring after 24 years of service. A speaker recalled watching them handle a serious multi-patient accident scene early in their career. Speakers thanked them and wished them well.

  2. Poppy Day proclamation for Veterans Day 2026

    0:09:01

    The chairman read a proclamation naming November 11, 2026 as Poppy Day, asking residents to wear the memorial poppy to honor those who died in war. Representatives of the American Legion Auxiliary received it.

  3. New county administration building at Hammond Drive and South Hammond development

    0:14:34

    Staff and a consultant presented a preliminary plan for a roughly 50,000 square foot administration building across from the courthouse, modeled on the Jackson County building, with a 16,000 square foot basement for elections and storage. The consultant gave a preliminary estimate of just under $40 million before bidding, and a commissioner expected bids to come in lower. It would house planning, EMA, fire, EMS, HR and the tax offices, freeing courthouse space for courtrooms. Some commissioners asked about phasing it or building a cluster of smaller buildings, and staff said that would require starting design over. One commissioner said they did not want to commit to $40 million. A motion to move forward, address space needs by developing South Hammond, and schedule a work session covering all options passed unanimously.

  4. Ending repurposing of old jail and marketing it for sale

    0:30:42

    After commissioners said they had heard enough and the idea was not popular, a motion was made to stop repurposing the old jail and spending money on it, have the tract surveyed, and give it to the development authority to assess and market for sale. The chairman noted the 186-acre tract holds roads, animal control and a senior center. It was seconded and no opposition was heard.

  5. Floating local option sales tax to offset property taxes

    0:32:22

    The county manager explained the FLOST, a one-cent sales tax whose revenue would only offset property taxes, requiring agreement with the cities and a vote on the ballot. Staff would negotiate with cities and return in December to meet the deadline for the March ballot. A commissioner warned that agreement with cities is difficult and doubted it could be done by year end. Staff said only half of qualifying municipalities are needed and the term could be up to five years. A motion to proceed passed by voice vote.

  6. County manager's update: airport law, elections, parks, budget, and traffic light

    0:37:52

    The county manager praised the county extension agent's award and described House Bill 1434, which requires added airport-area regulation and could risk state road funding if not followed; it affects the Sidon airport only. Updates covered 56% turnout and about 80,175 registered voters, parks events including Santa photos benefiting a domestic violence shelter, the start of the next budget cycle, a highway safety grant of about $72,032, and the new traffic light at Youth Monroe and 78, where several wrecks occurred early. A draft 2027 meeting calendar was shared.

  7. Water rate study, rate increases, connection fees, and billing software

    0:50:05

    Consultants presented five rate scenarios, saying residential and commercial rates are in line with neighbors but the wholesale rate of $2.97 per thousand gallons is far below a weighted cost of about $4.80. They also discussed replacing the billing system. Commissioners asked about subsidized wholesale sales, Gwinnett water costs, and whether cities might buy elsewhere. A commissioner moved scenario five (no residential increase, commercial increase), new connection fees from $4,500 for a three-quarter-inch meter up to $80,000 for six-inch, and a wholesale rate of $5.10. Fees and commercial changes start December 1 and wholesale January 1 after 30-day notice. It passed by voice vote.

  8. GIS services contract with regional commission for water department

    1:29:30

    The water department asked to contract with the Northeast Georgia Regional Commission for GIS support through June 30 at about $14,450 as a trial, cheaper than hiring a technician. It could expand to other departments. Discussion covered meter replacement, with about 4,300 replaced in three years and roughly 80% changed out, and software that does not connect with finance. The motion was approved by voice vote.

  9. District attorney evidence software contract extension with AI features

    1:38:05

    The district attorney asked to extend the Axon contract one year and upgrade to Premier Plus at $22,474 annually, with the increase not due until December 2027 and an opt-out provision. The district attorney said the AI video summaries, translation, search, and a coming phone extraction reviewer save staff time. A commissioner asked about timing and the contract runs to December 2030. The motion passed by voice vote, contingent on Newton County approving the same.

  10. Administrative consent agenda including grant applications

    1:49:28

    The county manager pointed out that the consent agenda included several departments' requests to pursue grants. A motion to approve was seconded and passed by voice vote.

Las respuestas las escribe la IA a partir de este documento, que está en inglés, y cada cita se verifica con él. No es asesoría legal.

Transcripción automática

This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.

591 turnos.

Abrir la grabación en www.youtube.com. La grabación se abre en el sitio donde la publicó el órgano. En esta página no se reproduce nada.

  1. 0:04:47

    Your seats.

  2. 0:04:53

    We have two presentations tonight that we'll do first before we open our meeting. Uh, we have retirement recognit- recognization. Uh, Anise Phillips, EMS.

  3. 0:05:11

    So like every month, I'm just, uh, proud to celebrate Miss Anise's, um, retirement with EMS, and, uh, sh- she was hired as an emergency medical technician in 2002, promoted to emergency medical technician in, uh, one, in 2007, and w- will be retiring as an emergency medical technician, uh, here in 2026 with 24 years of dedicated service to Walton County. Anise, congratulations on your retirement.

  4. 0:05:42

    Thank you very much. Thank you for being here to celebrate with us. Thank you. Yeah, please do.

  5. 0:05:53

    Whenever you hire a new employee, you're always kinda anxious about how they're gonna do.

  6. 0:06:01

    Until you get a chance to see 'em in action, and Anise was no different. She came, as John said, in 2002, and not long after that, we got a call one day, it was a pretty serious accident with multiple patients. Several ambulance responded, and she happened to be on one of them. And so when I was out and about, and I thought, "Well, this is gonna be a good opportunity just to see how she, she does." So I went to the, to the scene, and, and she ended up with a patient by herself.

  7. 0:06:46

    And so when I got a chance, I made my way back over to where she was at. And y'all know what she was doing?

  8. 0:06:56

    That's all.

  9. 0:06:56

    She was doing everything she's supposed to do. She's taking care of the patient and had the patient immobilized. Had started an IV on the patient, was treating their injuries, and had him ready to go to the hospital. I remember thinking when I saw all that, "Well, she might just make it." And so 24, 24 years later, here we are. She, she did.

  10. 0:07:26

    We appreciate you, and we appreciate all that you've done for, for the ambulance service, for Walton County, and Walton County as a whole. And I wanna thank you on behalf of the EMS, and also on behalf of the county, for all that you've done for us. It's been a joy having you to work with us, and, uh, we hope that, uh, this new era of your life will, will, uh, will be a blessed time, that God will bless you. And I know that He, I know that He will.

  11. 0:07:59

    And anything that we can do to help you out at any time, just, just give us a, a call. And we won't think it's strange if you wake up one morning and just out of habit show up at work. We'll, we'll, we'll understand that- ... after 20, 24 years of, of, of service. So we love you, and we appreciate you, and God bless you in all that you do.

  12. 0:08:23

    Thank you, Ronnie.

  13. 0:08:24

    You're welcome.

  14. 0:08:24

    I appreciate it.

  15. 0:08:43

    Thank you very much.

  16. 0:08:44

    Do you mind if I make a comment, Mr. Chairman?

  17. 0:08:46

    I'm sorry.

  18. 0:08:47

    Do you mind if I make a comment? Anise, congratulations. But Shannon, you're not retiring, are you?

  19. 0:08:52

    I wish.

  20. 0:08:55

    Good.

  21. 0:08:55

    I got 10 more years.

  22. 0:08:56

    We're gonna miss you.

  23. 0:08:56

    10 more years.

  24. 0:08:58

    Thank you for all you've done. See y'all.

  25. 0:09:01

    Okay. Uh, everyone knows what tomorrow is. It's Veterans Day. And we have a proclamation here, uh, for Poppy Day 2026. It's been a tradition to give the poppies out to recognize, uh, those that have died serving this country. So I'm gonna read this proclamation, and then, uh, ask the ladies to come up and receive it.

  26. 0:09:32

    America is the land of freedom, preserved and protected willingly and freely by citizen soldiers. Millions who have answered the call to arms have died on the field of battle. A nation at peace must be reminded of the price of war and the debt owed to those who have died in war. The red poppy has been designated as a symbol of sacrifice of lives in all wars, and the American Legion Auxiliary has pledged to remind America annually of this debt through the distribution of the memorial flower.

  27. 0:10:17

    Educator and humanitarian Mona Michael was born in the town of Good Hope and developed the program of distributing poppies for donation to honor and assist veterans in need of medical treatment. Therefore, I, David G. Thompson, chairman of the Walton County Board of Commissioners, do hereby proclaim the 11th day of November 2026 as Poppy Day, and ask that all citizens pay tribute to those who have made the ultimate sacrifice in the name of freedom by wearing the memorial poppy on this day.

  28. 0:11:27

    Last

  29. 0:11:48

    year, the commission allowed us to come, and Ronnie was, we asked if she could speak about Poppy, Poppy's meaning.

  30. 0:11:56

    She did.

  31. 0:11:56

    She was-

  32. 0:11:57

    She did

  33. 0:11:57

    ... a candidate for the state board of Miss Poppy production for the state.

  34. 0:12:05

    Thank you. Thank y'all.

  35. 0:12:29

    At this time, uh, I would like everyone to please stand. We'll do the Pledge of Allegiance, and then we'll have

  36. 0:12:39

    I pledge allegiance to the flag of the United States of America, and to the Republic for which it stands, one nation, under God, indivisible, with liberty and justice for all.

  37. 0:12:54

    Father, we humbly come before you tonight and thank you so much for keeping us all safe. Thank you and ask you to please bless all our veterans and their families. And without them, we're nowhere we would be. Please be with us tonight and help us to make the right decisions when we can, and keep us safe as we all, as we all go home tonight. It's in Jesus' name we pray. Amen.

  38. 0:13:23

    Amen.

  39. 0:13:29

    Okay, I'll call the meeting to order, and we can let roll call. I see everyone's present, so, uh, next item is adoption of the agenda. Are there any addit- additions or deletions?

  40. 0:13:45

    Um, I motion that we swap four point one and four point two, so we have a full picture before we vote on four point one.

  41. 0:13:56

    I didn't understand. What-

  42. 0:13:57

    I motion that we move, that we rearrange the old business and discuss four point two before four point one.

  43. 0:14:05

    You wanna discuss four point two before four point one?

  44. 0:14:09

    Yes.

  45. 0:14:10

    Well, we can do that.

  46. 0:14:11

    Second.

  47. 0:14:16

    All right. Any other changes?

  48. 0:14:23

    Entertain a motion to approve the agenda with the change.

  49. 0:14:29

    So moved.

  50. 0:14:30

    Second.

  51. 0:14:31

    All in favor say aye.

  52. 0:14:33

    Aye.

  53. 0:14:33

    Aye.

  54. 0:14:34

    All right. Now we'll discuss Liz Hudson, uh, space for Hammond Drive. Uh, wait a minute. I, I'm sorry. We don't need to discuss this if we're still gonna look at the repurposing of the jail. I thought it was gonna get voted down tonight from my conversations for most of the board members, and that needs to be taken care of before we discuss any other options, doesn't it?

  55. 0:15:15

    No?

  56. 0:15:15

    I, I think that we should have the con- ha- hear what the other options are before we take repurposing the jail off the table completely. I mean, we, we wanna have, know what the other options are. I would, but it, that's up to the rest of the board.

  57. 0:15:32

    I mean, I agree with Commissioner, uh, Warren. Let's hear the options.

  58. 0:15:36

    All right. Well, we've had, uh, Liz, if she wants to come up. Liz, it was comments were made, why don't we buy the additional land at Hammond if we're not gonna use it. So I've went up, and so has a couple more, to Jackson County. They just built a new admin building up there, moved in it two years ago. And the layout was great, uh, and we were gonna try to copy it, expand on it out at Hammond.

  59. 0:16:15

    Uh, and Liz has looked to see if it would go on one of the lots that we have, and it will. Um, and in addition to the proposal of the old jail, uh, repurposing, this admin building, we can get two more departments and free up the first floor at Hammond. We can move the tax assessors and the tax, uh, commissioner to this new admin building, which would free up the first floor space to mirror the second floor courtrooms in Hammond.

  60. 0:16:58

    And that's what we've been looking at, and Liz has started looking at that. So Liz, you wanna tell us where you at and what you ...

  61. 0:17:08

    I will. Good evening, everybody. Um, keep in mind this is very preliminary. We just started looking at this about a month ago and pulling together the information that we had, um, and considering a new site. So looking at the property over at Hammond Drive, the government center property, we've looked at several different options for what piece of property would make the most sense for an administration building and what needed to be in the administration building. Um, we've looked at, uh, I think some of y'all may have been to see the Jackson County Administration Building, which is a pretty good example, comparable size, um, county facility that was built about three years ago.

  62. 0:17:53

    So the property that we have looked at that seems, um, that makes the most logical sense for the administration building is the one that's directly across from the courthouse, across from the, the DFCS building. This would take advantage of the new radial parking in front of the courthouse. We can connect to that. Um, the new little road that goes across to the jail, we can take advantage of that as a staff entrance to the building. Um, this building is configured very similar to the one in Jackson County. It's, uh, a long building with a central gallery.

  63. 0:18:26

    Makes it very easy for way finding to get into the different departments. Makes it easy to find the departments and gives you a good central lobby. Lot of shared space. Um, the other advantage that this has is that because of the topography we can do a daylight basement over on, on the right end, and we can have elections down on that end, as well as some storage, and access a basement that way, and do a full basement underneath the facility.

  64. 0:18:54

    So I'll show you... This is what the Jackson County building looks like if you haven't seen it, and kinda the configuration of the floor plan and the different departments. Their departments are not... They don't line up exactly with what departments we're talking about using in, or putting in the Walton County facility, but very similar. Um, this was about a 48,000 square foot building. Um, if we put planning and development, EMA, fire administration, EMS, tax commissioner, tax assessor, and human resources, as well as some shared space in this building, you're looking at about 50,000 square feet on the main level.

  65. 0:19:32

    And then if we do the daylight basement, about 16,000 square feet of the basement would be elections. The rest of the balance of the basement space could be future storage, um, for the county.

  66. 0:19:49

    So we've done a very preliminary diagram of what that would look like if we did it for Walton County. This would, this indicates the 50,000 square foot main level, and then below this, we would have elections down on one end, and storage in the balance of the space.

  67. 0:20:09

    The building in Walton, or in Jackson County that was constructed in 2023, the cost of that building was a little over 14 million. This is about twice the space, and obviously we've had a few years go by. Um, but we did have the same contractor that built that facility give us a preliminary estimate on if they were to build it again today, what would we be looking at in terms of cost per square foot. So we've based these preliminary numbers on what that contractor's told us. So these are the numbers.

  68. 0:20:41

    Um, the main level administration and of the election's on the lower level, and then the storage. We've got different cost per square foot for each of those. So the hard costs look like about 34.1 million, and then these are the soft costs associated with it. The fixtures, furniture, and equipment number is a little bit higher than what we looked at for the old jail because we've added tax commissioner and tax assessor, which will have a good bit of, of FF&E. Um, the architecture, engineering, and management of the project is at, we've just plugged in a 6% number for that for budgeting purposes.

  69. 0:21:17

    Um, we have a number for testing. So the soft costs come to about 3.18, and if we put in contingency just to make changes and because we're so early in the project, we're looking at just under 40 million if we were to build this new facility across from the courthouse.

  70. 0:21:34

    And I'd like to point out, that's before its bid. Uh-

  71. 0:21:39

    That's, yeah, this is a very-

  72. 0:21:40

    True, true bid

  73. 0:21:41

    ... right.

  74. 0:21:41

    Right now, commercial construction has really slacked off, and I expect the bid to be considerably less.

  75. 0:21:51

    This is a real conservative number.

  76. 0:21:54

    Um, but we won't know that until we get detailed plans that we can actually bid out, and then we can reserve the right to accept or decline all of them. Um, but we need to look at it. We've, HR is totally out of space. Uh, the DA's gonna need the additional space where Finance is at in very near future, um, out at Hammond.

  77. 0:22:28

    Code Department could use a better place than where they've got, uh, with all the parking issues they have. And of course, the tax assessors and tax commissioner have ample space right now, but it would be moving them out to do the additional courtrooms for the judiciary.

  78. 0:22:51

    S- so we, we don't necessarily, correct me if I'm wrong, we don't necessarily have to do all of this at one time. We could change up this plan to do, tweak it. I mean, we could change the, the, I mean, this is the closest I'm guessing to apples and apples, even though it's still not, 'cause this moves tax assessor, and that was not moved with the jail renovation project.

  79. 0:23:13

    Correct.

  80. 0:23:15

    So it's, it's not really... And, uh, this is more square footage. But we do have the option to take the concept of building new at South Hammond and change it a little bit.

  81. 0:23:34

    Well, you always have different options, but you wanna provide for the need of the departments that you are going to move, not just the present-day need, but the 10, 15 year-

  82. 0:23:47

    Right

  83. 0:23:47

    ... need also.

  84. 0:23:49

    But we don't nece- I'm, I'm just saying we, we have the option to adjust this to m- m- maybe phase it in so we do address the needs of the courthouse, which was the original problem, first, and then if we need additional space or as we need additional space, we can add on.

  85. 0:24:05

    But how can you address the courthouse when they're still occupying that space? We've got to get them out of the courthouse-

  86. 0:24:12

    Right, but-

  87. 0:24:13

    ... and the courtroom.

  88. 0:24:14

    Right.

  89. 0:24:14

    Where are they gonna go?

  90. 0:24:15

    That, that's what I just said. We can address the n- the spatial needs at the courthouse by moving the people out of the courthouse. We don't necessarily have to build

  91. 0:24:25

    A 50,000 square foot building with 16,000 square foot of basement right off the bat.

  92. 0:24:31

    You mean do smaller-

  93. 0:24:32

    Well, we-

  94. 0:24:32

    ... smaller bites that-

  95. 0:24:33

    We can do... We, we have different options if we relocate down to South Hammond, do we not?

  96. 0:24:38

    Yeah, I think this is just getting the discussion started about what we wanna do.

  97. 0:24:42

    What is a better, what is a better plan for the county?

  98. 0:24:45

    Which I think is in the better-

  99. 0:24:47

    And then, then you're gonna have to discuss what you're gonna do with the old jail. There's three different companies have contacted me wanting to purchase it, of course, they're wanting to steal it. Um, it doesn't need to sit vacant like it's sitting. It's deteriorating, uh, and we need to... If we're not gonna use it, we need to sell it and get what we can out of it, in my opinion. Um, and that could easily pay for this basement on this building.

  100. 0:25:22

    We have a prospect on the USDA building across the street through Shane. That's gonna be close to another million. Um, so and we have the money in the bank to do that and that much more. Um-

  101. 0:25:41

    Some of it. I just wanna have a clear picture of what... Like, I don't, I don't wanna commit to spending $40,000-

  102. 0:25:49

    You're not committing to spending-

  103. 0:25:50

    ... $40 million

  104. 0:25:50

    ... a dime right now except-

  105. 0:25:52

    Right

  106. 0:25:52

    ... paying Liz-

  107. 0:25:53

    I'm just asking

  108. 0:25:53

    ... to do the plans, and without the plans, you don't know what it's gonna cost.

  109. 0:25:57

    I understand that. I'm just asking questions.

  110. 0:26:00

    Are you suggesting potentially doing a cluster of smaller buildings?

  111. 0:26:07

    Potentially. That would have a... I mean-

  112. 0:26:10

    But we do have more property, right? All, all around there. I mean, how many acres do we have?

  113. 0:26:15

    You've got, you've got a lot of property.

  114. 0:26:16

    So we can build several out partial buildings, is what you're saying, and still be in the same campus but just spread out in different buildings.

  115. 0:26:24

    Yeah.

  116. 0:26:25

    And b-

  117. 0:26:25

    I think we're moving in the right direction. Um, but I think probably what we're gonna have to do for us all on the same page with this much money being spent is we're gonna have to look at doing the old jail, considering those options, and have a work session and talk it all out, um, so we're all comfortable with it. But I think this is moving in the right direction. We're heading in a better direction. So yeah, that would be my, that would be my recommendation is this gets the ball rolling and now we start serious discussions and have the work session where we can vet it all, I think is more palatable moving forward.

  118. 0:26:57

    Yeah, 'cause, 'cause if we're gonna, if we're gonna get into more detailed design on a structure like this, you can potentially tighten up some cost and everything. We won't really know until we go out to bid, but if we're gonna go and look at designing a cluster of three potential buildings, that's a whole nother, um, process that we would need to start because that's not included in this. So we would need to start over and have that as a potential option, too, if that's what the commission would like.

  119. 0:27:31

    Um, you do get some economies of scale on having, um, one envelope for, for e- energy and different things like that, but they are much larger, like HVAC. But you are going with smaller HVAC and other units. You just got multiple, um, you may have two to three different operating budgets as opposed to one that's then divided up among the different departments. But that's definitely something we would just need to step back and look at if we go that route.

  120. 0:28:06

    I think all the options are still on the table, but at least we're getting a discussion going on this and-

  121. 0:28:09

    Yeah

  122. 0:28:09

    ... this can come up, whatever we need here can come up here and give us some ideas of looking at it.

  123. 0:28:13

    One thing I would point out, if you do put everything under one roof and we, we plan for the future of each one of the departments, with them being under one roof, uh, if one department were to grow more than another, then that, that department can expand into space and the other department wouldn't have to, whereas if you built individual buildings, it would be difficult, a little bit more difficult to expand if a department needed to grow.

  124. 0:28:40

    There's pl- there's pros and cons to both-

  125. 0:28:43

    Definitely

  126. 0:28:43

    ... concepts, yeah. But that was definitely something we could look at.

  127. 0:28:50

    Do you need a motion on this, Chair?

  128. 0:28:51

    We do.

  129. 0:28:53

    I'd be happy to make a motion that we move forward looking at this project and schedule a work session in the near future and sit down and go over it all together.

  130. 0:29:00

    Can we clarify what the project is? Can we, can we clarify what we're, uh, trying to accomplish? 'Cause I think we've, we've muddied the water a little bit.

  131. 0:29:10

    Creating more space for our departments and clearing the courthouse out to allow them to fit the court system.

  132. 0:29:16

    And, and developing the South Hammond property.

  133. 0:29:21

    Yes.

  134. 0:29:21

    All right, we have a motion. Do we have a second?

  135. 0:29:24

    Second.

  136. 0:29:25

    We got a motion and a second to move forward.

  137. 0:29:28

    And we're gonna get a, we're gonna fix it when we get a plan and a price, right?

  138. 0:29:32

    We, we'll get plans and then agree to put it out to bid once we've agreed on the plan. Prequalify the bidders-

  139. 0:29:40

    We're talking to them

  140. 0:29:41

    ... and then see what we, what we're gonna do.

  141. 0:29:45

    They're saying bidders.

  142. 0:29:47

    All right, we got a motion and a second. Any further discussion?

  143. 0:29:50

    David, just for clarification, before we s- spend any, we're, we're, our, the motion is for us to look at all the options and then we'll put it out for spending any big money. You know, before we spend any big money, let's look at everything first.

  144. 0:30:05

    Do you get that? All right.

  145. 0:30:08

    Just for, just for clarification, does that include alternative plans to this one that would be-

  146. 0:30:14

    Yeah, when we have-

  147. 0:30:15

    ... smaller in scale?

  148. 0:30:16

    When we have the work session, I think we need to have everything on the table and be able to discuss all the options and whichever one the board's most comfortable with, then we move forward on it.

  149. 0:30:23

    Okay.

  150. 0:30:24

    So can I... The motion is to move forward with devel- to addressing our spatial needs-

  151. 0:30:31

    In developing South-

  152. 0:30:31

    ... by developing South Hammond.

  153. 0:30:33

    Yes.

  154. 0:30:37

    All right, call the questions. Those in favor say, "Aye."

  155. 0:30:41

    Aye.

  156. 0:30:41

    Aye.

  157. 0:30:42

    Opposed? Passes unanimous. Now let's take care of the repurposing of the old jail.

  158. 0:30:53

    Does anybody wanna discuss the old jail?

  159. 0:30:56

    I've heard enough on it. Everybody didn't like the idea. I was trying to utilize what we had.

  160. 0:31:02

    I'd like to make a motion then that we, uh, vote down or we all agree that we're not gonna repurpose the old jail, and with that discussion ended, that we engage the development authority to, um, assess the value and then take proposals on the potential pur- uh, purchase, and let us choose which proposal we like the best.

  161. 0:31:24

    Okay. S- all in one motion. It's, uh, do away with repurposing, spending any more money on the old jail, and work to get it surveyed out. We gotta have it surveyed 'cause that's a 186-acre tract that has roads and bridges, animal control, even the, uh, senior citizen center on.

  162. 0:31:57

    And turn it over to the development authority to market and try selling it. Do we have a second?

  163. 0:32:06

    I second.

  164. 0:32:07

    All right. We have a motion and a second. Any further discussion? All those in favor say, "Aye."

  165. 0:32:15

    Aye.

  166. 0:32:15

    Aye.

  167. 0:32:16

    Opposed? Okay, John.

  168. 0:32:20

    All right.

  169. 0:32:20

    Thank you, Liz.

  170. 0:32:22

    I'll try to get through some of this, but I do have some meaty questions for you. On, on the table in front of you is a document provided by ACCG involving the floating local option sales tax. Um, we're up against a deadline, and we will need to begin working with, um, the, uh, municipalities, uh, throughout the county to develop an agreement that is required by, um, the FLOST-enabling legislation.

  171. 0:32:54

    But really, the, um, question before you is, and f- and just for the general public's information, floating luctual- option sales tax is a one-cent tax that would be collected, uh, um, through a sales tax program. And 100% of the money that is collected by the g- the one cent would then go into a pot that's, um, agreed upon by the county and the municipalities, and that would go to offset property taxes.

  172. 0:33:28

    It couldn't be used for anything else, so there's predesignated, um, laws and everything, so none of the money could be used for anything else other than to offset property taxes.

  173. 0:33:40

    Just like a LOST.

  174. 0:33:42

    It's, it's just like a LOST. Um, in this one, the benefit for those that are in a municipality is that there would be an offset of the property tax on the county level, and the monies that goes to the municipality, there would also be an offset of the city tax. Those participating have to off- uh, obviously have a, um, property tax, and there's additional information in that. But to move forward with this, we would need to bring something back for final approval.

  175. 0:34:16

    We'll begin working with the cities, bring that back for final approval at the December meeting in order to meet the deadline to get it on the ballot. So really before you is a question of would you like me and staff to work on this in order to get it ready for the ballot, um, at the next municipal election? But the other side of that is that r- what you're really deciding is do you want the, the voters to decide whether they would like to have a FLOST to offset their own property tax?

  176. 0:34:47

    So that's the question before you tonight. Um, and I'm just, uh... I can pivot. We can go. We can delay this. We can move forward with having it, but the next... But because of the deadlines that are involved, we just need to know whether you would like us to move forward to get it on the next municipal election.

  177. 0:35:05

    Well, you need to have the agreements with the city 'cause I was involved in the LOST negotiation, and it's very difficult, uh, to get what the county percent-wise-

  178. 0:35:20

    Mm-hmm

  179. 0:35:20

    ... is supposed to get. And, uh, if they would agree to the same prorations as LOST, it would make it easy. Uh, but it's, uh, very difficult to-

  180. 0:35:32

    Yeah. We could go into the negotiations to try to get the percentages where you want them and the cities not agree, and that would end the, the possibility of having a FLOST because there has to be an agreement between the county and the cities. I already spoke to, um, one of the mayors, and they're ready to go ahead and start, uh, negotiations if the county commission chooses to go ahead and move forward with it on the next municipal election. Um, but we're just up against some deadlines to be able to get it on the ballot for that.

  181. 0:36:07

    So it's all or none when it comes to the city and county. Either we all agree, or it doesn't happen.

  182. 0:36:12

    Correct.

  183. 0:36:13

    Okay.

  184. 0:36:13

    Well, all the, all the-

  185. 0:36:14

    Well, you only have-

  186. 0:36:15

    ... municipalities that have a-

  187. 0:36:16

    Right

  188. 0:36:16

    ... yeah, all the municipalities-

  189. 0:36:18

    It's very difficult

  190. 0:36:19

    ... you need-

  191. 0:36:19

    Let me tell you, when you sit down with four or five mayors and-

  192. 0:36:23

    I remember the last ones

  193. 0:36:23

    ... you're talking percentages instead of dollars, uh... But we did get the LOST, and that's for 10 years. How long is this FLOST?

  194. 0:36:34

    This one would be you can do up to five years

  195. 0:36:37

    It's just fine

  196. 0:36:38

    Yes, sir.

  197. 0:36:39

    Okay.

  198. 0:36:39

    Um, one of the things to note is that you don't need 100% of the municipalities. You need 50% of the qualified municipalities, and the qualified municipalities are defined as those that have a property tax.

  199. 0:36:54

    Okay.

  200. 0:36:55

    So it's a little bit... There's a little bit of math that could be done, so you could have two cities team up to work with the county, and then you could have that, um, move forward that way.

  201. 0:37:08

    All right. Well, what does the board want to do?

  202. 0:37:12

    I make a motion that you move forward to look into it with the cities and bring it back in December.

  203. 0:37:18

    Okay.

  204. 0:37:19

    I second.

  205. 0:37:20

    Second.

  206. 0:37:21

    And again, if any of this works out and it is approved by the voters, it would basically-

  207. 0:37:26

    What's the deadline for us?

  208. 0:37:28

    December meeting.

  209. 0:37:30

    When?

  210. 0:37:31

    December, to get it on the March ballot.

  211. 0:37:35

    You'll never get an agreement with the cities by the end of December.

  212. 0:37:38

    We're, we're gon- we're gonna see what we can pull off and try, but-

  213. 0:37:41

    All right. We got a motion and a second

  214. 0:37:42

    ... I'm not, I'm not sure if we can either or not.

  215. 0:37:45

    Uh, all those in favor say, "Yeah."

  216. 0:37:47

    Yeah.

  217. 0:37:47

    Yeah.

  218. 0:37:48

    Opposed? All right, what else you got, John?

  219. 0:37:52

    Okay. Next thing I got on the agenda, I just wanted to point out, um, Joel, our county extension agent, was just, uh... He received a Master Gardener Association award, and that comes back into a lot of the work that you've done. Um, when we moved the 4-H and county extension office out of downtown, where it was very difficult for anybody involved in agriculture to park, out to Criswell Park, that also opened up the, um, ability to greatly expand our Master Gardener program.

  220. 0:38:24

    We've had a ton of people in, throughout the county participate that. Um, and Joel serves as the agriculture and natural resource agent, um, and the county extension coordinator for Walton County. Um, his leadership has really expanded our 4-H program, family and commun- uh, con- consumer sciences. And, uh, he's worked with multiple agencies acro- across the county, the University of Georgia, and the state to really, um, bri- build a dynamic team of full-time 4-H agents, uh, here in Walton County.

  221. 0:38:58

    Just under his leadership, um, we've got one of the most active and engaged, uh, volunteer organizations through our Master Gardener program across the state. So I just wanted to point out the, um, excellent work that he's doing there. The second thing that I wanted to put on your radar is a document in front of you call, um, that's, uh, discussing Georgia House Bill 1434. This is a new law that passed, and everybody throughout the entire State of Georgia is working on how we're going to, um, adhere to this new law.

  222. 0:39:34

    It is really a law that requires cities and counties to have additional layers of planning and development regulation over the area that is impacted by the, uh, airports throughout our communities. Where this bleeds over from the city-owned, uh, uh, airport and the regulation that's there, it further expands that regulation out into the approach angles of the runways for the county airports.

  223. 0:40:05

    A lot of this is due to expansion of runway space. But it, it is a mandatory aviation regulation that we don't do right now, so it's gonna be some additional requirements and additional things. But what that does is there's gonna be decisions that are made that are constitutional property rights exposure. That means you're gonna have to make some decisions through this new regulation that takes place that's going to potentially, um, open up the county to, uh, legal action if the people don't agree with the regulation as it's being enforced.

  224. 0:40:44

    It's, um, gonna have... We're gonna have to deal with accelerated and additional development reviews. Um, there's gonna be some constraints on what can be developed on that property because of height restrictions, and then we're gonna have to deal with, um, enforcement. The teeth behind this is that if you don't do it, you could use, you could lose your LMIG money, and LMIG money is a sizable portion of what we get from the state through the gas tax to in, to pave our streets, renew roads, repave subdivision streets.

  225. 0:41:25

    So if you're not in compliance with this and you don't take on the additional burden, financial and regulation burden, they could take away your, uh, road paving money. So, um, everybody across the state's trying to figure out how they're gonna, um, absorb this and how they're gonna fund it because local taxpayers have to fund what the state passed on this. Um, it's for a good purpose, which is to protect the airspace on our approaches to runways, but it's one that was passed down in Atlanta that's then gonna turn back and ask local county commissions to fund it.

  226. 0:42:01

    So I just wanted to put that on your radar. Um-

  227. 0:42:03

    John, question for you.

  228. 0:42:04

    Yes.

  229. 0:42:05

    Does that affect, like, some of the rural, just, like, little landing strips on people's-

  230. 0:42:09

    No. It's just the-

  231. 0:42:10

    Landings

  232. 0:42:10

    ... municipal airports.

  233. 0:42:12

    Okay.

  234. 0:42:12

    Yeah.

  235. 0:42:13

    Uh, in Walton County, it just affects the Sidon only, uh, airport.

  236. 0:42:19

    Yeah.

  237. 0:42:20

    Okay.

  238. 0:42:20

    And, and we have to do a lot of, uh, coordination with the City of Monroe on those development, uh, plans as well. Um, just some updates from the different departments. The Board of Elections, we had a 56% turnout in the last election. 30 perc- 36% of that was in advanced voting Currently, right now, they're going through their risk limiting audits and everything that they're required to do. Um, and we currently have eighty thousand one hundred and seventy-five registered voters, uh, as of the last deadline.

  239. 0:42:53

    Um, in Parks and Rec, we've got multiple, uh, football and cheerleader, um, groups and teams that are moving through all through the, um, finishing up and the playoffs. Um, and we've had multiple that have won awards and received first place in different competitions. The, um, the next sports are all starting back up, and Saturday is the big kickoff for, um, the basketball, uh, program in Walton Parks and Recreation.

  240. 0:43:25

    So we've got a good bit of that. There's been some fence work, um, replaced and pickleball courts at Criswell Park and at Ayers Park. And we've got two programs that I wanted to point out for you. The first is, um, on December fifth at Felker Park at nine o'clock in the morning, they're gonna have an event where you can get pictures with Santa. On December fifth, that, uh, Santa's gonna move down to South Walton Park at eleven o'clock. Then on December twelfth, we'll have an opportunity to, uh, visit with Santa at nine o'clock at Meridian Park.

  241. 0:44:02

    Um, Renewal is the beneficiary, and they're asking for anybody that comes in with a picture to bring a toy. And, uh, Project Renewal is a domestic violence shelter that, uh, serves Rockdale, Newton, and Walton County. So the Parks and Recreation has partnered with them. Then on December eighteenth, The Grove, um, at The Grove Park in Walnut Grove, uh, we're having a Christmas at The Grove event. Um, that one will be, um, publicized, but it's an evening activity with hayrides, hot chocolate, and Christmas activities.

  242. 0:44:37

    And

  243. 0:44:43

    the next I just wanted to point out in finance, um, we kicked off our-- even though it seems like we just started the existing budget, we kicked off with all the departments today, uh, with Jennifer sending out, uh, Jennifer and Alicia sending out the request for, um, beginning to work on personnel budget. So we're kicking off the preparation of the FY twenty-eight, um, budget as we move forward. And the auditors are finishing up, and we should have an audit report in December on the current budget.

  244. 0:45:16

    All expecting sound numbers and sound, um, information.

  245. 0:45:20

    On the last budget, on the twenty-six budget, not the current budget?

  246. 0:45:22

    Yes, twenty-six. Yes. Um, in the sheriff's department, wanted to point out their good work, um, working with the Governor's Office of Highway Safety. They recently received a grant of seventy-two thousand thirty-two dollars and eighty cents for high visibility enforcement that'll be doing traffic enforcement in areas of high complaints that are, uh, received by the public and in high accident zones. Um, November third, uh, the light at Youth, um, Youth Monroe and seventy-eight went active.

  247. 0:46:00

    And I just wanna caution everybody because there's a light there now. You still need to be very, very cautious. Within the first day or two, we already had two or three wrecks, and I think there was another one there this morning. Um, the turning movement that seems to be the most challenging for people is turning off of seventy-eight onto Youth Monroe, coming from Monroe, heading towards Loganville. So that left-hand turn movement, um, even with a signalized light, is still, uh, proving to be a little bit of a challenge in that area.

  248. 0:46:36

    Um, so hopefully the newness will wear off, and everybody will get used to that light. Uh, but the DOT did fulfill their promise and got it, uh, installed and operational on November third. The budget process, we've got-- I've got a sample schedule of the budget process on here. I need you to look at that because, as always, we'll be, uh, recruiting some assistance from commissioners to work on that group. The next thing I wanted to point out is we also have a draft two thousand and seven meeting calendar.

  249. 0:47:08

    So if anybody notices any, um, conflicts, uh, we're gonna go ahead, and we'll be adopting that shortly, not tonight. But I wanted to go ahead and put that on there so that we could identify. We have identified the, uh, potential conflict with spring breaks at the April meeting, and I'll work with Rhonda and Gretchen to try to go ahead and adjust that if there's any conflict with the, uh, clerks training. But we don't anticipate that there will be any right now. Sometimes it's a little early in when we need to adopt it and when they'll actually announce training.

  250. 0:47:42

    So with all of those things that we have tonight, um, I guess the final thing I wanted to just let you know is that based on some of our earlier Parks and Recreation discussion, um, all of Criswell Park has been, uh, repaved thanks to cooperation between Jody and, uh, John in Public Works. Uh, Hank is working with Jody on a concession stand renovations as well as bathroom renovations. Um, we're also moving forward, and in the report that was given to you about some of the needs that we're able to be able to, um, for them to do some of their ongoing upgraded maintenance that they needed to do, that was, uh, items that were in the, um, capital items that you approved a month ago.

  251. 0:48:29

    So we're moving forward with the purchase of those to do additional. We have, um, done some additional work. We have a large contract that was approved by the county commission to do, um, maintenance, landscaping, that type of stuff at the Hammond Drive Complex. That has been working exceptionally so we have begun working with the company to assess a further expansion of that and I think that's one of the things that you'll need to consider at a future date because what that'll allow is for the Parks and Rec staff to focus on these fields that we need to get, uh, improved and better, uh, um, attention to.

  252. 0:49:11

    They can't do it if they're spread out all over the county cutting grass at the senior center and different things like that. So if we revert back to, um, Parks and Rec staff having the time and the attention and the equipment to do that, I believe we'll have some answers for the field complaints that you've received there. So that's some progress that we're working on there, and with that, I'll, uh, wrap up my, um, update for you.

  253. 0:49:37

    All right. Just one quick question.

  254. 0:49:38

    Yes, sir.

  255. 0:49:39

    From the time we contacted GDOT to the time they finally got the light up, how much time lapsed?

  256. 0:49:47

    A agonizing little over two years.

  257. 0:49:52

    All right. Thank you, John. All right. Uh, Water Department, finally.

  258. 0:50:05

    Several months back y'all approved a contract to engage the Speigler Group, uh, to do a rate study for the Water Department. The last time rates were changed was 2021. During that time period, our cost of water has increased pretty much every year with all of our suppliers as well as just the operating cost. Uh, we, we've had inflation just like everybody else has. So anyway, they, we did engage them. They came in and did a rate study, uh, did an excellent job, and David Speigler and Allie Berry are here with the company to do the presentation on the rate study.

  259. 0:50:40

    Thank you.

  260. 0:50:42

    Thank you.

  261. 0:50:43

    Be-before they begin, because part of their presentation's gonna hit on something, let me add one thing that I failed to, to mention to you. We don't have anything to bring to you right now, but staff and Finance, HR, the Sheriff's Department, um, Purchasing, the clerk have all been working together to identify software that will allow our departments to actually have communication when it comes to the budgeting process. Currently, right now, the software that's used in the Water Department doesn't necessarily communicate well with the Finance Department, so a lot of that has been data that's being hand entered.

  262. 0:51:21

    We're having issues with, um, payroll and different things like that, so we're looking at new updated software. That'll be a big change. There'll be a big cost with it, but what we're looking at is that we'll be able to update and modernize, go paperless on a lot of things, but also be able to run reports and get you information even quicker. But right now, we're heavily dependent on, um, thing, paper, Excel and all these type things. So a lot of that will end up being updated with that.

  263. 0:51:52

    So we're working on identifying, um, state, uh, contract providers that can provide that service for us, and we'll be bringing that forward to you if and when we can, um, finalize all the reviews and get a, uh, recommendation from the group that everybody's satisfied with.

  264. 0:52:12

    Thank you.

  265. 0:52:12

    Thank you.

  266. 0:52:15

    So good evening. Uh, my name is David Speigler, and this is Allie Berry. Uh, we're gonna present, uh, some of the findings that we had as part of this process. As we go through it, we encourage any questions that come up to, to walk through it. I'll make a, a couple of opening remarks and then, uh, turn it over to Allie. One thing I will just comment, in the presentation, in the materials that we've provided, the comments that John just made about the billing system, we have a section in there to provide some thoughts 'cause we knew this was an issue that was of concern and eventually was gonna need to, need to be dealt with.

  267. 0:52:46

    So it's an area that we've done a lot of work, so we wanted to provide some information even though it didn't specifically tie to rates, but there is some, there is a chapter in this presentation specifically focused on that. So just, just to, uh, to highlight that. Um, a- as Morris mentioned, costs have been going up. One of the big drivers is the fact that not only the operating cost, but there's a lot of capital costs associated with continuing to support the, the wa- water distribution operations. And so one of the issues that we've looked at is accounting for all of the operations and maintenance costs as well as the increases in the capital expense that's forecasted into the future.

  268. 0:53:22

    Taking all that into account, we've looked at residential rates, commercial rates, and wholesale rates to take a look to see where are we at right now, um, a- and the answer is w- w- there, there needs to be an increase. There, there's clearly a gap that increase in costs, um, necessitate the, some increase o- of some kind of a, o- of some fashion. We have looked at, and Allie will go into the details, of five different scenarios that will address the concerns and, and get you to where you need to be, and they just do it in different forms and fashions, so we can talk about the pros and cons associated with each of them.

  269. 0:53:57

    One of the key takeaways that I just want to present to you is the fact that today, with any of the scenarios that we've put in place, today you're-- We've benchmarked how Walton County's rate structure is for residential, commercial rates. It's in the ballpark of what other neighboring communities are. With any increases, there are no dramatic, you know, drastic increases on residential, wholesale, and, and commercial rates. Um, you'll still be within the kind of the, the realm of, of what other folks are doing. But the area, the big area of concern that we have is with wholesale rates where you are drastically undercharging relative to, to others and, and so we've recommended a, a significant increase on that.

  270. 0:54:37

    So at any rate, so those are a couple of, uh, highlights. I'll turn it over to Allie to go into the details. And again, a- as, as we go through this, please, uh, feel free to ask any questions or any comments a- as we go along.

  271. 0:54:49

    Perfect. Hi, like David said, my name is Allie Berry, and he-- David gave a really good overview, and now we'll get into some of those details of our rate study findings. So first, this just kind of outlines the process we followed. First, we looked at the Walton County Water system operations, examined all of the financials to see what revenue would be required for these rates to reach. We also looked at cost allocation, breaking down the costs of water expansion, and how those would be attributed to the different customer segments using water.

  272. 0:55:22

    And then lastly, we created our five rate scenarios for rate design. So first, getting into revenue requirements. As David said and John said earlier, the water department has seen increases not only in its operating revenue, but also in its expenses, depreciation expense, and operating income over the last five years. And of that, residential customers are responsible for eighty-five percent of the water sold, so the rates charged to residential customers do make up a significant portion of the, the water billing.

  273. 0:55:57

    And then this just provides an overview of the current water rates. These were first introduced in twenty twenty-one, which includes a minimum water bill that covers a minimum bill quantity, and then increasing tiered rates which differ between residential customers have three tiers, and then commercial customers have two tiers. But again, those have not changed since twenty twenty-one, and then the current wholesale rate also has not changed. It's two dollars and ninety-seven cents per every one thousand gallons.

  274. 0:56:29

    So based on current trends, we forecasted out where we expected the water growth to go, and we forecasted an annual growth of one point seven percent for the forecast period. And then just to break that down into what the fixed service charge is, that minimum water bill cost versus those volumetric rates, we see sixty percent of the revenue does come from that fixed minimum bill cost, while forty percent of the water sales are coming from those volumetric rates. And based on the current rates, overall revenue is expected to increase by about two point nine million by twenty thirty-four, but that is just looking at the revenue.

  275. 0:57:10

    So now we'll get into the more cost segment of this, and first looking at the debt. So right now, Walton County Water Department has some legacy debt service, which is about seven million dollars a year through twenty thirty-seven, and then it slowly pays down. But in addition to that, we also have forty-two million dollars in capital projects that have been identified through twenty thirty-four, and those are funded in three different ways: cash, debt, and SPLOST. And then one significant thing to point out for capital projects is the transmission infrastructure bond of forty-five million dollars, which will take effect in twenty twenty-seven and increase some of that debt significantly.

  276. 0:57:49

    So this is just an overview of what the capital projects plan looks like. As you can see, several different projects and split over several different years. And so we looked at all of these and the costs associated when we were factoring in the revenue requirement.

  277. 0:58:07

    And then we also see, as I said earlier, the total interest expense peaks in twenty twenty-eight as that new debt is issued. However, it will slowly decline after that as both the legacy and the new debt are paid down.

  278. 0:58:21

    And then this is the revenue requirement. So that blue line shows how much revenue is needed, and then the orange is where we forecasted the revenue to be. And so you can see it narrows in twenty twenty-eight with that new debt being increased, but then there's potential of recovering by twenty thirty-four, and that's the current state.

  279. 0:58:41

    Then we looked at the cost allocation, first breaking down the operating expenses. About fifty-four percent of those were due to just variable costs and not those fixed, um, personnel and other costs. And we broke down the cost allocation. Um, this is just the residential customers because again, they're responsible for that eighty-five percent of water sold, and we found that it breaks down to about five hundred and five dollars per account is the cost associated with residential customers.

  280. 0:59:12

    And this is kind of the math breaking that down. If anyone has a question, we can get into that, but that's allocating for both the fixed and variable portion of the water costs. And then how we calculated that, we did for all of the different segments and found that the wholesale customers currently face the highest total cost per account.

  281. 0:59:35

    And the fixed costs we also looked at with meter size, and they increase drastically as the meter size increases. And then we compared those fixed costs with the current minimum bill charge, and we found that the minimum bill charges are on average forty-two percent higher than the fixed cost per month. So with that, we were able to determine that the minimum bill fixed charge was not the main point of concern or increase because we feel that the-- based on our calculations, those fixed costs are more than accounted for by the minimum bill currently.

  282. 1:00:12

    However, we then took a look at the capital improvement plan and found that in order to account for those water growth at, um, operations, we would have to allocate about four hundred and forty thousand dollars annually to all of those different projects listed there. And then based off of all those calculations, we were able to create these recommendations for connection fees. And on here we have both the short side and the long side fees broken down, and that accounts for the potential growth of the water systems, including the capital projects as well as the material costs for those meters to be installed.

  283. 1:00:52

    And then we also took a look at wholesale water rates. The cost of water has increased, um, and this shows where we're currently getting our water and the different prices. And the weighted average cost of that wholesale water is currently four eighty, and if you remember, the wholesale water price right now is two ninety-seven.

  284. 1:01:13

    And so with that, we are proposing that the wholesale water rate increases to four dollars and ninety-nine cents per a thousand gallons from that two dollars and ninety-seven cents. And then the graph at the bottom shows the two main customers are Loganville, which has the majority of the sales, and then Social Circle, and that shows what their current rate would be, and then what the new rate would be.

  285. 1:01:40

    Then looking at the rate design, we developed five rate design scenarios. And before we get into the scenarios, just looking at the need to revisit these rates is we mapped out the last three rate changes. And prior to this proposed one, the last two were every three years, every four years, with that one in twenty twenty-one seeing a significant base rate change. And now it's been six years since that. And so as this graph shows, in these past five years, the cost of living has increased by twenty-seven percent, but the average monthly water bill has not increased at all.

  286. 1:02:18

    So the water department has been absorbing all these rising costs due to inflation and then the rise of, um, operating costs. And so that justified the need to examine a rate change.

  287. 1:02:32

    So this is an overview of the five different scenarios. We'll unpack each of those in depth. But the first one looks at a percent increase that applies to everything, including the minimum bill and the volumetric rates on residential and commercial customers. All of those rates increase by a flat two point eight percent. And this kind of maintains the ex- existing rate approach that we have. The second scenario keeps the minimum bill the same for all residential and commercial customers, but it increases those tiered volumetric rates by seven point three percent.

  288. 1:03:08

    And this balances out that rate structure. As I mentioned earlier, we found that the minimum bill charge was adequate, and this addresses that volumetric piece where customers with higher usage will have those higher charges. The third scenario is, again, no minimum bill increase, but it introduces a steeper rate. So we have three tiers for residential and two tiers for commercial. And so for residential, the first tier would increase by four point five percent, but the last tier would increase by eighteen percent.

  289. 1:03:38

    So you see significant, um, impact on those larger accounts while the smaller accounts face less impact. Then for our fourth scenario, we are proposing increasing minimum bills and introducing that steeper inclining block rate. And that's a small increase for all customers, but the higher increase is still on the largest customers. And then lastly, for that fifth scenario, the residential rates remain completely unchanged, and then the commercial rates have those, um, minimum bill and tiered increases the same as scenario four.

  290. 1:04:14

    Ju- ju- just to jump in for a moment, the, the key takeaway that, that I think is useful to remember on this is that these five scenarios all at the end of the day get you to the same place. Th- there's a way that more revenue is generated, uh, in each of these. The question is who's-- h- how are we allocating the costs? You know, for example, in scenario one, it's just a very crude two point eight percent across the board. That gets you to the same place as having some of these differentiated rates as well. So what we're trying to do is come up with some different approaches to get to the-- where you need to be in any scenario.

  291. 1:04:49

    Okay. So looking at the first scenario, again, maintaining that current minimum consumption level, but increasing the minimum bill charge and the volumetric rates by two point eight percent. And then the table below shows what the new rates would be under that change. And then applying that increase across every rate component would lift that revenue requirement that we looked earlier, um, and would not change the current rate approach. And then this graph shows the impact on residential and commercial customers by low usage and then high usage.

  292. 1:05:23

    So everyone would be impacted by this rate change in a small way, regardless of their usage.

  293. 1:05:33

    Then the second scenario, there would be no minimum bill change, but all the volumetric rates would increase by seven point three percent. And this is what the, um, revenue would look like. Again, like David said, all of these will reach the same end goal. It's how they're structured is where the difference is. And then here we see that residential and commercial customers with low usage would not be impacted by this rate change, but the residential and commercial customers with high usage would be impacted.

  294. 1:06:06

    Then for the third scenario, like the last one, there would be no minimum bill change, but it would implement a steeper inclining block rate structure. So those residential tiers would increase by four and a half percent, nine percent, eighteen percent, and then the commercial tiers would increase by six point eight percent and thirteen point five percent. And the-- to show what those percentage impacts would be, that table right below shows what the new prices would be. Again, that would reach that same revenue target, but would not raise the bills for those low volume customers.

  295. 1:06:39

    And then again, the impact for residential and commercial customers with low usage, um, there would be no impact, but for high usage there would be a greater impact there.

  296. 1:06:50

    Then looking at the fourth scenario, the minimum bill charge would also increase, and then there would be a steeper inclining block rate. So the minimum bill increase proposed is six-- or it's two-point-six percent. Um, and then the following rate increase percentages are also listed there. And again, all customers would receive a rate increase, but the higher rate increases would be concentrated in those upper tiers. So it would still limit the impact on smaller customers, but there would still be an impact on those smaller customers.

  297. 1:07:22

    Again, the revenue would, um, be increased through this. And then the... as you can see in this, the residential and commercial low usage customers would have a small increase in their bills, but then the residential and commercial high usage customers would have a greater increase in their bills. And then we also wanted to model out what it would look like if we continue to increase rates year by year to account for inflation and the-- and those rising costs, and we modeled out a one-point-two percent increase year by year.

  298. 1:07:54

    And we found that the net impact of that would be five-point-eight million by twenty thirty-four compared to the one-time change. We just modeled it on scenario four. Um, however, as you can see from the graph, the margins are healthy enough that a one-time change would be sufficient for right now. Year-by-year increases are not necessary, but they are a possibility, and we did model that out if that's something of interest.

  299. 1:08:19

    And then lastly, looking at the last scenario. In this scenario, all of the residential rates remain unchanged, including the minimum bill and those volumetric rates. But for the commercial side, we have the same increases as last time with a two-point-six percent increase on the minimum bill and then those increased volumetric rates. And this would keep residential customers, um, not impacted at all with this rate change, while commercial customers would receive an adjustment with larger, um, costs associated with higher usage.

  300. 1:08:53

    And again, we would see that it would still exceed the revenue requirement modeled. And residential customers would have no change, and then the low usage customers would have less of an increase than those high usage commercial customers. And then this just shows what the difference in the minimum bill would be across scenarios. And so in scenarios one, two, three, and four, the minimum bill would stay the same for residential, and one, two-- or one, three, and four for commercial.

  301. 1:09:27

    Um, and then you can see those increases the most in scenario one. And then showing the volumetric tiers, this is for residential. Scenarios three and four would shift those costs toward the higher volume users, while scenario five would hold those rates at what they're currently at.

  302. 1:09:49

    And then for commercial, tier two is where you see those large increases as the larger usage is impacted with higher costs.

  303. 1:10:00

    We also took a look at some nearby communities and where the current rates and the proposed rates would be compared to your neighbors. And so we found that the Walton County Water residential costs are on the higher range of neighboring water systems, but they are not the highest. Um, and so the dark red line shows what they're currently at, and then the other colors are the other scenarios. And as you can see, there's not significant changes, um, comparatively to the neighbors no matter which of these is enacted.

  304. 1:10:30

    Can you clarify which is the one on the far right?

  305. 1:10:34

    The light blue line?

  306. 1:10:35

    The, the two lines on the right.

  307. 1:10:36

    Social Circle.

  308. 1:10:37

    Oh, that is Social Circle, both the inside and outside costs.

  309. 1:10:41

    Okay. Thank you.

  310. 1:10:41

    Yes.

  311. 1:10:44

    And then we also looked at the commercial costs, and those are in the middle range of your neighbors. And as you can see, the current and all scenarios are together, so changing that would keep the placement the same compared to neighbors.

  312. 1:11:02

    And then we also looked at the wholesale rates. And as you can see here, the current rates are the bo- uh, the least by far compared to all neighbors. Um, but then if you enacted the new change, it would bring Walton County to that middle range.

  313. 1:11:21

    And then we also looked at connection fees. So for residential meters, Walton County is on the lower end, and this would bring them a little more in the middle, but no significant changes there for short side. Um, and then for the commercial meters, again, they're also in the middle, and that would bring them a little higher, but stay in the middle of the pack. And so that is all the material we have on the water rate study. I'll go through some quick slides, as John mentioned, about the billing system and how that could have a great positive impact on the water department's operations.

  314. 1:11:57

    So the current billing software has several limitations. It's very hard to access data, and there are a lot of manual workarounds making the process pretty inefficient for employees in the water department. And a possibility is looking at a new CIS or billing solution. And with that, the water department would be able to define their requirements. Here's-- this table shows some example categories of requirements of things that they would look at. And then from there would put out an RFP to solicit vendors, and this would be through a pro- an iterative process of internal evaluation, um, a vendor response, again, another internal evaluation, and then demonstrations to select a vendor.

  315. 1:12:45

    And this is a sample of some of the functionality categories that would be examined with getting a new CIS billing system to ensure that it is actually a good fit for the water department.

  316. 1:12:57

    Just, I just wanna add one comment. On this one, what, what you're looking at on the left-hand side on, on that left column, one of the things as you think about when the decision is made to move forward with a, a new billing system, you wanna be very thoughtful about the requirements that are built into that procurement process because you don't wanna just buy the same system that a neighboring county has just because the neighboring county has it. You wanna think about what your requirements are. So if you look at some of the, the tabs, I realize it's difficult to read up here, uh, but general and technical billing, customer information system, customer portal, cashiering, payment processing, prepaid, meter data management, workflow management, work and asset management, general ledger and financial reports, chart of accounts, payroll, purchasing, accounts receivable, capital asset accounting, budget management.

  317. 1:13:42

    Those are all the kinds of things... And you may not need all of those, but that's one of the things that you wanna do before you put a bid out, is really think about what that needs to look like specifically for the needs, to meet the needs of Walton County as opposed to what someone else has. And so those are, that's kinda why we put that in there. These are some of the things you'd wanna think about.

  318. 1:14:02

    Yes. And like David said, this is kind of blowing up that last chart, showing some general categories, general and technical, billing, customer portal, and then some more specific requirements within those categories that the water department would consider when looking for a new system. We would also make sure that data is secure through the SOC 2 considerations and would integrate that evaluation into our approach. Lastly, here's just some vendors that, um, could be considered.

  319. 1:14:35

    And then that is everything. So if anyone has any questions about rate design, we're happy to answer them.

  320. 1:14:43

    Could you go back to the connection fee page-

  321. 1:14:46

    Yes

  322. 1:14:46

    ... where you compared to our neighbors, please?

  323. 1:14:51

    Here's the residential, and then this is commercial. And both are for a short side-

  324. 1:14:55

    Okay

  325. 1:14:55

    ... comparisons.

  326. 1:14:57

    So that's just the average, I guess, you got there, or?

  327. 1:14:59

    Yes.

  328. 1:15:00

    Okay.

  329. 1:15:01

    Well, for residential, it's for the three-quarters meters, and for commercial, it's two-inch meter.

  330. 1:15:06

    And this is the total connection cost, all of the elements included, or just the flag?

  331. 1:15:11

    Can, can Morris kinda explain that? Like, how they, they, when you call for a three-quarter to a two-inch, how you put it in compared to three-inch and above.

  332. 1:15:20

    Yeah. Yes. Um, if somebody comes in and purchases a meter, uh, they pay the connection fee, which right now is $29.50 for a three-quarter inch. Uh, so that means once they've bought it, we go out, of course, we have to install it. If it's long side, you have to bore the road. Uh, as Timmy knows, you have to dig both sides of the road, bore it, and run the line over to the, to connect to the main. On a two-inch or three-inch or above, those require a vault.

  333. 1:15:51

    They don't go in just a regular meter box. So normally, the customer in most... Those are big commercial. Uh, customer comes in and pays for the meter, then we ship that meter to the vault company, who puts it in the vault with the backflow, and so it comes on site actually in the vault, and then the developer puts that vault in the ground and connects it.

  334. 1:16:13

    But out of m- most of your meter sales are three-quarter, correct?

  335. 1:16:16

    Correct.

  336. 1:16:17

    90%?

  337. 1:16:18

    Yeah.

  338. 1:16:18

    And it's mostly developers, builders, or?

  339. 1:16:22

    Yeah, it's, it's, yeah, builders and developers. I mean, we, we do have a few people build houses, but the bulk of the house sales and new meters go to developers and to builders doing subdivisions.

  340. 1:16:33

    So very few three-inch and above.

  341. 1:16:35

    Right. Yeah, we probably have four to six six-inch meters in our whole, whole system.

  342. 1:16:43

    Okay. Thank you.

  343. 1:16:43

    Most of those are schools.

  344. 1:16:51

    Any other questions?

  345. 1:16:59

    Why... How long have we been subsidizing wholesale water sales? Did we go into that?

  346. 1:17:05

    Yeah. It's been-

  347. 1:17:06

    I mean, we've been subsi- that's a pretty significant subsidiza- I don't even know that word-

  348. 1:17:10

    Yes

  349. 1:17:10

    ... subsidizing.

  350. 1:17:11

    Yeah, it is. Um, in the past, where politics gets involved, when you start trying to raise wholesale rates with the cities, but yes, we have been subsidizing. You know, it's a little... If you just look at our straight Newton County cost, then w- we're not subsidizing. But especially in Loganville, a lot of that has to be supplemented with Gwinnett water. That Gwinnett water's 580, I forget, 585 a thousand.

  351. 1:17:41

    So yes, and those just-

  352. 1:17:42

    We're subsidizing by almost 50%?

  353. 1:17:44

    Yes. Uh, now you'd have to blend the rates between the Newton water and the Gwinnett water to get our actual cost of water. But even doing that, as David said, when, when they went in and did that, it's 460-

  354. 1:18:00

    480.

  355. 1:18:01

    4- 480.

  356. 1:18:01

    Mm-hmm.

  357. 1:18:02

    So that's why we're proposing that wholesale rate going to 499.

  358. 1:18:06

    How long have we been subsidizing it? I mean, seems like we're... Never mind. I just-

  359. 1:18:10

    Yeah

  360. 1:18:10

    ... feel like that's-

  361. 1:18:11

    Well, I mean, they all... Like, Oconee, January 1st of this year, they went from 290 to 3... No, excuse me, to $5 a thousand, uh, January 1st of this year. So they've all been increasing. In Newton County, they've only increased about two and a half percent a year, uh, since '21. But they, uh, but, and it's still our cheapest water, but we can only get so much of that in the system at a time.

  362. 1:18:43

    I've got a quick question. So if we're... What, what was the Gwinnett rate?

  363. 1:18:48

    It's 585, I think.

  364. 1:18:50

    So

  365. 1:18:53

    if we buy Gwinnett water and then we resell it at 499, help explain that to me.

  366. 1:19:00

    We're still subsidizing it

  367. 1:19:01

    Well, it's still, you have to go back to that blended rate. I mean, it's not gallon for gallon Gwinnett water going to Loganville.

  368. 1:19:09

    Mm-hmm.

  369. 1:19:09

    Some of that's gonna be Newton water.

  370. 1:19:11

    Okay.

  371. 1:19:12

    So-

  372. 1:19:12

    How much of the Gwinnett water is going outside of Loganville?

  373. 1:19:16

    Well, it goes into the system in, uh, two spots, Rosebud Road and then also up at, uh, Shall- um, Sharon, Sha- not Sharon Church, uh-

  374. 1:19:27

    Centerville Road

  375. 1:19:28

    ... Centerville Roa- no, that's, that's Rosebud. But, um, anyway, uh, North Count- Bold Springs area. Those are two areas that it comes into the county. So, uh, not all of it's going to Gwinnett, and we only have to buy it primarily through the summer months when demand's high, keep pressure up, and keep water in the tanks, especially the Bold Springs area. That's the area we have the most issue with pressure and keeping water in the tank. So, uh, that Gwinnett water's supplementing the Newton water, so it's not all going straight through Loganville.

  376. 1:20:07

    But it definitely needs to, to go up so that we're, we're no longer supplementing.

  377. 1:20:14

    So a- as you can see from this table that's up here, you can see Oconee and Gwinnett water are higher than the $4.99, $5 and $5.78. You can see the amounts, and tho- those are the two largest sources of water. But the, the weighted average of all of the water is brought down, in particular by Newton, not so much by Monroe, because it's just such a tiny volume there. Um, but if you weight all of them together, it's $4.80. The $4.99 at least gets you whole. It doesn't create a huge margin. So I mean, $4.99, I, I, I would suggest that the, the $4.99 is the bare minimum that you would charge on a wholesale rate, but at least it gets you out of the subsidization that you're in right now.

  378. 1:20:57

    Okay, any other questions?

  379. 1:21:01

    The, the cost per gallon on the hundred gallons rates, is that what you're paying currently, or is that what everybody's paying?

  380. 1:21:09

    It's, it's 1,000 gallons.

  381. 1:21:10

    Or a 1,000 gallons, but like-

  382. 1:21:12

    That's-

  383. 1:21:12

    ... is it $1.59 that Newton County is selling that per thousand to anybody?

  384. 1:21:17

    Yes.

  385. 1:21:17

    No, no, to you.

  386. 1:21:18

    To Walton County.

  387. 1:21:19

    That's to us.

  388. 1:21:20

    Yeah.

  389. 1:21:20

    That's how much Walton is buying it for.

  390. 1:21:21

    You know that, yeah, yeah.

  391. 1:21:22

    That's your cost.

  392. 1:21:23

    That's our cost, and remember, we've got a contract with them that goes through 2055. It gives us-

  393. 1:21:29

    Wow

  394. 1:21:29

    ... we get the cost of water at their cost. We've already paid all the capital expense-

  395. 1:21:35

    Yeah

  396. 1:21:35

    ... and debt expense on that water plant.

  397. 1:21:37

    No, I was trying to clarify, 'cause looking at, like, that significant difference, I was thinking about Coal Creek, and I'm like, okay, I get it. Like, I'm just trying to justify what that number difference-

  398. 1:21:47

    Right. Yeah, well-

  399. 1:21:48

    ... what they're selling to everybody else.

  400. 1:21:50

    Yeah, they're, they're, they're not selling to anybody else but us for that price, 'cause we went in with them on that water plant early on and paid the capital costs up front. Uh, and keep in mind, too, that when that new water plant comes on board, it's gonna be more expensive water than that, but we're gonna have to have that for, for the future.

  401. 1:22:09

    We won't, we won't actually get a whole, probably for two years, on what it will cost for production on the new plant, uh, until it has some history. This, this definitely gets us back whole, but at the same time, you know, you've got the, um, potential to at least charge the minimum of what we're paying anybody else for wholesale rates. So this is, while $4.99 is the minimum, you may wanna consider charging at least what we're paying Gwinnett to make sure that we're not- Well, I like the idea of the minimum users, those that, you know, use what, 2,000 gallons or less, not changing, not changing theirs.

  402. 1:23:00

    And the ones that are using more are the ones that we need to go up on. And I think Pete had looked at tap fees and everything else, too. But, uh-

  403. 1:23:11

    Yes, sir. I'm ready whenever.

  404. 1:23:14

    I'm ready.

  405. 1:23:15

    When everybody else is. Anybody got more questions?

  406. 1:23:18

    I'll, I'll just make a quick comment. So what, the, the scenario you described is really scenario three, i- is you keep the, the minimum users, so low-income folks with small homes that don't use a lot of water-

  407. 1:23:28

    Right

  408. 1:23:28

    ... they stay where they're at. But folks with large homes, large water usage, pool, all those kinds of, they pay based on the volumetrics. That's really your scenario three.

  409. 1:23:39

    Okay. Pete?

  410. 1:23:44

    Yes, sir. Um, I appreciate y'all putting that together, by the way. It's a lot, and a lot to take in for, for sure. But, um, I wanna make a motion to approve scenario five. Um, scenario five, just so we know, implements, uh, existing res- residential rate hold. There's no, no ho- no increase on, on residential at all. Um, to do that, that would be only a commercial increase only. Approve the connection fees for new construction, um, and the three-quarter-inch connection fee.

  411. 1:24:20

    I wanna address that, John, uh, on the, the number. You want me to read that out?

  412. 1:24:25

    Yeah, I think it would be helpful just to clarify between short side and long side.

  413. 1:24:29

    Okay. Yeah, so this would be the fee for short side and long side. So three-quarter-inch meter would be $4,500. One-inch meter would be $6,500.

  414. 1:24:39

    Short side.

  415. 1:24:40

    Inch and a half would be $12,500. Two-inch would be $17,500. Three-inch would be $25,000. Four-inch would be $40,000. Six-inch would be $80,000. And then eight-inch and above would be, um, determined Um, by administration at the time of sale. And then I'd also like to, on the wholesale, address that. I think we should go to 5.10 on that.

  416. 1:25:15

    And that would conclude my motion, but I would like to say for the record, um, as the, we watch the revenues increasing, th- this time for the new growth, meter repairs, system repairs, and the new tap fee adjustments, in the future there could be an adjustment on the existing residential meter customers, um, before the new water plant goes online in 2028. But there'll be no increase on residential, existing residential at this time.

  417. 1:25:47

    All right, did you get all that?

  418. 1:25:50

    And when would this take effect?

  419. 1:25:52

    I'd like to, um, if we could take effect in December 1st.

  420. 1:25:56

    Except for wholesale. We need to give 30-day notice to-

  421. 1:25:59

    Okay

  422. 1:25:59

    ... the sale customers, so.

  423. 1:26:00

    Okay, so 30 days from today?

  424. 1:26:03

    Well, that basically would put it January 1st on the wholesale, December 1st on the other rates.

  425. 1:26:10

    January 1st on wholesale only. December 1st on tap fees and commercial.

  426. 1:26:16

    Okay.

  427. 1:26:17

    I got, I got a question for you, Pete.

  428. 1:26:19

    I, I'm gonna-

  429. 1:26:19

    I got one.

  430. 1:26:20

    I'm gonna second the motion and then go in, 'cause don't we need to second before going to discussion?

  431. 1:26:24

    Yes.

  432. 1:26:25

    So I'm good with what we're doing, but what happens if, when we raise this wholesale rate, they just buy it from Monroe? Is that gonna hurt their system?

  433. 1:26:36

    No, 'cause-

  434. 1:26:37

    So it's no-

  435. 1:26:38

    No, no. I mean, that's not a big part of this. Like, like David was saying, 85% of the income is on the residential. So no, it's, it... I mean, water sales could drop some, but I think Monroe are, is charging them $440, $450, and I think they're about to go up, I believe January 1st. Plus, that doesn't include the cost, like in Loganville, they paid half the cost to get that transmission line over to them. So, uh, and where th- that goes into their system, they can't take all their water through that location.

  436. 1:27:13

    That was the problem we had because it's on the opposite side of the system from their tank, and they don't have sufficient pipes to get it all over to the other side. So they're still gonna have to pull some from us to get back around through the south side.

  437. 1:27:27

    I've notified all the municipalities that purchase water from us that this discussion was occurring and that I would update them, and, uh, we'll get Morris to do that, as soon as any decision was made. So I went ahead and gave them advance notice that this was being discussed and contemplated because we were doing a rate study.

  438. 1:27:49

    And like Ann Marie was saying, you know, even going to 5.10, we'll be making a little bit, but it, we're still not gonna be making a fortune off of wholesale, so that if, if they do drop, it's, there's not a big margin on those sales.

  439. 1:28:05

    Um.

  440. 1:28:05

    Well, all right.

  441. 1:28:07

    Would you-

  442. 1:28:07

    Where, where does the 5.10 come from, Pete? W- Is that number just pulled out of... What's the rationale between the 5.10?

  443. 1:28:12

    He just said 40, $4.99.

  444. 1:28:14

    $4.99, right.

  445. 1:28:15

    I mean.

  446. 1:28:16

    You're just trying to go a little above the $5 that we got?

  447. 1:28:18

    Yes, sir.

  448. 1:28:18

    Okay.

  449. 1:28:18

    Yes, sir.

  450. 1:28:20

    Pete, would you, you said short side and long side tap fee would, or connection fee, whatever we wanna call it, would be the same for short side and long side. Would you-

  451. 1:28:30

    Correct

  452. 1:28:30

    ... recommend implementing a separate bore fee if that was required?

  453. 1:28:35

    No, I think what Pete took into account was the bore fee. Uh, and that's when, the figure he's using was basically the long side figure.

  454. 1:28:43

    Okay.

  455. 1:28:44

    Um, which actually from an administrative standpoint would be easier for us because if somebody comes in and, and buys a meter now, they pay for the meter, and of course, we go install it. Under the system, if you did a long side, short side, you would actually have to verify whether it's a long side or short side before you could tell them exactly what their cost would be.

  456. 1:29:03

    You'll reduce staff having to go out multiple times.

  457. 1:29:05

    So the answer is no. The prices that you were quoting includes a bore fee if necessary.

  458. 1:29:11

    Correct.

  459. 1:29:11

    Thank you.

  460. 1:29:11

    And that's, that's the way it's set up now. You have, that's the way they have it set up now.

  461. 1:29:17

    All right, we have a motion and a second. Any further discussion? All those in favor say, "Aye."

  462. 1:29:24

    Aye.

  463. 1:29:24

    Aye.

  464. 1:29:24

    Aye.

  465. 1:29:25

    Opposed? Okay.

  466. 1:29:29

    Thank you, guys.

  467. 1:29:30

    The... Thank y'all so much. That's a lot of work. The, uh, GIS services, Morris.

  468. 1:29:39

    Yes.

  469. 1:29:40

    What's that contract for?

  470. 1:29:42

    Okay. As, as y'all remember, about two years ago, we had a company come in and do GIS on our, on our system. Uh, they got all that data, and we talked at the time, and it's actually been in the budget a time or two about what we need to do, not only for our department, but for the whole county from a GIS standpoint. I know there were discussions at one point about even doing a GIS department. Uh, but j- uh, Northeast Georgia Regional Commission actually about six months ago started a GIS program where under a contract basis, they come out and s- uh, will provide, uh, technical support on GIS.

  471. 1:30:25

    So this is kind of a, a trial for, we're gonna try it through the water department. If it works well, then we'll expand it to the other departments, where they'll actually help us make sure that the GIS stays up to, up to date and can be fully used and implemented in the water department. And they only can contract through their year-end, which is June 30th, so that's why we're looking at a tier three, which is $14,450, I think. What you had b- before, there was a year contract using tier four, but we're actually looking at a little bit lower, uh, tier and cost to try it through, uh, June 30th.

  472. 1:31:06

    This is, this is a much cheaper approach by utilizing the regional commission where we already spend money and send a membership dues to as opposed to, uh, going out to hire a full-time GIS technician with all the overhead and all the additional benefit cost. Um, but this comes in, we explain what we need, they help us get there as opposed to bringing somebody on that's an additional person to supervise and try to figure a lot of this out.

  473. 1:31:35

    All right.

  474. 1:31:37

    So-

  475. 1:31:37

    Entertain a motion on this request.

  476. 1:31:40

    And this is if they have a water leak and they need to look up valves or anything to locate, they can look it up on their tablet or their phone. They, they're not doing that right now, but they will be if they train.

  477. 1:31:50

    Right. Yeah, valves, uh, meters, and it also will be layered with the rest of the county, too. So say the fire department need to find a hydrant or whatever, I think they already have their own GIS mapping on a lot of that. But yeah, it would be layered so that other departments could pull the data if they need to also. And like John said, you know, we'll try this through June 30th. If it doesn't meet our needs, you know, we'll see what we need to do at that point. If it does work well, then we can move it to the re- other departments in the county and, uh, use their expertise there.

  478. 1:32:25

    So Morris, you've replaced quite a few meters lately. Um, will this help us get to the program to where we can put dates with meters and use that to develop a meter replacement program?

  479. 1:32:39

    Yes. Actually, the, the billing software would do a lot more towards that. Uh-

  480. 1:32:44

    Okay

  481. 1:32:44

    ... that data's not currently available, so, uh, under the old billing system. But that'll do more for it, and the GIS system would integrate with the new data, uh-

  482. 1:32:56

    Yeah

  483. 1:32:56

    ... the new billing software also.

  484. 1:32:58

    Yeah, it's just a huge part of our intent to modernize what we've got.

  485. 1:33:03

    How long does a water meter last?

  486. 1:33:07

    Anywhere from 20 to 30 years, uh, normally.

  487. 1:33:11

    It doesn't sound like things like they used to, so I'm gonna guess ... Okay.

  488. 1:33:15

    Yeah. It d- it depends on battery life as much as anything, uh, but 20 to 30 years is normally the, the maximum lifespan on a meter.

  489. 1:33:24

    And Morris, while we're talking about meters, where are we at on, uh, currently on the percentage of getting all those meters we need to replace?

  490. 1:33:33

    We're pulling a report. At the end of each cycle, we pull a report of any meter showing zero reading. And so we go out and verify did it really have zero reading, which a lot of them do, uh, maybe vacant property or whatever, or is there an issue with the meter? And we're replacing those meters. We've replaced roughly 4,300 over the last three years. Uh, as y'all remember, 2006, all the meters were replaced at one time.

  491. 1:34:04

    Uh, so that's been a challenge. We've been replacing every year for about the last five years, and we've actually stepped up that program the last year or so. Uh, we're probably, probably about 80% having changed those out. The new meters, the old meters were basically like a speedometer on a car. Water went through it, you know, it turned the meter, and you knew what the reading was, and that was all you had. The new meters are, are a lot smarter. They'll store the data, which has been, been a huge help when people come in and say, "Hey, my bill's too high.

  492. 1:34:40

    I hadn't used this much water." And then you go pull the data, and you see every night at 3:00 AM, their sprinklers are kicking on and they're using 4,000 gallons. And you can show that to them and say, "Oh, well, I didn't think I had my sprinklers on." Uh, so that's been a huge help i- in billing disputes. And so, uh, the bulk of those, like I say, roughly 80% of our meters are changed out.

  493. 1:35:01

    Have a, have a lot of those been more recent replacements?

  494. 1:35:04

    Yes. Yeah, they're, uh, we're getting close to the end of life on those meter, those old meters. So yes, we're-

  495. 1:35:11

    Okay

  496. 1:35:11

    ... we're having to replace, we've had to replace a lot more over the last year.

  497. 1:35:15

    Would, would the new billing, the new software that we're discussing pr- be more, um, I'm gonna say have more information available to the consumer? Because when I go in and I try to... I mean, it's not exactly easy to find the water bill and water usage trends on my water bill.

  498. 1:35:32

    Yes, it, it would. Uh, depending on which software you go with, a lot of them have a consumer portal now where they can go in and, and pull up their account. What they're looking there will be the same thing as, as the bill that goes out. Uh, you would be able to geo-fence. So say you have a water main break on this road, then you can basically geo-draw a, a, a circle around it on the computer, and then it could, if you've got good emails, that's gonna be a challenge getting emails on everybody, uh, it would send out an email or a text to the individuals of what's going on, uh, for that section.

  499. 1:36:08

    Um, AI reporting, you'll be able to basically just say, "I want a report doing XYZ," and it would be able to pull it. Whereas right now, it's a pretty cumbersome process to try to get a report. So yeah, there's a lot that it would be able to do that we can't do now.

  500. 1:36:23

    Y- you had to get pretty creative to even get to the point of being able to get which meters weren't-

  501. 1:36:29

    Yeah, we had-

  502. 1:36:29

    ... were reporting zero usage-

  503. 1:36:31

    Yeah

  504. 1:36:31

    ... with our current software.

  505. 1:36:33

    Yeah. You, uh, we've actually had to get a report that we get off of 360, which is the meter reading software, not off the billing software to get, get that n- that number.

  506. 1:36:45

    That would be a one software or an APS that would make each other much more-

  507. 1:36:48

    It would be very helpful to have integration.

  508. 1:36:49

    Yeah, and that's the other issue. Right now, our software, Black Mountain, will not s- talk with just, uh, finance software. So when we pull our numbers each month, we have to send them to them, and then they manually have to sort of manipulate them into the finance software. And there's no desktop on it, just come in in the morning like I was used to in my, my previous-

  509. 1:37:13

    a job where you can come in and you can pull up and see where you stand that day on, you know, water sales, your costs, all that. That's not available right now.

  510. 1:37:23

    So our biggest revenue generator doesn't talk to finance department. That's been one of the big issues.

  511. 1:37:30

    All right. Well, let's move forward, please, on this as recommendation from the water department.

  512. 1:37:36

    I make-

  513. 1:37:37

    Need a motion.

  514. 1:37:37

    I make a motion to approve.

  515. 1:37:40

    You have a motion?

  516. 1:37:41

    Aren't we approving the motion that you already made? Is that what we're doing?

  517. 1:37:44

    I thought we were approving that.

  518. 1:37:46

    We already approved it. Okay, sorry.

  519. 1:37:49

    Second.

  520. 1:37:49

    I am lost.

  521. 1:37:50

    All right, we got a second. Any further discussion? All those in favor say aye.

  522. 1:37:55

    Aye.

  523. 1:37:56

    Opposed? I'm sorry to make the DA wait so long, but, uh, everybody's concerned about what they're paying for water.

  524. 1:38:05

    Yeah. I don't know if everybody's had a chance to meet Amber, but I just wanted to point out a little short bio about her as part of an introduction in, in advance of this. But, um, Amber was appointed and sworn in as the district attorney of the Alcove Judicial Circuit by Governor Brian Kemp on September 14th, twenty twenty-six. A career prosecutor with more than a decade of experience, Ms. Dahle has served the Alcove Judicial Circuit since twenty fourteen. She's prosecuted numer- uh, numerous serious felony cases, including murders, crimes against children, and previously served as the chief assistant DA in Newton County, where she helped oversee the office's operations and supervise fellow prosecutors.

  525. 1:38:50

    In addition to her extensive trial experience, she has been actively involved in the circuit's accountability programs, serving as the prosecutor assigned to the drug court as a member of the advisory board for Newton County's Adult Felony Drug Court and Veterans Treatment Court programs. She was a founding member of the Newton County Boys and Girls Club and president of her Leadership Walton Class twenty twenty-four. She graduated from the Georgia Institute of Technology, Kirkland, uh, Honors Program in twenty eleven, earning a BS degree in international affairs, and received her JD from Georgia State University College of Law in twenty fourteen.

  526. 1:39:32

    She resides in Social Circle with her husband, Patrick, and their two children. Thank you.

  527. 1:39:38

    I don't have a PowerPoint or anything, but I have a sheet that kind of goes through the highlights of, of, um, my talking points today.

  528. 1:39:48

    But, um, as you all probably know, we have had the Axon Justice program for a little over two and a half years now in the DA's office, and it has been excellent. It's sort of a one-stop shop for all of our evidence, downloading, managing, editing, sending, everything we need, uh, in sort of one space. It also operates as a, a way to store it and comply with our statutory requirements over long periods of time, which is about twenty-five years that we have to have that. Um, so that has been working wonderful. And what I'm asking for today is, uh, we have the opportunity to e- both extend for one year the contract with Axon and, um, contract with them for their Premier Plus version.

  529. 1:40:31

    What the price of that is essentially is twenty-two thousand four hundred and seventy-four dollars annually for this county. It would be for Walton and Newton, so both counties would pay that same amount. But that would be the price for Walton County, and it would not even technically be in this fiscal budget. It would be for the next one. So that payment wouldn't be due until-- That increase of payment, uh, wouldn't be due until December of twenty twenty-seven. And there's an opt-out provision in the contract, so if the Premier Plus version does not provide the benefits that, uh, I believe that it will, um, and I'll talk about what those are shortly here, then we can tell Axon by September first of twenty twenty-six that we don't want that product anymore, and we'll revert back to our old contract, and we won't pay anything more.

  530. 1:41:16

    Um, I think that the product in the Premier Plus version is, is really, really helpful. I had the experience of being able to use a trial version of it when I tried a, um, murder case in Newton County this summer in August. It was a, a very complicated cold case, uh, murder case that actually happened in two thousand sixteen, and so there was a lot of information and investigation that happened over a decade in multiple states, and I had over ten thousand pieces of digital evidence in the Axon file.

  531. 1:41:46

    And so they let us have this, um, Premier Plus version, and I could tell immediately that it was incredibly helpful in digesting that information. It saves a lot of time for both myself as an attorney working on the case, also for our investigators and our trial assistants. It just saves a lot of time, um, with their processing of information and being able to streamline things. And so what I mean by that is when I started prosecuting in two thousand fourteen, I don't think a single officer in either county had a body cam. You were lucky if they had a dash cam, right?

  532. 1:42:18

    But in today's day and age, if, if we're talking about a run-of-the-mill aggravated assault drive-by shooting, so not even a murder case or something, this is the kind of evidence you'll have. You'll have ten or so officers respond to a scene. They'll all have body cams on, okay? And so if they're there for three hours collecting evidence, doing interviews, things like that, you've got over thirty hours to watch, you know? Uh, you're gonna have five phone extractions that you'll get. And so this phone will have-- I- if you break it down and you plug this in and you extract all the information, it's gonna be a hundred thousand pages of information you get.

  533. 1:42:50

    You'll have multiple social media, um, account information to look through. You'll have fifteen interviews with different witnesses and victims, which is gonna be another thirty hours of information to review. You'll have surveillance videos, and that's all in addition to your regular incident reports, ballistics evidence, things like that. So it's very, very time-consuming for personnel to sit down and watch all of those videos, to listen to all of those, those interviews, um, early on in a case, early enough to get it resolved and worked up and, and ready to go, uh, in an efficient way for taxpayers and for the jail and for everyone like that.

  534. 1:43:25

    Um, and so what the Premier Plus version does, uh, that's incredibly helpful is it has a, a closed source AI component. It watches those videos, and it gives you a summary of everything that's happening with timestamps, with important moments, and things like that. So it really cuts down on my investigators and my attorneys having to spend as much time watching nothing happen for hours to try to filter through and get to the important parts that are really relevant. Um, in this day and age, that is just how we're going to be able to process a lot of this digital evidence that isn't going anywhere.

  535. 1:44:00

    There's only going to be more phone extractions, more body cam, more social media evidence, and things like that. Uh, so the AI component is very helpful in streamlining that and cutting down, frankly, costs. I mean, uh, it, it does what, what personnel can do in a lot of ways, and personnel is a lot more than $22,474 a year. Um, it also has features that include translation, like live, real-time translation. So if there's an interview that's in Spanish or something like that, it's gonna translate it for you, um, very quickly and provide a transcript of that.

  536. 1:44:35

    It also has, uh, easy search features contained within the platform itself. So if you're talking about having those 10,000 sort of pieces of evidence to look through, it actually can be very time-consuming to filter through all the tabs just to get to where you need to go when you're talking about having 15 different agencies and, and all of that. So it, it streamlines that process. And I think the biggest thing that it's going to be able to do, um, that Axon hasn't rolled out yet, but it's part of this platform, and it's supposed to roll out in December, but is also why I was insistent on having the opt-out provision in the contract, is a phone extraction reviewer.

  537. 1:45:12

    So currently, how it stands with phone extractions is if you take this phone itself, right, and you plug it in, you download it, I don't remember exactly how many gigabytes I have on here, but it's probably bigger than my laptop itself. So if I plug that into a laptop, you're not gonna be able to open it. Or if it is, is small enough that you can, it's gonna take 10 hours to download. So I've got attorneys trying to open it at night to come back in the morning and hope that they're able to review it, you know, and nothing went wrong through the night of it opening. Um, and so what we've had to do is buy a few gaming computers that are $6,000 to $8,000 each and, uh, share those among, between the two offices.

  538. 1:45:52

    I have, you know, 40 different people that will be looking at evidence of this nature and share gaming computers. It's so big it doesn't even fit in my, like, rolling, you know, la- uh, briefcase to take home. Um, but look at phone extractions in that way because that's incredibly good evidence. That's a GPS tracking device. That's every social media interaction and message someone's had, messages they have at the time of a crime, all, all of that kind of information. So what Axon promises is a browser, meaning you use this laptop, you log on to a browser, and you can look at that phone extraction in its own reader, and you don't need the special computer, and you don't need anything like that, uh, and you're able to just do that.

  539. 1:46:31

    That would be incredibly time-saving for all of my people. Again, that's a personnel cost just because of the time it can save for people to be able to digest and review that information in that way. And if Axon doesn't fulfill that promise, which I'll tell you, so far Axon hasn't disappointed. They haven't said, "We're going to do something," and then not, uh, in terms of the services they provide. But if they fail to actually provide that, then we have the opt-out provision, and we don't have to continue with the contract. Um, so I think we're s- I think it makes a lot of sense to do this.

  540. 1:47:03

    I think it, it's, um, it's an upfront cost that I think in the long run is, is beneficial. Um, and, um, I, I'll, I say why I think we need to do it now is that Axon is going to have a price increase, uh, come January. Next year their prices are gonna go up. They know they have good products, and so, um, we have the ability to, to lock in this price now, not pay it until December, and opt out if we don't wanna do it. So essentially it extends it one more year, and it's an annual increase of $22,474.

  541. 1:47:36

    I don't think you have to do much more hard sale.

  542. 1:47:38

    Okay. Sorry.

  543. 1:47:40

    We-

  544. 1:47:40

    Budget's approved

  545. 1:47:40

    ... we're, we're-

  546. 1:47:41

    We've coordinated with Newton County.

  547. 1:47:42

    I've always, I've always been a big supporter of keeping our software updated, and especially we need to get it where we can communicate with each other departments. And, uh, so I'll entertain a motion from the board.

  548. 1:47:57

    I-

  549. 1:47:57

    So moved.

  550. 1:47:59

    Second. Second.

  551. 1:48:00

    I have a question.

  552. 1:48:02

    All right.

  553. 1:48:02

    Yes, ma'am.

  554. 1:48:03

    When it renews it for 2020, so we're gonna, we're, we're approving it for 2027 calendar year essentially.

  555. 1:48:13

    Uh, for fi- for the fiscal, yes, aspect of it. We- one of the years will count for this year, if that makes sense. Like, it, the contract will start December of 2026, and the whole first year will be till December of 2027.

  556. 1:48:26

    2027.

  557. 1:48:26

    So it, right now our-

  558. 1:48:27

    When it renews in 2027, we expect an increase, or does this lock in-

  559. 1:48:32

    Yes

  560. 1:48:32

    ... the 22,000? Okay.

  561. 1:48:33

    December 2027 is when the increase would occur, that extra 22,474 in addition to what we pay now, which is a little over 60,000. I could find the exact number.

  562. 1:48:44

    Okay. And then it would increase again probably in December 2028.

  563. 1:48:48

    No. This contract takes us to December 2030.

  564. 1:48:52

    Okay. That's what I thought.

  565. 1:48:52

    Um, so right now our contract ends December, or I think technically August 2029. This basically renews the entire contract through December of 2030 with that increase.

  566. 1:49:02

    Okay. That, that answers my question.

  567. 1:49:04

    Okay. All right. Thank you.

  568. 1:49:07

    Okay. Did we get a motion?

  569. 1:49:09

    Motion and a second.

  570. 1:49:10

    Yes, sir.

  571. 1:49:11

    All right. We got a motion and a second. Those in favor say, "Aye."

  572. 1:49:14

    Aye.

  573. 1:49:15

    Aye.

  574. 1:49:16

    Opposed? Thank you.

  575. 1:49:19

    I should say, um, I, I guess now that we've already approved it, but it's contingent upon Newton County approving the same, obviously. So, um, I have, I will present to them next week.

  576. 1:49:28

    All right. Thank you All right. You have the administrative consent agenda before you. Are there any questions or anything you want to take out-

  577. 1:49:43

    Just-

  578. 1:49:43

    ... and vote on separately?

  579. 1:49:45

    The only thing I'd like to point out is this, the continued exploration of grants. There's multiple items on there that specifically are involved your approval for departments to go after grants to offset operating costs or add additional equipment.

  580. 1:50:00

    Motion to approve.

  581. 1:50:01

    We got a motion to approve. I second. We got a second. All those in favor say aye.

  582. 1:50:07

    Aye.

  583. 1:50:08

    Opposed? We had one speaker sign up for public comment, Jeffrey... I'm not gonna butcher this. I'll spell it D-O-B-S-K-I. Is Jeffrey here?

  584. 1:50:27

    Well, no-show. Are they... Don't forget tomorrow is Veterans Day. Uh, show your appreciation. And, uh, any announcements from the board?

  585. 1:50:42

    Yeah, the Monroe Purple Hurricanes made the playoffs. They, uh, they moved the game to, uh, Saturday at 5:30 here at our home field.

  586. 1:50:51

    Wow.

  587. 1:50:52

    We'd love to have everybody be there.

  588. 1:50:54

    Very good. All right. There's no need for executive session. Entertain a motion to adjourn.

  589. 1:51:00

    Motion to adjourn.

  590. 1:51:03

    Second. Second. All those in favor say aye.

  591. 1:51:05

    Aye.