Avondale Estates · Ordenanza de zonificación
Appendix A / Chapter 21 - ZONING ORDINANCE / Article 6 - SITE DEVELOPMENT FEATURES / Division 6.10 - SIDEWALK, STREET, AND OTHER CONSTRUCTION STANDARDS
Sec. 21-6.10.2. Sidewalk installation and timing.
Sobre este texto
- As published by Municode, current through 2024-04-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Residential subdivision projects. Sidewalks shall be installed on new internal streets (both sides including "eyebrow" turnarounds, cul-de-sac, and hammerheads) and on adjacent external streets prior to the recordation of the final plat, unless a performance bond is secured pursuant to division 6.9 - guarantees and sureties.
B. Nonresidential subdivision projects. Sidewalks shall be installed on new internal streets (both sides including cul-de-sac, hammerheads, and "eyebrow" turnarounds) and on adjacent external streets prior to the recordation of the final plat, unless a performance bond is secured pursuant to division 6.9 - guarantees and sureties.
C. Nonsubdiuision projects. Required sidewalks shall be installed prior to the issuance of a certificate of occupancy/completion, unless a performance bond is secured pursuant to division 6.9 - guarantees and sureties.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.