Sec. 9-11-6. E-I (Employment-Industrial) and I (Industrial) design standards.
Sobre este texto
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. All outside storage must be completely screened from view from adjacent properties and the street(s).
B. Loading docks must be located to the side or rear of the building unless the loading area is completely screened from the street.
C. Site must be designed to permit on-site maneuvering of all vehicles (no backing in from street).
D. Front yard landscaping. A minimum of 25 percent of the designated front yard setback shall be landscaped with a combination of trees, shrubs, and ground cover. The remainder of the front yard setback areas not paved with driveways or sidewalk shall be vegetated, which may be grass or other ground cover.
E. Riparian buffers for the I (Industrial) zone. Developments in the I (Industrial) zone must observe a minimum buffer of 150 feet (measured horizontally from uppermost part of the river, stream or lake bank usually marked by a break in slope) from all perennial rivers, lakes, and streams identified on the Athens-Clarke County Environmental Areas Map. Buffers are to be maintained in accordance with section 8-6-8, "Land Disturbing Activity Standards for Riparian Buffer Areas," of the Code of Athens-Clarke County, Georgia.
F. When within 400 feet of a property line associated with a residential or agricultural zoned property, mechanical equipment located on the property, whether on a roof top, on the ground level, or elsewhere on the subject property, must be screened on all four sides by an acoustical barrier. For purposes of this section, acoustical barrier is defined as an exterior solid or louvered wall containing sound-proofing materials designed to absorb noise.
G. When within 400 feet of a property line associated with a residential or agricultural zoned property, applicants are required to have a buffer wall per the requirements of Section 9-15-3 of this Code and the required buffering must also have an earthen berm that has a minimum height of 6 feet and a grade lower than 2:1. Use of natural topography and preservation of existing vegetation, supplemented by new vegetation, if needed, may be substituted if determined by the Planning Director.
H. Generator testing is limited to 9:00 a.m.—5:00 p.m. Except for generator testing or commissioning activities, generator use is limited to backup/emergency use only.
I. Data Centers. Data Centers shall use a true closed-loop cooling system.
Historia
(Ord. of 12-5-2000, § 1; Ord. of 9-4-2001, § 3; Ord. of 4-7-2026(1), § 9)
Reuniones que se refieren a esta sección
- Athens-Clarke County Mayor & Commission, 7 de abril de 2026 (Actas)Se refiere a esta sección en las actas: “Sec. 9-11-6”, “Section 9-11-6”, “Section 9-11-6”Nombra una ordenanza de la historia de esta sección en las actas: “Sec. 9-11-6”
- Athens-Clarke County Planning Commission, 5 de febrero de 2026 (Actas)Se refiere a esta sección en las actas: “section 9-11-6”, “section 9-11-6”
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.