Avondale Estates · Ordenanza de zonificación
Appendix A / Chapter 21 - ZONING ORDINANCE / Article 6 - SITE DEVELOPMENT FEATURES / Division 6.10 - SIDEWALK, STREET, AND OTHER CONSTRUCTION STANDARDS
Sec. 21-6.10.3. Sidewalk site preparation and material standards.
Sobre este texto
- As published by Municode, current through 2024-04-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Cross slope. Sidewalks shall be constructed with a cross slope of 0.25 inch per foot. Sidewalks shall maintain this cross slope at driveway crossings or transition the sidewalk to a driveway with ramps and detectable warnings.
B. Material. Class "B" (as defined by Georgia Department of Transportation) with a minimum strength of two thousand two hundred (2,200) PSI at twenty-eight (28) days.
C. Final stabilization. Disturbed areas resulting from sidewalk construction shall be backfilled, stabilized, and grassed or landscaped.
D. Sidewalk curb ramp construction standards. Intersection radius curb ramps shall be provided at street intersections. Straight ramps may be provided at intersections of curbed driveways and at streets without sidewalks. Curb ramps shall meet the requirements of DeKalb County.
E. Damage repair. Damage to sidewalks and ramps caused by construction or development activity shall be repaired at no cost to the city within thirty (30) days, or prior to issuance of a certificate of occupancy, whichever is earlier.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.