Ir al contenido
Georgia Commons
Menú

Atlanta · Código de ordenanzas

Atlanta Code of Ordinances

Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.

Sobre este texto

  • As published by Municode, current through 2026-10-21
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 26 de 29. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

find or reach the meter or device. The property owner and/or occupants where such activity has been identified shall be subject to the penalty set forth in section 1-8 of the Code of Ordinances, as may be amended from time to time.

(Code 1977, § 9-4032; Ord. No. 1998-87, § 22, 12-10-98; Ord. No. 2006-53, § 28, 8-29-06) Sec. 154-73. Water use restrictions.

(a) This section and all sections beginning with 154-73 shall collectively be known as the "City of Atlanta Water Use Restrictions Ordinance" and

may be referred to throughout sections beginning with 154-73 as "this ordinance."

(b) City of Atlanta has the authority to adopt this ordinance pursuant to Article 9, Section 2, Paragraphs II and III of the Constitution of the State of Georgia, Chapter 35 of Title 36, Section 31 of Chapter 5 of Title 12 of the Official Code of Georgia Annotated, Section 7 of Chapter 5 of

Title 12 of the Official Code of Georgia Annotated, the Georgia Department of Natural Resources

Rules for Outdoor Water Use, Ga. Comp. R. & Regs. Ch. 391-3-30, and Section 1-102(c)(9) of the Atlanta City Charter (1996 Ga. L. (Act No.

1019), p. 4469).

(Ord. No. 2000-40, §§ 1—7, 6-27-00; Ord. No.

2002-71, § 57[2], 9-16-02; Ord. No. 2003-83, § 8, 7-29-03; Ord. No. 2007-39(07-O-0956), §§ 1, 2,

6-26-07; Ord. No. 2010-70(10-O-1914), § 2, 12-15- 10)

Sec. 154-73.1. Purpose and intent.

(a) The purpose of this ordinance is to protect the public health, safety and welfare by adopting and enforcing water use measures that encourage water conservation and ensure adequate supplies of water for the residents and water

customers of the city.

(b) It is the policy of the city to promote water conservation by regulating outdoor water use, by complying with the laws and regulations imposed

by the State of Georgia on outdoor water use;

and by restricting water usage during nondrought periods or state-declared periods of drought to avoid or relieve a local water shortage, or during emergency conditions.

(Ord. No. 2007-39(07-O-0956), § 3, 6-26-07; Ord.

No. 2010-70(10-O-1914), § 3, 12-15-10) Sec. 154-73.2. Definitions.

When used in this ordinance:

(1) Address means the *house number* (a numeric or alphanumeric designation) that, together with the street name, describes a physical location of a specific property.

a. Even numbered address means a house number ending with the number 0, 2, 4, 6, 8, or no house number.

b. Odd numbered address means a house number ending with the number 1, 3, 5, 7, or 9.

(2) Commissioner means the commissioner of the department of watershed management or his/her designee who is vested with the authority and responsibility for

the implementation of an effective outdoor water use program and for the enforcement of the provisions of this ordinance.

(3) Declared drought response level means one of three levels of drought that can be declared by the environmental protection division based on the severity of drought conditions, with one being the

least severe and three being the most severe.

(4) Director means the director of the environmental protection division as defined in this ordinance.

(5) Drip irrigation means the use of an irrigation system manufactured and sold specifically for delivering water through small flexible pipes and emitters slowly and directly to the soil around the base of individual plants in a manner that minimizes evaporative losses, pooling, runoff and wetting of plant foliage. This type of system may be part of a larger automated irrigation system or may operate as a stand-alone system connected to a typical outdoor faucet.

(6) Environmental Protection Division (+EPD+ or +Division+) means an organizational unit of the State of Georgia Department of Natural Resources (*DNR*), which has responsibility for administration of the State of Georgia's Rules for Outdoor Water Use (Ga. Comp. R. & Regs. Chapter 391-3-30) promulgated by the State of Georgia Board of Natural Resources.

(7) Soaker hose means a hose that is connected to a typical outdoor faucet and that is manufactured and sold specifically for delivering water slowly and directly to the soil around the base of

individual plants by allowing water to seep from it in a manner that minimizes evaporative losses, pooling, runoff and wetting of plant foliage.

(Ord. No. 2007-39(07-O-0956), § 4, 6-26-07; Ord.

No. 2010-70(10-O-1914), § 4, 12-15-10: Ord. No.

2017-13(17-O-1131), § 1, 4-26-17) Sec. 154-73.3. Predrought mitigation strategies and drought response strategies.

(a) Predrought mitigating strategies.

(1) During non-drought periods, persons may irrigate outdoors daily for purposes of planting, growing, managing, or maintaining ground cover, trees, shrubs, or other plants only between the hours of 4:00

p.m. and 10:00 a.m.

(2) The restriction in paragraph (1) shall not create any limitation upon the following outdoor water uses:

a. Commercial agricultural operations as defined in O.C.G.A. § 1-3-3;

b. Capture and reuse of cooling system condensate or stormwater in compliance with applicable local ordinances and state guidelines;

c. Reuse of gray water in compliance with O.C.G.A. § 31-3-5.2 and applicable local board of health regulations;

d. Use of reclaimed waste water by a designated user from a system permitted by the Division to provide reclaimed waste water;

e. Irrigation of personal food gardens;

f. Irrigation of new and replanted plant, seed, or turf in landscapes, golf courses, or sports turf fields during installation and for a period of 30 days immediately following the date of installation;

g. Drip irrigation or irrigation using soaker hoses;

h. Handwatering with a hose with automatic cutoff or handheld container;

i. Use of water withdrawn from private water wells or surface water by an owner or operator of property if such well or surface water is on said property;

j. Irrigation of horticultural crops held for sale, resale, or installation;

k. Irrigation of athletic fields, golf courses, or public turf grass recreational areas;

l. Installation, maintenance, or calibration of irrigation systems; or

m. Hydroseeding.

(3) The restriction in paragraph (1) shall not create any limitation upon outdoor water uses for purposes other than planting, growing, managing, or maintaining ground cover, trees, shrubs, or other plants.

(b) Drought response strategies. Within five days of receipt of notice from the Division of a declared drought response level the city will

implement the applicable drought response strategies listed below.

(1) Drought response level 1. The city will implement a public information campaign that will include, at a minimum, public notice regarding drought conditions and drought specific public-service messages in one or more of the following ways:

newspaper advertisements, bill inserts, website homepage, social media, and notices in public libraries.

(2) Drought response level 2. During drought response level 2, the city will implement the drought response level 1 measures plus the following additional drought response level 2 measures:

a. General outdoor watering. Outdoor irrigation for purposes of planting, growing, managing, or maintaining ground cover, trees, shrubs, or other plants, as described in paragraph (a)(1), shall be limited to two days a week on an odd-even schedule. Even numbered addresses may irrigate on Wednesday and Saturday between the hours of 4:00 p.m. and 10:00 a.m. Odd numbered addresses may irrigate on Thursday and Sunday between the hours of 4:00 p.m. and 10:00 a.m.

b. Specific categories of outdoor water use. The outdoor water uses listed in paragraph (a)(2) shall be allowed.

c. The following outdoor water uses shall not be allowed:

1. Washing hard surfaces such as streets, gutters, sidewalks and driveways, except when necessary for public health and safety;

2. Using water for ornamental purposes, such as fountains, reflecting pools, and waterfalls;

3. Use of fire hydrants, except for the purposes of firefighting, public health, safety, or flushing;

4. Washing vehicles, such as cars, boats, trailers, motorbikes, airplanes, or golf carts;

5. Non-commercial washing, or pressure washing, of buildings or structures, except for immediate fire protection; and

6. Charity, or non-commercial fund-raiser, car washes.

(3) Drought response level 3. During drought response level 3, the city will implement all drought response level 1 and 2 measures plus the following additional drought response level 3 measures:

a. General outdoor watering. Outdoor irrigation for purposes of planting, growing, managing, or maintaining ground cover, trees, shrubs, or other plants, as described in paragraph (a)(1) is not permitted.

b. Specific categories of outdoor water use. The outdoor water uses listed in paragraph (a)(2) shall be allowed, subject to the following additional requirements:

1. Irrigation of personal food gardens shall be conducted between the hours of 4:00 p.m.

and 10:00 a.m., unless done using drip irrigation or soaker hoses. Irrigation of personal food gardens using drip irrigation or soaker hoses may be done at any time;

2. Handwatering with a hose with automatic cutoff or handheld container may be conducted between the hours of 4:00 p.m.

and 10:00 a.m.;

3. Irrigation of athletic fields or public turf grass recreational areas may be conducted between the hours of 4:00 p.m.

and 10:00 a.m., subject to the two days a week odd-even schedule described in drought response level 2;

4. Irrigation of golf courses shall be conducted in accordance with the ,Golf Irrigation Prediction and Estimation Worksheet, and only between the hours of 4:00 p.m. and 10:00 a.m., provided, however, irrigation of golf course greens may occur at any time of day;

5. Use of reclaimed waste water by a designated user from a system permitted by the Division to provide reclaimed waste water shall not be allowed for

general outdoor watering as described in paragraph (a)(1).

It shall be allowed for any use described in paragraph (a)(2), subject to the limitations in this subparagraph;

6. Installation, maintenance, or calibration of irrigation systems is allowed, provided that it is done by professional landscapers or golf course superintendents.

(Ord. No. 2007-39(07-O-0956), § 5, 6-26-07; Ord.

No. 2010-70(10-O-1914), § 5, 12-15-10: Ord. No.

2017-13(17-O-1131), § 2, 4-26-17) Sec. 154-73.4. Exemptions.

The following commercial outdoor water uses are exempt from the outdoor water use restrictions contained herein:

(1) Pressure washing;

(2) Permanent car wash facility, provided that it is connected to a sanitary sewer system of a political subdivision or local government authority or recycles used wash water;

(3) Construction sites;

(4) Watering-in of pesticides and herbicides on turf; and

(5) Other activities essential to daily business.

(Ord. No. 2007-39(07-O-0956), § 6, 6-26-07; Ord.

No. 2010-70(10-O-1914), § 6, 12-15-10: Ord. No.

2017-13(17-O-1131), § 3, 4-26-17) Sec. 154-73.5. Authority to restrict water usage to avoid or relieve a local water shortage, or during emergency conditions.

(a) Authority. In accordance with O.C.G.A.

§§ 12-5-7(a)(1) and 12-5-7(a)(2), the commissioner may implement special water conservation measures during emergency conditions that threaten the public health, safety or welfare, or for repairs, water shortages or potential water

shortages in addition to any outdoor water use restrictions in place during non-drought conditions or declared drought response levels. The type, nature, degree, commencement and duration of any restrictions or prohibitions are to be determined by order of the commissioner and in

accordance with O.C.G.A. §§ 12-57(a)(1) and 12-5-7(a)(2).

(b) Restrictions. The water conservation measures imposed by the commissioner under section 154-73.5(a), above, may include restrictions or prohibitions on nonessential uses such as swimming pool filling, watering of lawns and

gardens, washing of recreational or other vehicles, equipment, sidewalks, driveways, parking areas,

tennis courts, patios, and other paved areas, recreational uses, and any other uses which the commissioner may deem to be nonessential.

(c) Notice. Prior to the imposition of any restrictions under this ordinance, written notice of the restrictions or prohibitions imposed under this section due to water shortage, potential

water shortage, emergency, or prolonged routine maintenance interruptions shall be provided to the city council and through the news media simultaneously. The notice shall set forth the specific nature of the restrictions or prohibitions, the reasons for the imposition of the restrictions or prohibitions, the date upon which the restrictions or prohibitions become effective, and their duration. Notice is not required for emergency

diversions of water or emergency repairs; except to the city council.

(d) Modifications and additional restrictions.

The commissioner of the department of watershed management, in accordance with O.C.G.A. §§ 12- 5-7(a)(1) and 12-5-7(a)(2), may modify or cancel water restrictions and schedules or add additional restrictions for any and all water users from

time to time as conditions affecting the water system such as drought, emergency, repairs, water shortages, or potential water shortages, may worsen or abate. Modifications to water restriction schedules may include but are not limited to restricting public parks and recreational facilities to the scheduled days of Monday and

Friday during the hours of 12:00 midnight to 10:00 a.m., during declared drought response level three.

(Ord. No. 2007-39(07-O-0956), § 7, 6-26-07; Ord.

No. 2010-70(10-O-1914), § 7, 12-15-10) Sec. 154-73.6. Enforcement, penalties for violation and termination of service.

(a) Liability and conditional provision of water services. No resident or customer shall use or

allow the use of water in violation of the restrictions contained in this ordinance or restrictions issued by the commissioner pursuant to this

ordinance. All customers of water services are required to comply with this ordinance and restrictions issued pursuant to this ordinance as a condition of continued water services.

(b) Enforcement authority. The department of watershed management shall be the enforcement authority for this ordinance. The mayor may also authorize other departments in the city as may be deemed necessary to support enforcement.

(c) Administrative penalties and termination of water service. No customer shall use or allow the use of water in violation of any provision of this ordinance or restrictions issued by the commissioner pursuant to this ordinance.

(1) Violators of this ordinance or restrictions issued by the commissioner pursuant to this ordinance shall be subject to the following schedule of administrative penalties:

a. First violation. Written notice mailed to the property or posted at the property where the violation occurred.

b. Second violation. An administrative penalty of one hundred dollars ($100.00) placed upon the water bill of the customer's property where the violation occurred.

c. Third violation. An administrative penalty of two hundred fifty dollars ($250.00) placed upon the water bill of the customer's property where the violation occurred.

d. Fourth and subsequent violations.

An administrative penalty of five hundred dollars ($500.00) placed upon the water bill of the customer's property where the violation occurred, or service termination including charges for reconnection of service, or both.

(2) Notice. Notices of violation for the first and all subsequent violations of the prohibitions in this ordinance shall be posted at the property or sent by first class mail to the customer of record. The notice shall be in writing, include the address of where the violation occurred, the restriction which has been violated, and the consequences of subsequent violations. In the case of multi-family residential dwellings where two or more

units are served by a single meter, written notice shall be mailed to the person in whose name the water bill is issued

and administrative penalties shall be assessed accordingly.

(3) Any administrative penalties imposed pursuant to this section shall be payable to the City of Atlanta, remitted to the Water and Wastewater Operation and Maintenance Fund (5051), and shall commence on the date of issuance of any notice of violation. Any such administrative penalties shall become a part of the customer's regular bill for service. Failure

to remit payment shall be subject to the rules, procedures and penalties under Chapter 154, Article III, Section 120, Nonpayment of Bills.

(4) Any customer aggrieved or adversely affected by an administrative penalty imposed pursuant to this ordinance shall have an opportunity to request and be given a hearing before the water and sewer appeals board, established under Chapter 154, Article II, wherein the aggrieved or adversely affected customer shall have an opportunity to show cause as to why an administrative penalty or other enforcement action under this ordinance should not be taken,

a. An aggrieved or adversely affected customer may request a show cause hearing by filing a written appeal to the water and sewer appeals board with the commissioner of the department of watershed management, setting forth the basis of the appeal, provided that such appeals shall be

forwarded to the water and sewer appeals board only if filed within seven business days of the date that the written notice to customers regarding their right to request a show cause hearing on or before the due date of the administrative penalty or other enforcement action is to be disputed.

b. Upon receipt by the commissioner of the department of watershed management of a request for a show cause hearing, customers shall not be required to pay the administrative penalty or be subject to service termination for nonpayment of such

administrative penalty, until final determination by the water and sewer appeals board, provided however, that a request for a show cause hearing shall not affect authority of the city to require full payment of other amounts under Chapter 154, Article II, Water Sewer

Appeals Board, or to collect other amounts in dispute under Chapter 154, Article III, Water.

c. Any administrative penalties imposed pursuant to this ordinance may at the discretion of the commissioner under extraordinary circumstances, be waived or reduced.

(Ord. No. 2007-39(07-O-0956), § 8, 6-26-07; Ord.

No. 2010-70(10-O-1914), § 8, 12-15-10) Sec. 154-73.7. Rulemaking authority.

The commissioner is authorized to make all necessary and reasonable rules and policies with respect to the enforcement of this division. All such rules and policies shall be consistent with the provisions of this ordinance and O.C.G.A.

§§ 12-5-7(a)(1) and 12-5-7(a)(2) and shall also be provided to the Atlanta City Council.

(Ord. No. 2007-39(07-O-0956), § 9, 6-26-07; Ord.

No. 2010-70(10-O-1914), § 9, 12-15-10) Sec. 154-73.8. Severability.

If any provision, clause, sentence or paragraph of this ordinance, or the application thereof to any person or circumstances, shall be held invalid, such invalidity shall not affect the other provisions or application of the provisions of this ordinance which can be given effect without the

invalid provisions or application and, to this end, the provisions of this ordinance are hereby

declared to be severable.

(Ord. No. 2007-39(07-O-0956), § 10, 6-26-07;

Ord. No. 2010-70(10-O-1914), § 10, 12-15-10) Sec. 154-74. Outdoor water requirements for large landscapes.

Sec. 154-74.1. Purpose.

The purpose of this article is to reduce discretionary outdoor water use and avoid wasting water by adopting more efficient irrigation system design requirements.

(Ord. No. 2018-66(18-O-1712), § 2, 12-12-18) Sec. 154-74.2. Definitions.

The following words, terms and phrases, when used in this ordinance, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Flow sensor means an inline device installed at or near the supply point of the landscape irrigation system that produces a repeatable signal proportional to flow rate.

Landscape irrigation system means an assembly of component parts that is permanently installed for the controlled distribution of water to irrigate landscapes.

Landscape means ground cover, trees, shrubs, and other plants.

Large landscape means the landscape areas associated with a development (excluding singlefamily homes) served by one or more landscape irrigation systems where all irrigated areas added together total more than one acre (or 43,560

square feet).

Master shut-off valve is an automatic valve such as a gate valve, ball valve, or butterfly valve) capable of being automatically closed by the WaterSense controller. When this valve is closed water will not be supplied to the landscape irrigation system.

Rain sensor shut-off means an electric device that detects and measures rainfall amounts and overrides the cycle of a landscape irrigation system so as to turn off such system when a predetermined amount of rain has fallen.

WaterSense controller means weather-based irrigation controllers labeled under the U.S.

Environmental Protection Agency's WaterSense program, which includes standalone controllers, add-on devices, and plug-in devices that use current weather data as a basis for scheduling irrigation.

(Ord. No. 2018-66(18-O-1712), § 3, 12-12-18) Sec. 154-74.3. Avoiding water waste through design.

All landscape irrigation systems shall be designed, installed, maintained, and operated to prevent runoff from leaving the target landscape due to low-head drainage, overspray, or other

similar conditions where water flows onto adjacent property, non-irrigated areas, walks, roadways,

parking lots, or structures. This requirement helps ensure compliance with, and is in addition to, the department of watershed management's

more general prohibitions against water waste.

(Ord. No. 2018-66(18-O-1712), § 4, 12-12-18) Sec. 154-74.4. Large landscape irrigation system requirements.

(a) Applicable backflow prevention, a WaterSense controller, and the rain sensor shutoff as required of all new landscape irrigation systems;

(b) A master shut-off valve for each controller installed as close as possible to the point of connection of the water but downstream of the backflow prevention assembly;

(c) Pressure-regulating devices such as valve pressure regulators, sprinkler head pressure regulators, inline pressure regulators, or other devices shall be installed as needed to achieve

the manufacturer's recommended pressure range at the emission devices for optimal performance;

and

(d) At least one flow sensor connected to the WaterSense controller that will detect and report high flow conditions to such controller and

automatically shut master valves.

(Ord. No. 2018-66(18-O-1712), § 5, 12-12-18) Sec. 154-74.5. Compliance self-certifications for 1 and larger service connections.

As a condition of selling a new water meter or irrigation meter for any new service connection of one inch or larger, the purchaser of such meter shall submit a certification of compliance along with any other required paperwork and project

information as may be required by the department of watershed management.

(1) Such certification of compliance shall include a certification that one of the following is true and correct:

a. the development will not include any landscape irrigation systems;

b. the development will include a landscape irrigation system that does not serve a large landscape, and as a result the system will only include applicable backflow prevention, a WaterSense controller, and the rain sensor shut-off; or

c. the development will include a landscape irrigation system that does serve a large landscape, and as a result all requirements in this section will be met.

(2) For all new service connections of one inch or larger, the department of watershed management shall receive the signed certification of compliance and determine whether all required information has been provided. If the certification of compliance has not been completed with all required information, the department of watershed management shall return the certificate of compliance to

the purchaser specifying what information is missing and asking that a complete certificate be resubmitted.

(Ord. No. 2018-66(18-O-1712), § 6, 12-12-18) Secs. 154-75—154-78. Reserved.

Secs. 154-80—154-90. Reserved.

DIVISION 2. FIRE HYDRANTS*

(a) Purpose. The purpose of this section is to require the installation of a detector meter or factory mutual fire line water meter on all new unmetered fire service systems.

(b) Work is to be performed by the city.

(1) Installation of detector meters or factory mutual fire line meters as required by this section will be handled by city personnel at the expense of the building owner or lessee.

(2) The charges for the installation shall be set by city council.

(c) Authority of commissioner. Water service to buildings whose owners refuse to comply with this section upon notification and hearing as required by this article may be terminated.

[d] Standby charge. The regular monthly fire service standby charge shall be continued for fire service installations having a detector meter.

The commissioner of the department of watershed management may bill factory mutual fire line meters at metered rates.

(Code 1977, § 9-4079; Ord. No. 1998-87, § 29, 12-10-98; Ord. No. 2005-01, § 3, 1-10-05; Ord.

No. 2006-53, § 30, 8-29-06) Sec. 154-92. Connections for fire service and water meters.

(a) Separate properties under one ownership.

Whenever one or more connections from the city water main to the property line are used for the purpose of supplying more than one property

under one ownership, a separate charge, according to the schedule of charges for fire service connections, shall be made and assessed against

the owner and tenant; that is to say, if the connection from the city main to the property line is separated or divided or extended for the protection of more than one building or property, a separate charge according to the schedule of

charges for connections or size of connection shall be made for each building or property so connected.

(b) Separate meters or connections. The commissioner of the department of watershed management may require separate water meters and fire service connections for each owner.

(c) Subdivision. Whenever property formerly held by one owner is subdivided and sold to multiple owners, it shall be unlawful for the new owners of the various parcels to be served collectively on one or more meters. Instead, the water supply for both domestic use and fire

protection shall be metered on a separate meter for each parcel under separate ownership.

Application for such additional services or connections shall be made to the department of watershed management. The applicant will be

charged for the cost of making the tap, setting the meters and other expenses in connection therewith. In addition, the department may, after notice to at least one offending property owner and to all other property owners known to the department and reasonable opportunity to cure the violations, discontinue water service to properties in violation of this section.

(Code 1977, § 9-4081; Ord. No. 1998-87, § 30, 12-10-98; Ord. No. 2006-53, § 31, 8-29-06) Sec. 154-93. Possession of key to fire hydrant.

(a) It shall be unlawful for any person to have in possession any key to any fire hydrant owned by the city, except such key as may be furnished by permit from the commissioner of the department of watershed management or the commissioner's designee. Only persons named on the permit or a duly authorized agent of a permittee may possess a key issued by the commissioner of

the department of watershed management or the commissioner's designee. It shall be unlawful for any person to use any instrument, other than a

key issued by the commissioner of the department of watershed management or the commissioner's designee, to open a fire hydrant.

(b) The commissioner of the department of watershed management or the commissioner's designee shall impose, as a condition to the issuance of a permit, the agreement of the permit holder to be subject to any of the following penalties if there is a finding by the commissioner of the department of watershed management or the commissioner's designee of a

violation of subsection (a) of this section or section 154-94:

(1) Immediate confiscation of the key or instrument used to open the fire hydrant.

(2) Costs of all labor and materials needed to repair or replace any damage to the fire hydrant or meter.

(3) Revocation of the permit and forfeiture of the deposit.

(Code 1977, § 9-4036; Ord. No. 2006-53, § 32, 8-29-06) Sec. 154-94. Use and misuse of fire hydrants.

(a) It shall be unlawful for any unauthorized person to use water from any fire hydrant from which city water is drawn without permission from the department.

(b) In case of a violation of subsection (a) of this section, the department shall impose a charge for the unauthorized use of water of:

(1) $300.00 plus retail cost for water used for first-time offenders.

(2) $500.00 plus retail cost for water used for second-time offenders.

(3) $750.00 plus retail cost for water used for third-time offenders.

(4) $1,000.00 plus retail cost for water used for fourth-time offenders.

The retail cost for water used will be the rate in effect.

(c) Tampering. It shall be unlawful to tamper, plug or interfere with any fire hydrant from which city water is drawn without written authorization.

(d) Apparatus without backflow prevention. It shall be unlawful to connect any vehicle, container or equipment which is subject to the danger of backflow or back siphonage to a fire hydrant.

(e) Penalty. In addition to the costs and charges listed above, any violation shall subject the offender to punishment pursuant to the penalty set forth in section 1-8 of the Code of Ordinances, as may be amended from time to time.

(Code 1977, § 9-4037; Ord. No. 1998-87, § 31, 12-10-98) Secs. 154-95, 154-96. Reserved.

Sec. 154-97. Charges for use.

(a) Deposit. A person desiring to use water from a fire hydrant shall be required to deposit $2,900.00 for the use of a temporary meter and

any accessories and, upon approval by the commissioner of the department of watershed management or the commissioner's designee, shall be allowed to use water from fire hydrants. Upon

return of the temporary meter and accessories and provided that satisfactory evidence is presented that all bills and charges are paid, the commissioner of the department of watershed

management or the commissioner's designee is authorized to refund the deposit made without interest, charging such voucher to the refund of meter deposit account. A monthly reading of the

meter associated with the fire hydrant for which the temporary meter was obtained shall be used

for the calculation of the actual consumption charges to be assessed in connection with the use of water from the fire hydrant.

(b) Schedule of charges. After a permit is issued, charges for the use of water from hydrants shall be based on a flat daily rate or a retail rate for water used as measured through a temporary

meter installed by the permit holder for this purpose. The method of determining charges shall be decided by the commissioner of the department of watershed management or the commissioner's

designee based on the following:

(1) The flat daily rate will be as established by the city including the use of the key.

(2) If a temporary meter is installed, the charges will be either the retail charge for water used or the minimum bill based on meter size.

(c) Monthly meter readings. The person to whom a meter is issued is required to make monthly readings of the water used and to submit such readings to the commissioner of the department of watershed management or the commissioner's designee. Upon request by the commissioner of the department of watershed management or the commissioner's designee, the meter must be brought in for verification or testing. A bill based on the monthly meter reading shall be issued to

the permit holder.

(d) Minimum charge. The minimum rate for the use of a fire hydrant shall be as established by the city.

(e) Failure to pay bill. If the water bill is not paid within 90 days from the date of the bill, the key will be confiscated and the deposit will be

forfeited.

(Code 1977, § 9-4062; Ord. No. 1998-87, § 34, 12-10-98; Ord. No. 2005-01, § 6, 1-10-05; Ord. No.

2006-53, § 33, 8-29-06) Secs. 154-98—154-110. Reserved.

DIVISION 3. RATES, CHARGES AND

RELATED MATTERS

(a) The mayor or the commissioner of the department of watershed management, subject to the approval of the council, shall fix rates for which water shall be furnished for all purposes

within the area served by the city water system.

Water rates shall be sufficient to pay for the operation, maintenance, reserves, debt service, additions, extensions and betterments of the water system, including those reasonably required for the anticipated growth of the area served, and should also be sufficient to provide for the accumulation of reserves for improvements that cannot be acquired from a single year's receipts.

(b) The authority granted in subsection (a) of this section shall apply to all charges made by the department of watershed management including,

without limitation:

(1) Deposits for water service;

(2) Use of fire hydrants and deposits for fire hydrant keys;

(3) Filling swimming and other pools;

(4) Turning off water, locking the meter, cutting at main, plugging the service or removing the meter;

(5) Moving water meters;

(6) Installation of meters on fire service systems;

(7) Filling fire service system tanks;

(8) Fire service connections; and

(9) Purchase, installation and service of meters.

Water rates are hereby waived by 30 percent for domestic customers, aged 65 and older, with a maximum household income of $25,000.00 or less.

(Code 1977, § 9-4002; Ord. No. 1998-87, § 35, 12-10-98; Ord. No. 2001-99, § 1, 12-11-01; Ord.

No. 2004-01, §§ 1, 3, 1-9-04; Ord. No. 2004-05, § 1, 1-5-04; Ord. No. 2006-53, § 34, 8-29-06)

Sec. 154-112. Established.

The rates and charges for city water service shall be as established by the city.

Water rates are hereby waived by 30 percent for domestic customers, aged 65 and older, with a maximum household income of $25,000.00 or less.

(Code 1977, § 9-4061; Ord. No. 2001-99, § 1, 12-11-01; Ord. No. 2004-01, §§ 1, 3, 1-9-04; Ord.

No. 2004-05, § 1, 1-5-04) Sec. 154-113. Charges for water connections and setting meters.

The charges for making water connections and setting meters inside and outside the city shall be fixed by ordinance.

(Code 1977, § 9-4065) Sec. 154-114. Deposits for water service.

(a) The commissioner is authorized and directed to require deposits from customers as follows:

(1) Prior to, and as a condition of, the establishment of water service at any address within the service area of the water department.

(2) Prior to, and as a condition of, the restoration of water service terminated for nonpayment of charges due at any address within the service area of the water department, after any credit from a deposit previously made by the customer is applied to charges due.

(3) New applicants for water service that qualify for assistance under the established guidelines of the care and conserve program may elect to split the required

deposit into four equal payments over a four-month period.

(4) As adequate assurance of payment from customers of the water department who have commenced a case under the United States Bankruptcy Code or from the bankruptcy trustees.

(b) The amount of the deposit required for single-family residential, commercial and industrial meters will be as follows:

Meter Size (inches) Deposit /4 $ 80.00 1 to 2 140.00 3 to 4 300.00 6 to 8 500.00 10 to 12 1,200.00

(c) The amount of the deposit required as adequate assurance of payment from bankruptcy debtors or their trustees in bankruptcy shall be based on the rate of two periods of average

billings.

(d) No deposit shall be required from customers who request the transfer of water service to a different address within the service area, provided that no action to terminate service has been taken at the customer's present service address

within the previous 24 billing periods, and further provided that no payments are overdue at the

customer's present service address.

(e) Deposits made on accounts shall be refunded, provided no action to terminate service has been taken, after five years of uninterrupted water service.

(f) When accounts are closed, the deposit collected for such accounts shall be applied to any unpaid balance. Any funds remaining for the

account after unpaid balances are satisfied shall be refunded within 60 days without interest, or

upon customer request, shall be transferred without interest to another account to serve as a deposit or a portion of the required deposit for such new account.

(g) Any deposit returned to the department with no forwarding address, or otherwise unclaimed within 12 months after the account to which it is credited is closed, shall be transferred from the water and sewer revenue fund to the

water and sewage renewal and extension fund.

(h) There will be a nonrefundable charge of $15.00 applied to every account at the time it is established to cover administrative costs. Changing the name on the account at the customer's request shall be considered establishing an account. This charge will appear on the customer's first bill.

(i) For multiple-dwelling unit account, the deposit shall be $25.00 per living unit.

(Code 1977, § 9-4004; Ord. No. 1995-12, 4-24-95;

Ord. No. 2008-04(07-O-2586), §§ 1—3, 1-30-08) Sec. 154-114.1. Establishment of water service.

The commissioner may require proof of identity of each applicant and occupancy information sufficient to establish the identity of the consumer of water and sewer services. In addition, the commissioner may require tenant and/or property ownership information on each property served at the time of application regardless of whether the property owner is the occupant or consumer. No

new account shall be established for customers with delinquent charges on any account in the name of such customers or for customers on any partial payment plan agreement until such charges are paid.

(Code 1977, § 9-4004.1) Sec. 154-115. Residential customers served through single meter.

Use of sub-meters in multifamily or mixed use structures containing residential units and residential customers served through a single meter during construction.

(1) No water shall be supplied nor any building permit issued to any newly constructed multi-family residential building or structure or mixed use building or

structure containing residential units unless the building or structure is built with either individual meters that measure

water provided to each residential unit or private sub-unit meters owned and managed by the property owner that measure water provided to each residential unit

with a utility owned master meter that measures the quantity of water to the master meter. This requirement shall not apply to those applications received by the bureau of buildings prior to July 1, 2009.

(2) Nothing in this Code section shall render the department of watershed management responsible for providing, owning, operating, or maintaining any sub-meter

required under this Code section. For buildings with master meters required to install sub-meters under this Code section, the property owner shall be responsible

for providing, owning, operating, and maintaining the sub-meters.

(3) Monthly water and sewer rates and charges applicable to a single account will be charged while under construction for structures that have more than one house, apartment or condominium living unit on

one meter. As soon as any part of the building is occupied, water and sewer base charges will be applicable for each house, apartment or condominium living unit that may be occupied and monthly rates and charges for water consumption and sewer service will be computed based on each unit having used water within each consumption range of the adopted rate schedule.

(Code 1977, §§ 9-4082, 9-7006; Ord. No. 1998-87, § 36, 12-10-98; Ord. No. 2005-88, § 1, 12-13-05;

Ord. No. 2009-14 (09-O-0285), § 1, 3-24-09) Sec. 154-115.1. Charge for notification of termination of service to residents of multiple dwelling units.

Whenever it is necessary for the commissioner or designee to notify the residents of multiple dwelling units of pending termination of services due to nonpayment of water and sewer bills, a

charge of $1.00 per dwelling unit will be assessed against the account in order to recover the associated costs incurred by the department.

(Code 1977, § 9-4082.1) Sec. 154-116. Installation of separate water meters for individual units of groups of single-family dwellings.

(a) Individual water meters for each living unit of groups of single-family dwellings served by a single water meter will be installed by the city, on request, after the following conditions are met:

(1) The owner of all individual living units served by a single meter must give written consent to the installation of individual water meters.

(2) The owner of each individual living unit must pay the cost of the meter and all installation costs in accordance with the city's fee schedule in force at the time of installation.

(3) Existing and proposed distribution piping and appurtenances must conform to the department of water design criteria and construction manual in force at the time of installation.

(4) Except as provided in this section, the meters and appropriate housing for the meters must be designed for installation in an existing city-owned street right-ofway.

(5) If existing city-owned rights-of-way are not suitable for the installation of individual meters, in addition to subsections (a)(1) through (a)(4) of this section, the

following conditions must be met for the installation of individual meters on private property:

a. The owners of all individual living units shall grant easements to the city for meter installation within ten feet of the curbline of existing rightsof-way for water mains.

b. The easements shall comply with the specifications then in force of the department of water.

c. The owner of all individual living units shall sign an agreement indemnifying the city from any and all damage claims resulting from the

installation, maintenance of and access to meters on private property.

d. The owner of each individual living premises shall sign a written acknowledgement that water lines between the meter and living unit and the living unit interior plumbing will be maintained by the owner and that cutoff valves must be installed by the owner on the discharge side of the meter box at or near the property line.

e. If required in lieu of dedicated streets, a 20-foot right-of-way centered on the water main shall be conveyed to the city, except that the commissioner of water may accept a narrower right-of-way where obstructions are involved.

(b) Water and sewer rates for individual units of groups of single-family dwellings for which individual meters are installed shall be in accordance with the rates set forth for single-family residences.

(Code 1977, § 9-4083) Sec. 154-117. Charges made to trailer parks.

All water service charges made to trailer parks shall be uniform and shall be charged at the regular city water system rate on a one-unit basis for the amount of water used.

(Code 1977, § 9-4066) Sec. 154-118. Water and wastewater systems security surcharge.

(a) That the imposition of a surcharge shall be placed on all domestic, commercial, industrial and other users of the City of Atlanta Water and Wastewater System to pay for the cost to implement the security and infrastructure requirements as described in the Safe Drinking Water Act and Public Health Security and Bioterrorism

Preparedness and Response Act.

(b) That for purpose of this section, the surcharge will be described as the "water and wastewater systems security surcharge."

(c) That the water and wastewater systems security surcharge shall be $0.15 per hundred cubic feet for all billing cycles beginning on and after January 1, 2004. Funds collected from the

surcharge shall be deposited in a fund separate and distinct from other funds of the water and wastewater system.

(Ord. No. 2004-01, § 7, 1-9-04) Sec. 154-119. Temporary use of water by contractors and others.

(a) Charges. Contractors and other persons may be supplied with water for temporary use according to the regular monthly rate of charges provided for water supply. They shall be required to deposit an amount equal to that charged for

making water connections of various sizes as scheduled for these connections, the deposit to be held as a guaranty of the safety of the meter and other equipment owned by the city furnished such persons and for the payment of charges for water used through the meter. The applicant shall be

charged for cost of making the tap, setting the meter and other expenses in connection therewith and for the removal of the meter and connections.

(b) Refund of deposit. Upon payment of all charges and the removal and discontinuance of service through the meter, the commissioner of the department of watershed management is authorized to refund the amount of the deposit without interest.

(Code 1977, § 9-4063; Ord. No. 2006-53, § 35, 8-29-06) Sec. 154-120. Nonpayment of bills.

The department of watershed management and the treasury division of the department of finance will develop written policies and procedures for the billing, collection and cut-off procedures for the provision for water and sewer services. The

policies and procedures developed must contain at least the following provisions:

(1) Upon the failure of any person to: (i) Pay any water bill assessment, advance payment or charge against any premises for which the person is responsible by the due

date set forth in the bill; or (ii) To send a written notice of dispute in accordance with the instructions contained on the applicable bill, the person will be sent a notice that their service will be terminated without further notice and the commissioner of the department of watershed management are authorized to turn off

and discontinue water service to the person and premises until the bill or charge is paid, and a charge fixed by the council

will be made for each turnoff. Subject to O.C.G.A. § 36-60-17, the delinquent bill or charge shall be a lien on the property where the bill or charge was incurred. In no event will the termination of service be later than 30 days from the due date of the bill for monthly bills and 60 days for bi-monthly bills.

(2) A late fee of $5.00 or five percent of the total bill, whichever is greater, will be assessed on all water and sewer bills rendered that are not paid by the established due date on the bill. The bill rendered for the following billing cycle will contain the past due amount plus the

$5.00 or five percent of the total bill, whichever is greater, late fee.

(3) The past due charges, late fee and any other appropriate charges must be paid in full before service is restored. Said late fees shall be deposited into fund, account, and center number 2J01 462601 B00001.

(4) The department of finance shall cause books recording all liens for unpaid water and sewer bills and charges to be prominently displayed for public inspection in the office where the chief financial officer

keeps other lien information books and in the office where the general execution docket of the county wherein the delinquent property is located.

(5) Subject to O.C.G.A. § 36-60-17, the charge must be paid before water is turned on again unless the commissioner of the department of watershed management, in the commissioner's discretion, waives such

charges.

(6) The commissioner of the department of watershed management or the commissioner's designee may authorize agreements, with the person responsible for the payment of water services, for an installment payment schedule not to exceed 12 months in order to alleviate the customer's financial burden caused by periods of high usage.

(7) The commissioner of the department of watershed management are authorized to turn off and discontinue water service to any property where the responsible party does not meet the agreed-upon payment schedule and make timely payments for current usage charges.

(8) Water and sewer revenues collected will be prorated between the water, sewer and industrial surcharge accounts on a percentage to total bill basis when received and recorded on the books. Any partial

payments received shall be applied in the appropriate percentages to the water, sewer and industrial surcharge accounts based on each accounts pro rata share of the total water/sewer bill.All past due amounts from the previous billing periods must be paid in order to continue water service.

All cutoff dates must be strictly adhered to and enforced. When calculating the application of the appropriate percentages to the water, sewer and industrial surcharge accounts on a partial payment,

the methodology in the following hypothetical must used:

a. Total water/sewer/industrial surcharge bill = $1,000.00 comprised of $300.00 water, $600.00 sewer and

$100.00 industrial surcharge;

b. Pro-rata allocation = water—30 percent + sewer—60 percent + industrial surcharge—Ten percent;

c. Total water/sewer/industrial surcharge bill collected = $500.00;

d. Allocate as follows:

1. Water (0.3 x $500.00 = $150.00);

2. Sewer (0.6 x $500.00 = $300.00);

and

3. Industrial surcharge (0.1 x $500.00 = $50.00).

(9) Placement of fieri facias (fi. fa.) for delinquent bills. The chief financial officer or other duly authorized collector of water and sewer charges shall, after the failure of any person to pay delinquent water and sewer bills and the commissioner of the department of watershed management has certified that other methods of collection are ineffective, place a fi. fa.

on the property where service was received and shall maintain a docket on delinquent water and sewer bills which shall be available for examination; in addition to any delinquent water and sewer bills, the chief financial officer is authorized to charge the property owner any costs for the execution of the fi. fa. and maintenance of this docket.

(Code 1977, § 9-4072; Ord. No. 1998-87, § 38, 12-10-98; Ord. No. 2001-97, § 3, 12-11-01; Ord.

No. 2006-53, § 36, 8-29-06; Ord. No. 2021-62(21- O-0883), § 2, 12-15-21, eff. 3-1-22)

Secs. 154-121—154-129. Reserved.

Sec. 154-130. Care and conserve program.

(a) Findings.

(1) Authority. The City of Atlanta pursuant to the Article IX, § II, Paras. II and III, and Art. IX, §IV, Para. II of the Constitution of the State of Georgia, O.C.G.A.

§ 36-34-5, and the Atlanta City Charter § 1-102(C)(9) has the authority to provide and the responsibility of providing drinking water and wastewater service to its water and sewer customers both inside

and outside the corporate, boundaries of the City of Atlanta and to fix rates, charges and fees for same. The provision of clean drinking water and continuous wastewater service promotes the safety, health and general welfare of the City of Atlanta and its inhabitants pursuant to the Atlanta City Charter § 1-102(b).

(2) Water conservation. The City of Atlanta finds that water is a vital resource that requires conservation to sustain adequate supplies for emergencies and future system needs as well as to protect water quality and the environment. Conservation of water supplies by various means is now required and encouraged by the

United States of America through statutes such as 42 U.S.C. § 10302 and 42 U. S.C.

§ 6295; and the State of Georgia through Title 12, Chapter 5, Article 1; the Georgia Water Quality Control Act, O.C.G.A. § 12- 5-20, et seq.; the. Georgia Safe Drinking Water Act of 1977, O.C.G.A. 12-5-170, et seq.; the Metropolitan North Georgia Water Planning District Act, O.C.G.A.§ 12- 5-470, et seq.; and O.C.G.A.§ 8-2-1 et seq.; among others. To conserve its vital water resources, the government of the City of Atlanta shall establish programs that expand customer access to water conserving measures, fixtures and devices.

(3) Lifeline access to water and wastewater service. The City of Atlanta finds that it is standard practice throughout the United States for water and wastewater utilities to implement well-tailored programs that provide assurance of the availability of service to all customers, especially economically disadvantaged households.

To assure lifeline access to water for economically disadvantaged customers, the government of the City of Atlanta shall establish programs that improve customer accessibility to the minimum quantity of water necessary to sustain life, safety, and health.

(4) Sustainable infrastructure. The City of Atlanta finds that operation of the city's drinking water and wastewater system in an efficient and economical manner and on a revenue-producing basis is necessary to sustain strong public water and wastewater infrastructure. The City of

Atlanta further finds that programs that assist customers with conserving water through installation of water conserving devices and repair of leaks in service lines, as well as programs that otherwise facilitate lifeline access to water and wastewater service by providing limited bill payment assistance, and programs that provide limited assistance for the restoration of property that is damaged as a result of a sewer spill or water main break, to qualified low-income customers provide a direct and substantial benefit to the drinking water and wastewater system and are therefore reasonable and customary costs of operating and maintaining the City of Atlanta's drinking water and wastewater system because they:

(i) Retain customers;

(ii) Avoid costs of disconnection and collections;

(iii) Reduce bad debt expenses;

(iv) Further federal, state and city policy to conserve water resources upon which the city relies;

(v) Avoid or defer costly water supply enhancement projects and allow the City better leverage existing water resources;

(vi) Reduce the likelihood of sewage spills and water main breaks and minimize potential claims and the costs for processing such claims for sewage spills or water main breaks; and (vii) Enhance the city's good will.

Further, the City of Atlanta finds that all of the foregoing enhance the City of Atlanta's ability to operate the drinking water and wastewater system in an economical manner and on a revenueproducing basis and are reasonably incurred in connection with the operation and maintenance of such system and will result in the combined benefits of

providing assurance of the availability of service to all customers, enabling ratepayers to remain connected throughout particularly challenging periods, and

enhancing water use efficiency among low-income households.

Further, the City of Atlanta finds that it is a national standard practice to fund conservation and affordability programs by combining system revenues (or receivable reductions) and local charitable contributions to fund program

expenditures. Therefore, implementation of such programs will further the efficient and economical operation of the

drinking water and wastewater system and are necessary expenses of operation and maintenance. Any benefit which may inure to private citizens in connection with or as a byproduct of the provision of these services is merely incidental to fulfilling the paramount public purposes served by such programs. When sufficient funds exist, system revenues may be utilized in part to fund conservation

and affordability programs.

(5) Care and conserve program. The achievement of the policies and purposes described in subsections (a)(1) through

(a)(4) require that the mayor or their designee, the commissioner of the department of watershed management, be charged to create a care and conserve

program that may provide certain services for qualified low-income customers of city's drinking water and wastewater system that further the policies declared in this Code Section. These services may include installation of water conserving devices, water conserving services, leak detection services, leak repairs for water and sewer service lines, residential plumbing repairs; bill payment assistance; and limited assistance for the restoration of

property that is damaged as a result of a sewer spill or water main break, to qualified low-income customers.

(b) Care and conserve program established.

The City of Atlanta Care and Conserve Program is established for the purposes described in subsection (a), which shall include the provision of the following defined services for qualified

low-income water and/or sewer customers of the City of Atlanta: installation of water conserving devices, leak repairs for water and sewer service lines, residential plumbing repairs, bill payment assistance, and limited assistance for the restoration of property that is damaged as a result of a sewer spill or water main break.

(c) Funding sources. The care and conserve program may be funded through corporate donations, customer contributions, revenues generated from cell tower lease agreements governing the use of properties used as part of the water or sewer system under the purview of the department of watershed management or revenues generated from any service line warranty program or other revenue sources where funds are so

designated for the care and conserve program and/or the care and conserve trust fund through appropriate legislative authorization; and further such water and sewer revenues of the city's

drinking water and wastewater system, as such funds may be properly authorized in an approved budget or other legislative authorization.

(d) Annual contribution to the care and conserve program. The city may authorize and appropriate for the care and conserve program such funds as may be designated in appropriate legislation

at least annually from the authorized funding sources described in subsection (c). The city may select and award funds from authorized City of

Atlanta funding sources through a competitive grant selection process, which process shall be overseen by the chief financial officer in connection with the commissioner of the department of watershed management, or their authorized

designees. The city may utilize or apply for federal, state, community development block grants, or other grants when implementing the care and conserve program without seeking council approval prior to filing any grant application in accordance with section 2-910 of the Atlanta City Code.

(e) Administration of the care and conserve program.The care and conserve program shall be administered by any non-profit entities selected and properly awarded the grant funds by the

City of Atlanta pursuant to subsection (d). The care and conserve program administrator shall be required to comply with such program requirements provided in any grant selection process and all other procedures and program requirements as may be developed by the City of Atlanta in connection with its oversight and

participation in the care and conserve program.

(f) Care and conserve program requirements.

The commissioner of the department of watershed management is authorized to oversee and manage on behalf of the city all aspects of the care and conserve program, including the development of

grant recipient criteria and customer income and other qualifying criteria, criteria for the property restoration program for sewer spills and water

main breaks including any limitations on payment amounts per incident and limitations on work or replacement materials, program requirements, program processes and oversight and management of the grant recipient and its

administration of the care and conserve program service delivery as may be needed to ensure the successfull implementation of the care and conserve program consistent with this section.

(Ord. No. 2013-14(13-O-0119), § 1, 5-15-13; Ord.

No. 2022-23(22-O-1456), §§ 1—6, 7-14-22) Secs. 154-131—154-140. Reserved.

ARTICLE IV. SEWER CONSTRUCTION

AND ASSESSMENTS*

DIVISION 1. GENERALLY

Sec. 154-141. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Appurtenances means structures, devices and appliances, other than pipe or conduit, which are integral parts of sewer systems, such as manholes, catchbasins, drop inlets, headwalls, etc.

Combined sewer means a sewer which carries both surface runoff and sewage.

Commissioner means the commissioner ofpublic works or the designated representative of the commissioner of public works.

Contractor means the party performing work under this article.

Cover means the vertical distance in feet and inches from the finished surface to the top ofpipe.

Culverts means that system of pipe and appurtenances necessary to convey water across roadways or other obstacles, as distinguished from a full system of storm sewers.

Discharge means the quantitative outflow of water in million gallons per day, cubic feet per second or other volumetric flow rate from a pipe, channel, structure or drainage area.

Domestic sewage meansthe water-carried waste products discharged from residences or commercial or business establishments, as distinguished from industrial waste.

Dry sewers means sewer works provided but not yet in use due to no fault of the city.

Effluent means the outflow of drainage water from a pipe, channel, structure or drainage area.

Engineer means the owner's or developer's professional engineer registered in the state.

Fill means any material that was placed by humans and not naturally deposited or any earth or other material, compacted or not compacted, that does not exhibit the characteristics of natural soils about it with regard to weight, density or erosion resistance.

Floodplain high water means that elevation accepted by the commissioner as the anticipated flood level ofa 100-year flood in the drainage area concerned.

High water means that water elevation established by the commissioner as the estimated flood level of a reoccurrence interval established for particular types of development.

House building sewer means the portion ofthe sewer line connecting the building or house to the city sewer.

House connection means the extension of the house building sewer from the property line to the city sewer lateral in a city street.

Improved channel means provisions made to stabilize stormwater ditches by the installation of city standard riprap or reinforced concrete or as directed by the commissioner.

Industrial waste meansthe water-carriedwaste products resulting from a process of industry, manufacture or business or from the development of any natural resource.

Inspector means the authorized representative of the commissioner and who is responsible for enforcement of this article.

Live sewers means those pipes and appurtenances conveying sewage or industrial wastes.

Private sewer means a sewer located on private property not serving the community at large and for which the city does not have an executed and recorded easement for the purpose of providing

city maintenance.

Public sewer means a sewer serving a city facility or located on city property or located within a legally executed and recorded easement for providing maintenance of the sewer.

Pumping facilities means those facilities designed and constructed to pump sewage or industrial waste from one elevation to another.

Runoffmeans that quantity ofwater generated by rainfall within a given area which moves across the land surface as flowing water.

Sanitary sewer means a sewer which carries sewage and from which stormwaters, surface waters and groundwaters are excluded.

Sewage means the water-carried wastes from residences, business buildings, institutions, and commercial and industrial establishments.

Sewage treatment means the necessary processing of sewage prior to its discharge.

Sewer specifications means sewer specifications for work by contractors and developers as furnished by the commissioner.

Sewer system means all facilities for collecting, pumping, treating and disposing of sewage.

Sewer works means all facilities for collecting, pumping, treating and disposing of sewage.

Standard sections means those typical drawingsissued by the commissioner from time to time as a supplement to this article.

Storm sewer means a sewer which carries stormwaters and surface waters and drainage, but excludes sewage and contained polluted industrial wastes.

Stormwater means that water caused by rainfall.

Streets means those streets identified in section 15-06.001 of this Code.

Structures means those appurtenances associated with sewer works that may be required in this article and as indicated on applicable standard sections.

Surface drainage means that water that results from rainfall and that flows away from an area on the ground or pavement, including groundwater.

Swale means any defined depression or restricted alteration ofthe land to control and direct surface drainage.

Tributary population means the number of persons indicated as residing within a given area.

The indication of population may have many sources.

Vehicular traffic means traffic other than pedestrian which might cross over the sewer easement.

Velocity dissipator means those devices constructed at the discharge end of sewers to reduce the velocity of flowing water.

Wetlands means those areas defined by federal and/or state law as wetlands.

(Code 1977, § 9-3129) Sec. 154-142. Adoption of rules and regulations.

An ordinance of the city providing rules and regulations governing private development ofsanitary or storm sewers, effective February 1, 1967, is incorporated in this article as if set out at length in this article, and a copy ofthe ordinance shall be kept on file in the office ofthe municipal clerk.

(Code 1977, § 9-5061) Sec. 154-143. Administration.

(a) All work of laying down or constructing sewers or drains shall be done under the direction of the commissioner. The commissioner shall furnish to the council, when requested, information and advice as to the necessities of any particular locality for sewers, the kind ofsewersthat may be desirable, with estimates of cost and plans and

profiles, and such other like information that may be necessary and proper.

(b) Construction of sewers and provision of sewer service in areas where no sewers exist may be considered on petition of affected property

owners or where in thejudgment and discretion of the council the public health and good of the city so require.

(Code 1977, §§ 9-3141, 9-3144) Sec. 154-144. Ordinance for construction.

The construction of all sewers and the assessment for the construction shall be provided for by ordinance. After the first reading of an ordinance providing for a sewer, a notice ofthe introduction shall be published in one or more of the daily

papers of the city; the notice shall contain a statement of the line along which the proposed sewer is to be laid and a statement ofthe general character, material and size of the sewer. The

notice shall be published at least ten days before the adoption of the ordinance, and the ordinance may be adopted at the next meeting after the

notice has been published. Substantial compliance with this section as to notice shall be sufficient.

(Code 1977, § 9-3142) Sec. 154-145. Plans and specifications generally.

(a) Submission; permits.

(1) Applicability. This article is applicable to sanitary and storm sewers eight inches in

diameter and larger, together with associated house connections. Extensions of the existing combined sewer system shall not

be permitted. This article is supplemented for smaller size pipe by the city’s plumbing code and falls under its jurisdiction.

(2) City approval prior to permit issuance. It shall be mandatory that all appropriate departments and bureaus of the city government ensure that this article is met prior to permit issuance.

(3) Approval of plans. Upon approval by the commissioner of plans and specifications submitted by the developer, the city will issue a permit for the work so approved.

Permit approval may be withheld where downstream problems exist until the problems are addressed to the satisfaction of the commissioner. No work is to be started

prior to permit authorization. Necessary changes made to plans subsequent to approval and permit issuance will be indicated on revised plans submitted and the permit corrected.

(4) Preparation of engineering material. Engineering material for public sewers submitted under this article shall be prepared by a professional engineer competent in the

design of sewer systems.

(5) Copies submitted for approval. Four copies of all plans, profiles and specifications relating to storm or sanitary sewers and other drainage facilities shall be submitted

for approval.

(6) Preconstruction conference. Aconference with contractors and developers and various governmental departments may be called when deemed necessary by any party concerned.

(7) Permit and related requirements.

a. Permits, see section 154-147.

b. Assessments, connection fees and recovery of fines, see section 154-147.

c. Inspection fees, see section 154-147.

d. Inspection notification and procedures, see section 154-147.

e. Subdivisions, see part 15 of this Code.

(8) Additional requirements. All sewer work covered by this article shall include but not be limited to:

a. Current city business license for an appropriate type of work.

b. Submittal of a three-year maintenance bond set for that portion of the sewer contract for which the sewers will be maintained by the city. The bond shall represent 33 percent ofthe value ofthe installed sewer where a television inspection which is satisfactory to the commissioner has been submitted. In

lieu thereof, the commissioner may accept a bond representing 100 percent of the value ofthe installed sewer.

c. Submittal ofpermanentstorm and sanitary sewer maintenance easementsfor sewers which are to be maintained by

the city. The easements are to provide a width as determined by the commissioner. Easements for off-site sewer construction shall be recorded before

sewer construction commences on any project. On-site easements shall be recorded in the county property records prior to final approval.

d. No building construction will be allowed within the easement of any existing or proposed sewer or so close to the easement that soil bearing loads of

the proposed structure are imposed, unless special permission is obtained from the commissioner.

(b) Recovery offinesfrom spillage. Pursuant to state law, fines due to spillage from sewers may be recovered from the property owner responsible for the spillage. Further, any repair costs for such sewer shall be charged against the owner by the

commissioner and collected by the chieffinancial officer.

(Code 1977, § 9-3130) Sec. 154-146. Contents of plans and specifications.

(a) General layout. The general plans for sewers shall include a suitable title and name of the project, subdivision or institution; its location;

district, land lot and unit and intended use; the scale in feet; a graphical scale; the north point;

the date; the name and signature of the party designing the system and the imprint of the party’s professional seal, certificate number or registration number.

(1) Scale and size. General layout and profile scales and structural and/or architectural drawing scales shall be distinguished. The scale for general plans should not be less than 20 feet and/or greater than 100 feet to the inch.

(2) Notations. The lettering and figures on the plans should be of appropriate size of distinct outline. Surface elevations should be placed preferably just outside street lines

opposite theirrespective position. The benchmark used should be indicated. For large sets ofdrawings, an index to the sheets and

sections shall be provided on or near the cover sheet.

(b) Geological features. Existing or proposed streets and all stream or water surfaces shall be clearly shown. The elevation of all proposed sewer inverts shall be clearly and distinctly written

close to the manhole, parallel with the sewer line, and expressed to the nearest 0.01 foot. All elevations used will be based on USC&GS benchmark datum.

(c) Existing facilities. The following existing facilities shall be indicated:

(1) Sewers. The location, type, size, length, slope and direction of flow of all existing sewers shall be indicated sufficiently so that adaptability to the proposed system and future expansion may be readily elevated.

(2) Water supplies and facilities. The location of water supplies, water treatment plants, reservoirs or other structures, existing and proposed, will be indicated.

(d) Proposed facilities. The following proposed facilities shall be indicated:

(1) Sewers. The location ofall proposed sewers, with the size, pipe, type, class, grade, length and direction of flow, shall be indicated.

Some numbering and/or lettering system shall be used to distinguish the manholes on the layout and the profile for adequate identification.

(2) Detailed plans.

a. Generally, White prints with black or blue lines are acceptable. Drawings must be legible, with scales as indicated in subsection (a) of this section.

For modifications or extensions to an existing system or pumping station, the drawings should distinguish clearly the new facilities from the existing facilities and clearly indicate the connection and relation thereto.

b. Sewers. Detail plans for sewers should show the following:

1. Plan and profile. Show plan and profile drawing along the route of all sewers to be constructed. The plan and profile should indicate all special features such as inverted siphons, extra-strength pipe, concrete encasements and sewer

bridges. All stream crossings and sewer outlets should be shown on the profiles, including the elevations of the streambed and the normal and 100-year highwater

levels. Horizontal scale of profiles should be limited to not more than 50 feet to the inch and vertical scales be limited to not more than ten feet to the inch. Indicate both scales clearly on the profile. All known structures both above and below ground which might interfere with the proposed system should be shown, particularly such

items as gas mains, water mains, storm drains and nature of street surfacing. Where work proposed is of a minor nature, profiles may be omitted at the option of the commissioner.

2. Details. Distinguishing numbers and/or letters for manhole identification, size ofsewer, surface and sewer invert elevations at structures and distance and grade of all sewers between the adjacent structures will be shown on the profiles.

Both invert and structure top elevation will be shown. Plans must show location and surface elevations of developed abutting buildings except where otherwise noted on plans.

3. Appurtenances. Include details of all appurtenances such as standard manholes, drop manholes and inverted siphons, as well as of all

special appurtenances and structures such as regulators, floodgates and sewer bridges. These detailed plans should be drawn to

such a scale as will indicate clearly the nature ofthe design of each of the structures and its equipment.

Dimensions, elevations, capacities and explanatory notes should be appropriatelymarked so asto make details ofthe appurtenancesreadily intelligible.

4. Crosssections. Detailed plansshall be included for all sewer or grading cross sections. Details of cradling and encasement shall be included.

5. Flooding. The elevation ofthe 100- year flood high water will be indicated on the general plan and on the profile ofsewers located within

floodprone areas. Sewers will not be permitted in floodplain areas without special provisions.

6. Test borings. Location and logs of test borings or seismic studies for determination of soil conditions, when required, will be shown on the plans.

(3) Final (as-built) plan.

a. Contents. The final sewer plat required under this section shall consist of a revised and corrected plan and profile in a Mylar-reproducible format containing the information outlined in this section with the further provision that

the final plat shall reflect as-built locations of facilities determined by review or resurvey after construction and shall be tied to the state plans coordinate system. The size ofthe plans will be 23 inches by 36 inches. All drawing

sheets in a set for a proposed project shall be of the same size.

b. Certificate. The final sewer plat will also contain a certificate signed by the licensed professional engineer responsible for the design containing essentially the following statement:

“I certify that the data reflected on this drawing has been verified in the field and to the best of my knowledge is accurate and correct and in general compliance with existing rules and regulations governing development ofsanitary or storm sewers in the City of Atlanta.

Signature (Seal)” (Code 1977, § 9-3131) Sec. 154-147. Design criteria.

(a) Generally. The requirements in this section have been prepared with an attempt to give full consideration to general conditions in the city.

The requirements are established to represent the criteria upon which approval of designs will be considered and given. Any design that includes materials other than those recommended, grades

less than the listed minimum and like variances from accepted practice must be supported by appropriate engineering study and approved by the commissioner.

(b) Design period. In general, sewer systems should be designed for the estimated future tributary population to 50 years.

(c) Materials. Materials shall be selected by reference to the city’s rules and regulations. The material selected should be adapted to local conditions, special consideration being given to the character of industrial wastes, possibilities of septicity, exceptionally heavy loads, abrasion, the necessity of reducing the number of joints, soft foundations and similar problems.

(d) Location. Sewers shall be constructed so as to be remote from public water supply wells, other water supply sources and structures. Water pipe

and sanitary sewer lines shall not be laid in the same trench. A lateral separation of at least ten feet and for crossings a vertical separation of not less than 18 inches should be maintained. Ifthis is impractical, special provisions should be made.

(e) Interconnections. No physical connection between a potable water supply system and a sewer, sewage treatment plant or appurtenancesthereto

which might permit the passage of any sewage or polluted water into the potable water supply shall be permitted.

(f) Sizes, slopes, depths and velocity offlow.

(1) Size. The minimum allowable size for any sanitary sewer governed by this article other than house sewer connections shall be eight inches in diameter.

(2) Slopes. All sewers should be designed and constructed with hydraulic slopes sufficient to give mean velocities, when flowing half full, of not less than 2.5 feet per

second, based on Manning’s formula. Sewer velocities should be determined using coefficients of friction (“n”) appropriate for the pipe material specified.

(3) Increasing size. At manholes where the sewer is increased in size or at points where a smaller sewer connects into a larger sewer, the crown elevations of the pipes shall be notched at a minimum to maintain the same energy gradient.

(4) Alignment. Sewers up to and including 30-inch diameter must be laid with uniform slope and alignment between manholes. On larger sizes, horizontal curves may be permitted.

(g) Basis of design.

(1) Generally. The design analysis to determine the required capacities of sanitary sewers will consider the following factors:

maximum hourly quantity of domestic sewage and industrial wastes and groundwater infiltration or the 50-year design period.

(2) New systems. New sewer systems will be designed on the basis of an average per capita daily flow of not less than 100 gallons of sewage. On this basis the lateral sewers will be designed with capacities

when running full of not less than four times the average flow. Trunk and outfall sewers must have an appropriate peak factor under the same conditions ofnot less than 2.5 times the average flow. Special allowance should be made in each case for sewage or water from industrial plants.

(h) Manholes.

(1) Location. Manholes shall be installed at the end of each eight-inch or larger sanitary sewer, at every change in grade, except as indicated in subsection (f)(4) ofthis section, change in size or alignment, at all

intersections and at distances not greater than 400 feet for sewers of 15 inches in diameter or less and 500 feet for sewers 18 inches to 30 inches. Greater spacing may be permitted in larger sewers and those carrying treated effluents with approval of the commissioner.

(2) Drop manholes. Inside drop manholes are permitted for drops of up to four vertical feet for eight-inch through 12-inch diameter pipe where special filleted inverts with reinforced concrete bottom are provided.

For drops greater than four feet, city standard outside drop manholes shall be used.

All manholes will have a shaped rowlock, brick invert or an alternative invert if approved by the commissioner. Standard manhole sections will be used ifthe elevation difference between the manhole invert and the incoming sewer invert is less than

36 inches, in which case the invert will be filleted to create a channel which will prevent solids depositing in the manhole.

(3) Diameter. See applicable standards.

(4) Materials and watertightness. Manholes will be constructed to city standards and will be waterproofed where groundwater conditions are unfavorable. Special manhole covers are required to prevent flooding, when ordered by the commissioner. Manholes

will have city standard castings and steps throughout.

(5) Flow channel. The manhole floor shall have a flow channel made to conform in shape and carrying capacity to that ofthe sewers, as indicated on the applicable standard section.

(6) Top elevation. Top elevation will conform to street grade and slope. Manholes outside

the paved roadway shall be three feet higher than the ground elevation unless otherwise permitted by the commissioner. The developer is responsible for any final adjustment.

(i) Inverted siphons. Inverted siphons will have at least two barrels with minimum pipe size ofsix inches. Necessary flushing and maintenance appurtenances will be provided. The manholes will have adequate clearances for rodding, and the

inlet and outlet details must be arranged so that normal flow is diverted to one barrel and so that either barrel may be taken out of service for

cleaning. In general, sufficient head should be provided and pipe sizes selected to secure velocities of at least three feet per second at average flows. Siphons will be used only when approved

by the commissioner.

(j) Force mains. Force mains will be allowed only with the permission of the commissioner.

Installation, design and material specifications shall be approved by the commissioner.

(k) Depth.

(1) Sanitary sewers shall be located with a minimum ofthree feet of cover in areas not subject to vehicular traffic and a minimum of six feet of cover under areas designated for vehicular traffic. Specific exceptions to this subsection may be made where special material or bedding is provided.

(2) Documentation ofsoil compaction tests meeting city standards shall be submitted to the commissioner for approval.

(1) House connections.

(1) House connections in new developments will be extended one joint (three feet) beyond the property side ofthe sidewalks at a location selected to best serve each property. A city standard cleanout shall be provided at the property line. All house connection extensions will be properly sealed prior to backfilling.

(2) The house connections where provided shall be accurately located in the field by the owner’s engineer, who shall submit an acceptable plat in two copies indicating the location, along with an affidavit by the

owner’s engineer confirming such locations.

(3) Prior to the use of any house connection provided in the metropolitan sewersystem, all provisions of the city’s plumbing code shall be met.

(Code 1977, § 9-3132(a)—(e), (g)—(m)) Sec. 154-148. Stormwater.

(a) Standardsfor calculations. Acceptable standards for calculating stormwater runoff are found in the city’s rules and regulations for developers.

(b) Assessments. Assessments for installations of storm sewers are found in the city’s rules and regulations for developers.

(c) Design period. Consideration of 50-year development trends shall be applied to drainage area studies for design purposes.

(d) Materials. Storm sewers in the city shall be constructed with materials meeting city specifications.

(e) Location.

(1) The locations of all stormwater structures will be accurately shown on plans submitted for approval. Permanent maintenance easements will be indicated to provide a

width as determined by the commissioner.

Easements must be properly drawn and conveyed to the city prior to final approval of any development.

(2) Building or grading over any sewer shall first be approved by the commissioner. The commissioner shall examine the application, and, if satisfied that the proposed work will not place an excessive load on the

sewer, injure the sewer or not prevent reasonable access for repair and maintenance or harmfully affect the drainage system of the city nor any of its streets and sidewalks, the commissioner may issue a

permit to do so.

(3) All storm sewers shall terminate at a point of discharge acceptable to the commissioner.

(Code 1977, § 9-3133) See. 154-149. Construction and connection of sewer outside city.

(a) Generally. All sewers constructed outside the city, to be connected with the city’s sewer system, shall be laid under the direction and control ofthe commissioner, and the material and work shall be approved by the commissioner.

(b) Permit required. No property outside the city shall be connected with the city’s sewer system without a permit.

(c) Application for permit; filing ofplat. When the owner of any property outside of the city desires to make connection to the city’s sewer system, the owner shall make a written application to the commissioner and shall file with the application a detailed plat showing the location and dimensions of the property and the location

and size of the sewer to be connected.

(d) Consent ofcounty required. No permit shall be granted unless and until the owner making the application has procured the consent ofthe county in which the property to be connected to the sewer lies, under the terms and conditions of contracts which have been entered into with such county by the city.

(e) Fee for connection. The commissioner shall charge a fee established by the council for each connection to a sewer outside the city to cover the cost of the work making the connection.

(f) Excavation and refilling. All excavation and refilling shall be done by the person making

application for the connection.

(Code 1977, §§ 9-3152, 9-3153) Sec. 154-150. Maintenance of sewers outside city.

(a) Duty ofproperty owner. Sewers outside the city, constructed by private owners for the use of their property, which are connected to a city sewer shall be maintained by the private owners. The

owner shall make all necessary repairs or do work necessary forthe maintenance ofthe sewer within

48 hours after notice of the necessity therefor is given by the commissioner.

(b) Authority of city. If the work is not done within the time allowed, the commissioner shall make such repairs as may be necessary to protect the city’s sewer system from any damage and

shall charge the cost thereof to the property owner. Further, the city may recover fines resulting from spillages pursuant to state law.

(c) Effect of nonpayment by owner. When the owner fails or refuses to pay the cost of those repairs, as required by subsection (b) of this section, the commissioner shall give the owner notice of a hearing in regard to cutting off the owner’s water connection to the city water system, if it is connected with the city’s water system. After hearing, if no justification is shown for not paying such cost, the water shall be cut off until the cost and the charges for cutting off and again turning on the water shall have been fully paid.

(Code 1977, § 9-3154) Sec. 154-151. Building over or filling over city sewers.

(a) Permit required. It shall be unlawful for any person to build over, cover or fill over a city sewer without first obtaining written permission from the commissioner.

(b) Application for permit. Application for a building permit shall be in writing. A current plat of the applicant's property, showing the location and the extent of the proposed building or proposed structure, fill, depth, size and type of sewer over which the fill, building or structure is to be placed; any openings or drains which may be

affected by the fill; and the topography of the property to be affected before and after the filling may be included in the commissioner's review. If application is made to construct over a sewer in addition to the information required in this subsection, the applicant must submit plans showing the proposed method for providing adequate protection to the sewer to ensure that the proposed building or structure will not cause harm to the sewer. The commissioner shall examine the application, and, if satisfied that the proposed work will not place an excessive load on the sewer,

injure the sewer in any way or not prevent reasonable access for repair and maintenance, or harmfully affect the drainage system of the city or any of its streets or sidewalks, the commissioner may approve the proposal upon the execution of

an indemnification and hold-harmless agreement between the applicant and the city.

(c) Inspection of work. The work shall be subject to the inspection of the commissioner.

(Code 1977, § 9-3155) Sec. 154-152. Connection of surface water drains to sanitary sewers.

No drain for surface water shall be connected with any sanitary sewer.

(Code 1977, § 9-3156) Sec. 154-153. Placing obstruction in stream or drain.

(a) Unlawful. It shall be unlawful for any person to place any obstruction in any stream, natural drain or waters of the city in such a manner as to divert, decrease or obstruct the natural flow of water therein.

(b) Permit required. It shall be unlawful for any person to place, to lay or extend any pipe or any type of structure in any stream or natural

drain in the city in such a manner as to divert, decrease or obstruct the natural flow of the water therein without first obtaining the written permission of the commissioner.

(c) Application for permit. Application for the permit shall be in writing and shall be accompanied by a plat showing the property of the applicant, location and topography of the property to be affected. The commissioner shall examine the

application, and, if satisfied as to the location, size and material of the proposed obstruction and

convinced that it will not harmfully affect adjacent upstream and downstream properties, the drainage system of the city or any of its streets or sidewalks, the commissioner may approve the

proposal.

(d) Inspection of work. The work shall be subject to the inspection of the commissioner.

(Code 1977, § 9-3157) Sec. 154-154. Obstructing catchbasins, drop inlets and other entrances to sewers and drains.

(a) It shall be unlawful for any person to dump, deposit or otherwise place grass, leaves, trash, rubbish, shrubberies, trees, tree limbs or any other type of debris or refuge in, on, in front of or beside the entrances to catchbasins, curb

inlets, drop inlets or any other entrances and exits to the city's sewers and drains. It shall also be unlawful to deposit or otherwise place or cause to be placed such debris and refuse in curbs,

gutters, flumes, swales and any other type of drain so as to stop, restrict, impede or otherwise affect the flow of water therein.

(b) It shall be unlawful for any person to blow, rake or deposit refuge of any type into a public street as a means of disposal.

(c) Penalties for any person violating this section shall be as follows:

(1) First offense. A fine of $250.00.

(2) Second offense. A fine of $500.00 and confinement in the city jail for a period not to exceed ten days.

(3) Third offense. A fine of $1,000.00 and confinement in the city jail for a period not to exceed 30 days.

(Code 1977, § 9-3158; Ord. No. 2013-08(98-O0817), § 1, 6-23-98) Sec. 154-155. Private decentralized wastewater systems prohibited.

(a) A "private decentralized wastewater system" means any privately owned wastewater collection, treatment, or disposal system:

(1) Serving more than one residential lot or business; or

(2) That has a daily flow in excess of 2,000 gallons per day; or

(3) That transfers flows between more than one parcel or tract of land.

(b) The construction, permitting or maintenance of a private decentralized wastewater system is prohibited within the boundaries of the City of Atlanta.

(Ord. No. 2011-13(11-O-0494), § 1, 5-11-11) Secs. 154-156—154-165. Reserved.

DIVISION 2. ASSESSMENTS

Sec. 154-166. Lien against property.

The amount of assessments for sewers shall be a lien on abutting property as provided by the Charter and related state laws of the city. Assessments shall be paid in full prior to connection.

(Code 1977, § 9-3159) Sec. 154-167. Amount where sewer laid in street; right of abutting property owners to connect.

(a) If a sewer is constructed by or under the authority of the city in any street, except those sewers designated as outfall sewers, the cost

thereof shall be assessed upon the property and estates respectively abutting on the street, on each side of the street in which the sewer is laid or constructed. The cost shall be calculated based on the time and materials required for the installation and inspection.

(b) Each lot or parcel of property abutting on the sewer shall be assessed according to its frontage on the street. In consideration of the payment of the assessment, the owners of the property and estates shall have the right to connect their

drains from the abutting property and estates for the discharge of sewage into the sewer upon

payment of the rates for connection then in effect and subject to availability of sewer capacity and the terms and conditions set forth in this chapter.

(c) When a property owner or lessee requests that the city construct a connection to an existing sewer, the charge for such connection shall be

assessed at the rate established by ordinance.

(Code 1977, § 9-3160; Ord. No. 2005-01, § 14, 1-10-05) Sec. 154-168. Payment for privilege of connecting to sewer when assessment not made.

Where a lot or parcel of property which has a city sewer in front of or abutting the lot or parcel to which the lot or parcel has never been connected and for which no assessment by the city for the cost of the sewer or the use of the city sewer system and the owner desires to connect to the

city sewer system, the property owner shall be required to pay to the city an amount equal to the sewer assessment rate per front foot then in effect for each front foot of the lot or parcel of property so connected for the privilege of connecting the lot or parcel to the city sewer system. This amount is to be paid in advance of connection but after work is authorized, and shall be collected by the municipal revenue collector.

In addition to the payment of the assessment, the property owner shall also be required to pay all other sewer fees then in effect, including but not limited to installation, connection and inspection fee, which are then in effect.

(Code 1977, § 9-3162; Ord. No. 2005-01, § 16, 1-10-05) Sec. 154-169. Payment when pumping required for service.

If residential, apartment, commercial or industrial buildings are constructed at an elevation which is too low to be served by gravity flow into the sewer for which assessment will be made, the owners of the residential, apartment, commercial or industrial buildings shall pay the assessment, and when required to connect onto the sewer the

owners shall install sewage pumping facilities to make use of the sewer. The amount of assessment

shall be the same as that provided for in section 154-167. Minimum pumping system specifications may be found in the city's rules and regulations for sewers.

(Code 1977, § 9-3164) Sec. 154-170. Report and record of completion of work.

When any sewer construction is completed, for which an assessment lien attached in favor of the city, the completion of the sewer shall be reported immediately to the chief financial officer by the commissioner of public works, and the chief financial officer shall cause an entry of that completion to be promptly entered in a book provided for this recorded information, which book shall be made

available to the public.

(Code 1977, § 9-3168) Sec. 154-171. Charges for additional connections.

Whenever it is necessary to install an additional sewer connection in front of any property, the cost thereof and any additional assessments

shall be paid by the property owner before it is installed by the commissioner.

(Code 1977, § 9-3171) Sec. 154-172. Conditions for construction of private sewers.

Any permit for the construction of a private sewer or for connection therewith shall be granted and accepted upon condition that thereafter, when the city constructs a public sewer, the abutting property shall be subject to assessment in the

manner provided by the Charter and related state laws, this Code and other ordinances of the city, without regard to the existence of or connection with the private sewer.

(Code 1977, § 9-3174) Sec. 154-173. Charges for sewers laid by developer for use of development.

(a) Established. Where sewers are laid by a developer for the use of the developer's development, fees shall be collected in accordance with the schedule of fees and charges established by

the council from time to time, copies of which shall be kept on file in the office of the municipal clerk and the commissioner.

(b) Inspection fees. All sewer work, both storm and sanitary, grading and drainage improvements performed by private contract for a private development approved on a permit by the commissioner shall be subject to inspection fees established by the council.

(Code 1977, § 9-3175) Secs. 154-174—154-195. Reserved.

ARTICLE V. SEWAGE DISPOSAL*

DIVISION 1. GENERALLY

Sec. 154-196. Definitions Unless the context specifically indicates otherwise, the meaning of terms used in this article shall be as follows:

(1) Act or the Act: The federal Water Pollution Control Act, also known as the Clean Water Act, 33 U.S.C. § 1251, et. seq., as it may be amended.

(2) Ammonia (NH3 ): A colorless gaseous alkaline compound of nitrogen and hydrogen that is very soluble in water.

(3) Authorized representative of industrial user:

a. If the industrial user is a corporation, authorized representative shall mean the president, secretary, treasurer, or a vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation.

b. If the industrial user is a partnership or a sole proprietorship, the authorized representative shall mean

a general partner or proprietor, respectively.

c. If the industrial user is a federal, state, or local governmental facility, the authorized representative shall mean the director or highest designated official overseeing the activities of the facility.

d. The commissioner may allow the individuals described in subparagraphs

(a) and (b) above to designate another authorized representative if the authorization is in writing, and if

the authorization specifies the individual or position responsible for the overall operation of the facility from

which the discharge originates, or having overall responsibility for environmental matters for the company.

(4) Biochemical oxygen demand: The quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedure, five days at 20° Celsius expressed in terms of weight

or concentration (milligrams per liter, mg/ 1).

(5) Building sewer: A sewer conveying wastewater from the premises of a user to the water pollution control facilities.

(6) Bypass: The diversion (both intentional and accidental) of wastestreams from any portion of any pretreatment system.

(7) Categorical pretreatment standard or categorical standard: Any regulation containing pollutant discharge limits promulgated by EPA in accordance with sections 307(b) and (c) of the Act (33 U.S.C. § 1317)

which apply to a specific category of users and which appear in 40 CFR Chapter I, Subchapter N, Parts 405-471.

(8) Chemical oxygen demand: A measure of the oxygen-consuming capacity of inorganic and organic matter present in water and wastewater. It is expressed as the

amount of oxygen in milligram per liter by weight consumed from a chemical oxidant in a specific test.

(9) City: The City of Atlanta, Georgia.

(9.1) Collection system: Sewers, force mains, pump stations, ejector stations and other equipment for the conveyance of wastewater to a publicly-owned treatment works.

(10) Combined sewer: A sewer receiving both storm water and wastewater.

(11) Commissioner: The commissioner of the department of watershed management or his/her duly authorized assistant, agent, or representative, or such person as the mayor may designate to carry out the functions set forth herein.

(12) Compliance: The level of conformity with all applicable regulations. There are three levels of compliance:

a. Consistent compliance.

b. Infrequent noncompliance.

c. Significant noncompliance.

(13) Composite sample: The accumulation of a number of individual samples over a period of time, so taken as to represent the nature of the wastewater.

(14) Constituents: The combination of particles, chemicals, or conditions which exist in the wastewater.

(15) Customer: Every person who is responsible for contracting (expressly or implicitly) with the city in obtaining, having or using water or wastewater connections

with, or sewer taps to the city wastewater system and in obtaining, having or using water or other related services furnished by the city for the purpose of disposing of wastewater through said system. The term "customer" shall also include illicit users of the water or wastewater systems.

(15.1) Dilute: To make any pollutant, pollution, waste or wastewater thinner or weaker by adding water or any other

substance.

(16) Direct discharge: The discharge of treated or untreated wastewater directly to the waters of the State of Georgia.

(17) Domestic wastewater: That wastewater discharged into the wastewater system from domestic sources such as toilets, washing machines, dishwashers, sinks, showers, and bathtubs from normal household usage.

(18) Effluent: The treated flow discharged from a water pollution control facility.

(19) Environmental Protection Agency or EPA:

The U.S. Environmental ProtectionAgency, or where appropriate, the term may also be used to designate the administrator or other duly authorized official of said agency.

(20) Existing source: Any source of discharge, the construction or operation of which commenced prior to the publication by EPA of proposed Categorical Pretreatment Standards, which will be applicable to such source if the standard is thereafter promulgated in accordance with section 307 of the Act.

(21) Flammable: As defined by existing City of Atlanta Fire Department regulations.

(22) Floatable oil and grease: Oil, fat or grease in a physical state such that it will separate from wastewater by treatment in an American Petroleum Institute (API) type

oil/water gravity separator.

(23) Food processing industry: Any user whose primary business is the preparation of food products. Users are identified as having SIC Codes in the range 2011-2099, including but not limited to baking products, canned products, dairy products, grain mill products, sugar and confectionery

products and meat products.

(24) Food service establishment: Any restaurant, eatery, food caterer, cafeteria, or other institution processing and serving

food.

(25) Grab sample: A sample which is taken from a wastewater stream on a one-time basis with no regard to the flow in the wastewater stream and over a period of time not to exceed 15 minutes.

(26) Grease and oil: The group of substances with similar physical characteristics, which includes fatty acids, soaps, fats, waxes, oils and any other material that can be solvent extracted and is not volatilized during evaporation of the solvent.

(27) Grit: Matter consisting of sand, gravel, cinders, or other heavy solid materials that has settling velocities or specific gravity's greater than those of organic putrescible solids normally encountered in domestic wastewater.

(28) Health department: The Fulton County Board of Health, or any successor agency.

(29) Holding tank waste: Any waste from holding tanks such as vessels, chemical toilets, campers, trailers and septic tanks.

(30) Industrial user: A source of discharge of industrial wastewater into water pollution control facilities.

(30.1) Indirect discharge: The discharge of treated or untreated wastewater to the publicly owned treatment works (POTWs) of the city.

(31) Industrial wastewater: Wastewater in which the solid, liquid and gaseous wastes from process of industry, manufacture, trade or business, or from the development or recovery of any natural resource (as distinct from domestic or sanitary

wastes) is found.

(32) Industrial waste surcharge: The additional service charge assessed against inUTILITIES § 154-196 dustrial users in the city whose wastewater characteristics exceed established limits for COD, TKN, and TSS.

(33) Infiltration: Groundwater and surface water which leaks into the wastewater system through cracked pipes, joints, manholes or other openings.

(34) Inflow: Water that flows into the wastewater system from the surface, streams, roof drains, down spouts, or other such

sources.

(35) Influent: The wastewaters arriving at the water pollution control treatment facility.

(36) Interference: An inhibition or disruption of operation or maintenance of the water pollution control facilities, city wastewater treatment processes or operations, or sludge processes, use or disposal:

a. Which is a cause of or significantly contributes to a violation of any requirement of the city's NPDES permit (including an increase in the magnitude or duration of a violation); or

b. Which causes or significantly contributes to an increase in the discharge of pollutants above normal conditions or an increase in the cost of operation of the POTW above normal conditions; or

c. Which causes or significantly contributes to the prevention of sludge use or disposal by the city in accordance

with the Georgia Water Quality Control Act, and any permits or regulations issued thereunder. Section 405 of the Act, (33 U.S.C. § 1345), the

federal Solid Waste Disposal Act (SWDA), the federal Clean Air Act, and the federal Toxic Substances Control Act. An industrial user significantly contributes to such interference or prevention of sludge use or disposal in accordance with abovecited authorities whenever such user:

1. Discharges a daily pollutant loading in excess of that permitted by the provisions of this article or by federal or state

law;

2. Discharges wastewater which substantially differs in nature or constituents from a user's average discharge; or

3. Knows or has reason to know that the user's discharge, along or in conjunction with discharge from other sources, would result in a NPDES permit violation by the city or would prevent sludge use or disposal in accordance with the above-cited

authorities as they apply to the city's selected method of sludge management.

(36.1) Maintenance, operations and management ("MOM") program: A program for the efficient and proper operation and

maintenance of the sewer collection system and includes, but is not limited to, a collection system contingency and emergency plan, an operations plan, a grease management plan, a maintenance management plan and a training program for appropriate personnel of the department

of public works.

(37) Medical waste: Isolation wastes, infectious agents, human blood and blood products, pathological wastes, sharps, body parts, contaminated bedding, surgical

wastes, potentially contaminated laboratory wastes, cultures and dialysis wastes.

(38) Metered water: The amount of water used by the customer as measured by a city water meter, or other approved metering device.

(39) Milligrams per liter (mg/1): The units for expressing weight per unit volume and when multiplied by the factor 8.34, mg/l is equivalent to pounds per million gallons of water. For a water solution, mg/l is equivalent to parts per million (ppm) on a weight basis.

(40) National pollutant discharge elimination system permit: A permit issued pursuant to section 402 of the Act (33 U.S.C. § 1342).

(41) New source: Any building, structure, facility or installation from which there is or may be a discharge of pollutants, the

construction of which commenced after the publication of proposed pretreatment standards under section 307(c) of the Act which will be applicable to such source if such standards are thereafter promulgated in accordance with that section, provided that:

a. The building, structure, facility or installation is constructed at a site at which no other source is located;

or

b. The building, structure, facility or installation totally replaces the process or production equipment that causes the discharge of pollutants at

an existing source; or

c. The production or wastewater generating processes of the building, structure, facility or installation are

substantially independent of an existing source at the same site. In determining whether these are substantially independent, factors such as the extent to which the new facility is integrated with the existing plant, and the extent to which the

new facility is engaged in the same general type of activity as the existing source should be considered.

1. Construction on a site at which an existing source is located results in a modification rather than a new source if the construction does not create a new building, structure, facility or

installation meeting the criteria of paragraphs (41)(b), or (c) of this section but otherwise

alters, replaces, or adds to existing process or production equipment.

2. Construction of a new source as defined under this paragraph has commenced if the owner or operator has:

d. Begun, or caused to begin, as part of a continuous onsite construction program:

1. Any placement, assembly, or installation of facilities or equipment; or

2. Significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or

e. Entered into a binding contractual obligation for the purchase of facilities or equipment which are intended to be used in its operation within a reasonable time. Options to

purchase or contracts which can be terminated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under this paragraph.

(42) Noncontact cooling water: Water used for cooling which does not come into direct contact with any raw material, intermediate product, waste product, or finished product or to which the only pollutant

added is heat. Examples are water discharged from any use such as air conditioning, cooling, or refrigeration.

(43) Nondomestic user: Any user of the Atlanta water pollution control facilities who discharges wastewater from a structure other than a residential unit.

(44) Nondomestic wastewater: The wastewater generated from nondomestic users as distinct from domestic or sanitary wastes.

(45) Pass-through: Any discharge which exits the POTW into waters of the United States in quantities or concentrations which, alone or in conjunction with a discharge or discharges from other sources, is a cause of a violation of any requirement of the POTW's NPDES permit (including an increase in the magnitude or duration of a violation).

(46) Person: Any individual, partnership, copartnership, firm, company, corporation, association, joint stock company, trust,

estate, governmental entity, or any other legal entity; or its legal representatives, agents, or assigns. This definition includes all federal, state and local governmental entities.

(47) pH: The logarithm (base 10) of the reciprocal of the concentration of hydrogen ions expressed in grams per liter of solution. A measurement of the acidity or alkalinity of a substance expressed on a

scale of 0—14 standard units, with 0 being highly acidic and 14 being highly alkaline.

(48) Pollutant: Any dredged material, spoil, solid waste, incinerator residue, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discharged equipment, rock, sand, cellar dirt and industrial, municipal, or agricultural

waste discharge into water.

(49) Pollution: The man-made or man-induced detrimental alteration of the chemical, physical, biological and radiological integrity of water or soil.

(50) Pretreatment or treatment: The reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties to a less

harmful state, prior to or in lieu of discharging or otherwise introducing such pollutants into the wastewater treatment

system. The reduction or alteration can be obtained by physical, chemical or biological processes, or by process changes or other means, except as prohibited by 40

CFR § 403.6(d).

(51) Publicly-owned treatment works (POTW):

A treatment works as defined by section 212 of the Act, (33 U.S.C. § 1292), including any devices or systems designed, intended, or used in the collection, storage, treatment, recycling, and reclamation of

wastewater.

(52) Pumpage: The wastes removed from a container by pumping.

(53) Receiving waters: Those waters into which wastewaters are discharged.

(54) Sanitary sewer: A sewer which carries wastewater from which storm, surface, and ground waters are excluded.

(55) Self-monitoring: Monitoring by an industrial user of the regulated discharge of that industrial user at the expense of the

user.

(56) Septage: Any wastes removed from a portable toilet, chemical toilet, holding tank, or septic tank.

(57) Septic tank: A subsurface impervious tank designed to temporarily retain sewage or similar waterborne wastes together with:

a. A sewer line constructed with solid pipe, with the joints sealed, connecting the impervious tank with a plumbing stub out; and

b. A subsurface system of trenches, piping and other materials constructed to drain the clarified discharge from

the tank and distribute it underground to be absorbed or filtered.

(58) Severe property damage: The substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.

(59) Sewer: A pipe or conduit in which all owners of abutting properties have equal rights and which is controlled by a public entity.

(60) Sewer assessment rate: The average cost per foot of all lateral sewers constructed in the city during the previous year, exclusive of house connection, and adjusted for unusual or extraordinary costs.

(61) Sewer meter: Those devices approved by the commissioner for the purpose of establishing the quantity of wastewater discharged by a premise or person.

(62) Sewer service charge: The charge assessed against the persons in the city that are connected to, or have access to, the city water pollution control facilities.

(63) Significant industrial user or SIU.

a. Except as provided in paragraph (63)(b) of this section, the term significant industrial user means:

1. All industrial users subject to categorical pretreatment standards under 40 CFR § 403.6 and 40 CFR Chapter I,

Subchapter N; and

2. Any other industrial user that:

discharges an average of 25,000 gallons per day or more of process wastewater to the POTW (excluding sanitary, noncontact

cooling and boiler blowdown wastewater); contributes a process wastestream which makes up 5 percent or more of the

average dry weather hydraulic or organic capacity of the POTW treatment plant; or is designated as such by the Control Authority as defined in 40 CFR

§ 403.12(a) on the basis that the industrial user has a reasonable potential for adversely affecting the POTW's operation

or for violating any pretreatment standard or requirement (in accordance with 40 CFR

§ 403.8(f)(6)).

b. Upon a finding that an industrial user meeting the criteria in subparagraph (a)(1)(2) of this section has no reasonable potential for adversely

affecting the POTW's operation or for violating any pretreatment standard or requirement, the control authority (as defined in 40 CFR § 403.12(a)) may at any time, on its

own initiative or in response to a petition received from an industrial user or POTW, and in accordance with 40 CFR § 403.8(f)(6), determine that such industrial user is not a significant industrial user.

(64) Slug loading: Any pollutant released in a discharge of such volume or strength as to cause interference in the water pollution control facility.

(65) Standard industrial classification (SIC):

A classification pursuant to the most current Standard Industrial Classification Manual issued by the U.S. Office of Management and Budget.

(66) Standard methods: The examination and analytical procedures set forth in the latest edition, at the time of analysis, of Standard Methods for the Examination of

Water and Wastewater as prepared, approved and published jointly by the American Public Health Association, the American Water Works Association, and the Water Environment Federation.

(67) Storm sewer: A sewer which carries storm and surface waters and drainage, but excludes domestic and industrial wastewaters.

(68) Suspended solids: The total suspended matter that floats on the surface of, or is suspended in, water, wastewater or other liquids, and which is removable by laboratory filtering.

(69) TKN: Total nitrogen as measured by the Kjeldahl technique, expressed in milligrams per liter by weight.

(70) Toxic: Any pollutant or combination of pollutants listed as toxic in regulations promulgated by the administrator of the EPA under the provision of the Clean Water Act, section 307(a) or other acts.

(70.1) Trucked or hauled pollutants: Any dredged material, spoil, solid waste, incinerator residue, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discharged equipment,

rock, sand, cellar dirt and industrial, municipal, or agricultural waste discharge transported by truck, rail or dedicated

pipeline.

(71) User: Any person who contributes, causes, or permits the contribution of wastewater into the city's water pollution control facilities.

(72) Waste: Includes sewage and any and all other waste substances, liquid, solid, gaseous or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing or processing operation of whatever nature, including such waste placed within containers of whatever nature prior

to, and for purposes of, disposal.

(73) Wastewater: A combination of the watercarried wastes from residences, business buildings, institutions, and commercial

establishments, together with those ground, surface, and storm waters as may be present.

(74) Water meter: Those devices approved by the commissioner for the purpose of establishing the quantity of water used by a premise or person.

(75) Water pollution control facilities: All facilities for collecting, pumping, or treating wastewater or storm water.

(Ord. No. 1998-71, § 2, 10-13-98; Ord. No. 1999- 30, §§ 2, 3, 2-9-99; Ord. No. 2006-53, § 37, 8-29-06;

Ord. No. 2013-67(12-O-0563), § 1, 12-11-13) Sec. 154-197. Abbreviations.

The following abbreviations shall have the designated meanings:

BOD, biochemical oxygen demand.

CFR, Code of Federal Regulations.

COD, Chemical oxygen demand EPA, Environmental Protection Agency.

GPD, gallons per day.

mg/l, milligrams per liter.

MOM, maintenance, operations and management.

NPDES, National Pollutant Discharge Elimination System.

O&M, operation and maintenance.

POTW, publicly owned treatment works.

RCRA, Resource Conservation and Recovery Act.

SIC, standard industrial classification.

TKN, total Kjeldahl nitrogen.

TSS, total suspended solids.

USC, United States Code.

(Ord. No. 1998-71, § 2, 10-13-98; Ord. No. 1999- 30, § 4, 2-9-99)

Sec. 154-198. Findings and purposes.

The city finds that, in order to provide for the public health and welfare, and to comply with the laws and regulations of the State of Georgia and the United States Government, it is necessary to set uniform requirements for all users of the

water pollution control facilities of the city; to establish effluent limits; to require minimum frequencies of inspections depending upon size of the city sewer system, to require pretreatment, where necessary, by system users; to regulate the use of municipal pollution control facilities through the issuance of permits to certain industrial users; to establish charges and fees for the equitable distribution of costs; and to authorize monitoring and enforcement activities.

The purpose of article V is to prevent the introduction into the municipal pollution control facilities of pollutants which will interfere with the proper operation of the system or contaminate the resulting sludge; to prevent the introduction into the municipal pollution control facilities of pollutants which will cause the city to be in

violation of any permits; to prevent the introduction into municipal pollution control facilities of toxic pollutants which would pass through the

facilities in toxic amounts, into receiving water or the atmosphere, or otherwise be incompatible

with the facilities; to prevent unauthorized discharges of pollutants into the environment; to improve the opportunity to recycle and reclaim

wastewaters and sludges from the facilities; and to provide for equitable distribution of the cost of the municipal pollution control facilities.

The city finds that criteria are needed to better control the discharge of grease and oils to the

city's sewer system and that due to the diameters of the existing sewer piping system that certain portions of the city require additional inspections to accommodate compliance with this section. The accumulation of grease and oils discharged into

the sewer system can lead to grease blockages, which in turn can cause overflows from the sewer system. The city must protect its sewer system

against accumulations of grease and oils. Sources of grease and oil discharges include industrial

users of the sewer system and food service establishments. Industrial users are subject to industrial user permitting and pretreatment requirements. The best method for reducing discharges of grease and oil from food service establishments is the installation of grease traps at the food

service establishment and proper maintenance of the grease traps by the owner or operator of the food service establishment. The sewer use ordinance establishes requirements that control the discharge of grease and oil from industrial sources and food service establishments.

(Ord. No. 1998-71, § 2, 10-13-98; Ord. No. 1999- 30, § 1, 2-9-99; Ord. No. 2001-5, § I, 1-23-01)

Sec. 154-199. Public nuisance.

It shall constitute a nuisance and shall be unlawful for any user to discharge a wastewater in any manner in violation of this article, or of any condition of an industrial wastewater discharge

permit.

(Ord. No. 1998-71, § 2, 10-13-98) Secs. 154-200—154-210. Reserved.

DIVISION 2. ADMINISTRATION AND

ENFORCEMENT

Sec. 154-211. Confidential information.

All information and data concerning a user or obtained from a user shall be available to the public or other governmental agencies in accordance with the requirements of the Georgia Open Records Act, O.C.G.A. § 50-18-70, et seq., and

subject to exemption from disclosure only as authorized by Georgia law.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-212. Notification of pretreatment standards promulgation.

The commissioner shall notify industrial users of applicable national pretreatment standards within 30 days of promulgation of final pretreatment standards.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-213. Right to object.

The industrial user has the right to object within 30 days of notification of action taken on behalf of the city which changes the industrial

user's obligations or subjects it to penalties, restrictions or further obligations. The objection and all evidence supporting such objection must

be made in writing to the commissioner. In his/ her discretion, the commissioner shall make written response to the objection, stating his/her decision and reasons thereof. All decisions by the commissioner shall be final.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-214. Reporting requirements for the permittee.

(a) Reporting requirements for all industrial users subject to pretreatment standards; the baseline monitoring report. Within 180 days after the effective date of a national categorical pretreatment standard promulgated under section 307(b) or (c) of the Act, all existing industrial users subject to such standards shall submit to the

commissioner the information listed in subparagraphs (a)(1)—(10) of this section.

At least 90 days prior to commencement of discharge, new sources and sources that become industrial users subsequent to the promulgation

of an applicable standard, shall be required to submit to the commissioner a report which contains the information requested in subparagraphs (a)(1—3) and (a)(5—-7) of this section.

(1) The name and address of the facility, including the name of the operator and owners.

(2) A list of any environmental control permit(s) applied for or held by the facility.

(3) A brief description of the nature, average rate of production and standard industrial classification of the operation(s) carried out by the industrial user. This description should include a schematic process diagram, site plans, floor plans,

and plumbing plans which indicates points of discharge to the water pollution control facility from the regulated processes.

(4) Number of employees and hours of operation of the facility.

(5) Information showing the time, duration, and volume, including average daily and maximum daily flow in gallons per day, to the water pollution control facilities from each of the following:

a. Regulated process streams; and

b. Other streams as necessary to allow use of a combined wastestream formula of 40 CFR § 403.6(e), if applicable.

(6) The pretreatment standard applicable to each regulated process.

(7) The results of sampling and analysis identifying the nature and concentration of regulated pollutants in the discharge from

each regulated process. Both daily maximum and average concentration (or mass, where required) shall be reported. The

sample shall be representative of daily operations and subject to the following conditions:

a. A minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organics. For all other pollutants, 24-hour composite samples must be obtained through flow-proportional composite sampling techniques, where feasible. The commissioner may waive flow-proportional composite sampling for any industrial user that demonstrates that flow-proportional composite sampling

is not feasible. In such cases, samples may be obtained through timeproportional composite sampling techniques or through a minimum of four grab samples where the industrial user demonstrates that this will provide a representative sample of

the effluent being discharged;

b. The industrial user must take a minimum of three representative samples, in a time frame to be determined by the commissioner, to compile the data necessary to comply with

the requirements of this paragraph;

c. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment

exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula of 40 CFR § 403.6(e) in order to evaluate compliance with the pretreatment standards;

d. Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 CFR, Part 136 and amendments thereto. Where

40 CFR, Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using procedures approved by EPA;

e. A baseline monitoring report may be submitted which utilizes only histor- ical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures; and

f. The baseline monitoring report shall indicate the time, date, and place of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the water pollution control facility.

(8) A statement, reviewed by an authorized representative of the industrial user and certified by a registered professional engineer in the State of Georgia, indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional O&M and/or additional pretreatment is required for the industrial user to meet the pretreatment

standards and requirements.

(9) If additional pretreatment and/or O&M will be required to meet the pretreatment standards; the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not

be later than the compliance date established for the applicable pretreatment standard.

(10) Any other information deemed necessary by the commissioner to ensure compliance with this article or other applicable ordinances, laws, or regulations.

(b) Pretreatment compliance schedule: Where pretreatment is required to meet pretreatment standards or the provisions of this article, a compliance schedule must be submitted to the commissioner for which the following conditions apply:

(1) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing the contract for major components, commencing construction, completing construction, etc.).

(2) No increment referred to in subparagraph (b)(1) of this section shall exceed nine months.

(3) Not later than 14 days following each date in the schedule and the final date of compliance, the industrial user shall submit a progress report to the commissioner including, as a minimum, whether it complied with the increment of progress to be met on such date and, if not, the date on

which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the industrial

user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the commissioner.

(4) Compliance with categorical pretreatment standard deadline: Within 90 days following the date for final compliance with applicable pretreatment standards or, in

the case of a new source following commencement of the introduction of wastewater into the wastewater treatment facility, any industrial user subject to pretreatment standards or permit requirements shall submit to the commissioner a report containing the information described in subparagraphs (a)(5) through (a)(8) of this section. For industrial users

subject to equivalent mass or concentration limits, this report shall contain a reasonable measure of the user's longterm production rate. For all other industrial users subject to pretreatment standards expressed in terms of allowable pollutant discharge per unit of production

(or other measure of operation), this report shall include the user's actual production during the appropriate sampling period.

(c) Reporting of monitoring results: Demonstrating continued compliance with applicable standards. Any industrial user required to selfmonitor by the industrial wastewater discharge permit required by subdivision II herein shall

submit to the commissioner during the months of January and July, unless required more frequently, a report indicating the nature and concentration or mass, if required, of pollutants in the effluent which are limited in the industrial wastewater discharge permit. In addition, this

report shall include a record of measured or estimated average and maximum daily flows for the reporting period for the discharge. At the discretion of the commissioner and in consideration of such factors as high or low flow rates, holidays, budget cycles, etc., the commissioner

may agree to alter the months during which the above reports are to be submitted. Falsification of self-monitoring reports shall be considered a violation of this article. For industrial users subject to equivalent mass or concentration limits established by the commissioner, the report required by this paragraph shall contain a reasonable

measure of the user's long-term production rate.

For all other industrial users subject to pretreatment standards expressed only in terms of allowable pollutant discharge per unit of production (or other measure of operation), the report required by this paragraph shall include the user's actual average production rate for the reporting period.

Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern.

(d) Self-monitoring and analysis of industrial discharges:

(1) The monitoring reports required in subparagraphs (a), (b), and (c) of this section shall contain the results of sampling and

analysis of the discharge, including the flow and the nature and concentration, or production and mass where required, of pollutants contained therein which are limited by the industrial wastewater discharge permit. The commissioner may allow the use of monitoring results obtained by the city, in lieu of self-monitoring by the industrial user. This will only be granted by permit condition or written

authorization from the commissioner.

(2) If a sampling performed by the industrial user indicates a violation, the industrial user shall notify the commissioner within 24 hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and shall submit the results of the repeat analysis to the commissioner within 30 days after

becoming aware of the violation, except that the industrial user is not required to resample if (i) the control authority performs the sampling at the industrial user's site at a frequency of at least once per month, or (ii) the control authority performs sampling at the industrial user's site between the time when the industrial

user performs its initial sampling and the time when the industrial user receives the results of the sampling.

(3) The reports required in subparagraph (c) of this section shall be based upon data obtained through appropriate sampling and analysis performed during the reporting period and must be obtained so as to be representative of the reporting period.

The date of month, day of week, and in the case of grab samples, time of day, shall be altered for each sampling cycle.

(4) The frequency of monitoring to demonstrate compliance shall be prescribed in the industrial wastewater discharge permit. All analyses shall be performed in accordance with procedures established

by the EPA pursuant to section 304(g) of the Act and contained in 40 CFR, Part 136 and amendments thereto, or with any other test procedures approved by the EPA. Sampling shall be performed in accordance with the techniques approved by the EPA. Where 40 CFR, Part 136 does

not include sampling or analytical techniques for the pollutants in question, or where EPA determines that the Part 136

sampling and analyses techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed

using validated analytical methods or any other sampling and analytical procedures, including procedures suggested by the city or other parties, and approved by

the EPA.

(5) If an industrial user subject to selfmonitoring requirements contained in subparagraph (c) of this section monitors any pollutant more frequently than required

by the industrial wastewater discharge permit, using procedures prescribed in subparagraph (d)(4) of this section, the results of this monitoring shall be included in the report.

(e) Reporting of potential problems, including slug loadings:

(1) The industrial user shall notify the commissioner within one hour of becoming aware of any spill, dump, or discharge

that could cause problems in the water pollution control facility; including, but not limited to, any slug loading as defined in section 154-196.

(2) Additionally, within five days of becoming aware of a discharge described in subparagraph(e)(1) of this section, the industrial user must submit a written report to the commissioner. This report shall include the date, time, duration, cause of

discharge and, in accordance with section 154-303, provisions of protection against such discharges.

(f) Reporting of changes in discharge: The industrial user shall notify the commissioner at least 30 days in advance of any change in the

facility or pretreatment operations which may substantially change the volume or character of the discharge. Additionally, any industrial user operating under an industrial wastewater discharge permit incorporating equivalent mass or concentration limits calculated from a productionbased standard shall notify the commissioner within two business days after the industrial user has a reasonable basis to know that the production level will significantly change within the next calendar month.

(g) Certification and signatory requirements:

The reports required in subparagraphs (a), (b), and (c) of this section shall include the following statement: "I certify under penalty of law that

this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or

these persons directly responsible for gathering the information, the information within this document and attachments is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including fines and/or imprisonment for knowing violations."

Pursuant to 40 CFR § 403.6(a)(2), each report must include a statement describing, and providing evidence and/or reasons a particular industry subcategory is or is not applicable.

These reports must be signed in accordance with section 154-196(3).

(Ord. No. 1998-71, § 2, 10-13-98; Ord. No. 2013- 67(12-O-0563), §§ 4, 5, 12-11-13)

Sec. 154-215. Notification of the discharge of hazardous waste.

(a) Any user who commences the discharge of hazardous waste shall notify the commissioner, the state hazardous waste authorities, and the EPA regional waste management division director, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR, Part 261.

Such notification must include the name of the hazardous waste as set forth in 40 CFR, Part 261, the EPA hazardous waste number, and the type of

discharge (continuous, batch, or other). If the user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent such information is known and readily

available to the user: (i) an identification of the hazardous constituents contained in the waste;

(ii) an estimation of the mass and concentration of such constituents in the wastestream discharged

during that calendar month; and (iii) an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days after the discharge commences.

Any notification under this section needs to be submitted only once for each hazardous waste discharged. This notification requirement does not apply to pollutants already reported by users subject to section 154-214(d).

(b) Users are exempt from the requirements of subparagraph (a) of this section above, during a calendar month in which they discharge no more

than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR §§ 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of nonacute hazardous wastes in calendar month, or of any

quantity of acute hazardous wastes as specified in 40 CFR §§ 261.30(d) and 261.33(e), requires a

one-time notification. Subsequent months during which the user discharges more than such quantities of any hazardous wastes do not require additional notification.

(c) In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the commissioner, the state hazardous waste authorities, and the regional waste management division director of the discharge of such substance within 90 days of the effective

data of such regulations.

(d) In the case of any such notification made under this section, the user shall certify that it has a program in place to reduce the volume and

toxicity of hazardous wastes generated to the degree determined to be economically practical.

(e) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this article, any permit issues thereunder, or any applicable federal or state law.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-216. Maintenance of records.

(a) Sampling and analysis records: Any industrial user subject to the reporting requirements established in section 154-214 of this article shall maintain records of all information resulting from any monitoring activities required by such section 154-214. Such records shall be maintained on site and available for the city's review at any time.

These records shall include for all samples:

(1) The date, exact place, method, and time of sampling and names of the person or persons taking the samples;

(2) The dates analyses were performed;

(3) The name(s) of the person or persons who performed the analyses;

(4) The analytical techniques/methods used;

and

(5) The results of such analyses.

(b) Monitoring activities and results record:

Any industrial user subject to the reporting requirements established in section 154-214 of this article shall be required to retain for a minimum of three years any records of monitoring activities and results (whether or not such monitoring activities are required by this article) and shall make such records available for inspection and

copying by EPA, the state, and the city. This period of retention shall be extended during the course of any unresolved litigation regarding the industrial user, or when requested by the commissioner, State of Georgia, or EPA.

(Ord. No. 1998-71, § 2, 10-13-98) Secs. 154-217—154-225. Reserved.

Sec. 154-226. Required permitted discharges.

It shall be unlawful for any industrial user to discharge any industrial waste or wastewater to any city water pollution control facility without an approved industrial wastewater discharge permit.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-227. Industrial wastewater discharge permitting process.

(a) Approval pre-requisite to plumbing permit.

The plumbing inspector shall not issue a plumbing permit for changes in existing plumbing or the installation of new plumbing, to any significant industrial user, until the applicant presents plans reviewed and stamped by the commissioner.

(b) Baseline monitoring report required. Any significant industrial user discharging or proposing to discharge an industrial waste or wastewater, may be required by the commissioner to submit a baseline monitoring report as outlined

in section 154-214 of this article.

(c) Incomplete baseline monitoring reports. Persons who have filed incomplete baseline monitoring reports, as deemed by the commissioner, will be notified of the deficiency and will be given 30 days to correct such deficiency. If the deficiency is not corrected within 30 days or an extended

period as allowed by the commissioner, the commissioner can deny the permit and shall notify the applicant in writing of such action. The applicant may object to such action, as provided in this article.

(d) Permit application form. The commissioner may require any significant industrial user to submit a completed permit application form prior to issuance of an industrial wastewater discharge permit. A new user must submit an application

for a permit within 60 days prior to any wastewater discharge. An existing user must apply for a reissuance of the permit at least 30 days prior to permit expiration. The application may contain a statement describing which categorical pretreatment subcategories might be applicable and cite evidence and reasons why a particular category is applicable and why others are not. Any person

signing the application statement pursuant to this section shall make the following certification:

"I certify under penalty of law that this document and all attachments were prepared under my

direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or

persons who manage the system, or these persons directly responsible for gathering the information, the information within this document and attachments is, to the best of my knowledge and

belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including fines and/or imprisonment for knowing violations."

(e) Permit issued. Upon receipt of a completed baseline monitoring report or permit application form, the commissioner shall review and evaluate the information and shall issue a permit subject to any necessary conditions. The applicant may

object in writing to any conditions within 30 days of permit issuance, as provided in this article.

Conditions may include, but are not limited to, the following:

(1) A statement of permit duration, as per sections 154-229 of this article;

(2) A statement on nontransferability, as per sections 154-230 of this article;

(3) Pretreatment requirements;

(4) Average and maximum wastewater pollutant concentrations;

(5) Limits on rate and time of discharge or requirements for flow regulations and equalization;

(6) Requirements for installation of inspection and sampling facilities;

(7) Requirements for self-monitoring of wastewater, including sampling location, frequency, and methods of sampling and analysis;

(8) Requirements for maintenance of records and submission of reports relating to wastewater discharge;

(9) A compliance schedule to ensure the industrial user's compliance with pretreatment requirements of this article or other applicable law or requirements;

(10) Requirements for installation of facilities to prevent and control accidental or

unpermitted discharge or spills by the industrial user;

(11) Statement of applicable penalties (civil and criminal) for violations;

(12) Statement of permission to the commissioner and other duly authorized employees of the city, bearing proper identification, to enter upon the user's property without prior notification for the purpose

of inspection, observation, photography, records examination and copying, measurement, sampling or testing; and/or

(13) Other conditions deemed necessary by the commissioner to ensure compliance with this article or other applicable ordinance, law, or regulation.

(f) Questionnaire required. At the discretion of the commissioner, any user of the water pollution control facility may be required to complete a

wastewater discharge questionnaire form furnished by the commissioner, which may contain, but is not limited to, questions concerning type of manufacturing or service activity, location of sewers, quality and quantity of discharge to the city facilities, other disposal facilities and other pertinent data.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-228. Conditions for issuance of permits.

The commissioner may decline to issue an industrial wastewater discharge permit to any user which has failed to comply with the terms and provisions of this article, any lawful orders issued by the commissioner or a previous industrial wastewater discharge permit. The commissioner may require the filing of a bond payable to the city, in a sum determined by the commissioner, to ensure consistent compliance by the user. In appropriate circumstances, the commissioner may require the user to submit proof that it has obtained financial assurances sufficient to

restore or repair damage to the POTW caused by its discharge.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-229. Permit duration.

Permits shall be issued for a time period not to exceed five years. The terms and conditions of the permit may be subject to modification by the

commissioner during the term of the permit as limitations or requirements of this article are modified or for any other just cause. The permittee shall be informed of any proposed changes in its permit at least 30 days prior to the effective date of change. Any more stringent or new conditions in the permit shall include a reasonable time schedule for compliance.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-230. Permit transfer.

Industrial wastewater discharge permits are issued to a specific user for a specific operation. A request for transfer or reassignment shall be

submitted in writing to the commissioner at least 60 days prior to the proposed date of transfer or reassignment by the permittee. The permittee

must provide a copy of the industrial wastewater discharge permit to the new owner or operator. No user is authorized to operate pursuant to the

permit issued to a previous owner or user without the written approval of the commissioner.

(Ord. No. 1998-71, § 2, 10-13-98) Secs. 154-231—154-240. Reserved.

Sec. 154-241. Installation, location, and maintenance of monitoring manhole.

(a) When required by the commissioner, industrial users shall install a suitable monitoring manhole on the building sewers on their property to facilitate observation, sampling, and measurement of wastewaters. The manhole, when required, shall be accessibly and safely located and shall be constructed in accordance with plans

approved by the commissioner. The manhole shall be installed by the industrial user at their expense and shall be so maintained by the industrial users as to be safe and accessible at all times.

(b) It shall be unlawful for any industrial user to discharge, or cause or allow to be discharged, any industrial wastewater which bypasses or does not flow through the monitoring manhole, unless

discharged through a NPDES permitted facility or disposed of off site at a licensed disposal facility.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-242. Inspection, testing, and observation.

The commissioner or other duty authorized employees of the city bearing proper credentials and identification, and under appropriate legal

authority for entry, shall be given immediate access to all properties without prior notification for the purpose of inspection, observation, photography, records examination and copying, measurement, sampling or testing, in accordance with the provisions of this article.

(1) Where an industrial user has security measures in force which require proper identification and clearance prior to entry, the industrial user shall make necessary arrangements with its security guards so that upon presentation of suitable identification, personnel from the city will be permitted immediate access.

(2) The commissioner shall have the right to set up on the industrial user's property, or require the installation of, such devices as are necessary to conduct sampling, metering, and/or observation of the user's operations. It shall be a violation of this article for any person or industrial user to tamper with, remove, adjust, disconnect or otherwise interfere with the operation of

these devices.

(3) The commissioner may require the industrial user to install equipment necessary to conduct sampling, metering, and/or observation of the user's operations. The facilities equipment shall be maintained

at all times in a safe and proper operating condition. All devices used to measure wastewater flow shall be calibrated at least annually to ensure their accuracy.

Records of this calibration must be submitted to the commissioner upon request.

(4) If the commissioner has been refused access to a building, structure, or property, or any part thereof, and is able to demonstrate probable cause to believe that there may be a violation of this article, or that

there is a need to inspect and/or sample as a part of a routine inspection and sampling program of the city designed to verify compliance with the ordinance or

any permit or order issued hereunder, or to protect the overall public health safety and welfare of the community, then the commissioner may seek issuance of a search warrant.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-243. Standards for sampling, measurements, testing and analysis of wastewater.

All sampling, measurements, tests and analyses of the characteristics of wastewaters to which reference is made in this article, shall be performed in accordance with procedures established by the EPA pursuant to section 304(g) of the Act and contained in 40 CFR, Part 136, as amended.

(Ord. No. 1998-71, § 2, 10-13-98) Secs. 154-244—154-255. Reserved.

Sec. 154-256. Notification of user of violation.

Whenever the commissioner finds that any person has violated or is violating this article or industrial wastewater discharge permit, the commissioner may serve written notice upon the person, stating the nature of the violation and

requiring submission of a plan for the satisfactory correction thereof within a specified time limit.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-257. Compliance meetings.

The commissioner may invite representatives of the user to a compliance meeting to review the commissioner's determination that a violation of this article or industrial wastewater discharge

permit has occurred, and the consequent remedial action to be taken. If the user and the commissioner can agree to appropriate remedial

and preventive measures, such measures and a reasonable compliance schedule shall be incorporated as a supplemental condition of the user's industrial wastewater discharge permit. If an

agreement is not reached through this process, the commissioner shall institute such other actions, as deemed advisable, to ensure the user's compliance with the provisions of this article or other laws or regulations.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-258. Show cause hearing.

The commissioner may order any user which causes or contributes to violations of this article or industrial wastewater discharge permits, to

appear before the commissioner and show cause why enforcement actions should not be taken.

Notice shall be served on the user specifying the date, time, and location of the hearing, the reasons for this hearing, and proposed enforcement actions. Such notice shall be served on any representative of the user or by registered or certified mail.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-259. Citation to municipal court.

The commissioner may cite any person to the municipal court for violation of any provision of this article or other portions of the city Code or for violation of any condition of the user's industrial wastewater discharge permit.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-260. Assessment of damages.

When a discharge of waste causes an obstruction, damage, or any other impairment to the facilities, or any expense of whatever character or nature to the city, the commissioner shall assess the expenses incurred by the city to clear the

obstruction, repair damage to the facility, and any other expenses or damages incurred by the city.

The commissioner shall file a claim with the user, or any other person causing said damages, seeking reimbursement for any and all expenses or damages suffered by the city. If the claim is

ignored or denied, the commissioner shall notify the city attorney to take such measures as shall be appropriate to recover for any expense or other damages suffered by the city.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-261. Disconnection for violation.

In the event of an actual or threatened discharge of wastes or wastewater which, in the opinion of the commissioner, presents an imminent and substantial danger to the health or welfare of persons or the environment, or causes interference with the water pollution control facilities or cause the violation of any permit held by the city, the commissioner shall seek authority immediately, pursuant to section 74-161 of this

Code of Ordinances, to disconnect the water discharge from the city's system by discontinuing water service to that property or by disconnecting sewer service to that property.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-262. Consent agreements.

The commissioner is hereby empowered to enter into consent agreements, consent orders, or other similar documents establishing an agreement with any user responsible for noncompliance. Such orders will include specific action(s) to be taken by the user to correct the noncompliance within a time frame specified in the order.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-263. Significant noncompliance.

Any industrial user whose actions or failure to act meet any or all of the following criteria may be placed in the category of significant noncompliance.

(1) Violations of wastewater discharge limits:

a. Chronic violations. A pattern of violations of specific pollutant limitations, as defined in this article, indicated by 66 percent or more of the measurements exceeding (by any

magnitude) the same daily maximum limit or the same average limit for a given pollutant in a six-month

period; or

b. Technical review criteria (TRC). A pattern of violations of specific pollutant limitations, as defined by this article, indicated by 33 percent or

more of the measurements exceeding the same daily maximum limit or the same average limit by more

than the TRC in a six-month period.

The TRC = 1.4 for conventional pollutants, and 1.2 for all other pollutants except pH; or

c. Any other violation or violations of a pretreatment effluent limit (longer term average or daily maximum) that has caused, alone or in combination with other discharges, interference or pass-through; or endangered the health of city personnel or the public.

(2) Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or the environment or has resulted in the POTW's exercise of

it's emergency authority to halt or prevent such a discharge.

(3) Failure to meet, within 90 days of the scheduled date, a compliance schedule milestone, contained in an industrial wastewater discharge permit, a compliance directive, a consent agreement, or any other compliance schedule.

(4) Failure to provide within 30 days of the due date, any reports such as, but not limited to, the following: self-monitoring reports, baseline monitoring reports, 90- day compliance reports, periodic reports, or any other reports required by the city.

(5) Failure to report accurately noncompliance.

(6) Any other violation or group of violations which the commissioner determines will adversely affect the operation or implementation of the pretreatment program.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-264. Publication of list of violators.

The city shall publish, annually, in the newspaper with the largest daily circulation in the city, a list of industrial users which during the previous 12 months were significantly violating applicable pretreatment standards as defined in 40 CFR, Part 403.8(f)(2)(vii).

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-265. Federal, state and municipal enforcement.

In addition to the enforcement actions provided herein, the commissioner may petition the state or the EPA, as appropriate, to exercise such methods or remedies as shall be available to such governmental entities to seek criminal penalties, injunctive relief, as may be provided by applicable federal or state laws to ensure compliance by

industrial users with applicable pretreatment standards, to prevent the introduction of toxic pollutants in toxic amounts, or other regulated pollutants into the water pollution control facilities or to prevent such other water pollution as may be

regulated by state or federal law.

Under 40 CFR § 403.10, the city has legal authority, pursuant to its Code of Ordinances, including, but not limited to, sections 1-8 and 74-161 to prosecute violations of the sewer use ordinance, and to abate the violating condition as a public nuisance. Such actions may be brought in Atlanta Municipal Court.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-266. Revocation of permits.

Any permit issued under the provisions of this article may be suspended or revoked in whole or in part during its terms for the following causes:

(1) Any discharge of industrial wastewater which causes or contributes to any violation of any section of this article;

(2) Violation of any terms or conditions of the industrial wastewater discharge permit;

(3) Obtaining a permit by misrepresentation or failure to disclose fully all relevant facts;

(4) Refusal of immediate access to the user's premises;

(5) Failure to accurately report the constituents and characteristics of the wastewater discharge;

(6) A change in volume or character of the discharge;

(7) A discharge which, in the opinion of the commissioner, may cause interference with the operation or maintenance of the water pollution control facilities or threaten human health or safety;

(8) Failure to provide advance notice of the transfer of the business ownership of a permitted facility; or

(9) Failure to pay fines;

(10) Failure to pay sewer charges;

(11) Failure to meet compliance schedules;

(12) Falsifying self-monitoring reports; or

(13) Tampering with monitoring equipment.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-267. Penalty for violation.

A person convicted of a violation of this article shall be punished by a fine not exceeding $1,000.00, imprisonment for a term not exceeding six months, or any combination thereof. With respect to violations of this article that are continuous with respect to time, each day the violation continues is a separate offense.

(Ord. No. 2013-67(12-O-0563), § 6, 12-11-13) Secs. 154-268—154-275. Reserved.

DIVISION 3. RATES AND CHARGES

Sec. 154-276. Establishment of charges.

Sewer service charges shall be as established by the city.

Sewer rates are hereby waived by 30 percent for domestic customers, aged 65 and older, with a maximum household income of $25,000.00 or less.

(Ord. No. 1998-71, § 2, 10-13-98; Ord. No. 2001- 99, § 2, 12-11-01; Ord. No. 2004-01, § 2, 1-9-04;

Ord. No. 2004-05, § 2, 1-5-04) Sec. 154-277. Sewer service charge.

(a) Established. It is hereby determined to be necessary, in order to provide facilities for the protection of the public health, safety, welfare, and to comply with state and federal water quality laws and regulations for the protection of the quality of the waters of the state, to fix and collect charges upon all premises or facilities served by the water pollution control facilities of the city.

(b) Uses of proceeds. The revenue received from the collection of these charges, as hereinafter authorized, together with other revenue derived from the operation of the system and from the sale of water, shall be deposited with the chief financial officer and credited to the water and

sewer revenue fund and shall be used for the operation and maintenance of the water pollution control and water purification systems and incidental expenses connected therewith to (i) pay debt requirements on revenue bonds issued; (ii)

provide funds for the planning, design, construction, improvement, repair and extension of the water pollution control and water purification

systems, facilities and appurtenances used in connection with the operation of the systems; (iii) acquire necessary easements or the purchase of

land; and (iv) provide funds for the necessary reserves for debt and improvements; however, said revenues shall not be used for the construction of lateral or storm sewers.

(c) Determination of amounts. For the purposes provided in subparagraph (b) hereof, there is hereby charged and assessed to each premise or facility served by the water pollution control

facilities of the city, or otherwise discharging wastewater, industrial wastes, water or liquids, either directly or indirectly into the water pollution control facilities, a sewer service charge and assessment payable as hereinafter provided, and

in the amount determinable as follows:

(1) The sewer service charge shall be based upon the quantity of water used by the premises or facility therein or thereon as measured by a water meter or meters there in use, or as otherwise currently established.

(2) The sewer service charge shall consist of a charge per hundred cubic feet of water consumed, including adjustments thereto.

(3) Water used from private sources shall be metered as required in subparagraph (d) of this section and shall be figured at prevailing city water rates and the sewer service charges shall be billed accordingly.

(d) Independent water supply; installation of meter. In the event a lot, parcel of land, premises or facility discharging wastewater, industrial waste, water, or other liquids which either directly or indirectly enters into the city's water pollution control facilities, or ultimately enters the facilities, is supplied either in whole or in part with water from wells or any source other than the

City Bureau of Operations - Drinking Water, those wells or other sources of supply shall be registered with the City Bureau of Operations - Drinking Water on or before the effective date of this article, and if not measured by a water meter, the owner or occupant shall, at his own cost,

install and maintain a meter on the supplies in such a location and in such a manner as is satisfactory to the commissioner. These meters shall serve as a control for the establishment of the sewer service charge and shall be read monthly or bimonthly by employees of the City Bureau of

Operations - Drinking Water. Rainwater catchment systems installed and operated pursuant to Atlanta City Code Section 1300 of Appendix C

"Plumbing Code Amendments," Chapter I shall be exempt from the requirements of this subsection.

(e) Additional meters. Where it can be shown to the satisfaction of the commissioner that a significant portion of the water used by customers, as measured by the water meter or meters, does not enter the water pollution control facilities, then that portion of water shall not be used for billing of the sewer service charge. The commissioner may require or permit the installation of additional meters or other devices as may be

deemed necessary to establish that portion which does not enter the system.

(f) Applicability of section. Where the commissioner determines that sewer service is available to any lot, parcel of land, premises, or facility, 60 days' notice will be given to the owner of such lot, parcel of land, premises, or facility directing connection to available sewer, and billing as provided in subparagraphs (a) through (e) above will thereafter be initiated unless an exemption is authorized as set forth in subparagraph (g) below.

(g) Exemption authorized. The mayor or his designee is hereby authorized to waive 12 percent of the sewer service charges for those domestic

customers in the city who make application for such waiver and who can show to the satisfaction of the commissioner by certification of a master plumber licensed in the City of Atlanta, that they are not connected to the city's water pollution

control facilities. Said 12 percent constitutes that part of the sewer service charge imposed for the city's water pollution control facilities' operating costs that is directly associated with the treatment of wastewater.

The mayor is hereby authorized to waive the entire sewer service charge for those domestic customers in the city who make application for such waiver and who can show to the satisfaction of the commissioner by certification of a master plumber licensed in the city that they are not

connected to the city's water pollution control facilities. This certification must state that the lowest floor of their residence which contains rest room facilities, cannot be served by gravity flow.

The waiver, once granted, shall continue in force, unless revoked, until plumbing permits are issued by the city's plumbing inspector for connection to the sewer. Such waiver, when authorized by the mayor, shall become effective on the first day of the next billing cycle after the date of

authorization. No waiver will be authorized if any portion of the residence is connected to the city's water pollution control facilities.

Sewer rates are hereby waived by 30 percent for domestic customers, aged 65 and older, with a maximum household income of $25,000.00 or less.

(Ord. No. 1998-71, § 2, 10-13-98; Ord. No. 2001- 99, § 2, 12-11-01; Ord. No. 2003-83, § 8, 7-29-03;

Ord. No. 2004-01, § 2, 1-9-04; Ord. No. 2004-05, § 2, 1-5-04; Ord. No. 2011-43(11-O-0740), § 2,

9-28-11) Sec. 154-278. Industrial wastewater surcharges.

(a) Established. All persons discharging industrial wastes into the public sewers shall be charged and assessed a surcharge, in addition to any

sewer service charges, if these wastes have a concentration greater than the following:

(1) A COD content of 500 mg/l as determined by laboratory analysis in accordance with procedures prescribed in section 154-282, subparagraph (b).

(2) A TSS content of 250 mg/l as determined by laboratory analysis in accordance with procedures prescribed in sections 154- 282, subparagraph (b).

(3) A TKN content of 25 mg/l as determined by a laboratory analysis in accordance with procedures prescribed in section 154- 282, subparagraph (b).

The amount of the surcharge, which is hereby charged and assessed against all persons discharging industrial wastewater into the public sewers, shall reflect the cost incurred by the city in

handling the excess COD, TKN, and TSS. This surcharge shall include a proportionate share of charges for maintenance and operation of the

water pollution control facilities including depreciation and other incidental expenses.

(b) Formula determining surcharge. When any or all the COD, TKN, and TSS of wastewater or waste accepted for admission to the city water pollution control facilities exceed values of these constituents set forth in subparagraph (a) hereof, the excess concentrations of any or all, as the case may be, shall be evaluated in terms of these

values and be subject to a surcharge on the amount derived in accordance with the following formula: Amount of surcharge = (B + C + D) × effluent flow (CCF) Where:

B = The cost factor for TSS discharged to the sewer above 250 mg/l. This quantity is determined by the multiplication of a factor herein called "X", by the excessive pounds of TSS in the

wastewater as measured in samples collected so as to be representative of the daily wastewater discharge.

C = The cost factor for COD discharged to the sewer above 500 mg/l. This quantity is determined by the multiplication of a factor herein called "Y", by the excessive pounds of COD

in the wastewater as measured in samples collected so as to be representative of the daily wastewater discharge.

D = The cost factor for TKN discharged to the sewer above 25 mg/l. This quantity is determined by the multiplication of a factor herein called "Z", by the excessive pounds of TKN

in the wastewater as measured in samples collected so as to be representative of the daily wastewater discharge.

X = The annual average cost of removal of one pound of TSS.

Y = The annual average cost of removal of one pound of COD.

Z = The annual average cost of removal of one pound of TKN.

(c) Determination of amounts. The rates of surcharge for each of the aforementioned constituents shall be determined annually by the commissioner in order that the above factors may correctly represent current treatment costs. A

schedule of the surcharge shall be filed with the municipal clerk by the commissioner.

(d) Changing industrial wastewater surcharge.

The industrial waste surcharge cost factors shall not be increased in any year by more than 20

percent of the charges for the preceding year without written approval of the city council.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-279. Reserved.

Sec. 154-280. Billing procedure.

Industrial wastes surcharges provided for in this article shall be prepared and rendered with the regular water bill. The volume of flow used in billing the industrial waste surcharges shall be based upon metered, estimated, or prorated water consumption for the period during which the

sampling was conducted.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-281. Payment of bills.

Sewer service charges and surcharges provided in this article shall be payable at the office of the chief financial officer in the city hall or at other authorized locations, at the same time as the

water bills for a lot, parcel of land, building, premise or facility are payable and payments for water shall not be accepted unless payment of the sewer service charge or surcharge is made at the same time, provided however, the sewer service

and/or surcharge is applicable.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-282. Annual analysis.

(a) Frequency of analysis. The industrial wastewater of each significant industrial user discharging into the city sewers shall be subject to periodic inspection and a determination of character and

concentration of the wastewater shall be made annually, or more often, as may be deemed necessary by the commissioner.

(b) Sampling and analysis procedures. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to section 304(g) of the Act and contained in 40 CFR, Part 136, as amended. If 40 CFR, Part 136 does not contain sampling or

analytical techniques for the pollutant in question, sampling and analysis must be performed in accordance with procedures approved by EPA.

(Ord. No. 1998-71, § 2, 10-13-98) Secs. 154-283—154-295. Reserved.

DIVISION 4. DISCHARGE RESTRICTIONS

Sec. 154-296. Discharge of septic tanks.

(a) Restricted. It shall be unlawful to empty, dump, throw or otherwise discharge into any manhole, catch-basin or other opening into city water pollution control facilities, or any sewer connected with and discharging into the collection facilities, the contents of any septic tank or chemical toilet, sludge, wastewater or other similar matter or material, except as provided in subparagraph (b) of this section.

(b) Authority of commissioner. The commissioner is hereby authorized to grant permits to discharge the contents of septic tanks or chemical toilets at locations specified by him/her and under his/her supervision, provided that such permits

shall be limited to the discharge of domestic wastewaters. The permits may be revoked at any time if, in his/her opinion, continued discharge of that matter will be injurious to water pollution control facilities, or if any provisions of ordinances regulating such discharges are violated by the permittee. Permits shall include provisions, standards, and requirements to be met by the

discharger. A current Fulton County Health Department Permit must be presented with the permit application.

(c) Fees. The fee for discharges authorized under subparagraph (b) hereof shall be determined annually by the commissioner based on the current costs for treatment of the discharges. The schedule of fees for the discharges shall be filed with the municipal clerk by the commissioner

annually.

(Ord. No. 1998-71, § 2, 10-13-98) Sec. 154-297. City of Atlanta Grease Management Ordinance.

This division shall be known and may hereafter be referred to as the "City of Atlanta Grease Management Ordinance."

(Ord. No. 2003-90, § 1(Exh. A), 9-10-03) Sec. 154-297.00. Definitions.

The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Applicant means any owner or agent of the owner of any food service, food sales or food processing establishment submitting an application for a food service wastewater discharge permit to the department of watershed management for consideration for approval.

Commissioner means the commissioner of the department of watershed management or his designee, or such person as the mayor may designate to carry out the functions set forth herein.

Department means the department of watershed management.

Facility means a building or a location where food service, sales or processing, as defined in this section, occurs as identified by the numbering system for public streets used as directions for delivery.

FOG means fats, oil and grease.

Food means any raw, cooked, or processed edible substance, ice, beverage or ingredient used or intended for use or for sale in whole or in part for human consumption.

Food processing establishment means a commercial establishment in which food is manufactured or packaged for human consumption.

The term does not include a food service establishment, retail food sales store, or commissary.

Food sales establishment means retail and wholesale grocery stores, retail seafood stores, bakeries, confectioneries, fruit, nuts, and vegetable stores and places of business, and similar establishments, mobile or permanent, engaged in the sale of food primarily for consumption off premises.

Food service establishment means any establishment for the preparation and/or serving of meals, lunches, short orders, sandwiches, frozen desserts, or other edible products. The term includes: restaurants, coffee shops, cafeterias, short order cafes, luncheonettes, tav-erns, lunchrooms, places which manufacture

retail sandwiches, soda fountains; institutional cafeterias, catering establishments, food vending vehicles and operations connected therewith; and similar facilities by whatever name called. The term "food service establishment"

shall not mean a "food sales establishment," as defined in this division, which does not provide seating or facilities for consumption of food on the premises.

Fryer oil means oil that is used and/or reused in fryers for the preparation of such foods as fried chicken or french fries.

Grease means rendered animal fat, vegetable shortening, and other such oily matter used for the purposes of and resulting from cooking

and/or preparing foods.

Grease trap means a device or interceptor that is designed, installed and operated in accordance with the manufacturer's specifications to separate and retain fats, oils and grease from liquid waste and allow the remaining liquid waste to discharge into the city's sewer collection system.

Mobile food unit means a self-propelled vehicle or mounted unit intended to be used as a food service establishment and is not regulated

by this division.

Permit means written authorization to discharge to the city's wastewater collection system granted by the department to the owner of a facility or his/her authorized agent to operate a food service establishment, food sales or food processing establishment and indicates satisfactory compliance with this division.

Sampling port means the last point downstream of a grease trap that will accommodate sampling to take place prior to the discharge of effluent to the city's sewer collection system.

Temporary food service establishment means a food service establishment that has no permanent sewer connection and operates at the same location for a period of time of not more

than 14 consecutive days in conjunction with a single event, such as a fair, carnival, circus, exhibition or similar temporary gathering, is not regulated by this division.

User means, for purposes of this division, the owner or operator of a food service, food sales or food processing establishment that discharges wastewater into the city sewer system.

(Ord. No. 2001-5, § II, 1-23-01; Ord. No. 2003-90, § 1(Exh. A), 9-10-03)

Sec. 154-297.01. Food processing, sales, and/or service establishment (grease trap) regulations/ new installation.

(a) Permit required. For new construction after the effective date of this section and after the issuance of a plumbing permit issued by the

bureau of buildings, the owner or operator (hereinafter called the user) of a food processing, sales, or service establishment which discharges wastewater into the city's sewer system shall obtain a food service wastewater discharge permit. This

permit shall be obtained prior to the issuance of any business license issued by the city. Failure to obtain the food service wastewater discharge permit shall be grounds for revocation of the city business license.

(1) Annual fee. There will be an annual permit fee for a food service wastewater discharge permit as set forth in the schedule below:

Number of Grease Traps Fee 0—5 $ 300.00 6—10 600.00 11—15 900.00 16—20 1,200.00 21—25 1,500.00 26—30 1,800.00 31—35 2,100.00 36—40 2,400.00 41—45 2,700.00 46—50 3,000.00 51—55 3,300.00 56—60 3,600.00 For each five additional grease traps in excess of 60 traps, the maximum fee shall be increased by $300.00.

(2) A re-inspection fee of $100.00 dollars per each trap shall be charged for any facility that fails any grease trap inspection, in addition to any fines that may be imposed by the courts for any other violations as provided in this section.

(3) The commissioner will evaluate these fees annually, based on the cost to the city of operation and maintenance, and adjust such fees administratively to ensure full cost recovery; provided however, a fee increase of less than ten percent per year shall not require approval of the city council. Any such fee adjustment shall be posted in the office of the municipal clerk

and permittees shall be given written notice prior to the time for renewal of annual permits.

(4) Application. All information requested in the food service wastewater discharge permit application shall be certified by the applicant as true and complete prior to

review for approval. The application shall apply to all grease traps located at the same facility having the same street address and operated by the same owner and/or management (referred to as "user"). Each grease trap shall be identified by a unique identifier selected and noted

in the application by the user. The commissioner shall review completed applications for approval within 30 days of receipt.

(5) Permit conditions may include, but are not limited to, the following:

a. Permit duration;

b. Permit fee;

c. Permit non-transfer;

d. Frequency of inspections;

e. Pretreatment requirements;

f. Maintenance requirements;

g. Limitations on time or rate of discharge;

h. Compliance schedules;

i. Requirements for maintenance of records and submission of reports;

j. Statement of permission to the commissioner and other duly authorized employees of the city to enter upon

the user's property without prior notification for the purposes of inspection, observation, photography, records examination and copying,

measurement, sampling or testing;

and/or

k. Other conditions deemed necessary by the commissioner to ensure compliance with this article or other applicable ordinances, laws, or regulations.

(6) Denial of permit. If a permit for a location is denied, the applicant will be notified

within 60 calendar days of the commissioner's determination to deny the application.

a. Notification. The applicant will be advised in writing of the specific cause for the denial.

b. Process. An applicant who is denied a permit under this article shall have the right to appeal such denial to the mayor. The appeal shall be filed within three business days after the notice of denial is received.

(b) Grease trap requirements. All food service, sales and processing establishments, except for small areas designated as break areas or the equivalent and/or industrial user's wastewater discharge regulated under the pretreatment ordinance, discharging wastewater containing fats, oils and grease (FOG) to the city's sewer collection system and water pollution control facilities shall install, operate, and maintain a sufficiently sized "grease trap" necessary to achieve and maintain

compliance as indicated below:

(1) Outdoor grease traps requirements.

a. Grease traps for new food processing, sales, or service establishments shall have a capacity not less than

two 1,500 gallon traps in series for a total capacity of 3,000 gallons. See City of Atlanta Detail entitled Recommended Grease Trap Design.

Exceptions:

1. Limited space available to install outside grease traps. The commissioner may approve the

installation of a single 1,500- gallon grease trap in cases where site conditions prevent the installation of two 1,500- gallon traps in series.

2. Seating capacities of 100 persons or less. The commissioner may approve the installation of

a single 1,500-gallon grease trap in facilities having a seating capacity of 100 persons or less.

See City of Atlanta Detail entitled Recommended Grease Trap Design.

3. Indoor grease trap. The commissioner may approve the installation of indoor grease traps provided the establishment is

not equipped with a dishwasher and/or food waste grinder. All indoor traps shall be sized and installed in accordance with the following Tables I, II, and III, which have been extracted from Plumbing and Drainage Standard PDI-6101, Testing and Rating Procedure for Grease Interceptors with Appendix of Sizing and Installation Data, 1996 or

as updated from time to time.

(2) It is prohibited to discharge the following materials into an indoor grease trap:

a. Wastewater with a temperature higher than 140 degrees Fahrenheit.

b. Wastewater discharge from dishwasher.

c. Acid or caustic trap cleaners.

d. Wastewater discharge from garbage disposals.

Table I. Typical Sizes and Volumes of Sink Compartments Fixture Compartment

Size (Inches) Number of Compartments Drainage Load (Gallons) Recommended PDI Size Grease Interceptor 18 × 12 × 6 1 4.2 7 16 × 14 × 8 1 5.8 7 20 × 18 × 8 1 9.4 10 18 × 16 × 8 2 15.0 15 20 × 18 × 8 2 18.7 20 30 × 20 × 8 1 15.5 20 24 × 20 × 12 1 18.7 20 22 × 20 × 8 2 23.0 25 22 × 20 × 12 2 34.0 35 48 × 24 × 12 2 44.9 50 22 × 20 × 12 3 51.4 70 22 × 20 × 12 4 68.6 70 Table II. Procedure for Sizing Indoor Grease Traps (Flow rates shall be calculated based on a two minute drainage period) Steps Formula Example

1 Determine cubic content of fixture by multiplying length width × depth A sink 48" length by 24" wide by 12" deep.

Cubic content 48 × 24 × 12 = 13,824 cubic inches.

Steps Formula Example 2 Determine capacity in gallons.

1 gal. = 231 cubic inches Contents in gallons 13,824/231 = 59.8 gallons.

3 Determine actual drainage load. The fixture is normally filled to about 75% of capacity with

water. The items being washed displace about 25% of the content, thus actual drainage load = 75% of fixture capacity

0.75 × 59.8 = 44.9 gallons.

4 Determine flow rate and drainage period. In general, drainage period is the actual time required to completely drain the fixture. Flow rate = (Actual Drainage Load)/(Drainage Period) Flow rates shall be calculated on the basis of a two-minute drainage period.

Two-minute period 44.9/2 = 22.5 GPM flow rate.

5 Select indoor grease trap using the Following Table A1.2 for Sizing & Rating, which corresponds to the flow Rate, calculated.

Note: Select next larger size when flow rate falls between two sizes listed.

For two-minute period:

22.5 GPM requires PDI size "25."

Table III. Sizing and Rating of Indoor Traps PDI Size Symbol 4 7 10 15 20 25 35 50 Flow Rate

GPM

4 7 10 15 20 25 35 50 Grease Capacity Pounds 8 14 20 30 40 50 70 100

(c) Outdoor grease traps shall have the following design features. A tee inlet in which one tee branch extends a minimum of one foot below the

liquid level, an outlet tee with a minimum submergence of 2 /3 the liquid depth, a baffle to separate the trap into two compartments and two manhole access ways for inspection of inlet and

outlet tees. The trap shall have cleanouts and be located for easy access for pump out and inspection. Dishwasher, floor drains, mop sink and food grinder wastewater shall be discharged to outdoor grease traps. See City of Atlanta Detail entitled Recommended "Grease Trap Design.

(d) Alternative grease trap technologies.

(1) The commissioner may approve the use of alternative grease trap technologies, e.g.

skimmers, for controlling FOG discharges in lieu of a passive grease trap if he determines such device would be as effective or more effective. If approved, any such device must be wired directly to the

circuit breaker and contain an audio and visual alarm that can only be reset by opening and servicing such device.

(2) The user shall provide the following information to allow the commissioner to evaluate the proposed technology:

a. A proposal that is specific for the food service, sales or processing establishment under consideration. The commissioner will not consider a general or generic proposal.

b. Complete information regarding the performance, and proof of effectiveness of removing FOG of the proposed alternative grease trap technology, including specifications for maintenance service frequency and

other performance related documents as may be required.

c. The manufacturer's installation and operation manuals.

(3) If approved, the user shall install and maintain such device in accordance with the manufacturer's installation and operation specifications; provided however, frequency of maintenance shall not be less than as specified in the user's permit.

(Ord. No. 2001-5, § II, 1-23-01; Ord. No. 2003-90, § 1(Exh. A), 9-10-03)

Sec. 154-297.02. Food service establishment (grease trap) regulations/ existing installations.

(a) Permit required. The owner or operator (hereinafter called the user) of a food processing, sales, or service establishment which discharges wastewater into the city's sewer collection system, installed before the adoption of the section, shall obtain a food service wastewater discharge permit. This permit shall be obtained prior to the issuance of any business license issued by the city.

Failure to obtain the food service wastewater discharge permit shall be grounds for revocation or denial of the city business license.

(1) There will be a fee for a food service wastewater discharge permit as set forth in the schedule below.

Number of Grease Traps Fee 0—5 $300.00 6—10 600.00 11—15 900.00 16—20 1,200.00 21—25 1,500.00 26—30 1,800.00 31—35 2,100.00 36—40 2,400.00 41—45 2,700.00 46—50 3,000.00 51—55 3,300.00 56—60 3,600.00 For each five additional traps in excess of 60 traps, the maximum fee shall be increased by $300.00.

(2) A re-inspection fee of $100.00 dollars for each grease trap shall be charged for any facility that fails any grease trap inspection, in addition to any fines that may be imposed by the courts for any other violations as provided in this section.

(3) The commissioner will evaluate these fees annually, base on the cost to the city of operation and maintenance, and adjust such fees administratively to ensure full cost recovery; provided however, a fee adjustment of less than ten percent per year shall not require approval of the city council. Any such fee adjustment shall be posted in the office of the municipal clerk and permittees shall be given written notice prior to the time for renewal of annual permits.

(4) Application. All information requested in the food service wastewater discharge Permit application shall be certified by the applicant as true and complete prior to

review for approval. The application shall apply to all grease traps located at the same facility having the same street address and operated by the same owner and/or management (referred to as "user"). Each grease trap shall be identified by a unique identifier selected and noted

in the application by the user. The commissioner shall review completed applications for approval within 30 days of receipt.

(5) Permit conditions may include, but are not limited to, the following:

a. Permit duration;

b. Permit fee;

c. Permit non-transfer;

d. Frequency of inspection;

e. Pretreatment requirements;

f. Maintenance requirements;

g. Limitations on time or rate of discharge;

h. Compliance schedules;

i. Requirements for maintenance of records and submission of reports;

j. Statement of permission to the commissioner and other duly authorized employees of the city, to enter upon

the user's property without prior notification for the purposes of inspection, observation, photography, records examination and copying,

measurement, sampling or testing;

and/or;

k. Other conditions deemed necessary by the commissioner to ensure compliance with this article or other applicable ordinances, laws, or regulations.

(6) Denial of permit. If a permit for a location is denied, the applicant will be notified

within 60 calendar days of the commissioner's determination to deny the application.

a. Notification. The applicant will be advised in writing of the specific cause for the denial.

b. Process. An applicant who is denied a permit under this article shall have the right to appeal such denial to the mayor. The appeal shall be filed within three business days after the notice of denial is received.

(b) Replacement of an existing grease trap shall be subject to the standards applicable to new installation of a grease trap set out in this section, unless otherwise approved by the commissioner pursuant to other authority set out in Part 154 of the Code.

(Ord. No. 2001-5, § II, 1-23-01; Ord. No. 2003-90, § 1(Exh. A), 9-10-03)

Sec. 154-297.03. Maintenance and inspection requirements for new and existing grease traps.

(a) Frequency of maintenance by the owner/ user.

(1) Maintenance of an outdoor grease trap.

Maintenance shall be performed at frequencies necessary to protect the capacity of the sewer system against the accumulation of fats, grease and oils (FOG), as required by the "25 Percent Rule" as defined in paragraph (4) below, and at intervals specified in the permit but, in any event, not less than once every 90 days.

(2) Maintenance of indoor grease trap. Maintenance shall be performed at frequencies necessary to protect the capacity of the

sewer system against the accumulation of fats, grease and oils (FOG) as required by the "25 Percent Rule" as defined in this section. Indoor grease traps must be cleaned at intervals specified in the permit, but, in any event, at intervals no less than once every 14 days. For those food

service, sales or processing establishments that are operated infrequently and only for special events, the commissioner

may permit a maintenance frequency related to the event schedule.

(3) It is specifically prohibited to maintain grease traps or any component of the plumbing system tributary to a grease trap or interceptor that discharges into the city's waste system by the introduction or addition of bacteriological, chemical, or enzymatic addition or treatment.

It shall also be prohibited to dispose of fryer oil to the city's wastewater collection system.

(4) The "25 Percent Rule" requires that the depth of oil and grease (floating and settled) in a trap shall not be equal to or greater than 25 percent of the total operating depth of the trap. The operating depth of a trap is determined by measuring the internal depth from the outlet water elevation to the bottom of the trap.

In application of this rule, the depth of floating oil and grease shall not be greater than 20 percent of total operating depth of a trap since five percent of the oil and grease is generally settled at the bottom of the trap.

(5) The user shall be responsible for the proper removal and disposal of the grease trap

waste to a transporter and maintenance of records of disposal as specified in this section.All waste removed from each grease trap must be disposed of at an appropriate facility designed to receive such waste.

In no manner shall any grease trap pumpage be discharged to the city's sewer collection or stormwater sewer system as otherwise prohibited in the sewer use

ordinance.

Maintenance shall include the complete removal of all contents, including floatable materials, wastewater, sludges, and solids. Top skimming of outdoor grease

traps, decanting or back flushing of the grease trap or its wastes for the purpose of reducing the volume to be hauled is prohibited.

Further, the discharge of liquid, semisolids, or solids into a grease trap from vehicles after servicing is prohibited. Vehicles capable of separating water from grease shall not discharge separated water into the grease trap or into the wastewater collection system.

Grease traps must be operated in accordance with the manufacturer's specifications and/or in accordance with generally accepted engineering standards and practices.

(6) Record keeping requirement. The user shall be responsible for maintaining records (manifests), permit applications, correspondence, sample data or any documentation as may be requested by the commissioner) as to the dates of service, quantity of waste removed, end disposal

site of waste, and waste hauler. These records shall be kept on-site at the user's location for a period of three years and subject to the commissioner review without prior notification. The records shall also be submitted for annual permit renewal as required by the commissioner.

The manifest shall contain the information listed below:

Food service, sales or processing establishment Name:

Address:

Phone:

Food service establishment wastewater discharge permit #:

Trap type and size:

Authorized signature (verifying that grease trap was cleaned and in operable condition): and Date of service:

Service company information (waste hauler) Name:

Address:

Phone:

Hauler permit #:

Total gallons removed from grease trap:

Disposal method:

Authorized signature and date of service:

Disposal site Name:

Address:

Phone:

Facility permit #:

Total gallons received:

Authorized signature and date of disposal:

(b) Frequency of inspections by the city.

(1) In order to achieve compliance with this section, certain food service establishments located in designated portions of the city which have a small diameter

public sewer system (i.e., 8″, 10″, and 12″), shall be inspected a minimum of three times per year. Such inspection frequency shall be indicated on the "permit."

(2) Inspection of a grease trap shall be performed at frequencies necessary to protect the capacity of the sewer system against the accumulation of grease and

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:atlanta/code/whole@2026-10-21-58aabf232d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.