Ir al contenido
Georgia Commons
Menú

Atlanta · Código de ordenanzas

Atlanta Code of Ordinances

Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.

Sobre este texto

  • As published by Municode, current through 2026-10-21
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 15 de 29. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

(vii) The interior portion of the area below the lowest floor shall not be partitioned or

finished into separate rooms; provided however, the minimum area necessary for access to upper floors may be finished with flood damage-resistant materials in accordance with FEMA Technical Bulletin Flood Damage-Resistant Materials Requirements August 2008, or as

amended;

(viii) Elevated structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;

(ix) Heating and air conditioning equipment and components (including ductwork), electrical, ventilation, plumbing equipment (including water heater), and other service facilities shall be located at least

three feet above the base flood elevation or two feet above the highest observed flood (whichever is greater) to prevent water from entering or accumulating within the components during conditions of flooding;

(x) Designs for complying with the requirements of this article shall be certified by either a professional engineer or architect;

(xi) Landings and stairs that allow for the natural flow of floodwaters will be allowed for minimum entry access;

(xii) If the proposed elevated structure is located in multiple flood zones or if multiple base flood elevations cross the site, the higher or most protective base flood elevation shall take precedence;

(xiii) The design shall provide for the drainage of floodwaters in not less than 72 hours pursuant to FEMA Technical Bulletin 1 (August 2008); and (xiv) A file-stamped copy of an elevation

certificate filed in the land records of the county in which the property is located shall be submitted to the commissioner prior to the issuance of a certificate of occupancy. This elevation certificate shall be prepared by a licensed surveyor and shall document the elevation of the lowest floor relative to mean sea level and compliance with the ordinance.

(b) Elevation of existing structure via jacking on existing foundation. An existing structure that has been substantially damaged or is proposed for substantial improvement may be elevated by jacking, intact, on an existing foundation provided the criteria of Section 74-206.5(a) are met in addition to the following criteria:

(i) Foundations shall contain a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding as provided in 44 C.F.R. § 60.3 and Section 5 of the Metropolitan North Georgia Water Planning District's Model Floodplain Management/Flood Damage Prevention Ordinance (2006);

(ii) The bottom of all openings shall be no higher than one foot above grade; and (iii) Openings may be equipped with screens, louvers or other coverings provided they permit the flow of floodwater in both directions.

(c) Elevation of existing structure via demolition and rebuilding on an equivalent footprint area. An existing structure that has been

substantially damaged or is proposed for substantial improvement may be demolished and relocated on the lot such that the passage of water is facilitated or the floodplain is otherwise enhanced or protected provided the criteria of

section 74-206.5(a) are met in addition to the following criteria:

(i) Foundations shall be designed to resist anticipated hydrodynamic loads, potential for debris impact, and scour pursuant to FEMA Technical Bulletin 1 (August 2008).

Foundations shall be designed with the following criteria:

(A) The total area of the walls below the base flood elevation exposed to flood waters shall be at least 50 percent open. Wall openings shall be distributed along all walls exposed to flood waters;

(B) The bottoms of all wall openings shall be at grade;

(C) Garage doors not allowing the natural flow of floodwaters when closed shall not be considered wall openings; and

(D) Openings may be equipped with grilles, louvers, or bars provided they allow the natural flow of floodwater in both directions.

(d) Flood protecting structures. Flood protecting structures within the historically modified floodplain is generally prohibited, unless expressly authorized by the provisions of this article. If expressly authorized under the provisions of this article, a structure may be flood protected in

accordance with the following criteria:

(i) Constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located three feet vertically beyond the nearest

base flood elevation;

(ii) Designed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy in accordance

with the following;

(A) A registered professional engineer or architect shall develop and/or review structural design, specifications, and plans for the construction, and shall certify that the design and methods of construction are in

accordance with accepted standards of practice; and

(B) A record of such certificate, which includes the specific elevation (in relation to mean sea level) to which such structures are flood proofed shall be filed and recorded in the land records of the county in which the property lies; and (iii) Fully enclosed areas below the lowest floor are usable solely for parking of vehicles, building access or storage in an area other than a basement and which are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or meet or exceed the following minimum criteria:

(A) A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided.

(B) The bottom of all openings shall be no higher than one foot above grade;

and

(C) Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters.

(Ord. No. 2013-20(13-O-1021), § 14, 5-29-13) Sec. 74-207. Enforcement.

The commissioner is authorized to enforce the requirements of this article in accordance with the procedures set forth in this section.

(a) Violations. Any person in violation of this article shall be subject to the general penalty set out in section 1-8 and shall be required to modify or remove the violation to achieve compliance with this article. Each day during which violation

or failure to comply continues shall he a separate violation.

(b) Stop work orders. The commissioner of the department of watershed management, and the commissioner of the department of city planning, or their respective designees, are each authorized to issue

stop work orders to any person that violates this article. Stop work orders shall be effective immediately and remain in effect until corrective actions have occurred.

(c) Building permit. If the City of Atlanta determines that a permittee has failed to comply with any provision of this article, the commissioner of the department of city planning or said commissioner's designee may suspend or revoke the building permit.

(d) Withhold certificates of occupancy or completion. The commissioner of the department of city planning or said commissioner's designee is authorized to refuse to issue certificates of occupancy

or completion for the building or other improvements constructed or being constructed on a site in violation of a stop work order until the owner has taken the remedial measures as set forth in the stop work order, or has otherwise corrected the violations described therein.

(e) Flood damaged and unusable structures in a floodplain. If a structure has been flooded and sustained damage to a degree that renders the structure unusable or uninhabitable, or otherwise presents a threat to public health, safety, welfare and environment, the owner shall repair or demolish the structure. Any such structure that remains in a damaged state fair at least 24 months shall be declared a public nuisance and may be abated by injunctive or other equitable relief according to the provisions of article V of this chapter.

(f) Violations deemed public nuisance. In addition to the enforcement processes and penalties provided herein, any condition caused or permitted to exist in violation of any of the provisions of this article that constitute a threat to public health,

safety, welfare, and environment may be declared and deemed a nuisance, and may be abated by injunctive or other equitable relief according to the provisions of article V of this chapter.

(Ord. No. 2013-20(13-O-1021), § 15, 5-29-13;

Ord. No. 2017-14(17-O-1157), § 6, 4-26-17) Sec. 74-208. Relationship to other laws.

(a) Compatibility with other regulations. This article is not intended to modify or repeal any other ordinance, rule, regulation, statute, easement, deed restriction or other provision of law.

The requirements of this article are in addition to the requirements of any other ordinance, rule, regulation or other provision of law, and where

any provision of this article imposes restrictions different from those imposed by any other

ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or

imposes higher protective standards for the riparian environment shall control.

(b) Relationship to 42 U.S.C. 4001 et seq. This article is enacted pursuant to the National Flood Insurance Act of 1968 (42 U.S.C. 4001 et seq.).

44 C.F.R. § 60.1 et seq., and to implement the requirements of the Metropolitan North Georgia Water Planning District Act, O.C.G.A. § 12-5-570 et seq. Words and phrases used in this article

which are defined in the National Flood Insurance Program rules and regulations codified at 44 C.F.R. § 59.1 et seq. and effective December 1, 1976 (41 FR 46968 et seq.), and as they may be

revised, shall have the meanings set out in such rules and regulations unless the context in which such words or phrases are used in this article

clearly imports a different meaning, or unless otherwise defined herein.

(c) Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be adjudged invalid by a

court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this article.

(Ord. No. 2013-20(13-O-1021), § 16, 5-29-13) Sec. 74-209. Indemnity agreements.

The city finds that the construction of new structures, the elevation and flood protecting of existing structures, the installation of a swimming pool or other in-ground water features, or the construction of a parking lot in a special flood hazard area generally will not result in increased flood heights, additional threats to public safety, extraordinary public expense, or the creation of a nuisance. However, as stated in Atlanta City

Code section 74-201(b), such improvements may be subject to inundation under certain conditions. Therefore, prior to the issuance of any permit for construction of a new structure, the

elevation of an existing structure, the installation of a swimming pool or other in-ground water feature, or the construction of a parking lot in a special flood hazard area, the owner of the

subject property shall execute an indemnification and hold harmless agreement, in a form provided by the city, which shall state at a

minimum, that owner shall indemnify and hold harmless the city for any damages or claims for damages, suits, costs, judgments losses, and injuries arising out of the owner's construction, maintenance, use or removal of said improvements. The indemnification shall be filed and recorded in the land records of the county in

which the property lies and shall be a permanent covenant running with the land and shall be

binding upon the successors in title of the owner.

(Ord. No. 2013-20(13-O-1021), § 17, 5-29-13) Sec. 74-210. Appeal.

(a) Within 30 days of the date of the denial or issuance of a permit, aggrieved or adversely affected parties may file an appeal with the commissioner. Such appeal shall be in writing and shall include a copy of the initial denial or issuance of the permit.

(b) Upon receipt of an appeal, and for good cause, the commissioner may suspend the permit, or applicable portions thereof, pending review.

Within 30 days after receipt of an appeal, the commissioner shall make a determination and shall notify the appellant.

(c) The commissioner's determination may be appealed to the Superior Court of the County where the subject property is located. Such appeal shall be filed within 30 days of the date of issuance of the commissioner's determination as

provided in O.C.G.A. § 5-4-1 and will be reviewed under the standard provided by O.C.G.A. § 50-

13-19(h).

(Ord. No. 2015-36(15-O-1246), § 2, 7-15-15) Sec. 74-211. Letter of map change.

If a property owner feels their structure is improperly shown in a 100-year floodplain, the commissioner will direct them to complete the Federal Emergency Management Administration (FEMA) letter of map change process.

(Ord. No. 2015-36(15-O-1246), § 3, 7-15-15) Sec. 74-212. Proposed change in use of existing encroachments.

(a) Traditional floodplain. Existing structures in the traditional floodplain that are proposed for a redevelopment that will change the structure category (e.g., a multifamily structure redeveloped to a nonresidential structure) must comply with

the following:

(1) The proposed redeveloped structure shall be located not less than 15 feet horizontally and two feet vertically beyond the nearest base flood elevation.

(2) If due to site conditions, the redeveloped structure cannot comply with the 15-foot horizontal requirement, in accordance with section 74-212(a)(1), the structure may be elevated in accordance with sections 74-205.5(a) and 74-205.5(c).

(3) The proposed redeveloped structure must comply with the applicable requirements of section 74-205.1, 74-205.2 or 74-205.3.

(4) The type or degree of occupancy of the replacement structure must be less than the type or degree of occupancy of the original structure. (i.e. Multi-family or single-family occupancy may change to non-residential use but non-residential use may not change to residential).

(b) Historically modified floodplain. Existing structures in the historically modified floodplain that are proposed for redevelopment that will

change the structure category (e.g., a multifamily structure redeveloped to a nonresidential structure) must comply with the following:

(1) The proposed redeveloped structure shall be located not less than 15 feet horizontally and two feet vertically beyond the nearest base flood elevation.

(2) If due to site conditions, the redeveloped structure cannot comply with the 15-foot horizontal requirement, in accordance with section 74-212(b)(1), the structure may be elevated in accordance with sections 74-206.5(a) and 74-206.5(c)

(3) The proposed redeveloped structure must comply with the applicable requirements of section 74-206.1, 74-206.2 or 74-206.3.

(4) The type or degree of occupancy of the replacement structure must be less than the type or degree of occupancy of the original structure. (i.e. Multi-family or single-family occupancy may change to non-residential use but non-residential use may not change to residential).

(Ord. No. 2017-43(17-O-1393), § 5, 7-26-17) Secs. 74-213—74-274. Reserved.

ARTICLE VI-A. CHATTAHOOCHEE

TRAIL—PROCTOR CREEK

RESTORATION AREA REGULATIONS

Sec. 74-275. Intent, revision of policy and disclaimer.

(a) Intent. In order to support the restoration for a specific area adjacent to the Chattahoochee River, between Donald Lee Hollowell Parkway

and I-285, the intent of this article is to modify the application of the floodplain ordinance set

forth in article VI of this chapter 74 to allow the level of activities which would otherwise be

allowed by state and federal law.

(b) Statement of Policy. Within both traditional and historically modified floodplain areas, the

city has restricted all activities even those which state and federal law would otherwise allow.

While this policy has protected life and property, prevented or minimized the hazards and damage

which follow periods of severe inundation and reduced certain public costs, in certain areas of the city, revision of these restrictions has been found to be warranted where it is possible to

protect the natural function and character of the traditional floodplain and surrounding areas as

is required under state and federal law to explore future uses.

(1) The city finds that special consideration, to ensure that the restoration of properties within walking distance of the Chattahoochee River in the Restoration Area, is crucial to promote and ensure the

public health, safety and welfare, provide amenities for visitors, attract the investment necessary to make such improvements possible and spur further efforts in other areas.

(2) By allowing the restoration of flood areas such as that which will be authorized for the Chattahoochee Trail-Proctor Creek Restoration Area (the "restoration area"), whether in whole or in part, through the installation of new private water control infrastructure that can meet the requirements of state and federal law, it becomes possible to revitalize areas of the city in

or adjacent to the redevelopment area because of the increased quality of life, offered by its aesthetic and recreational value of the close proximity to the Chattahoochee River.

(3) The city further finds that as the restoration area attracts new investment for the installation of water control

infrastructure, the character of future growth therein and in adjacent areas can be designed to support the development of greenspace that will have a positive impact on communities in the area and the city as a whole.

(4) The city further finds that the construction of trails, including trails with elevated structures, in the restoration area can

play a vital role in connecting communities, provide enhanced recreational options for citizens and visitors, make large

amounts of greenspace available for enjoyment at minimal cost, and make it possible for more citizens and visitors to enjoy the Chattahoochee River by making

it more accessible will have a positive impact on communities in the area and the city as a whole.

(5) By establishing the redevelopment area, the city intends to institute a regulatory approach that protects the natural function and character of the traditional floodplain and surrounding areas as is

required under state and federal law and manages anticipates, manages, and encourages quality restoration of the banks of the Chattahoochee River.

(c) Disclaimer of liability. The Atlanta City Council finds the degree of flood protection provided by this article is reasonable and consistent with historically established and nationally accepted levels of protection based on scientific and engineering practices, even though larger floods can and will occur and flood heights may be increased by human-made or natural

causes and even though more stringent restrictions may apply in other parts of the city. This article VI-A does not imply that land outside the floodway, traditional floodplain, historically modified floodplain, special flood hazard area, or uses permitted within such areas will be free from

flooding or flood damages. This article VI-A shall not create liability on the part of the city or any elected official, officer or employee thereof for any flood damages that result from reliance on

this article or any administrative decision lawfully made hereunder.

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-276. Limits of Chattahoochee Trail—Proctor Creek Restoration Area.

The regulations in this article VI-A shall apply to the area set forth on the map attached in exhibit A which shall hereinafter be referred to as the Chattahoochee Trail - Proctor Creek

Restoration Area (the "restoration area").

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-277. Definitions.

The definitions set forth in section 74-203 are adopted as definitions for the use of this article VI-A; provided however that should any existing

definition in said section be amended or any new definition be added which would prevent the

water control infrastructure or greenspace and trails which would otherwise be allowed under applicable federal and state law, such definition shall be applied to this article VI-A in a manner which would allow such land development, land

development activity, land development project or infrastructure (collectively for the purpose of this article VI-A, the "regulated activities").

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-278. Permits required.

(a) None of the regulated activities described in this article which require an approval under federal or state law, including but not limited to section 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33 U.S.C. 1334 and

the Metropolitan River Protection Act ("MRPA"), codified at O.C.G.A. § 12-5-440 et. seq shall commence until such permits and a building permit from the city have been obtained.

(1) Permits from United States Army Corps of Engineers (USACE). Any review of the regulated activities described in this article VI-A which require a review under section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334 and a permit issued by

USACE shall be completed and the permit prior to further requests for the city to process other permits required.

(2) Metropolitan River Protection Act Certificate (MRPA Certificate). Applications for a MRPA Certificate or revisions to an application already submitted shall

be reviewed for completeness within a reasonable time, not to exceed 30 days, and either approved for submittal to the Atlanta Regional Commission or returned to the applicant with notations which state why such application cannot be submitted.

(3) City building permit application. Use of lands and buildings, and construction, reconstruction, repair, modification or demolition of any structure and / or any regulated activities, within all floodplains, including special flood hazard areas, which have received a MRPA certificate, shall also require review and approval of a permit by the commissioner or a designee who shall apply the standards set forth in this article, notwithstanding those limitations set forth elsewhere in this chapter. When article VI would otherwise prohibit regulated activities that would be allowed by this article VI-A, the permission granted by this article VI-A shall control, so long as compliance with

applicable federal and state law is maintained.

(b) Flood study or field run survey required.

The Federal Emergency Management Agency flood maps, more particularly described in section 74-202, adopted by the city are used for general reference purposes only. A flood study or a field run survey may be required to determine

the location and extent of the floodplain area on a specific parcel.

(1) Flood study. In an unmapped floodplain or in a mapped floodplain where elevation has not been established, a flood study may be required in order to establish

the base flood elevation. Such a flood study shall address, at a minimum, impact to upstream, downstream and adjacent properties, and the free flow of flood waters.

(2) Field run survey. In order to establish the horizontal extent of the vertical floodplain elevation, a field run survey may be required to establish the actual location of the limit when the proposed regulated activity is within the limits of a floodplain/floodway.

(3) A flood study or field run survey required under this subsection shall be certified by either a professional engineer or registered land surveyor.

(c) Review and approval. The commissioner shall authorize the approval of any city building permit for such regulated activities upon a finding, based on detailed plans and specifications submitted with the application for city building permit, that the regulated activity can be

completed and occupied or used in accord with the permission granted by any federal or state permit as required in this article VI-A and pursuant to city Code. No part of any such regulated activity shall be commenced before such permit approval has been issued and all other permits and licenses required by applicable law have been issued or obtained.

(d) Protection of existing flood storage and from protection from flooding. The commissioner shall not, by authorizing the approval of a permit under the authority of this article, authorize any use of land, where the effect thereof would be to decrease the volume of existing flood storage on that land or to increase flooding conditions

upstream, downstream or adjacent to that land.

(1) Protection of floodways. The floodway shall be that as defined in the flood insurance study, City of Atlanta, Georgia, Fulton and DeKalb County, Federal Emergency Management Agency, revised June 22, 1998, and as it may be subsequently revised or extended. On those watercourses and rivers regulated hereunder where the floodway has not been defined in the said flood insurance study and until such time as these watercourses and rivers are defined in an officially adopted or revised flood insurance study, the floodway shall be defined as the channel of the watercourse or river and the adjacent areas of the defined or undefined floodplain that must be reserved in order to discharge the 100-year base flood without cumulatively increasing the water surface elevation more than one foot upstream of, downstream of, or at the point being considered. Except as a part of a plan approved by the commissioner and as allowed by federal and state law, no fill or encroachments shall be permanently placed within the defined floodway that would impair the ability to carry and discharge the waters resulting from the 100-year base flood.

(2) Floodplain protection. Land development, land development activities or land development projects in the floodplain

shall be permitted only when the resulting configuration results in no loss of existing flood volume. Any land development, land development activities or land development projects activities within

the floodplain shall be subject to requirements of stream bank buffer limits and should be constructed using best management practices for soil erosion and sedimentation control. The use of

compensating excavation or contouring;

procedures to modify flood hazard limits may apply to install necessary public roadway and utilities within the flood limits to support existing and new development or to restore riparian buffer areas.

(3) All applications for permits issued by the commissioner which would allow any use or construction wholly or partly in a special flood hazard area shall include detailed plans and specifications which demonstrate that no expansion of a special flood hazard area would result from the work which would be authorized by any such permit. Any comments or requirements endorsed on such plans and specifications or on an addendum thereto,

by the commissioner shall become a part of any permit issued for the work covered by the plans and specifications and shall be enforced as are all other requirements applicable to such permit.

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-279. Appeal.

(a) Within 30 days of the date of the denial or issuance of a city permit, aggrieved or adversely affected parties may file an appeal with the

commissioner. Such appeal shall be in writing and shall include a copy of the initial denial or issuance of the permit.

(b) Upon receipt of an appeal, and for good cause, the commissioner may suspend the permit, or applicable portions thereof, pending review.

Within 30 days after receipt of an appeal, the commissioner shall make a determination and shall notify the appellant.

(c) The commissioner's determination may be appealed to the Superior Court of the county where the subject property is located. Such appeal shall be filed within 30 days of the date of issuance of the commissioner's determination as

provided in O.C.G.A. § 5-4-1 and will be reviewed under the standard provided by O.C.G.A. § 50-

13-19(h).

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-280. Relationship of this article to city code sections 16-23.001 et.

seq.

(a) In acknowledgement of the requirement set forth in O.C.G.A. § 12-5-444(b)(1) which state that after the Atlanta Regional Commission's

adoption of the Chattahoochee Corridor Plan (the "Corridor Plan") or any amendment thereto, that it shall be unlawful within such regulated areas for any person to engage in any landdisturbing activity which will be incompatible or inconsistent with the Corridor Plan or any amendment thereto and that proposed land or water use shall be deemed to be not in compliance

therewith unless and until the city, as the governing authority of the political subdivision issues a certificate for the proposed use pursuant to Code section 12-5-445 that for the city such requirement is satisfied pursuant to the procedures set forth in city Code sections 16-23.001 et. seq., the following shall be the rules of construction for the application of those sections:

(1) Section 16-23.007 provides that "The Metropolitan River Protection Act (MRPA), Georgia Laws 1973, Act No. 66 establishes requirements and procedures supplementary to those set forth generally or for specific districts in this part as follows" and set forth certain representations about state law which are modified by section 16-23.008.

(2) Section 16-23.008 provides that to the extent that the provisions set forth in abbreviated form in section 16-23.007 ("Summary of provisions of Metropolitan River Protection Act affecting local zoning") or "other MRPA provisions, supplement or alter procedures or requirements on use of land or construction and use of buildings in the Chattahoochee

[Corridor], such sections or subsections shall apply as though set forth in full herein" and thereby states that said that section 16-23.008 intends to incorporate the operation of all provisions of the Metropolitan River Protection Act, including amendments. when the same become effective and that such provisions will

supersede the provisions of section 16-23.007.

(3) This article which modifies the floodplain ordinance set forth in article VI of this chapter 74 for the redevelopment area, to allow the level of activities which would otherwise be allowed by state and federal law shall be used by any city agency which bases any decision on the city's floodplain ordinance.

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-281. Installation of water control infrastructure.

(a) As approved in the MRPA certificate, water control infrastructure installed for the purpose of restoration of the banks of Chattahoochee

River, including without limitation, stormwater and floodwater control may be allowed in traditional floodplain areas if designed and constructed to minimize and mitigate impact and are designed such that there is no net loss in flood plain storage volume.

(b) Properties benefitting from the water control structures approved under the MRPA certificate may be subdivided into different ownership that can be acknowledged as separate parcels, provided that sufficient arrangements are made

for the permanent maintenance of any infrastructure designed and constructed to minimize and mitigate impact on the traditional floodplain, and to reach the goal of no net loss in flood storage volume. Such arrangements shall

be approved by the commissioner and recorded in the records of the Clerk of the Superior Court of Fulton County as a covenant which runs with

the property and shall bind subsequent transferees.

(c) As a part of the installation of water control structures approved under the MRPA certificate, applicants shall be allowed to install limited amenity facilities in conjunction with

such strucutres, including, but not limited to, educational facilities demonstrating the use of the water control structures and other restoration activities, walking trails, observation decks, and public recreation areas, which may include

limited commercial activities.

(d) City approval of the transfer of any federal or state tax credits, received by any property

owner for the installation of any water control structures, shall not be required.

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-282. Specific standards.

In all areas of the special flood hazard where base flood elevation data has been provided, the following provisions are required:

(a) Non-residential construction. The elevation of new construction or substantial improvement of any non-residential building installed as a part of any water control features shall have the lowest

floor, including basement, elevated to the greater of either; three feet above the base flood elevation or two feet above the highest observed flood. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided.

(b) Ancillary structures. Ancillary structures are allowed if designed and constructed to minimize and mitigate impact on the floodplain in a manner that will not result in a net loss in flood storage volume or otherwise violate the provisions of this article or the MRPA cerfiticate.

(c) Elevated buildings. All new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.

(1) Basic requirements for elevating structures. The following requirements apply to the elevation of any structure within the redevelopment area:

a. Design and construction of elevated structures shall utilize methods and practices that minimize flood damage and current and future encroachment into the floodway and any historically modified floodplain;

b. The elevation of the structure's lowest floor shall be the greater of either; three feet above the base flood elevation or two feet above the highest observed flood;

c. Elevated structures shall be constructed with materials and utility equipment resistant to flood damage in accordance with FEMA

Technical Bulletin "Flood DamageResistant Materials Requirements" August 2008, or as amended;

d. The area below the lowest floor of an elevated structure shall be flood resistant, unfinished, and designed with piers or wall openings to facilitate the natural flow of floodwaters under the structure;

e. The unfinished and flood-resistant area below the lowest floor shall remain unoccupied and shall only be used for parking vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area;

f. Stormwater management facilities and grease traps with backflow prevention devices that are properly designed to be isolated from flood waters may be allowed;

g. The interior portion of the area below the lowest floor shall not be partitioned or finished into separate rooms; provided however, the minimum area necessary for access to upper floors may be finished with flood damage-resistant materials in accordance with FEMA Technical Bulletin "Flood Damage-Resistant Materials Requirements" August 2008, or as amended;

h. Elevated structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;

i. Heating and air conditioning equipment and components (including ductwork), electrical, ventilation,

plumbing equipment (including water heater), and other service facilities shall be located at least three feet above the base flood elevation or two feet above the highest observed flood (whichever is greater)

to prevent water from entering or accumulating within the components during conditions of flooding;

j. Designs for complying with the requirements of this article shall be certified by either a professional engineer or architect;

k. Landings and stairs that allow for the natural flow of floodwaters will be allowed for minimum entry access;

l. If the proposed elevated structure is located in multiple flood zones or if multiple base flood elevations cross the site, the higher or most protective base flood elevation shall take precedence;

m. The design shall provide for the drainage of floodwaters in not less than 72 hours pursuant to FEMA Technical Bulletin 1 (August 2008);

and

n. A file-stamped copy of an elevation certificate filed in the land records of the county in which the property is located shall be submitted to the commissioner prior to the issuance of a certificate of occupancy. This elevation certificate shall be prepared by a licensed surveyor and shall document the elevation of the lowest floor relative to mean sea level and compliance with the ordinance.

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-283. Installation of trails and trail structures.

Trails and trail structures, including elevated walkways and observation, is specifically allowed if permitted by a MRPA certificate.

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-284. Relationship to other laws.

This article is intended to comply with the National Flood Insurance Act of 1968, as amended (42 U.S.C. 4001 et seq.) which was enacted to

mitigate and reduce the nation's comprehensive flood risk through the development and implementation of federal floodplain management standards, and to implement the requirements of the Metropolitan River Protection Act ("MRPA"), codified at O.C.G.A. § 12-5-440 et.

seq. Words and phrases used in this article which are defined in the National Flood Insurance Program rules and regulations codified at 44 C.F.R. § 59.1 et seq. and effective December 1, 1976 (41 FR 46968 et seq.), and as they may be

revised, shall have the meanings set out in such rules and regulations unless the context in which such words or phrases are used in this article

clearly imports a different meaning, or unless otherwise defined herein.

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Sec. 74-285. Severability.

If the provisions of any section, subsection, paragraph, subdivision or clause of this ordinance shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or

invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this ordinance.

(Ord. No. 2021-61(21-O-0719), § 1, 12-15-21) Secs. 74-286—74-299. Reserved.

ARTICLE VII. RIPARIAN BUFFER

REQUIREMENTS

Sec. 74-300. Title, authority, and purpose.

(a) Title. This article may be cited as the "City of Atlanta Riparian Buffer Ordinance."

(b) Authority. This article is enacted pursuant to the city's authority under Ga. Const. Art. IX, § II (Home Rule and supplementary powers);

O.C.G.A. § 36-35-1 et seq. (Municipal Home Rule powers); Atlanta City Charter §§ 1-102(b), 1-102(c)(42), and 1-102(c)(46); and to implement the requirements of the Metropolitan North

Georgia Water Planning District Act, O.C.G.A.

§ 12-5-570 et seq.

(c) Purpose. The purpose of this article is to maintain stream water quality and protect water resources by protecting buffer areas along the streams and wetlands of the city; to minimize development within such buffers by requiring authorization for any development; to provide additional protection for streams and wetlands within the city beyond the buffer areas mandated by the State of Georgia; to minimize public and

private losses due to erosion, siltation, and water pollution; and to promote the safety, health,

peace, and general welfare of the city and its inhabitants.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 1, 4-27-10) Sec. 74-301. Findings and applicability.

(a) Findings. The City of Atlanta finds that buffers adjacent to streams and wetlands are beneficial to water quality because they:

(1) Protect, restore, and maintain the chemical, physical and biological integrity of streams and their water resources;

(2) Improve surface water, urban stormwater runoff, and groundwater quality by filtering pollutants, nutrients, sediment,

and other contaminants;

(3) Reduce erosion and sedimentation;

(4) Protect and stabilize stream banks and stream channels;

(5) Maintain base flow of streams by aiding in groundwater recharge, and thereby protect dry weather low flows in streams;

(6) Contribute organic matter that is a source of food, energy, and habitat for the aquatic ecosystem;

(7) Provide tree canopy to shade streams and promote desirable aquatic habitat including but not limited to the moderation of water temperature in streams;

(8) Provide and protect riparian wildlife habitat and wildlife migration corridors;

(9) Offer educational and recreational opportunities; and

(10) Protect greenspace.

Therefore, the city finds that the protection of the streams, wetlands, and the areas adjacent to them is vital to the safety, health, peace, and

general welfare of the city and its inhabitants.

(b) Applicability. This article shall apply to both public and private property within the city.

This article shall be administered in its entirety by the department of watershed management

unless otherwise specified herein.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 2, 4-27-10) Sec. 74-302. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

(1) Authorized encroachment means development in the buffer authorized by the technical panel allowing an activity

otherwise prohibited by this article.

(2) Applicant means the person who applies for an authorized encroachment and who must be the owner of the real property containing the buffer or an authorized agent of the owner.

(3) Best management practices (BMPs) means a collection of sound conservation and engineering practices, and vegetative measures to prevent or minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia, as referenced in section 74-302(16).

(4) Buffer means the area of land lying adjacent to a wetland or stream in which development is prohibited or limited as more particularly set out in section 74-303.

(5) City means City of Atlanta.

(6) Commissioner means the commissioner of the department of watershed management or a designee.

(7) Department means the department of watershed management or its successor agency.

(8) Development means any human-made change to improved or unimproved property that includes, but is not limited to, construction of buildings or other structures, mining, dredging, filling, clearing and grubbing, clearing, grading, paving, installation of impervious cover,

excavation or drilling, storage of equipment or materials, or any construction activity.

(9) Effective date means the date of adoption by city council and approval by the mayor of the Riparian Buffer Ordinance on December 11, 2001.

(10) EPD means the Environmental Protection Division of the State of Georgia Department of Natural Resources.

(11) Existing lot means a parcel of land that was both:

(i) approved by the director of the bureau of planning or incorporated in the city's official cadastral maps prior to the effective date, or approved later than the effective date but was initiated by an application for subdivision completed and filed on or before May 25, 2001,

with all necessary supporting documentation according to the Atlanta City Code, and (ii) recorded in the records of the Clerk of the Superior Court of Fulton or DeKalb County.

(12) Extreme hardship means a unique or special condition more particularly set out in section 74-306(b)(3) proposed by an applicant as grounds for the grant of an authorized encroachment on a new lot.

(13) Georgia Stormwater Management Manual means the guide, First Edition (August 2001 or as updated), published by the Atlanta Regional Commission and adopted by reference in section 74-508 of the Atlanta City Code, and commonly referred to as the "Blue Book." The Georgia Stormwater Management Manual is currently available from the Metropolitan North

Georgia Water Planning District (http:// www northgeorgiawater.com or http:// www georgiastormwater.com).

(14) Hardship means a unique or special condition, more particularly set out in section 74-306(a)(1), and not to include lesser

property value by comparison to properties in the vicinity, proposed by an applicant as grounds for the grant of an

authorized encroachment.

(15) Impervious cover or surface means any paved, hardened, or structural surface, regardless of material. Impervious cover or surface includes, but is not limited to buildings, rooftops, driveways, streets, roads, parking lots, swimming pools, dams, gaming courts, decks, any concrete or asphalt, and any other surfaces or structures that will substantially reduce or prevent the infiltration of water.

(16) Manual for Erosion and Sedimentation Control in Georgia means the guide published by the Georgia Soil and Water Conservation Commission specified in O.C.G.A. § 12-7-6(b) and adopted by reference in section 74-40(a) of the Atlanta City Code and commonly referred to as

the "Green Book." The Manual for Erosion and Sedimentation and Control in Georgia is currently available from the

Georgia Soil and Water Conservation Commission (http://www.gaswcc.org).

(17) Mitigation means measures undertaken to protect, restore, or enhance a stream, wetland, or buffer in order to compensate for or reduce the adverse impacts of development within a stream, wetland, or buffer, and more particularly set out in section 74-306(d).

(17.1) Multi-family residential development means a building containing three or more dwelling units whether or not the building is for a mixed-use.

(18) New lot means a parcel of land that:

(i) was approved by the director of the bureau of planning after the effective date, and was not initiated by an application for subdivision

completed and filed on or before May 25, 2001, and;

(ii) is recorded in the records of the Clerk of the Superior Court of Fulton or DeKalb County.

(19) Normal stream flow means any stream flow that consists of base flow during any period of the year under normal meteorological conditions. Base flow results from groundwater that enters the stream channel through sub-surface flow and includes spring flows into streams.

Base flow does not include surface water entering stream channels immediately after precipitation.

(20) On-site sewage management system means a system that includes a septic tank, absorption field and any other elements intended to be used for management and disposal of sewage on-site, as specified in GA Comp. R. & Regs. § 290-5-26-.02(gg) and as regulated by O.C.G.A. §§ 12-5-20 et seq.

(20.1) Redevelopment means a development project on a previously developed site.

(21) Stream means any watercourse that sustains normal stream flow during any period of the year under normal meteorological conditions.

(22) Stream channel means the portion of a watercourse in a well-defined channel that contains the base flow of the stream.

(23) Technical panel means at least three department of watershed management staff professionals designated by the commissioner in accordance with section 74-307 who hold periodic meetings,

develop procedures, make determinations, and maintain the public record in order to process applications for

authorized encroachments.

(24) Waters of the state means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation, as provided by O.C.G.A. § 12-7-3(16).

(25) Well means an excavation or constructed opening into the ground from which groundwater is sought or obtained.

(26) Wetlands means those areas, delineated in accordance with the U.S. Army Corps of Engineers Wetlands Delineation.

Manual, 1987 as amended that under normal conditions contain hydric soils, hydrophytic vegetation, and hydrologic conditions reflecting temporary or permanent inundation or saturation by surface or ground water. Wetlands generally include swamps, marshes, bogs, and similar areas and typically support a

prevalence of vegetation adapted for life in saturated soil conditions.

(27) Wrested vegetation, point of means that point at the edge of a stream where vegetation has been moved or wrested as a result of normal stream flow or wave action.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 3, 4-27-10; Ord. No. 2012-01(11-O1840), § 3, 1-26-12; Ord. No. 2022-37(22-O1714), § 1, 10-26-22) Sec. 74-303. Buffer requirements.

From and after the effective date of this ordinance, no person shall conduct development within the buffers set out as follows:

(a) City of Atlanta Stream Buffer. Streams shall have a 75-foot, natural, undisturbed, vegetative buffer measured perpendicularly and horizontally on both sides of the stream from the point of wrested vegetation.

(b) City of Atlanta Wetlands Buffer. Wetlands shall remain in their natural state and shall have a minimum 25-foot, natural, undisturbed, vegetative buffer measured horizontally and perpendicularly on all sides of the wetland (where applicable) from the edge of the wetland as determined and delineated in accordance with section 74-401 et seq. of the Atlanta City Code. Wetlands lying in part or in whole within a stream buffer shall have a buffer that includes the extent of the wetland within the stream buffer, plus the wetland buffer.

(c) Water Supply Watershed Buffer. The water supply watershed buffer applies to streams that are both tributary to a water supply and within a seven-mile radius of the boundary of a reservoir. A map of the Water Supply Watershed Buffer (which currently consists of the Long Island Creek Basin) shall be maintained for public inspection in the department of watershed management. The following buffer requirements shall apply from and after January 13, 2009:

(1) A natural, undisturbed vegetative buffer shall be maintained for a distance of 100 feet measured perpendicularly and horizontally on both sides of the stream from the point of wrested vegetation.

(2) No impervious surfaces or on-site sewage management systems shall be constructed within a distance of 150 feet measured perpendicularly and horizontally on both sides of the stream from the point of wrested vegetation.

(d) Waters of the State Buffer. As required by O.C.G.A. § 12-7-6 and section 74-43(c)(15) of the Atlanta City Code, waters of the state not otherwise covered by this article shall have a 25-foot, natural, undisturbed, vegetative buffer measured perpendicularly and horizontally from the point of wrested vegetation.

(e) Measuring of buffers. For purposes of measuring buffers set out in this section, if wrested vegetation is not present due to a human-made modification, removal, or replacement of the stream bank with a structure (e.g. concrete lining, gabions, retaining wall, or rip rap), the buffer shall be measured from the top of the structure or point of modification or removal.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 4, 4-27-10; Ord. No. 2012-01(11-O1840), § 4, 1-26-12) Sec. 74-304. Stream crossing requirements.

Construction or repair of structures that cross streams, including but not limited to those exempt under section 74-305, shall be subject to the

following:

(a) A hydraulic analysis prepared, signed, and sealed by an engineer registered to practice in the State of Georgia is required for any proposed stream crossing. The analysis shall demonstrate that the proposed crossing will not adversely impact upstream and downstream properties during a 100-year flood; and

(b) Free-span techniques shall be employed to prevent blockage or constriction of natural drainage ways; and

(c) Approximately perpendicular crossing angles shall be employed; provided, however, crossings shall be aligned to minimize buffer disturbance to the maximum extent practicable; and

(d) Best management practices shall be utilized, stream banks shall be properly stabilized, and buffers shall be vegetated in accordance with the City of Atlanta Buffer Revegetation Guidelines.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 5, 4-27-10) Sec. 74-305. Exemptions.

(1) Subject to protection of the buffer to the maximum extent practicable and compliance with stream crossing requirements set out in section 74-304, the construction, operation, and maintenance of the following are exempt from

the authorized encroachment requirements of section 74-306:

(a) Existing public streets, utilities, and related appurtenances;

(b) Stream crossings for public or private utility lines, and for streets and stormwater infrastructure and related appurtenances required to be dedicated

to the city;

(c) Public drinking water, public wastewater, and public stormwater infrastructure and related appurtenances and treatment facilities;

(d) Multi-use trails, pedestrian bridges, and associated appurtenances listed in the City of Atlanta Comprehensive Development Plan; provided, however, section 74-306(d) shall apply;

(e) A single driveway necessary to provide access to an existing lot;

(f) Environmental monitoring and remediation activities such as water quality monitoring, stream gauging activities,

and soil and groundwater monitoring or remediation;

(g) Removal of dead, dying, diseased, or hazardous trees, provided, however, no grading or stump removal shall be conducted, and such removal is authorized by the city arborist pursuant to section 158-26 et seq. of the Atlanta City Code;

(h) Removal without replacement of existing impervious cover from the buffer; and

(i) Activities to protect, restore, or enhance stream bank stability, vegetation, water quality, or aquatic habitat, or minor landdisturbing activities as set out in O.C.G.A.

§ 12-7-17(3); provided, however, no grading shall be conducted.

(2) Activities conducted on City of Atlantaowned public lands by the City of Atlanta for the purpose of stream restoration, buffer enhancement, bank stabilization, invasive species management, vegetated infiltration best management practices (BMPs) as defined in section 74-513(a) of the Atlanta City Code, vegetated green

infrastructure as defined in section 74-503 of the Atlanta City Code, or other ecological improvements, provided that such activities are designed to improve water quality, habitat, and buffer

function, shall be exempt from the requirements of this article.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 6, 4-27-10; Ord. No. 2026-19(26-O1216), § 1, 4-29-26) Sec. 74-306. Authorized encroachments.

The technical panel may authorize an encroachment to allow development within the buffer upon a showing by the applicant that due to

site-specific conditions, the buffer required by this article would result in a hardship or extreme hardship; provided however, the grant of such

encroachment shall require mitigation such that post-development conditions are at least as protective of water quality as pre-development conditions and as otherwise required by subsection (d).

An authorized encroachment may be granted in accordance with the following:

(a) Existing lots of record. In addition to the requirements set out in (c), (d) and (e) of this section, the technical panel may grant an authorized encroachment subject to the requirements of this article on existing lots of record (as defined herein):

(1) The technical panel may grant an authorized encroachment subject to the requirements of this ordinance when literal enforcement of the required buffer would result in a hardship, and no reasonable alternative to an authorized encroachment exists; and

(2) No authorized encroachment shall be granted to an existing lot of record that allows for development unless it is a redevelopment that meets the requirements of subsection 74-306(a)(3) of this article or a single- or two-family residential

development; and

(3) No authorized encroachment shall be granted for redevelopment of an existing lot of record unless the redevelopment:

(i) Results in a net reduction of the buffer encroachment from the existing condition, the redevelopment is designed to minimize the degree and impact of the encroachment, and the result of redevelopment is an overall improvement of buffer's ability to provide water quality and other

environmental benefits, or (ii) Is for the purpose of multifamily residential development and the proposed encroachment is

located in the outermost 25 feet of the buffer, the redevelopment is designed to minimize the degree and impact of the

encroachment, and the result of redevelopment is an overall improvement of buffer's ability to provide water quality and other environmental benefits.

(b) New lots of record. In addition to the requirements set out in (c) and (d) of this subsection, no authorized encroachment shall be granted to a new lot of record except in the case of an extreme hardship. An extreme hardship shall be based upon on a showing by the applicant (set

out more particularly in section 74-308) that no reasonable alternative for compliance exists and denial of such authorized encroachment would result in one of the

following:

(1) Non-compliance with applicable state or federal regulatory law, including, in particular, the Americans with Disabilities Act of 1990; or

(2) Severe and unavoidable hazard to public health or safety; or

(3) Severe and unavoidable harm to the environment;

Provided, however, neither lesser property value by comparison to properties in the vicinity, nor compliance with this or other applicable ordinances shall constitute grounds

for extreme hardship.

(c) All lots of record. The following are applicable to all authorized encroachments.

(1) Authorized encroachments shall not be granted that reduce the buffer to a width less than the minimum standards established by O.C.G.A.

§§ 12-2-8, 12-7-6, or federal law.

(2) Authorized encroachments shall not be granted for a distance, location, or activity that is greater than necessary to alleviate a hardship or extreme hardship imposed by a strict

application of this article.

(3) Actions of a property owner that have created a hardship or extreme hardship shall not constitute grounds for granting an authorized encroachment.

(4) The granting of a zoning variance shall not create a right to an exemption under section 74-305 or the grant of an authorized encroachment under section 74-306.

(5) Authorized encroachments shall not be granted for wells, on-site sewage management systems, detention ponds, or underground stormwater detention facilities, except upon a showing by the applicant of an extreme hardship as set out in section 74-306(b)(3).

(6) Authorized encroachments shall not be granted for impervious gaming courts.

(7) Authorized encroachments shall be designed to maximize the area of the buffer where sheet flow discharge of stormwater occurs. The sheet flow of stormwater through the entire buffer shall be the goal of the design.

However, where redirection of stormwater is necessary for drainage control, vegetated swales shall be

utilized where practicable.

(d) Mitigation generally. Mitigation shall be required as a condition for the grant of an authorized encroachment in order to ensure that post-development conditions are at least as protective of water quality as pre-development conditions. Mitigation shall be proposed by the applicant in accordance with guidance prepared by

the department of watershed management that shall include, at a minimum, the following options:

(1) Stormwater quality improvement measures or stormwater quantity reduction measures as specified by the Georgia Stormwater Management Manual;

(2) Stream or wetland restoration;

(3) Buffer revegetation as specified in the City of Atlanta Buffer Revegetation Guidelines, which shall be maintained by the department of

watershed management and available for public inspection;

(4) Reduction of run-off beyond predevelopment levels;

(5) Removal of existing impervious surfaces;

(6) Buffer compensation; or

(7) Green Infrastructure or low impact development practices designed in accordance with the Coastal Stormwater Supplement of the Georgia Stormwater Management Manual.

(e) Mitigation for certain multifamily residential development. Multifamily residential development referred to in subsection (a)(3)(ii) shall comply with the following mitigation requirements, in addition to the mitigation required in (d) above:

(1) Exceed the minimum post-development stormwater runoff reduction or water quality protection measures

referred to in section 74-513 of the Atlanta City Code by a minimum of 50 percent; and

(2) Onsite streams and wetlands must be restored to their natural state.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 7, 4-27-10; Ord. No. 2012-01(11-O1840), §§ 1, 2, 5, 1-26-12; Ord. No. 2022-37(22- O-1714), § 2, 10-26-22)

Sec. 74-307. Technical panel.

The commissioner shall designate a technical panel for the review and processing of applications for authorized encroachments. The technical panel shall be comprised of at least three staff professionals in the department of watershed management certified by the Georgia Soil and

Water Conservation Commission pursuant to O.C.G.A. § 12-7-19 in the field of pollution, erosion, and sedimentation control at the plan reviewer level (Level II). Technical panel members shall serve for a period of two years renewable by the commissioner, and should have expertise in

the following areas: stream buffer revegetation, erosion and sedimentation control, stream and

wetland restoration, mitigation (as defined herein), and riparian habitat restoration. The technical

panel shall meet not less than once monthly, shall develop procedural rules, maintain a docket, and make records available for review upon

request.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 8, 4-27-10) Sec. 74-308. Contents of an application for

an authorized encroachment.

(a) Applicants shall apply for an authorized encroachment on a form supplied by the department and in a format specified by the department. An application shall include, at a minimum, the following showings by the applicant:

(1) Documentation that the lot was recognized by the city either on or before the effective date of this ordinance (as defined herein), or after the effective date of this

ordinance;

(2) A written description of the project, including details of the buffer disturbance

(3) Documentation of hardship or extreme hardship should the authorized encroachment application be denied;

(4) Alternative plans which attempt to meet the same development goals as the original site plan while preventing buffer intrusion, and an explanation of why the alternative development is not feasible;

(5) Demonstration that impact to the stream buffer will be minimized and that impact only occurs to the extent necessary to remove a hardship or extreme hardship;

(6) Signature of the applicant; and

(7) A site plan that depicts the physical characteristics of the property, including, at a minimum, the following:

(i) Waters of the state, streams, wetland delineation, floodplain boundaries, other natural features, and all buffers as determined by a field survey;

(ii) Property boundaries, size, existing and proposed topography, slopes, soil types, vegetation, and other relevant physical characteristics of the property;

(iii) Locations of both existing and proposed structures, utilities, stormwater facilities, impervious surfaces, and the boundaries of the area of

soil disturbance both inside and outside of the buffer. The area of the buffer to be impacted shall be accurately and clearly delineated, and shall show the total area and length of buffer disturbance;

(iv) Erosion and sedimentation control measures in accordance with the Manual for Erosion and Sediment Control in Georgia to prevent the migration of sediment into streams, wetlands, or waters of the state;

(v) 100-year flood components for all streams with elevations and contour locations as they cross the property.

Where 100-year flood elevations have been determined by the Federal Emergency Management Agency Flood Insurance Rate Maps, or where other studies deemed acceptable by the department exist, those elevations shall be used. In areas that have not been studied by the Federal

Emergency Management Agency as shown on flood insurance rate maps, the technical panel may require a 100-year flood study prepared in accordance with Atlanta City Code Chapter 74, Article V, and prepared by a professional engineer or hydrogeologist currently licensed in the State of Georgia;

(vi) Proposed mitigation for the buffer disturbance in accordance with section 74-306(d).

(b) The technical panel may require other information deemed necessary to evaluate an application including, but not limited to, engineering analysis of stream

dynamics, cross sections and profiles, details of proposed mitigation, and modifications to site plans.

(c) The applicant shall certify that all information provided in the application and all supporting documentation is true and correct. The omission or misrepresentation of material fact in connection with the application shall be grounds for denial.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 9, 4-27-10; Ord. No. 2022-37(22-O1714), § 3, 10-26-22) Sec. 74-309. Technical review.

Within 30 days of receipt of a substantially complete application, the technical panel shall conduct a technical review, which shall include, at a minimum, an evaluation of the following:

(a) Whether the application meets the requirements of section 74-308 and provides sufficient information to proceed with review;

(b) Whether the application contains a disqualifying characteristic that makes the applicant ineligible for an authorized encroachment;

(c) Whether the proposed encroachment is on a wetland, 100-year floodplain, or other location that is inappropriate for development;

(d) Whether the property owner has demonstrated a hardship or an extreme hardship;

(e) Whether, in light of the showings by the applicant required by section 74-308, the applicant has demonstrated that the location and extent of the proposed buffer encroachment has been minimized;

(f) Whether alternative designs are possible which require less intrusion or no intrusion;

(g) Whether, in light of the mitigation proposed by the applicant in accordance with section 74-306(d), the post-development conditions will be at least as protective of water quality as pre-development conditions;

(h) Whether the proposed development meets all other requirements of this ordinance;

and

(i) Whether the property to be affected by the authorized encroachment has no reasonable use given, but not limited to, the current zoning if the authorized encroachment is denied.

Upon completion of technical review, the technical panel shall either request modifications, or in the event compliance with the applicable criteria is not possible, deny the application for authorized encroachment.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 10, 4-27-10; Ord. No. 2022-37(22-O1714), § 4, 10-26-22) Sec. 74-310. Public notice of application,

public comment, and maintenance of public record.

Public notice and the opportunity for public comment is required as a condition for the grant of an authorized encroachment. The purpose of

public notice and comment is to provide an opportunity for public input and engagement on the proposed encroachment, and to provide the technical panel with relevant information consistent with the requirements of this ordinance.

(a) Public comment. The public may comment on any application for an authorized encroachment during the pendency of

the application. Public comments may be submitted in writing to the attention of the riparian buffer technical panel in the department of watershed management or may be made during a hearing at which the technical panel considers the application. Public comments shall be timely and must identify the application to which they pertain. Public comments shall be made part of the application file.

(b) Public notice. The applicant shall notify the public of the application for an authorized encroachment in accordance with this section. The technical panel is authorized to develop standards and procedures for posting of notice, which shall, at a minimum, include the following:

(1) The applicant shall notify all owners of real property adjoining the stream or wetland for a distance of 200 feet upstream and 500 feet downstream as measured from the property line contiguous to the stream or wetland that an authorized encroachment is being requested. The notice shall be sent via U.S. mail, shall contain a copy of the application and the information listed in section 74-310(c), and shall be postmarked within 14 days of the date the application is submitted; and

(2) The applicant shall notify the chairperson of the NPU in which the subject property is located that an authorized encroachment is being requested. The notice shall be sent via U.S. mail, shall contain a copy of the application and the information listed in section 74-310(c), and shall be postmarked within 14 days of the date the application is submitted;

and

(3) The city shall post a sign on the property for which the authorized encroachment is being sought in accordance with the following specifications:

(i) Post one sign adjacent to each street the property abuts for every 600 feet of frontage;

(ii) The sign shall contain the words "stream buffer encroachment" in letters not less than three inches high;

(iii) The sign shall be legible and posted in a conspicuous place on the property so it can be easily viewed from the public street on which the property fronts;

(iv) The sign shall be at least one and one-half feet by two feet;

(v) The sign shall contain all information in section 74-310(c);

and (vi) The sign shall remain in place for a minimum of 30 consecutive calendar days.

(c) Notice contents. The notice required by subsections (b)(1) and (2) shall include the following information:

(1) The property address where the encroachment is being proposed;

(2) The scope of the proposed encroachment;

(3) The authorized encroachment application number;

(4) The location where plans may be reviewed and that comment may be submitted during the pendency of the application or during a hearing at which the technical panel considers the application; and

(5) The current address and contact information, including phone number and email address, for the riparian buffer technical panel, department of watershed management.

(d) Certification. Upon completion of public notice required by subsections (b)(1) and (2), the applicant shall certify to the technical panel that all public notification requirements have been fulfilled and shall provide documentation of compliance including, but not limited to, copies of required letters.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 11, 4-27-10; Ord. No. 2012-01(11-O1840), § 6, 1-26-12; Ord. No. 2022-37(22-O1714), § 5, 10-26-22) Sec. 74-311. Processing of applications for

authorized encroachments.

(a) Public comment. When determining the application, the technical panel shall determine whether public notice was completed in accordance with section 74-310.

(b) Determination. After due consideration of public comments, the technical panel shall issue a determination and notify the applicant of the

determination in writing. The technical panel may make findings of fact and conclusions to support its determination. The technical panel may take any of the following actions on an application for an authorized encroachment:

(1) Issue the authorized encroachment as requested in the application;

(2) Issue an authorized encroachment with written, site-specific conditions necessary to ensure conformity to the requirements and stated intent of this article; or

(3) Deny the application.

(c) Expiration. An application shall expire when there has been no activity on the application for a period of 180 days. With respect to an application not approved for issuance of an

authorized encroachment, "no activity" shall mean that the applicant has not responded to the

technical panel's notification that additional information or corrections are required before further processing of the application can take place.

(d) Term. An authorized encroachment may be transferred to subsequent property owners;

provided, however, changes to the site plan as set out in section 74-308(a)(7) require resubmission of the application. The authorized encroachment

shall expire if a building permit is not issued for the proposed encroachment within 30 months of

the date the encroachment is granted.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 12, 4-27-10; Ord. No. 2022-37(22-O1714), § 6, 10-26-22) Sec. 74-312. Notice of disposition.

(a) Following the grant of an authorized encroachment, the applicant shall notify each of the following parties of the technical panel's

determination under section 74-311(b) via certified mail return receipt requested within ten calendar days of receipt of notice:

(1) All property owners notified pursuant to section 74-310(b)(1); and

(2) The chairperson of the NPU in which the subject property is located.

(b) The notice required by section 74-312(a) above shall state the technical panel's determination, the location where the application and related records are available for inspection, and the deadline for appeal as set out in section

74-313(a).

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 13, 4-27-10) Sec. 74-313. Appeal.

(a) Within 30 days of the date of issuance of a determination by the technical panel, aggrieved or adversely affected parties may file an appeal with the commissioner. Such appeal shall be in

writing and shall include a copy of the technical panel's determination.

Appellants shall submit a copy of the appeal to the technical panel. Upon receipt of an appeal and for good cause, the commissioner may suspend the authorized encroachment pending review.

Within 30 days after receipt of an appeal, the commissioner shall make a determination and notify the appellant.

(b) The commissioner's determination may be appealed to the superior court of the county where the subject property is located. Such appeal shall be filed within 30 days of the date of issuance of the commissioner's determination as

provided in O.C.G.A. § 5-4-1 and will be reviewed under the standard provided by O.C.G.A. § 50-

13-19(h).

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 14, 4-27-10) Sec. 74-314. Relationships to other laws

and regulations.

(a) Relationship to O.C.G.A. §§ 12-2-8 and 12-7-6.

(1) The City of Atlanta Stream Buffer shall overlay the state waters buffer recognized by section 74-43(c)(15) of the Atlanta City Code, and created by O.C.G.A. §§ 12- 2-8 and 12-7-6. If an applicant applies to EPD for a state waters buffer variance under O.C.G.A. § 12-7-6, the applicant must also apply with the city for an authorized encroachment, and these applications may be considered concurrently.

(2) No provision of this article shall be interpreted as relaxing or exempting any requirement of O.C.G.A. §§ 12-2-8 or 12-7-6. The technical panel shall not grant an authorized encroachment to stream buffers otherwise regulated by the Environmental Protection Division, Department of Natural Resources, State of Georgia pursuant to O.C.G.A. § 12-2-8 absent the grant of a stream buffer variance from EPD.

(3) Receiving a stream buffer variance from EPD from the operation of O.C.G.A. § 12- 7-6 is not grounds for the technical panel to grant a similar authorized encroachment.

(b) Relationship to the Metropolitan River Protection Act. No provision of this article shall be interpreted as relaxing or exempting any

requirement of the Metropolitan River Protection Act, O.C.G.A. § 12-5-453. Further, the requirements of this article are intended to fulfill the requirements of the Metropolitan River Protection Act, O.C.G.A. § 12-5-453, which mandate that local jurisdictions adopt regulations governing the use of all land which is in the drainage basin of any tributary flowing into the Chattahoochee River Corridor (2,000-foot Chattahoochee River Corridor), which at a minimum, include buffer areas of adequate width as

determined by local governing authorities along all flowing streams in the drainage basin of any tributary, in which buffer areas there shall be no development.

(c) Relationship to Chapter 74 Article VIII of the Atlanta City Code (Wetland Protection Regulation).

(1) The technical panel shall not grant an authorized encroachment allowing development in a wetland under the jurisdiction of the United States Army Corps of Engineers pursuant to § 404 of the Clean Water Act absent the grant of a United States Army Corps of Engineers permit.

(2) No section of this article shall be interpreted as relaxing or exempting any requirements of section 74-401 et seq. of the Atlanta City Code, § 404 of the Clean Water Act, or any jurisdictional wetland disturbance permitting procedures under the jurisdiction of the United States Army Corps of Engineers.

(3) The City of Atlanta Wetland Buffer shall overlay any buffers or other protections that may be required by federal law. If an applicant applies to the Department of the Army for a wetland disturbance permit, the applicant must also apply with the city for an authorized encroachment, and these applications may be considered concurrently. Receiving a

United States Army Corps of Engineers permit is not grounds for the technical panel to grant a similar authorized encroachment.

(d) Relationship to O.C.G.A., 12-5-570 et seq.

The water supply watershed buffer is adopted, effective January 13, 2009, pursuant to O.C.G.A.

§ 12-5-570 et seq. and GA Comp. R. & Regs.

§§ 391-3-16.01 et seq.

As required by O.C.G.A. § 12-5-570 et seq., from and after January 13, 2009, new facilities located within seven miles of a water supply intake or water supply reservoir that handle hazardous materials of the types and amounts determined by the Department of Natural Resources, State of Georgia, shall perform their operations on impermeable surfaces having spill

and leak collection systems as prescribed by the Department of Natural Resources, State of

Georgia.

(e) Relationship to Chapter 74 Article II of the Atlanta City Code (Soil Erosion and Sedimentation Control). Erosion and sedimentation control best management practices as set forth in Chapter 74 Article II of this Code shall be implemented to prevent the migration of any sediment into a

stream, wetland, waters of the state, or buffer, if such practices are not already required by this or other ordinances.

(f) Relationship to plat approval process for lot creation. No new lot shall be created, and the commissioner shall not approve any preliminary

or final subdivision plat, that requires an authorized encroachment in order to comply with minimum lot development requirements as set out in section 74-306(b)(1) or section 74-306(b)(2), or in Parts 15 and 16 of the City of Atlanta Land Development Code. In addition,

the following requirements shall apply:

(1) All riparian buffers shall be shown on the plat;

(2) For any new development, the riparian buffer shall be physically delineated in accordance with City of Atlanta Buffer Revegetation Guidelines.

(g) Conflict with other laws. No section of this ordinance shall be interpreted as relaxing or

exempting any requirements of Chapter 74 Article II, Chapter 74 Article VI, or Chapter 158 Article II of the Atlanta City Code. In the event of a

conflict between or among any provisions of this article, or any other laws, regulations, or policies, the requirements that are most protective of water quality shall apply. Violation of this

article shall not preclude the prosecution of a violation of other sections of this Code which may apply.

(h) Liability. Neither the issuance of a building permit nor compliance with this article shall relieve any person from civil liability to any

person or property otherwise imposed by law, or constitute the assumption of such liability.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2009-01(08-O2281), § 1, 1-13-09; Ord. No. 2010-13(10-O0058), § 15, 4-27-10; Ord. No. 2022-37(22-O1714), § 7, 10-26-22) Sec. 74-315. Nonconformities.

Structures, or impervious surfaces, existing as of the effective date of this article, and as amended, shall be deemed existing nonconforming for the purposes of this article. No structure or impervious surface shall be horizontally

expanded to occupy greater land area inside the buffer; altered in a manner that changes the quantity, velocity, or quality of stormwater runoff;

or moved in whole or in part to any other portion of the buffer without an authorized encroachment. Any replacement or reconstruction activity within the buffer shall occur within the original footprint or shall require compliance

with the provisions of this article. No authorized encroachment is required by this article for

repairs, restoration, and renovation performed upon existing structures and impervious surfaces which are considered to be existing nonconforming as of the effective date of this article.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 16, 4-27-10) Sec. 74-316. Buffer management and

maintenance.

(a) In the event that development is conducted within 25 feet of any buffer, the buffer shall be physically protected by placing currently approved tree protection fencing at the buffer boundary or the limits of construction, whichever is more

protective of the buffer. If an authorized encroachment has been granted, the limits of the encroachment shall be similarly delineated.

(b) The owner of the property containing a buffer as defined herein shall be responsible for maintenance of the buffer and shall inspect the

buffer periodically for evidence of degradation in regard to the purposes listed in section 74-301

and compliance with all other provisions of this article. Corrective actions shall be taken by the owner in a manner to ensure compliance with

the terms of this article.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 17, 4-27-10) Sec. 74-317. Enforcement.

The commissioner is authorized to enforce the requirements of this article in accordance with the procedures set forth in this section.

(a) Any person who conducts development within a buffer that is in violation of this Code shall be subject to the general penalty set out in section 1-8 (a fine not exceeding $1,000.00, imprisonment for a term not exceeding six months, or any combination thereof) and shall be required to restore or remove the unpermitted encroachment and revegetate the area per the City of Atlanta Buffer Revegetation Guidelines. Each day during which violation or failure to comply continues

shall be a separate violation.

(b) Notice of violation. If the City of Atlanta determines that a person has failed to comply with any provision of this article, it may issue a written notice of violation to such applicant or other responsible person. Such notice shall be in writing and shall be served on the applicant, owner, or the responsible person in charge of the activity being conducted on the site.

(c) Stop work orders. The commissioner of the department of watershed management, and the commissioner of the department of city planning, and the commissioners' designee(s) are each

authorized to issue stop work orders to any person that violates any provision of this article. Stop work orders may include a specific area and activity, or the entire site and all activities. Stop work orders are effective immediately and shall remain in effect until the necessary corrective actions or remedial measures have occurred. Stop work orders shall state the conditions under which the work may be resumed.

(d) Refusal to issue certificates of occupancy or completion. The commissioner of the department of city planning or said commissioner's designee is authorized to refuse to issue certificates of occupancy

or completion for the building or other improvements constructed or being constructed on a site until the owner or responsible person has taken the remedial measures as set forth in the notice of violation or stop work order, or has otherwise corrected the violations described therein.

(e) Suspension, revocation, or modification of building permit. If the City of Atlanta determines that an applicant or other responsible person has failed to comply with any provision of this article or with the terms and conditions of an authorized encroachment, the commissioner of the department of city planning or said commissioner's designee may suspend, revoke or modify the building permit that was

issued authorizing the development, and following implementation of remedial measures or mitigation to protect water quality, may reinstate the building permit.

(f) Suspension, revocation, or modification of authorized encroachment. If the City of Atlanta determines that an applicant or other responsible person has failed to comply with the requirements of an authorized encroachment, the commissioner may suspend, revoke or modify the authorized encroachment, and following implementation of remedial measures or mitigation to protect water quality,

may reinstate the authorized encroachment.

(g) Restoration or removal of encroachment.

From and after the effective date of this ordinance, development within a buffer that is in violation of this article shall constitute a nuisance per se and shall be unlawful. The solicitor or city attorney is authorized to file such actions as may be necessary to remedy the encroachment in the buffer, including petition for a restraining order, injunction, abatement, or any other appropriate legal action or proceeding in a court of competent jurisdiction to prevent, restrain, or abate an unlawful use or activity.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 18, 4-27-10; Ord. No. 2017-14(17-O1157), § 6, 4-26-17) Secs. 74-318—74-320. Reserved.

Sec. 74-321. Severability.

Should any section, subsection, clause, or provision of this article be declared to be invalid, such decision shall not affect the validity of this article in whole or any part thereof other than

the part so declared to be invalid.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No.

2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O0058), § 22, 4-27-10) Secs. 74-322—74-400. Reserved.

ARTICLE VIII. WETLAND PROTECTION

REGULATIONS*

Sec. 74-401. Purpose and intent.

The intent of this article is to protect the environmental integrity of freshwater wetlands within the City of Atlanta. The purpose of this ordinance is to promote wetlands protection, while taking into account varying ecological, economic development, recreational and aesthetic values. Activities that may damage wetlands

should be located on upland sites to the greatest degree practicable as determined through the

permitting process.

(Ord. No. 2002-83, § 1, 11-26-02) Sec. 74-402. Definitions.

For purposes of interpreting this article, the following definitions shall apply:

Jurisdictional wetland determination means an official, written statement or map signed by the U.S. Army Corps of Engineers as required by Section 404 of the Clean Water Act.

Jurisdictional wetland means a wetland area that meets the definitional requirements for wetlands as determined by the U.S. Army Corps of Engineers.

Wetland delineation means the establishment of wetland boundaries by a representative of the U.S. Army Corps of Engineers or an authority

designated by the Corps.

Wetland means an area inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions.

(Ord. No. 2002-83, § 1, 11-26-02) Sec. 74-403. Coordination with the Army Corps of Engineers Wetland Permitting Process.

This section is included pursuant to the requirements of O.C.G.A. § 12-2-8 and is intended to provide applicants for a development or demolition permit with notice when the proposed activity may require a U.S. Army Corps of Engineers permit due to potential impacts upon jurisdictional wetlands, and to coordinate the City permitting

process with the Corps of Engineers permitting process.

(a) Permitting process. Prior to the issuance of a development or demolition permit, the commissioner of the department of watershed management, or designee, shall review plans; verify the certification required in section 74-403(c) below; and determine if the applicant is to be referred to the Corps of Engineers for a jurisdictional wetland determination. As a general rule, applicants and landowners should endeavor to avoid development and/or demolition activities in or near wetlands.

(1) If the proposed activity is not located within 50 feet of a wetland shown on the generalized wetland map, city permitting procedures shall proceed.

(2) If the proposed activity is located within 50 feet of a wetland shown on the generalized wetland map, the department of watershed management shall refer the applicant to the U.S. Army Corps of Engineers for a jurisdictional wetland determination and receive proof of such determination from the Army Corps of Engineers prior to the issuance of any city development or demolition permit.

(i) If the Corps of Engineers determines that a Department of the Army permit or letter of permission is required for the proposed activity, the city shall not issue a development or demolition permit for the proposed activity until after the issuance of the Department of the Army permit or letter of permission.

(ii) If the Corps of Engineers determines that the proposed activity does not require a Department of the Army permit, city permitting procedures shall proceed.

(b) Generalized wetland map. The generalized wetland map is hereby incorporated into and made a part of this article by

reference. Wetlands shown on the generalized wetland map do not necessarily represent the boundaries of jurisdictional

wetlands and cannot serve as a substitute for a jurisdictional wetland determination or a delineation of wetland boundaries as required by Section 404 of the Clean Water Act, as amended. No action

by the City of Atlanta pursuant to these regulations relieves the landowner or applicant from federal or state permitting requirements. The generalized wetland map may be amended as more

detailed information regarding the exact location and boundaries of wetlands becomes available. Not all wetlands in the City of Atlanta may be shown on the generalized wetland map and the omission of wetlands from the generalized wetland map does not relieve the applicant

or property owner from compliance with applicable laws regarding wetlands.

(c) Additional requirements. Upon application for a development or demolition permit, applicants shall be required to

certify that they have reviewed the generalized wetland map and to certify whether or not the proposed activity is to occur within 50 feet of a wetland shown on the map. The City of Atlanta may require additional information deemed necessary to verify compliance with the provisions of this article.

(Ord. No. 2002-83, § 1, 11-26-02) Sec. 74-404. Monitoring and enforcement procedures.

(1) If the City of Atlanta discovers a violation of this article that also may constitute a violation of any provisions of the Clean Water Act as

amended, the City of Atlanta shall issue written notification of the violation to the U.S. Environmental Protection Agency and the U.S. Army Corps of Engineers.

(2) The commissioner of the department of watershed management and/or his designee is authorized and empowered to enforce the requirements of this article in accordance with the procedures of this section. The department of watershed management shall have authority to issue stop work orders, citations, and/or revocation of permits in the event of any violation of this

article.

(3) Any enforcement activities for violations of the provisions of this article which are also violations of article II and III of chapter 74 for landdisturbing activities shall be undertaken pursuant to the provisions of article II and III of chapter 74.

(4) Any enforcement activities for violations of the provisions of this article which are also violations of chapter 158 for vegetation shall be undertaken pursuant to the provisions of chapter 158.

(5) In addition to any other sanctions listed in this article, a person who fails to comply with the provisions of this article may be liable to the city in civil court for any costs incurred by the city to enforce or correct violations of this article.

(Ord. No. 2002-83, § 1, 11-26-02) Sec. 74-405. Severability.

Should any section, subsection, clause, or provision of this article be declared to be invalid, such decision shall not affect the validity of this article in whole or any part thereof other than the part so declared to be invalid.

(Ord. No. 2002-83, § 1, 11-26-02) Secs. 74-406—74-425. Reserved.

ARTICLE IX. ILLICIT DISCHARGE AND

ILLEGAL CONNECTIONS

DIVISION 1. GENERALLY

Sec. 74-426. Statement of findings.

It is hereby determined that:

(1) Discharges to the storm sewer system of the City of Atlanta that are not composed entirely of stormwater runoff contribute to increased nonpoint source pollution and degradation of receiving waters;

(2) These non-stormwater discharges occur due to spills, dumping and improper connections to the storm sewer system of the City of Atlanta from residential, industrial, commercial or institutional establishments.

(3) These non-stormwater discharges not only impact waterways individually, but geographically dispersed, small volume nonstormwater discharges can have cumulative impacts on receiving waters.

(4) The impacts of these discharges adversely affect public health and safety, drinking water supplies, recreation, fish and other aquatic life, property values and other uses of lands and waters;

(5) These impacts can be minimized through the regulation of spills, dumping and discharges into the storm sewer system of the city;

(6) Localities in the State of Georgia are required to comply with a number of state and federal laws, regulations and permits which require a locality to address the impacts of stormwater runoff quality and nonpoint source pollution due to improper non-stormwater discharges to the storm sewer system of the city;

(7) Therefore, the City of Atlanta must adopt this article to prohibit such non-stormwater discharges to the storm sewer system of the City of Atlanta. It is determined that the regulation of spills, improper dumping and discharges to the storm sewer system of the city is in the public interest

and will prevent threats to public health and safety, and the environment.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-427. Statement of policy and intent.

(a) The purpose of this article is to protect the public health, safety, environment and general

welfare through the regulation of non-stormwater discharges to the storm sewer system of the City of Atlanta to the maximum extent practicable as

required by federal law.

(b) This article establishes methods for controlling the introduction of pollutants into the storm sewer system of the City of Atlanta in order to

comply with requirements of the National Pollutant Discharge Elimination System (NPDES) permit process. The objectives of this article are to:

(1) Regulate the contribution of pollutants to the storm sewer system of the City of Atlanta by any person;

(2) Prohibit illicit discharges and illegal connections to the storm sewer system of the city;

(3) Prevent non-stormwater discharges, generated as a result of spills, inappropriate dumping or disposal, to the storm sewer

system of the city; and

(4) To establish legal authority to carry out all inspection, surveillance, monitoring and enforcement procedures necessary to ensure compliance with this article.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-428. Definitions.

Accidental discharge means a discharge prohibited by this article which occurs by chance and without planning or thought prior to occurrence.

Clean Water Act means the Federal Water Pollution Control Act (33 U.S.C. 1251 et. seq.), and any subsequent amendments thereto.

Commissioner means the Commissioner of the Department of Watershed Management or his designee.

Construction activity means activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES General Construction Permits.

These include construction projects resulting in land disturbance. Such activities include but are not limited to clearing and grubbing, grading,

excavating, and demolition.

Department means the Department of Watershed Management (DWM).

Illicit discharge means any direct or indirect non-stormwater discharge to the storm sewer system of the city, except as exempted in section 74-437 of this article.

Illegal connection means either of the following:

(a) Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit discharge to enter the storm drain system including

but not limited to any conveyances which allow any non-stormwater discharge including sewage, process wastewater, and wash water to enter the storm drain system, regardless of whether such pipe, open channel, drain or conveyance has

been previously allowed, permitted, or approved by the department of watershed management; or

(b) Any pipe, open channel, drain or conveyance connected to the storm sewer system of the City of Atlanta which has not been

documented in plans, maps, or equivalent records and approved by an authorized enforcement agency.

Industrial activity means activities subject to NPDES Industrial Permits as defined in 40 CFR, Section 122.26 (b)(14).

National Pollutant Discharge Elimination System (NPDES) Storm Water Discharge Permit means a permit issued by the Georgia EPD under au-

thority delegated pursuant to 33 USC 1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis.

Storm sewer system of the City of Atlanta means any facility designed or used for collecting and/or conveying stormwater, including but not

limited to any roads with drainage systems, highways, streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural and man-made or altered drainage channels, reservoirs, and other drainage structures, and which is:

(1) Owned or maintained by the City of Atlanta; and

(2) Not part of a publicly-owned treatment works.

Non-stormwater discharge means any discharge to the storm drain system that is not composed entirely of stormwater.

Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.

Pollutant means anything which causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents;

petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; non-hazardous liquid and solid wastes and yard wastes;

refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that

same may cause or contribute to pollution;

floatables; pesticides, herbicides, and fertilizers;

liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter of any

kind.

Pollution means the contamination or other alteration of any water's physical, chemical or biological properties by the addition of any constituent and includes but is not limited to, a change in temperature, taste, color, turbidity, or odor of such waters, or the discharge of any liquid, gaseous, solid, radioactive, or other substance

into any such waters as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life.

Premises mean any building, lot, parcel of land, or portion of land whether improved or unimproved including adjacent sidewalks and parking strips.

Publicly-owned treatment works (POTW) means a treatment works as defined by section 212 of the Clean Water Act, which is owned by a state or

municipality (as defined by section 502(4) of the Clean Water Act). This definition includes any

devices and systems used in the storage, treatment, recycling and reclamation of municipal sewage or industrial wastes of a liquid nature. It also includes sewers, pipes and other conveyances only if they convey wastewater to a POTW treatment plant. The term also means the municipality as defined in section 502(4) of the Clean Water Act, which has jurisdiction over the indirect discharges to and the discharges from such a treatment works.

State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface and subsurface water, natural or artificial, lying within or forming a part of the boundaries of the State of Georgia which are not entirely confined and retained completely upon the property of a single person.

Stormwater runoff or stormwater means any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation.

Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the

characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

Violator means any person, business or commercial entity violating any provision of this article or allowing any person or persons under

their control or authority to violate any provision of this article.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-429. Applicability.

The provisions of this article shall apply throughout the corporate limits of the City of Atlanta.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-430. Compatibility with other regulations.

This article is not intended to modify or repeal any other ordinance, rule, regulation, other provision of law. The requirements of this article are in addition to the requirements of any other

ordinance, rule, regulation, or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other

provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-431. Responsibility for administration.

The police and the commissioner of the department of watershed management or his designee shall administer, implement, and enforce the provisions of this article.

(Ord. No. 2003-75, § 3, 6-24-03) Secs. 74-432—74-435. Reserved.

DIVISION 2. PROHIBITIONS AND NOTICE

OF VIOLATIONS

Sec. 74-436. Prohibition of illicit discharges.

No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into the storm sewer system of the City of Atlanta any

pollutants or waters containing any pollutants, other than stormwater.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-437. Exemptions.

The following discharges are exempt from the prohibition provision above:

(1) Water line flushing discharging potable water performed by a government agency, other potable water sources, landscape irrigation or lawn watering, diverted stream flows, rising ground water, ground water infiltration to storm drains, uncontaminated pumped ground water, foundation or footing drains (not including active groundwater dewatering systems), crawl

space pumps, air conditioning condensation, springs, natural riparian habitat or wetland flows, and any other water source

not containing pollutants;

(2) Discharges or flows from fire fighting, discharges from fire hydrant flushing, and other discharges as being necessary to protect public health and safety;

(3) The prohibition provision above shall not apply to any non-stormwater discharge permitted under an NPDES permit or order issued to the discharger and administered under the authority of the state and the Federal Environmental Protection Agency, provided that the discharger is in full compliance with all requirements of the permit, waiver, or order and other applicable laws and regulations, and

provided that written approval has been granted for any discharge to the storm sewer system of the City of Atlanta.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-438. Prohibition of illegal connections.

The construction, connection, use, maintenance or continued existence of any illegal connection to the storm sewer system of the city is prohibited.

(1) This prohibition expressly includes, without limitation, illegal connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection.

(2) A person violates this ordinance if the person connects a line conveying sewage to the storm sewer system of the City of Atlanta, or allows such a connection to continue.

(3) Improper connections in violation of this article must be disconnected and redirected, if necessary, to an approved onsite wastewater management system or the

sanitary sewer system upon approval of the commissioner of the department of watershed management.

(4) Any drain or conveyance that has not been documented in plans, maps or equivalent, and which may be connected to the storm sewer system, shall be located by

the owner or occupant of that property upon receipt of written notice of violation from the department of watershed management requiring that such locating be completed. Such notice will specify a reasonable time period within which the location of the drain or conveyance is to be completed, that the drain or conveyance

be identified as storm sewer, sanitary sewer or other, and that the outfall location or point of connection to the storm sewer system, sanitary sewer system or

other discharge point be identified. Results of these investigations are to be documented and provided to the department of watershed management.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-439. Industrial or construction activity discharges.

Any person subject to an industrial or construction activity NPDES stormwater discharge permit shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to the department

of watershed management prior to allowing discharges to the sewer system of the City of Atlanta.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-440. Access and inspection of properties and facilities.

The commissioner of watershed management or any duly authorized agent of the department may, upon the permission of the property owner, enter on and inspect any and all public and private property in the city to determine by inspection that those properties are or not free of any condition which may be in violation of this

article. For the purpose of this duty, the agent of the department of watershed management is eligible to apply for status as a code enforcement agent under section 98-1. In order to enforce code provisions and issue citations, the agent of the department of watershed management must apply for and receive status as a code enforcement agent.

(1) If a property or facility has security measures in force which require proper identification and clearance before entry into its premises, the owner, agent of the owner

or operator of any property or facility within the city shall make the necessary arrangements to allow access to representatives of the department of watershed management.

(2) The owner, agent of the owner or operator of any property or facility within the city shall allow the department of watershed management ready access to all parts of the premises for the purposes of inspection, sampling, photography, videotaping, examination and copying of any records

that are required under the conditions of an NPDES permit to discharge stormwater.

(3) The department of watershed management reserves the right, upon the approval of the property owner, to conduct monitoring and/or sampling of flow discharges.

(4) Any judge of the municipal court may grant permission to the department of watershed management to require the owner, agent of the owner or operator of any private property or facility to install monitoring equipment and perform monENVIRONMENT § 74-440 itoring as necessary, and make the monitoring data available to the department of watershed management.

a. It is prohibited for any person to interfere in any way with the proper sampling and monitoring operations of any equipment or devices.

b. All devices used to measure flow and quality shall be calibrated to ensure their accuracy.

(5) Any temporary or permanent obstruction to safe and easy access to the property or facility to be inspected and/or sampled shall be promptly removed by the owner, agent of the owner or operator at the written or oral request of the department of watershed management and any obstruction shall not be replaced. The costs of clearing such access shall be borne by

the owner or operator.

(6) Unreasonable delays in allowing the Department of Watershed Management access to a facility is a violation of this article.

(7) If the department of watershed management has been refused access to any part of the premises from which stormwater is

discharged, and the department of watershed management is able to demonstrate probable cause to believe that there may

be a violation of this article, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this article or any order issued hereunder,

or to protect the overall public health, safety, environment and welfare of the community, then the department of watershed management may seek issuance of a search warrant from any court of

competent jurisdiction.

(Ord. No. 2003-75, § 3, 6-24-03; Ord. No. 2006-74, § 1, 10-11-06)

Sec. 74-441. Notification of accidental discharges and spills.

(a) Notwithstanding other requirements of law, as soon as any person responsible for a facility, activity or operation, or responsible for emergency response for a facility, activity or operation has information of any known or suspected release of pollutants or non-stormwater discharges from that facility or operation which are resulting or may result in illicit discharges or pollutants discharging into stormwater, the storm sewer

system of the City of Atlanta, or State Waters, said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release so as to minimize the effects of the discharge.

(b) Said person shall notify the department of watershed management in person or by phone, facsimile or in person no later than 24 hours of the nature, quantity and time of occurrence of the discharge.

(1) If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence. Such records shall be retained for at least three years.

(2) Said person shall also take immediate steps to ensure no recurrence of the discharge or spill.

(c) Any notification made to the City of Atlanta is not exclusive of any state or federal notification requirements.

(d) Failure to provide notification of a release as provided above is a violation of this article.

(Ord. No. 2003-75, § 3, 6-24-03) Secs. 74-442—74-445. Reserved.

DIVISION 3. VIOLATIONS, ENFORCEMENT

AND PENALTIES

Sec. 74-446. Violations.

(a) It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of this article. Any person who has violated or continues to violate the provisions of this article may be subject to the enforcement actions outlined in this section or may be restrained by injunction.

(b) In the event the violation constitutes an immediate danger to public health or public safety, any judge of the municipal court shall have the

power to authorize the commissioner of the department of watershed management to enter upon the subject private property, without giving prior notice, to take any and all measures necessary to abate the violation and restore the property. The department of watershed management is authorized to recover the total amount of all costs of the abatement as outlined in sections 74-450 and

74-453.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-447. Notice of violation.

Whenever the department of watershed management finds that a violation of this article has occurred, the commissioner may order compliance

by written notice of violation.

(1) The City of Atlanta may serve notice to abate a violation, by mailing such notice to the last-known address of the alleged violator.

(2) The notice of violation shall contain the following information:

a. The name and address of the alleged violator;

b. The address when available or a description of the building, structure or land upon which the violation is occurring, or has occurred;

c. A statement specifying the nature of the violation;

d. A description of the remedial measures necessary to restore compliance with this article and a time schedule for the completion of such

remedial action;

e. A statement of the penalty or penalties that shall or may be assessed against the person to whom the notice of violation is directed; and

f. A statement that the determination of violation may be appealed to the department of watershed management by filing a written notice of appeal within 30 days of service of

notice of violation.

(3) Such notice may require actions including, but not limited to any of the following:

a. The performance of monitoring, analyses, and reporting;

b. The elimination of illicit discharges and illegal connections;

c. That violating discharges, practices, or operations shall cease and desist;

d. The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property;

e. Payment of costs to cover administrative and abatement costs; and

f. The implementation of pollution prevention practices.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-448. Appeal of notice of violation.

(a) Administrative remedy.

(1) Prior to any final order to comply with any notice of violation, the alleged violator shall be given the opportunity to appeal any notice of violation issued by the department to the commissioner of watershed management.

(2) The city acting by and through its commissioner of watershed management shall review the notice of violation, the reasons

submitted by the alleged violator for determining such conditions not to be in violation, and shall issue a decision in

writing.

(3) If such decision is to affirm, overturn or modify said notice of violation, the commissioner shall set forth the reasons for doing so.

(b) Judicial review.Any person aggrieved by such decision, after exhausting his or her administrative remedies, shall have the right to appeal to the Superior Court of the county wherein which such alleged violation occurred or is proposed to occur, for review of such written decision.

(c) The commissioner of the department of watershed management shall conduct the review process for any notice of violation, as described in this section.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-449. Enforcement measures after appeal.

If the violation has not been corrected pursuant to the requirements set forth in the notice of violation, or, in the event of an appeal, within ten days of any decision of the Superior Court upholding the decision of the department of watershed management and the commissioner, then representatives of the department of watershed management may enter upon the subject private property and are authorized to take any and all measures necessary to abate the violation and

restore the property. It shall be unlawful for any person, owner, agent of the owner or person in

possession of any premises to refuse to allow the government agency or designated contractor to

enter upon the premises for the purposes set forth above.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-450. Costs of abatement of the violation.

(a) Within 30 days after abatement of the violation, the owner of the property will be notified of the cost of abatement, including administrative costs.

(1) The property owner may file a written protest objecting to the assessment or to the amount of the assessment within ten days of such notice.

(2) If the amount due is not paid within 30 days after receipt of the notice, or if an appeal is taken, within 30 days after a decision on said appeal, the charges shall become a special assessment against the property and shall constitute a lien on the property for the amount of the assessment.

(b) Any person or business shall be liable to the city for the total amount of all costs and expenses incurred by the city in abating a violation.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-451. Enforcement.

The primary authority and responsibility for the enforcement of the provisions of this chapter shall be vested in the commissioner of watershed management. Upon a determination that a person is in violation of this chapter, the commissioner or his designee shall give written notice of violation that indicates they are in violation of a section in this chapter, and they may or issue a citation requiring the violator to appear before the judge of the municipal court for a hearing on the charge of violation of this chapter. Upon a

finding that a section of this chapter has been violated, the violator shall be subject to one or more of the penalties provided in section 74-452 of this article.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-452. Penalties.

(a) For any violations of this article, any person violating the provisions of this article may be subject to the following penalties:

(1) First violation. Upon conviction, a fine not less than $50.00 and not more than

$1,000.00 and a probationary period not to exceed 90 days.

(2) Second violation. Upon conviction, a fine not less than $250.00 and not more than $1,000.00, or probationary period not to exceed 180 days with a period of confinement in the city jail not to exceed ten days, or both.

(3) Third violation. Upon conviction, a fine not less than $500.00 and not more than $1,000.00, or a probationary period not to exceed one year with a period of confinement in the city jail not to exceed 30 days, or both.

(4) Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.

(b) In the event the alleged violator fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as the department of watershed

management shall deem appropriate, after the department has taken one or more of the actions described above, the violator may be subject to a fine not to exceed $1,000.00 for each day the

violation remains unremedied after receipt of the notice of violation.

(c) Businesses and commercial entities. In addition to any other penalty imposed under this article, if any person or business performing

work under any contract with the city is found guilty of violating this section, the city may terminate the contract by giving written notice of the termination to the person or business. The contract shall be null and void upon delivery of such notice.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-453. Violations deemed a public nuisance.

In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of this article is a threat to public health, safety, welfare, and environment may be

declared and deemed a nuisance, and may be abated by injunctive or other equitable relief according to the provisions of Article V of this chapter.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-454. Remedies not exclusive.

(a) The remedies listed in this article are not exclusive of any other remedies available under any applicable federal, state or local law and the department of watershed management may seek

cumulative remedies.

(b) The department of watershed management may recover attorney's fees, court costs, and other expenses associated with enforcement

of this article, including sampling and monitoring expenses.

(Ord. No. 2003-75, § 3, 6-24-03) Sec. 74-455. Severability.

If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or

invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this article.

(Ord. No. 2003-75, § 3, 6-24-03) Secs. 74-456—74-500. Reserved.

ARTICLE X. POST DEVELOPMENT

STORMWATER MANAGEMENT*

Sec. 74-501. Introduction.

It is hereby determined that:

(a) Development and its associated changes to land cover, permanently alter the hydrologic response of local watersheds and increase runoff rates and volumes, which in turn increase flooding, stream channel erosion, and sediment transport and deposition;

(b) Development also contributes to increased nonpoint source pollution and degradation of receiving waters;

(c) The impacts of post-development runoff quantity and quality adversely affects public safety, public and private property, drinking water supplies, recreation, fish and other aquatic life, property values, and other uses of lands and waters;

(d) These adverse impacts can be controlled and minimized through the regulation of runoff quantity and quality from new development and redevelopment by using green infrastructure, and other structural and nonstructural measures, including conserving or restoring open space and greenspace areas;

(e) The city is required to comply with several state and federal laws, regulations, and permits, and the requirements of the Metropolitan North Georgia Water Plan- ning District's regional water plan related to managing the water quantity, velocity, and quality of post-development runoff;

(f) The stormwater management standards are intended to encourage development that is environmentally functional, economically viable, and socially beneficial. It is acknowledged that conditions may arise where normal compliance is impractical or impossible and conditions associated with individual sites

may justify use of the alternative compliance process; and

(g) Therefore, the city has established this set of regulations governing the management of post-development runoff and the ongoing maintenance of stormwater

management systems for the purpose of protecting local water resources from degradation. It is in the public interest to regulate post-development runoff discharges and stormwater management systems in order to minimize runoff rates and volumes, post-construction soil erosion and sedimentation, stream channel erosion, and nonpoint source pollution

associated with post-development runoff.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-502. Purpose and intent.

(a) The purpose of this article is to protect, maintain, and enhance the public health, safety, environment, and general welfare by establishing minimum requirements and procedures to control the adverse effects of post-development

runoff and nonpoint source pollution associated with new development and redevelopment by focusing on the types of frequently occurring storm events that generate the most water quality impacts.

(b) Proper management of post-development runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment, and general welfare of the public, and protect water and aquatic

resources. This article seeks to meet those purposes through the following objectives:

(1) Establish decision-making processes surrounding development that protect the integrity of the watershed and preserve

the health of water resources;

(2) Establish post-construction stormwater management, and site planning and design criteria to protect natural resources from the direct impacts of the development process, and to preserve and restore natural hydrologic conditions on development sites;

(3) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of runoff quantity and quality;

(4) Encourage the use of nonstructural stormwater management measures, stormwater better site design, vegetated green infrastructure, rainwater harvesting and

reuse, and other innovative design practices that achieve runoff reduction;

(5) Preserve greenspace, and other conservation areas by establishing minimum postdevelopment stormwater management standards and design criteria for the

regulation and control of stormwater runoff quantity and quality;

(6) Establish design and application criteria for the construction and use of structural stormwater controls that meet the minimum post-development stormwater management standards;

(7) Coordinate site design plans with the city's greenspace protection plan;

(8) Establish provisions for the long-term responsibility for operation, inspection, maintenance, and repair of private structural stormwater controls and private commitments for nonstructural stormwater management measures to ensure that they continue to function as designed,

are maintained, and pose no threat to public safety or the environment;

(9) Establish administrative procedures for the submission, review, approval and disapproval of stormwater management plans, and for the inspection of approved active developments, and long-term compliance; and

(10) Protect public health and safety by reducing the risk of localized flooding and reducing the amount of runoff entering

public rights of way.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-503. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings defined in this section, except where the context clearly indicates a different meaning:

Alternative compliance process means the process set out in section 74-524.

Applicant means a person submitting an application for a permit and includes a person that undertakes new development or redevelopment.

Application for sewer service capacity means an application submitted to the department, in a form approved by the commissioner, requesting

certification that the combined sewer system or the separated sewer system, as the case may be, has adequate capacity to convey the wastewater generated by the new development or redevelopment.

BMP means both structural devices to store or treat runoff and non-structural programs or practices which are designed to prevent or reduce the pollution of the waters of the state.

Channel means a natural or artificial watercourse with a definite bed and banks that conveys continuously or periodically flowing water.

City means the City of Atlanta, a municipal corporation of the State of Georgia.

Code means the Atlanta City Code.

Combined sewer system means the city's system of pipes, tunnels, combined sewer control facilities, and other infrastructure that are designed to collect runoff, domestic sewage, and industrial wastewater in the same pipe. The boundaries of

the combined sewer system are as shown generally in, but is not limited to, the Department's GIS system.

Commissioner means the commissioner of the department or his/her designee.

Conservation easement means an agreement between a land owner and the City of Atlanta, other government agency, or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership.

Construction sequencing plan means a plan that identifies Infiltration zones and BMP locations, as well as a description of the sequence of construction and staged installation of permanent post-development BMPs that will protect infiltration zones and ensure suitable site conditions in areas designated for BMPs.

Demolition means removal of an existing building, structure, or other impervious surface.

Department means the city's department of watershed management.

Determination of infeasibility means a determination made by the commissioner in accordance with section 74-523.

Development means land disturbing activity, the installation of impervious surface, structural development (construction, installation or expansion of a building or other structure) that requires a permit, or linear transportation projects.

Erosion and sedimentation control plan means a plan, in accordance with Chapter 74 Article II of the Code, the Georgia Erosion and Sedimentation Control Act, and any NPDES Permit for construction activities, that is designed to

minimize the accelerated erosion and sediment runoff at a site during construction of a development.

Extended detention means the temporary storage of runoff in a stormwater management facility to control the peak discharge of runoff for an extended period of time.

Extreme flood protection means measures taken to prevent adverse impacts from large lowfrequency storm events with a return frequency of 100 years or more.

Flooding means a volume of water that is too great to be confined within the banks or walls of a conveyance or stream channel and overflows

onto adjacent lands.

Georgia Stormwater Management Manual means the latest edition of the Georgia Stormwater Management Manual, Volume 2: Technical Handbook, and its Appendices.

Green infrastructure means an interconnected natural system and/or engineered system that strengthens and mimics natural hydrologic functions and processes through the use of plants and soil to slow, filter, evapotranspirate, and

infiltrate runoff close to its source; or the capture and reuse of runoff.

High risk operation means an area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater as consistent with facilities operating under a Standard Industrial Code or requiring coverage under the Georgia General NPDES Permit for Stormwater Discharges associated

with industrial activities or as identified as a highly visible pollutant source per the City's

Stormwater Management Plan developed in accordance with the requirements of the MS4 Permit.

Hotspot means development on a site that has the potential to produce pollutant loads in runoff that are higher than normally found in runoff.

Impervious surface means a surface composed of any material that significantly impedes or prevents infiltration, which includes, but is not limited to, rooftops, buildings, streets and roads, and standard concrete or asphalt surface.

Infiltration means the process of absorption of runoff into the subsoil.

Land Development Code means Part III of the Code.

Land disturbing activity means any activity which may result in soil erosion from water or wind and the movement of sediments into waters of the state or onto lands within the state, including but not limited to clearing, dredging, grading, excavating, and filling of land.

Landscape architect means a person who possesses a current license issued by the Georgia Board of Landscape Architects.

Linear transportation project feasibility policy means the feasibility policy adopted by the commissioner, in accordance with section 74-516 which sets reasonable criteria for determining

when it is infeasible to implement the stormwater management standards for linear transportation projects.

Linear transportation projects means construction projects for the purpose of road, air, or pedestrian transportation, on public or private

rights-of-way, including but not limited to roads, sidewalks, multi-use paths and trails, and airport runways and taxiways. Linear transportation

projects do not include resurfacing, or construction of driveways used to access development.

MS4 permit means the NPDES permit issued to the city for discharges from the Municipal Separate Storm Sewer System.

Municipal Separate Storm Sewer System means a conveyance or system of conveyances including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels or storm drains, owned or operated by the city, designed or used for collecting or conveying Runoff and is not a combined sewer or part of a publicly owned treatment works.

New development means development on a previously undeveloped site.

Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a wastewater treatment facility or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials, and other contaminants from

land to surface water and groundwater via mechanisms such as precipitation, runoff, and leaching. Nonpoint source pollution is a byproduct of land use practices such as agricultural, silvicultural, mining, construction, subsurface

disposal, and urban runoff.

Nonstructural stormwater management measure means any natural or planted vegeta- tion or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels.

NPDES permit means a national pollutant discharge elimination system permit issued by the Georgia Environmental Protection Division and in effect at the time of an application for a permit to which this article applies.

Off-site facility means a stormwater management facility located outside the boundaries of the site.

Operation and maintenance agreement means a written agreement in accordance with section 74-517.

Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel

and enter the floodplain).

Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person in control of the site and includes their agent.

Permit means the permit issued by the city to the applicant which is required for undertaking any development.

Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board,

public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal

entity.

Post-development means the conditions anticipated to exist on-site immediately after completion of the development on a site.

Pre-development means the conditions that exist, on a site immediately before the implementation of a development. Where phased development or plan approval occurs, which includes but is not limited to demolition, preliminary grading, roads and utilities, the existing conditions at the time before issuance of the first development-related approval or permit shall represent pre-developed conditions, in

accordance with section 74-513(d).

Pre-development hydrology means (a) for new development, the runoff curve number determined using natural conditions hydrologic analysis based on the natural, undisturbed condition of the site as described in section 74-513(d) immediately

before implementation of the proposed development; and (b) for redevelopment, the existing conditions hydrograph may take into account the

existing development when defining the runoff curve number and calculating existing runoff, unless the existing development causes a negative impact on downstream property.

Professional engineer means a person who possesses a current certificate of registration as a professional engineer issued by the Georgia

State Board of Registration for Professional Engineers and Land Surveyors.

Redevelopment means development of a site that is not an undeveloped site.

Regional stormwater management facility means stormwater management facilities designed to control runoff from multiple properties, and the requirement for site-specific on-site controls may be either eliminated or reduced.

Resurfacing means road repair activities that consists of mill and overlay projects, pavement rehabilitation or pot-hole repair projects that do not alter soil material beneath the pavement or

impervious surface.

Runoff means the flow of surface water resulting from precipitation.

Runoff reduction means the interception, evapotranspiration, infiltration, or capture and reuse of runoff.

Runoff reduction feasibility policy means the feasibility policy adopted by the commissioner in accordance with section 74-516, which sets reasonable criteria for determining when it is infeasible to implement the stormwater management

standards for development other than linear transportation projects.

Single-family residence means a building that contains one or two dwellings only.

Single-family residential development has the meaning set out in section 74-504(b).

Site means an area of land where development is planned, which may include all or portions of one or more parcels of land. For subdivisions and other common plans of development, the site includes all areas of land covered under an applicable permit.

Stormwater better site design means nonstructural site design approaches, practices and techniques, especially those described in Sections 2.3 and 2.4 of the Georgia Stormwater Management Manual, that reduce a site's impact

on the watershed by preserving natural resources and drainage features, effectively laying out

elements of development to prevent or reduce environmental impacts, reduce the area and connectivity of impervious surfaces, and conserve trees and natural features on the site for the

purpose of stormwater management.

Stormwater consultation meeting certification means the certification issued under section 74-510.

Stormwater management means the collection, retention, detention, conveyance, storage, treatment, and disposal of runoff in a manner

intended to prevent increased flooding, streambank channel erosion, habitat degradation, water quality degradation, and to enhance and promote

the public health, safety, and general welfare.

Stormwater management facility means any infrastructure that controls or conveys runoff.

Stormwater management measure means any structural stormwater control or nonstructural stormwater management measure.

Stormwater management plan means the plan required by section 74-511 or 74-515, as applicable.

Stormwater management standards means those standards set out in section 74-513.

Stormwater management system means all the structural stormwater controls and nonstructural stormwater management measures that are used to capture, convey, and control the

quantity and quality of the runoff from a site.

Stormwater planting plan means the plan required by section 74-511.

Structural stormwater control means a structural stormwater management facility or device that controls runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release, or the velocity of flow of such runoff.

Examples include, but are not limited to, dry detention basins, stormwater ponds, and underground vaults.

Subdivision means the division of an existing parcel into two or more new parcels, or the consolidation of two or more existing parcels into a single parcel, or the consolidation of two or

more existing parcels and their simultaneous redivision, along new boundaries, into two or more new parcels, and includes divisions of land resulting from or made in connection with the

layout or development of a new street or roadway or a change in an existing street or roadway.

Undeveloped site means a site that has not been altered by development.

Vegetated green infrastructure means green infrastructure that uses trees, shrubs, grasses, or other vegetation along with amended or

engineered soils to intercept, retain, infiltrate, and evapotranspire runoff. Examples include,

but are not limited to, green roofs, bioretention, bioswales, and stormwater planters.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-504. Applicability.

(a) Development and redevelopment. Subject to sections 74-504(b), 74-504(c) and 74-504(d), this article shall apply to all development that meets one or more of the following criteria:

(1) New development that creates 500 square feet or more of any impervious surface; or

(2) New development or redevelopment that involves one disturbed acre or more; or

(3) Redevelopment that creates, adds, or demolishes and replaces 500 square feet or more of impervious surface; or

(4) Demolition that leaves in place more than 500 square feet of impervious surface within the area of demolition, unless a permit application is pending for a replacement structure or use which proposes appropriate stormwater management

measures.

(b) Single-family residential development.

Subject to section 504(d), sections 74-513(a), 74-513(b), 74-513(j), and 74-515 of this Article shall apply to single-family residential development. for the purposes of this article, singlefamily residential development does not include development of a site intended to be developed as a larger common plan of development or sale as

defined in section 74-37 of the Code and, is defined as development that creates, adds, or demolishes and replaces less than 5,000 square feet of impervious surface that meets one or more of the following criteria:

(1) New development or redevelopment of any site that, post-construction, will result in the site having one or two singlefamily residences (whether one or both of the single-family residences already exists

or not); or

(2) Addition or modification that creates, adds, or demolishes and replaces 500 square feet or more of impervious surface to any single-family residence.

Note: Other residential development including single-family residences that creates, adds, or demolishes and replaces 5,000 square feet or more of impervious surface is subject to section 74-504(a).

(c) High risk operation and hotspot. This article shall apply to any new development or redevelopment, regardless of size, that meets the definition of hotspot or high risk operation, which includes, but is not limited to, fueling stations, car washes, or industrial facilities with potential for runoff pollution.

(d) Exemptions subject to minimum requirements. The following development, other than linear transportation projects, is exempted from sections (a), (b) and (c) above, but shall be subject to the minimum requirements in section 74-513(j):

(1) Agricultural or silvicultural land management activities within properly zoned agricultural areas resulting in less than

1,000 square feet of impervious surface;

(2) Regrading or reshaping existing athletic fields or public parks resulting in less than 1,000 square feet of new impervious surface;

(3) Installations, repairs, or modifications to storm drains, drainage structures, stormwater management facilities, or other drainage facilities to improve drainage

capabilities;

(4) Installations, repairs, or modifications to sanitary sewer facilities to expand or improve sanitary sewer service capabilities;

(5) Work specifically related to the installation, repair, or maintenance of utility service connections, including but not

limited to sewer, water, electric, telephone, and gas, to existing facilities;

(6) Installations of dumpster pads with drains connected to sanitary sewers;

(7) Installations or modifications to existing structures to comply with Americans with Disability Act requirements, including but not limited to elevator shafts, access ramps, accessible parking, and accessible entrances or exits;

(8) Installations or modifications to existing structures to address health and safety issues or to comply with any Code requirements, including but not limited to fire escapes, stairways, and additional exits,

when not part of a development;

(9) Installations to existing structures of incidental mechanical or electrical equipment placed on areas of previously existing impervious surfaces;

(10) Installation of hardscape less than 5,000 square feet, such as uncovered parking, pedestrian, or patio areas, which utilize pervious pavement or other appropriate infiltration techniques;

(11) Incidental maintenance or repair of existing impervious surfaces which impact less than 1,000 square feet;

(12) Resurfacing of existing impervious surfaces, not including projects where impervious surfaces are removed down to the underlying soils;

(13) Stream bank stabilization or restoration activities, or activities solely for the purpose of environmental remediation;

(14) New construction or replacement of an existing driveway to access a singlefamily residential development, not including parking pads or similar areas,

that are 12 feet wide or less where runoff is directed via sheet flow toward vegetated areas at least twice as wide as the paved area;

(15) Any minor work which in the professional judgment of the commissioner is deemed in the best interest of the city.

(e) Exemptions for linear transportation projects. The following exemptions apply:

(1) Linear transportation projects are exempt from this article if those projects are identified as such in the linear transportation project feasibility policy.

(2) Linear transportation projects are exempt from the stormwater management standards where such standards are subject to, and identified in, a determination of infeasibility, but those projects are otherwise subject to the provisions of

this article.

Note: Linear transportation projects that do not have a determination of infeasibility or are not otherwise exempt from this article, remain subject to the provisions of this article.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-505. Designation of administrator;

liability.

(a) The commissioner is hereby appointed to administer and implement the provisions of this article.

(b) No action, decision, determination, or authorization under this article by the commissioner, the department, or by a department employee, shall impose liability upon the city for damage to a person or property.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-506. Compatibility with other regulations; rules etc.

(a) The requirements of this article are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law.

(b) In the event of any conflict or inconsistency between any provision in the MS4 Permit and

this article, the provision from the MS4 Permit shall control.

(c) In the event of any conflict or inconsistency between any provision of this article and the

Georgia Stormwater Management Manual, the provision from this article shall control.

(d) In the event of any other conflict or inconsistency between any provision of this article and any other ordinance, rule, regulation or

other provision of law, the provision that is more restrictive or imposes higher protective standards for human health or the environment shall control.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-507. Severability.

If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or

invalidate any remaining sections, subsections, paragraphs, subdivisions or clauses of this article.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-508. Applicability of rules, policies etc.

To implement and enforce the requirements of this article, the city will apply to any new development or redevelopment, the Georgia Stormwater Management Manual and any relevant rules, regulations, or policies of the city, including chapter 74 of the Code and procedures

of the department that are in effect at the time an application is made for a permit.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-509. Permit procedures and requirements.

(a) No owner or applicant shall perform any development without first meeting the requirements of this article prior to commencing the proposed development.

(b) Prior to approval of any development and stormwater management plan under this article, the applicant or owner shall certify and provide documentation to the city that all applicable

local, state, or federal permits have been acquired, or have been applied for, in relation to the

development.

(c) A Permit application shall be accompanied by the following items in order to be considered:

(1) Stormwater consultation meeting certification;

(2) Stormwater management plan; <http:// library.municode.com/HTML/10376/ leve13/PTIICOORENOR_ CH74EN_ARTXPODESTMA.html>

(3) An operation and maintenance agreement;

(4) Performance bond in accordance with section 74-518 <http://library.municode- .com/HTML/10376/leve13/

PTIICOORENOR_CH74EN_

ARTXPODESTMA.html>, if applicable;

and

(5) Permit application and relevant plans.

(d) The approved stormwater management plan shall obligate the owner or the applicant to accomplish all land clearing, construction, development and drainage in accordance with the stormwater management plan. Any and all permits for development may be revoked at any time if the

construction of stormwater management facilities is not conducted in strict accordance with approved plans.

(e) The city shall inform the applicant or owner whether any part of the permit application (such as the stormwater management plan, operation and maintenance agreement, or application for sewer service capacity) are approved or disapproved. If any part of the permit application is disapproved, the city shall notify the applicant or owner of such fact in writing. Where applicable, the applicant or owner may then

revise any item not meeting the requirements hereof and resubmit the same.

(f) Upon a finding by the department that the permit application meets the requirements of this article, the city may issue a permit for the development, provided all other legal requirements for the issuance of such permit have been met.

(g) Notwithstanding the issuance of any permit, in conducting the development, the applicant or owner shall be subject to the following requirements:

(1) The applicant or owner shall comply with all applicable requirements of the approved plan and this article and shall certify that all development will be done according to the approved plan;

(2) The development shall be conducted only within the area specified in the approved plan;

(3) The city shall be allowed access to the site for inspection and enforcement; and

(4) No changes may be made to an approved plan without review and written approval by the department.

(h) Upon completion of the development but before issuance of a certificate or occupancy or certificate of completion, the applicant or owner shall submit the professional engineer's certification and as-built plan as required by Section 74-519 <http://library.municode.com/HTML/10376/

leve13/PTIICOORENOR CH74EN ARTXPODESTMA.html>(b). If the as-built differs substantially from the approved plan but is still acceptable to the city, then the applicant or owner shall update the recorded operation and

maintenance agreement upon approval of the city.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-510. Stormwater consultation meeting.

(a) When proposed development of a site meets at least one of the applicability criteria found in section 74-504(a), 74-504(c), or where a request for a determination of infeasibility is to be made, the owner or applicant shall participate in a

consultation meeting with the department to discuss the post-development stormwater management measures necessary for the proposed development, as well as to discuss and assess

constraints, opportunities and ideas for stormwater management measures utilizing stormwater better site design, green infrastructure, and runoff reduction techniques.

(b) The consultation meeting shall be held prior to approval of a preliminary plat or the submittal of an application for a permit in accordance with the following procedure:

(1) The department shall schedule a consultation meeting within five business days from the date a written meeting request

is received by the department.

(2) Failure of the department to schedule a consultation meeting within the time required by this section shall waive the requirements of section 74-510(a) and a copy of the written meeting request submitted to the department by the owner or applicant attached to the permit application shall meet the requirement of section 74-509(c)(1).

(3) If no consultation meeting is requested or attended by the owner or applicant prior to the submittal of a permit application, the department may delay review of the permit application until such meeting is held; provided however that when the development involves only an application for the erection of a structure governed by chapter 16-28A of the Land

Development Code, the requirements of section 74-509(c)(1) and section 74-510(a) shall not apply.

(c) To assist the department's review of the development and to assist the applicant or owner with the creation of a stormwater management

plan, the following information should be submitted prior to or at the time of the consultation meeting:

(1) Existing conditions / Proposed site plans.

Existing conditions and proposed site layout sketch plans, which shall illustrate at a minimum:

a. existing and proposed topography;

b. perennial and intermittent streams;

predominant soils from soil surveys;

c. boundaries of existing vegetation especially trees;

d. proposed limits of clearing and grading; and

e. location of existing and proposed roads, buildings, parking areas and other impervious surfaces.

(2) Infiltration rates. Infiltration rates shall be determined by soil surveys, on-site

soil analysis, or infiltration test. If a site has been previously developed or graded or contains urban soil types, an infiltration test is required.

(3) Natural resources inventory. A written or graphic inventory of the natural resources in existence prior to the commencement of the development. Particular attention should be paid to

environmentally sensitive features that present constraints for development. This inventory shall address resources both on the site and in the surrounding area that are or may be impacted by the development. This inventory shall also include:

a. a description of soil conditions;

b. Trees and tree canopy cover;

c. topography;

d. wetlands;

e. other native vegetative areas on the site; and

f. the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks, including but not limited to drinking water

well setbacks and septic setbacks.

(4) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system that identifies the scope and magnitude of the development and related stormwater

requirements. The plan shall also include:

a. identification and description of how stormwater better site design is used to achieve the stormwater management standards and reduce the need for structural stormwater controls;

b. preliminary selection and location of proposed structural stormwater controls;

c. location of existing and proposed conveyance systems such as grass channels, swales, and storm drains;

d. existing and proposed flow paths and discharges;

e. location of floodplain/floodway limits;

f. relationship of the site to upstream and downstream properties and drainages; and

g. preliminary location of proposed stream channel modifications, such as bridge or culvert crossings.

(5) Any request for a determination of infeasibility.

(d) The applicant or owner shall receive a certification at the conclusion of the consultation meeting.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-511. Submittal requirements for stormwater management plans.

(a) A stormwater management plan is required where the development of a site meets at least one of the applicability criteria found in section 74-504(a) or section 74-504(c). The stormwater

management plan shall detail how post-development runoff will be controlled or managed and how the proposed development will meet the

requirements of this article, including the Georgia Stormwater Management Manual.

(b) This plan shall be in accordance with the criteria established in this section and must be prepared under the direct supervisory control of either a professional engineer or a landscape

architect, either of which may seal and sign the overall plan. However, the items required by

subsections (d)(6) through (d)(9) shall be sealed and signed by a professional engineer. Any document sealed and signed under this provision constitutes a verification that the design of all stormwater management measures meet the

submittal requirements of this article.

(c) Plans and studies shall be presented in a format that itemizes each of the requirements in section 74-511(d), including the stormwater

management standards.

(d) The stormwater management plan must ensure that the requirements and criteria in this article are being satisfied and that opportunities are being taken to minimize adverse postdevelopment runoff impacts from the development. The plan shall consist of maps, narratives, and supporting design calculations (hydrologic

and hydraulic) for the proposed stormwater management system. The plan shall include all applicable design requirements and forms found in the Georgia Stormwater Management Manual and the city's submittal requirements for all development that is subject to this article. This includes but is not limited to the following:

(1) Common address and legal description of the site;

(2) Vicinity map;

(3) Existing conditions/proposed site plans.

Existing conditions and proposed site layout sketch plans, which illustrate at a minimum:

a. Existing and proposed topography (minimum two-foot contours);

b. Perennial and intermittent streams;

c. Mapping of predominant soils from soil surveys;

d. Boundaries of existing predominant vegetation and proposed limits of clearing and grading; and

e. Location of existing and proposed roads, buildings, parking areas and other impervious surfaces;

(4) Infiltration rates. Infiltration rates shall be determined by soil surveys, on-site

soil analysis, or an infiltration test. If the site has been previously developed or graded or contains urban soil types, an infiltration test is required;

(5) Natural resources inventory. A written or graphic inventory of the natural resources in existence prior to the commencement of the development. This inventory shall address resources both

on the site and in the surrounding area that are or may be impacted by the development. Particular attention should be paid to environmentally sensitive features that present constraints for development. This inventory shall also include:

a. A description of soil conditions, trees and canopy cover, topography, wetlands, and other native vegetative areas on the site;

b. The location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers; and

c. Other setbacks, including but not limited to drinking water well setbacks and septic setbacks

(6) Existing conditions hydrologic analysis.

The existing condition hydrologic analysis for runoff rates, volumes, and velocities, in accordance with the Georgia Stormwater Management Manual, which shall include:

a. A topographic map of existing site conditions with the drainage basin boundaries indicated;

b. Acreage, soil types, and land cover of areas for each subbasin affected by the development;

c. All perennial and intermittent streams and other surface water features;

d. All existing stormwater conveyances and structural stormwater controls;

e. Direction of flow and exits from the site;

f. Analysis of runoff provided by offsite areas upstream of the site;

g. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the pre-development hydrology. For Redevelopment, predevelopment conditions shall be modeled using the established guidelines in section 74-513;

(7) Post-development hydrologic analysis. The post-development hydrologic analysis for runoff rates, volumes, and velocities, which shall be calculated in accordance with the Georgia Stormwater Management Manual, and include:

a. A topographic map of developed site conditions with the post-development drainage basin boundaries indicated;

b. Total area of post-development impervious surfaces and other land cover areas for each subbasin affected by the development;

c. Calculations for determining the runoff volumes that need to be addressed for each subbasin for the development to meet the stormwater management standards;

d. Location and boundaries of proposed natural feature protection and conservation areas;

e. Documentation and calculations for any applicable site design credits that are being utilized;

f. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the pre-development hydrology;

g. Evidence that an application for sewer service capacity has been made;

h. For a subdivision or planned development, post-development runoff volumes, rates, and velocities shall

be calculated based on the built-out conditions of the entire parcel to be subdivided, regardless of future ownership of individual lots; and

i. Estimates of impervious surfaces shall be made based on maximum allowable lot coverage in accordance with section 16-29.001(38) of the Land Development Code when meeting the stormwater management standards in section 74-513(c)

through (i). The owner of said subdivided parcel or applicant may provide the runoff reduction/water quality measures in accordance with sections 74-513(a) and (b) for individual lots and must be reflected accordingly on the final plat;

(8) Stormwater management system. The description, scaled drawings and design calculations for the proposed post-development stormwater management system, which include:

a. A map and/or drawing or sketch of the stormwater management measures, and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet

and outlets, location of bypass and discharge systems, and all orifice/ restrictor sizes;

b. A narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls

in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria;

c. A hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs);

d. Documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management standards;

e. Drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts,

catch basins, channels, swales, and areas of overland flow; and

f. Where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans, total maximum daily load implementation plans, and/or local greenspace protection plans;

(9) Post-development downstream analysis.

In accordance with the Georgia Stormwater Management Manual, a downstream peak flow analysis which includes the

assumptions, results and supporting calculations to show safe passage of postdevelopment design flows downstream and which shall:

a. Address each and every point or area along the site boundaries at which runoff will exit the property;

b. Focus on the portion of the drainage Channel or watercourse immediately downstream from the development.

This area shall extend downstream from the site to a point in the drainage basin where the development area is ten percent of the total basin area; and

c. Calculate runoff volumes and discharge rates with consideration to be given to any planned future upstream land use changes;

(10) Construction phase erosion and sedimentation control plan. An erosion and sedimentation control plan that shall

include:

a. Information on the sequence/phasing of construction and temporary stabilization measures and

temporary structures that will be converted into permanent stormwater management measures;

b. A proposed staged construction and inspection control schedule for approval; otherwise, the construction and inspection control schedule will be for the entire drainage

system;

c. A provision that no staged work related to the construction of Stormwater Management Measures or best management practices for erosion

and sedimentation control shall proceed to the next stage of work, according to the sequence specified in the approved staged construction and inspection control schedule, until that stage has been inspected and approved;

d. A construction sequencing plan; and

e. A proposal for runoff reduction and water quality measures to be installed according to the construction sequencing plan as late in the construction process as practicable

to prevent clogging, soil compaction and other issues;

(11) Stormwater planting plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to

stormwater management measures. The stormwater planting plan must also include:

a. The arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan;

b. Information necessary to construct the landscaping elements shown on the plan drawings;

c. Descriptions and standards for the methods, materials and vegetation that are to be used in the construction; density of plantings;

d. descriptions of the stabilization and management techniques used to establish vegetation; and

e. a description of who will be responsible for ongoing maintenance of vegetation for the stormwater management measures and how adequate vegetative cover is preserved;

(12) Operation and maintenance agreement.

An operation and maintenance agreement; and

(13) Request for a determination of infeasibility. Any request for a determination of infeasibility.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-512. Off-site facilities.

(a) The stormwater management plan for each development shall provide for stormwater management measures located on the site, unless provisions are made to manage stormwater by an off-site facility or regional stormwater management facility in which case the following applies:

(1) An approved operation and maintenance agreement must be recorded by the applicant or owner in the deed records of the Superior Court of Fulton or DeKalb County, whichever is applicable, on the following land:

a. the land where the off-site facility or regional stormwater management facility is physically located;

b. the site; and

c. any future sites that may utilize the off-site facility or regional stormwater management facility.

(2) The off-site facility or regional stormwater management facility must be designed and adequately sized to provide a level of

stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site stormwater management measures.

(3) On-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility.

(b) A stormwater management plan that shows the adequacy of the off-site facility or regional stormwater management facility must be submitted to the department.

(c) To be eligible for a modification, the applicant or owner must demonstrate to the satisfaction of the department that the use of an off-site facility or regional stormwater management facility will not result in the following impacts to upstream or downstream areas:

(1) Increased threat of flood damage to public health, life, and property;

(2) Deterioration of existing culverts, bridges, dams, and other structures;

(3) Accelerated streambank or streambed erosion or siltation;

(4) Degradation of in-stream biological functions or habitat; or

(5) Water quality impairment in violation of state water quality standards, or violation of any state or federal regulations.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-513. Stormwater management standards.

For new development, the following standards shall be applied to the area of the site impacted by the proposed work. For redevelopment, the

following standards shall be applied to the area of the site impacted by the proposed work,

provided that the impacted area does not exceed 35 percent of the previously developed area. If the impacted area exceeds 35 percent of the previously developed area, the following standards shall be applied to the entire site, including the previously developed area:

(a) Runoff reduction. The runoff volume generated by the first 1.0" of rainfall shall be retained on-site in order to help maintain pre-development site hydrology and help protect the local watershed from several indirect impacts of the

development process, including decreased groundwater recharge, decreased baseflow and degraded water quality. A stormwater management system is presumed to comply with this criterion if:

(1) It includes green infrastructure practices that provide for the interception and evapotranspiration, infiltration, or capture and reuse of runoff, that have been

selected, designed, constructed and maintained in accordance with the Georgia Stormwater Management Manual; or constitutes an alternative practice responsibly designed and documented by a professional

engineer to reproduce the intent of the Georgia Stormwater Management Manual; and

(2) It is designed to provide the amount of runoff reduction from the runoff generated by the first 1.0" of rainfall as specified in the latest edition of the Georgia Stormwater Management Manual.

(3) The applicant shall prioritize stormwater management measures used to meet the runoff reduction standard

in the following order:

a. Vegetated infiltration BMPs:

bioretention, stormwater planters, etc.

b. Permeable pavements.

c. Green roofs, rainwater harvesting and reuse, and lined bioretention or lined stormwater planters.

d. Infiltration practices installed underground, specifically dry wells, modified french drains, and similar practices.

(b) Water quality protection. All runoff generated from a site shall be adequately treated before discharge using stormwater management measures that remove at least 80 percent of the calculated

average annual post-development total suspended solids (TSS) load as defined in the Georgia Stormwater Management Manual for Runoff from a 1.2 inch rainfall event. it will be presumed that a stormwater management system complies with this requirement if it satisfies the runoff

reduction criteria in section 74-513(a).

All water quality protection measures shall be designed and constructed in accordance with the following criteria:

(1) The measure shall be sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual;

(2) Appropriate stormwater management measures are selected, designed, constructed or preserved,

and maintained according to the specific criteria in the Georgia Stormwater Management Manual; or constitutes an alternative practice

responsibly designed and documented by a professional engineer to reproduce the intent of the Georgia Stormwater Management Manual; and

(3) Runoff from a high risk operation or hotspot is adequately treated and addressed through the use of appropriate stormwater management measures and pollution prevention practices.

(c) Stream channel protection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all the following approaches:

(1) Preservation, restoration, or reforestation with native vegetation of the applicable stream buffer pursuant to chapter 74 article VII of the Code.

(2) Twenty-four-hour extended detention of the one-year, 24-hour return frequency storm event.

(3) Erosion prevention measures such as energy dissipation and velocity control. This stormwater management standard shall not be waived, however for development that creates, adds, or demolishes and replaces less than 5,000 square feet

of impervious surface and meets the performance criteria of section 74-513(a) and (b), stream channel protection is not required.

(d) Overbank flood protection. For new development, overbank flood protection and property protection shall be provided by attenuating the post-development peak discharge rate to the pre-development rate up to the 25-year, 24-hour return frequency storm event.

For redevelopment, overbank flood protection and property protection shall be provided by reducing the peak discharge

rate up to the 25-year, 24-hour storm event in accordance with the following formula:

PIS = Pre-Development Impervious Surface PDRR = Peak Discharge Rate Reduction For sites where previous demolition has removed impervious surfaces, pre-development peak discharge rate calculations and percentage of impervious surface

shall be calculated based on pre-demolition conditions. For sites that have been demolished and have remained fallow

and stabilized with vegetation for a minimum of five years, they shall be considered as having pre-development conditions of 20% impervious surface for purposes of calculating peak discharge rate reduction.

For development permitted post-2004 and served by appropriate stormwater management facilities, subsequent redevelopment of the same area is not required to further reduce the peak discharge rate, provided that the site continues to meet the reduction previously achieved.

For redevelopment that creates, adds, or demolishes and replaces less than 5,000 square feet of impervious surface and meets the stormwater management standards in section 74-513(a) and (b), overbank flood protection is not required.

(e) Extreme flood protection. Extreme flood protection and public safety protection shall be provided by attenuating and safely conveying the 100-year, 24-hour return frequency storm event without any increase in peak discharge rate, such that flooding is not exacerbated.

For redevelopment that creates, adds, or demolishes and replaces less than 5,000 square feet of impervious surface and meets the stormwater management standards in section 74-513(a) and (b), extreme flood protection is not required.

(f) Structural stormwater controls.

(1) All structural stormwater controls shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual.

(2) All structural stormwater controls must be designed appropriately to meet their intended function.

(3) For other structural stormwater controls not included in the Georgia Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be

documented through prior studies, literature reviews, or other means and receive approval from the city before being included in the design of a stormwater management system.

(4) In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the city may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume,

frequency, and rate of runoff or increased nonpoint source pollution loads created on the site.

(5) Applicant or owner shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design

feasibility when selecting and locating a structural stormwater control.

(g) Credits for stormwater better site design.

The applicant or owner may take credit for stormwater better site design and reduce the water quality volume and

%PIC= %PDRR

runoff reduction requirements. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual.

(h) Drainage system guidelines. Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutters, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-ofway and private properties adjoining sites and/or public rights-of-way. Stormwater

conveyance facilities that are designed to carry runoff from more than one parcel, existing or proposed, shall meet the following requirements:

(1) Methods to calculate stormwater flows shall be in accordance with the Georgia Stormwater Management Manual.

(2) All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan, using the methods in the Georgia Stormwater Management Manual.

(3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and

specifications found in the Georgia Stormwater Management Manual.

(4) Stormwater management facilities shall be designed and installed according to an approved application for sewer service capacity.

(5) Stormwater management facilities, including conveyance facilities shall not discharge to the surface of public rights-of-way.

(i) Rules for dam safety and any other applicable federal, state, or local requirement. Any development that proposes a dam shall comply with the Georgia Safe

Dams Act and Rules for Dam Safety as applicable.

(j) All development, including development exempted from this article under section 74-504(d), shall comply with the following minimum requirements:

(1) Lots and buildings shall be developed in a manner to ensure that stormwater exiting individual parcels or lots under post-development conditions does not adversely impact the adjacent parcels or lots as a result

of concentrated flows, flooding, erosion, or deposits of silt or sediment.

(2) The stormwater discharge from a downspout, cistern, or any water collection device shall be located a distance of no less than ten feet from common property line and oriented so the direction of flow is not toward the adjacent property line.

(3) Discharge from any downspout must be dissipated, infiltrated, or diverted such that flows are not concentrated.

(4) No person shall erect, construct, or otherwise permit any obstruction that prevents the natural or contained flow of water to any component of the stormwater system of the city, unless such obstruction is allowed as part of a permit approved after compliance with this article.

(5) An approved, installed stormwater management measure shall not be removed or demolished, without written permission from the city, nor shall the measure be prevented from

proper operation by action, inaction, or omission by the owner or any successors in title.

(6) Stormwater management plans under sections 74-511 and 74-515 that propose removing healthy, noninvasive trees solely for the construction of stormwater management systems may not be approved unless

the applicant can show that no other method is feasible, including but not limited to pervious paving, green roofs, bioretention, rainwater harvesting and reuse, or a treatment train of BMPs.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20;

Ord. No. 2026-30 (26-O-1369), § 1, 7-15-26) Sec. 74-514. High risk operation and hotspot requirements.

In addition to the provisions of this article, new development and redevelopment that meets the definition of high risk operation or hotspot shall meet the following criteria:

(a) No portion of the area of risk shall bypass the stormwater management system;

(b) At a minimum, treatment method must be as specified in the Georgia Stormwater Management Manual and be designed for the specific pollutant of risk; and

(c) High risk operations and hotspots shall not use permeable pavement to meet the performance standards of the article, except as approved by the commissioner based on detailed engineering studies and supporting documentation.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-515. Single-family residential development stormwater management plan requirements.

In addition to the requirements in sections 74-513(a), 74-513(b), and 74-513(j), single-family residential development not otherwise exempt

from this article under section 74-504(d), shall submit a plan to the department identifying the

following:

(a) Existing and proposed ground contours and elevations;

(b) Existing and proposed vegetative cover, including trees;

(c) Sanitary and storm sewers, structures and easements;

(d) Location, configuration and finished floor elevations for existing and proposed building structures;

(e) Location, configuration and finished elevations for existing and proposed paved areas;

(f) To the extent practicable, the location of any retaining walls along the property line and topographical features and the location of infrastructure, in relation to adjacent properties, that control or influence the flow of water towards or away from the site; and

(g) Erosion and sedimentation control plan.

The plan shall be signed and sealed by State of Georgia registered architect, landscape architect, professional engineer or land surveyor.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-516. Adoption of regulations and policies.

The commissioner may, from time to time, adopt such rules, regulations, or policies necessary to implement, give effect to, and enforce the standards and requirements of this article.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-517. Stormwater management operation and maintenance agreements.

(a) An operation and maintenance agreement is required for all development where stormwater management systems are to be installed, except for single-family residential development or development exempted under section 504(d).

Operation and maintenance agreements must also include any existing stormwater management measures on the site that will not be affected by the proposed development but which

will service the proposed development.

Note: The submittal of operation and maintenance agreements is provided for in section 74-509.

(b) An operation and maintenance agreement must be approved by the City; and upon approval, recorded in the deed records of the Superior

Court of Fulton or DeKalb County, whichever is applicable, for the Site or in accordance with the requirements of Section 74-512(a)(1), prior to

issuance of a Permit.

(c) The commissioner may adopt a template operation and maintenance agreement having regard to the matters set out in this section.

(d) The operation and maintenance agreement shall comply with the requirements of the department and shall include, at a minimum:

(1) A description of the property;

(2) A requirement that the owner must comply with the stormwater management plan and the operations and maintenance plan required by section

74-517(d)(11);

(3) Identification of the owner as having the responsibility for the ownership, inspection, operation, and maintenance of the stormwater management system;

(4) Language confirming that the operation and maintenance agreement runs with the land and that all successors in title are bound by its terms;

(5) If any part of a site with a stormwater management system is the subject of a subdivision, the creation of a property owner's association or the recording of condominium covenants, a requirement to comply with section 74-517(f), unless otherwise consented to by the commissioner, which consent may be subject to conditions;

(6) Maintenance access easements in favor of the city that ensure access to the stormwater management system for the purpose of inspection and maintenance;

(7) Procedures for the commissioner to consent to amending or terminating the agreement, and releasing the agreement from the title to the land;

(8) Where an off-site facility or regional stormwater management facility is used, in each of the applicable agreements required by section 74-512, a statement concerning the division of responsibility between the owner of each site and the owner of the land on which the off-site facility or regional stormwater management facility is located;

(9) A requirement for the submittal of an annual inspection and maintenance report to the department in accordance with the requirements of section 74-517(e);

(10) An indemnification and hold harmless provision, which shall state at a minimum, that the Owner and successor in title shall indemnify and hold harmless the City for any up-stream or down-stream damages due to structural, design, installation, maintenance, or any other failure of the stormwater management system;

and

(11) An operations and maintenance plan that must, at a minimum, include:

a. A narrative describing how the stormwater management system is designed to function, including runoff capture, runoff control, water quality treatment, channel protection, and flood protection;

b. An identification of the parts or components of a stormwater management system that need to be regularly or periodically inspected

and maintained, and the equipment and skills or training necessary;

c. An inspection and maintenance schedule, description of maintenance tasks, identification of responsible parties for ongoing maintenance, description of funding source, and a review of access and safety issues;

and

d. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures.

(e) An annual inspection and maintenance report must be submitted to the department, on forms supplied by the department, within 30 days of the first anniversary of the date that the final inspection was completed pursuant to section 74-43(f) of the Code and within 30 days of that anniversary date for each year thereafter.

The annual inspection and maintenance report shall contain all the following:

(1) The name and address of the owner;

(2) A statement that an inspection was made of all required components of the stormwater management system;

(3) The date of inspection;

(4) Current photographs of the stormwater management system;

(5) A certification statement from a Georgia Soil and Water Conservation Commission Level II Certified Design Profession or Certified Plan Reviewer, Professional

Engineer, or Landscape Architect who conducted the inspection stating either:

a. That the stormwater management system is performing properly and in compliance with the approved stormwater management plan, the applicable operation and maintenance agreement and the Georgia Stormwater Management Manual; or

b. That the stormwater management system is not compliant with the approved stormwater management plan or the applicable operation and maintenance agreement; and

(6) Execution by the owner with a statement certifying that the contents of the report are true and correct.

If the stormwater management system is certified as non-compliant, a plan and schedule for bringing the system into compliance must be

provided to the department for approval within 30 days of the certification of non-compliance.

The owner must carry out all work required to bring the stormwater management system into compliance in accordance with the department's approval. An updated annual inspection and maintenance report must be submitted to the department within ten days of the stormwater management system being brought into compliance. Any updated annual inspection and maintenance report that may be required does

not affect the date by which the annual inspection and maintenance report is required by this section.

(f) Where a stormwater management system exists on any property that is subject to subdivision, the creation of a property owner's association or the recording of condominium covenants, the stormwater management system shall be

owned in accordance with the following:

(1) If a property owners' association is created in accordance with the Georgia Property Owners' Association Act

(O.C.G.A. § 44-3-220, et seq.) or an association is created in accordance with the Georgia Condominium Act (O.C.G.A. § 44-

3-70, et seq.), the stormwater management system shall be treated as a common area (with respect to a property owners'

association) or a common element (with respect to a condominium association), and the following provisions, at a minimum, shall be included in the relevant declarations, bylaws or covenants:

a. Governance, where relevant, by the Georgia Property Owners' Association Act (O.C.G.A.§ 44-3-220, et seq.)

or Georgia Condominium Act (O.C.G.A. § 44-3-70, et seq.) or any successor Acts that grant lien rights to the relevant association for maintenance expenses and tax obligations;

b. Automatic compulsory membership in the relevant association of all lot purchasers and their successors in title;

c. A fair and uniform method of assessment and collection/payment for dues, maintenance, and related costs;

d. Perpetual and continued inspection and maintenance liability for the required stormwater management system;

e. Filing of all required declarations, bylaws, covenants and restrictions with the Clerk of the Superior Court of Fulton or DeKalb County, whichever is applicable; and

f. Subject to the requirements of state law, prior arrangement for the transfer of ownership of the stormwater management system in fair and equal parts to all lot owners in

the case of the relevant association dissolving.

(2) If a relevant association is not created, the stormwater management system shall be owned by all successors in title to the land that is subject to a subdivision.

Costs associated with the inspection and maintenance of the stormwater management system shall be assessed equitably among all of the lots in the development,

however each lot is jointly and severally liable to the city if the city is required to take action under section 74-520.

(g) An owner or a proposed purchaser of land that is subject to an operation and maintenance agreement, may request a certificate from the commissioner that no monies are owing to the city under the terms of the operation and maintenance agreement. The certificate must not address whether the owner is in compliance with the operation and maintenance agreement.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-518. Performance and maintenance bonds.

For development that requires an operation and maintenance agreement, the owner or applicant shall post a performance bond as required by section 74-509(c)(4), and in accordance with the following requirements:

(1) The bond amount shall be $3,000.00 plus a prorated amount of $3,000.00 per disturbed acre for any amount or fraction greater than one acre or, where the permit application relates to a site that is subject to a stormwater master plan approved in accordance with section 74-525, the bond amount shall be calculated by reference to the estimated disturbed acres or fraction thereof for all of the parcels of land that are subject to the stormwater master

plan;

(2) The bond shall be issued by a bonding company licensed and registered in Georgia;

(3) The bond shall ensure that the stormwater management system remains intact and functioning according to its design;

(4) The term of the bond shall extend from the date that the bond is posted until three years from the date that the final inspection was completed pursuant to section 74-43(f) of the Code; and

(5) The bond shall be written to the benefit of the city and shall obligate the bonding company to correct any violations of this article for the term of the bond.

(6) The bond may be released when the city receives the first annual inspection and maintenance report under section 74-517(e) that certifies that the stormwater management system is compliant.

(7) Failure to maintain or renew the bond, should it expire, shall be a violation of this article, and shall be a separate violation for each day of such failure.

(8) If during the term of the bond and after written notice is provided by city to the relevant parties, the owner or applicant fails to bring the stormwater management system into compliance with this article, the owner or applicant shall be

deemed in violation of this article. In addition to other fines or penalties, the owner or applicant shall be deemed to have forfeited the bond. Upon notice by the city that the bond is forfeited, the bonding company shall bring the stormwater management system into compliance. Alternatively, the city may undertake the necessary work to bring

the stormwater management system into compliance and the bonding company shall be responsible for the associated costs up to the amount of the bond. Any additional amounts that may be outstanding will be recovered under section 74-520.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-519. Construction inspections of post-development stormwater management system.

(a) Inspections to ensure plan compliance during construction. Periodic inspections of the stormwater management system construction

shall be conducted by the staff of the city.

Construction inspections shall utilize the approved stormwater management plan and the construction sequencing plan for establishing compliance.

(1) All inspections shall be documented with written reports that contain the following information:

a. The date and location of the inspection;

b. Whether construction is in compliance with the approved stormwater management plan and the construction sequencing plan;

c. Variations from the approved construction specifications; and

d. Any other variations or violations of the conditions of the approved stormwater management plan and the construction sequencing plan.

(2) If any violations are found, the applicant or owner shall be notified in writing of the nature of the violation and the required corrective actions. Failure to carry out the corrective actions is a violation of this article.

(b) Final inspection and as-built plans. Upon completion of a development, and prior to the final inspection pursuant to section 74-43(f) of the Code or the issuance of a certificate of

occupancy or certificate of completion, the applicant or owner shall:

(1) Certify that the completed development is in accordance with the approved stormwater management plan; and

(2) Submit the as-built plans, certified by a professional engineer, for the stormwater management system which must show the configuration of the system. The plans must be submitted in an electronic format as determined by the department and in paper format.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20) Sec. 74-520. Ongoing inspection and maintenance of stormwater management systems.

(a) Operation and maintenance agreements.

An owner must comply with any operation and maintenance agreement.

(b) Pre-existing facilities and other agreements. For any land that is not subject to an operation and maintenance agreement for a

stormwater management system, the following shall apply:

(1) Where another agreement is in place (such as an inspection and maintenance or indemnification agreement), the owner must comply with that agreement.

(2) Where there is no agreement in place, the owner must maintain the stormwater management system in a manner that ensures that the system performs as

originally designed.

(c) Maintenance inspections of stormwater management systems. The following shall apply to all land regardless of the existence of an operation and maintenance agreement or other similar agreement:

(1) Stormwater management systems must undergo ongoing inspections to document maintenance and repair needs and ensure compliance with the requirements of any agreement, any stormwater management plan and this article.

(2) A stormwater management system shall be inspected in accordance with any operation and maintenance agreement or other similar agreement. In the absence of an

operation and maintenance agreement or similar agreement, or where such an agreement does not provide for periodic inspections, the stormwater management system must be inspected by the owner at least annually.

(3) In the event that the stormwater management system has not been maintained and/or becomes a danger to public safety

or public health, the city shall notify the owner by registered or certified mail, or by delivery in person of a notice of violation. The notice shall specify the measures needed to bring the stormwater management system into compliance with this article and shall specify the time within

which such measures shall be completed.

Failure of the city to provide such notice shall not relieve the owner from performing proper maintenance and inspection of the stormwater management system.

A failure by the owner to comply with the notice is a violation of this article.

(4) Inspection programs by the city may be established on any reasonable basis, including but not limited to routine inspections, random inspections, inspections based upon complaints or other notice of

possible violations, and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to, reviewing maintenance and repair records,

sampling discharges, surface water, groundwater, and material or water in stormwater management systems, and evaluating the condition of those systems.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:atlanta/code/whole@2026-10-21-58aabf232d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.