Ciudad: Roswell
Roswell Design Review Board
Actas de Roswell Design Review Board: 21, del 2024-03-05 al 2026-11-05.
Qué contiene esta colección y qué deja fuera
- Georgia Commons holds a body's meetings only from the dates shown, and only the records the body has posted: a meeting with no posted record is not here.
- Each record's text is read from the file the body posted; the file's address is kept with it.
- Summaries, topics, and decision lists are written by AI from the record and labeled; they are never the record.
El sitio web del propio órgano: roswellcityga.iqm2.com
Para máquinas: https://georgiacommons.org/meetings/roswell-design-review-board.md
Reuniones
Reunión ordinaria, 5 de noviembre de 2026
Resumen de Georgia Commons (escrito por IA): Design Review Board approved the World Harvest Church detention pond at 320 Hardscrabble Road and set changes to its 2027 and 2028 meeting calendar.
Reunión extraordinaria, 12 de octubre de 2026
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved, with one staff condition, an outdoor classroom and playground at 300 Grimes Bridge Road.
Reunión ordinaria, 1 de septiembre de 2026
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved four projects with conditions, including a townhome community on Minhinette Drive and a retail center on Woodstock Road.
Reunión ordinaria, 7 de julio de 2026
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved plans for Fire Station 27 and Greenlawn Cemetery and gave feedback on two other projects.
Reunión ordinaria, 5 de mayo de 2026
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved, with conditions, the 2181 Strickland Road renovation and the Fellowship Church new construction at 480 West Crossville Road.
Reunión ordinaria, 7 de abril de 2026
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved conditions-based plans for new construction at 11033 Alpharetta Highway and exterior renovations at 891 Mansell Road.
Reunión ordinaria, 3 de marzo de 2026
Resumen de Georgia Commons (escrito por IA): Design Review Board elected a new chair and vice chair for 2026 and asked the 10471 Alpharetta Street applicant to revise plans.
Reunión ordinaria, 6 de enero de 2026
Resumen de Georgia Commons (escrito por IA): Design Review Board approved relocation of modular classrooms at 10965 Woodstock Rd with conditions and deferred its 2026 elections to February.
Reunión ordinaria, 9 de diciembre de 2025
Resumen de Georgia Commons (escrito por IA): Design Review Board approved Chattahoochee Nature Center Phase 2 plans and the 2026 meeting calendar, and reviewed a QuikTrip request without voting.
Reunión ordinaria, 6 de noviembre de 2025
Resumen de Georgia Commons (escrito por IA): Design Review Board approved the Fellowship Christian School dining and classroom addition on Woodstock Road with one staff condition, unanimously.
Reunión ordinaria, 2 de septiembre de 2025
Resumen de Georgia Commons (escrito por IA): Design Review Board approved the Public Safety Headquarters, Police Evidence Building and Liberty Square Park designs with comments, and deferred Fire Station 27.
Reunión extraordinaria, 17 de junio de 2025
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved exterior renovations at 2965 Holcomb Bridge Road with three conditions, including a revised rendering for board review.
Reunión ordinaria, 1 de abril de 2025
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved a new Dutch Bros. restaurant at 705 Holcomb Bridge Road with two conditions, including a pedestrian crosswalk.
Reunión ordinaria, 7 de enero de 2025
Resumen de Georgia Commons (escrito por IA): Design Review Board partially approved the Riverwalk II site plan and approved a Mansell Road mural, both with conditions.
Reunión extraordinaria, 18 de diciembre de 2024
Resumen de Georgia Commons (escrito por IA): Design Review Board approved the playground addition and parking lot repaving at 9212 Nesbit Ferry Road with one condition
Reunión ordinaria, 1 de octubre de 2024
Resumen de Georgia Commons (escrito por IA): Design Review Board approved the Roswell Housing Authority's new multi-family building at 199 Grove Way with one condition and adopted its 2025 meeting calendar.
Reunión ordinaria, 3 de septiembre de 2024
Resumen de Georgia Commons (escrito por IA): Design Review Board heard an initial presentation of a new Roswell Housing Authority multi-family building at 199 Grove Way, taking no vote.
Reunión ordinaria, 2 de julio de 2024
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved new construction of a Safelite at 10855 Houze Road, with five conditions including added screening.
Reunión ordinaria, 4 de junio de 2024
Resumen de Georgia Commons (escrito por IA): Design Review Board unanimously approved, with conditions, the final site renovation plan for 10925 through 10935 Crabapple Road.
Reunión ordinaria, 7 de mayo de 2024
Resumen de Georgia Commons (escrito por IA): Design Review Board approved the Palmer Dodge service center at 11460 Alpharetta Hwy with conditions and reelected its chair for 2024.
Reunión ordinaria, 5 de marzo de 2024
Resumen de Georgia Commons (escrito por IA): Board approved the St. Michael's Church expansion at 715 Hardscrabble Road with conditions and deferred its 2024 chair and vice chair elections to April.