Sec. 89-1260. Installation of streets and utilities.

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-11

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Street improvements shall be furnished and installed by the owner or developer in accordance with this Development Code. Any materials or work not covered by these specifications shall be performed in accordance with DOT specifications and these regulations.

(a) Grading.

(1) All streets shall be graded to their full width by the developer so that pavement extensions or sidewalks, where required or if installed in the future, can be constructed on the same level plane.

(2) Preparation of roadway: Before grading is started the entire area to be paved shall be first cleared of all stumps, roots, brush and other objectionable materials. In all areas to be graded or filled, the developer shall stockpile the topsoil later to be spread in all disturbed areas not paved.

(3) Grading shall be done in accordance with the site clearing and grading section of this article.

(b) Installation of utilities; general.

(1) After grading is completed and approved, the curb lines shall be staked by the developer's registered land surveyor, all of the underground utilities—water mains, sewer mains, water and sewer laterals, storm drains, gas mains, or any other underground utilities, and all service connections related thereto—shall be installed completely and provided throughout the length of the street and acrossthe flatsection. Service connectionsforsanitary sewer (if required) and water shall be extended to the right-of-way lines.

(2) It is the responsibility of the contractor to locate all underground utilities and to protect same.

Utility lines or services damaged by the contractor shall be repaired by the contractor at the contractor's own expense.

(3) Before any utility is installed, the entire width of the right-of-way shall be at finished grade.

(4) Any disturbance or construction in the completed (seeded and/or sodded) right-of-way by a public utility such as power, water, sewer, gas, phone and cable must be repaired and/or replaced with the specified materials as called for in the initial improvements.

(5) All utilities beneath pavement shall be installed and the ditch backfilled and thoroughly compacted before any pavement or base is installed, or the pipes shall be bored if installed after street construction.

(6) All utility manholes and valve boxes shall be brought to the finished grade within the roadway section.

(7) All private utilities that will cross under pavement shall be installed completely throughout the subdivision prior to any roadway base being applied. Installation of approved utility sleeves shall be considered as an alternate.

(c) Watersystem installation.

(1) If a public water system is required to be installed under the provisions of the project design standards article of this Development Code, the improvements are to be reviewed, approved and inspected by the providing jurisdiction. Installation shall be coordinated with the construction of streets.

(2) A contractor holding an underground utilities contractor license shall install all elements of the water system, including mains, valves, service laterals through the curb line, and fire hydrants.

(3) Within the water system jurisdiction, water mains and appurtenances shall be installed after installation of the curbs and gutter and before paving, or after staking of the curb line and submission to the water system entity of an as-graded survey of the street profile accompanied by a certification executed by the owner that the subgrade will not change. Water mains shall be relocated as necessary to meet water system regulations prior to approval of development conformance, if improperly located to final curb line or grade.

(d) Installation ofsanitary sewage disposal.

(1) If a public sanitary sewerage system is required to be installed under the provisions of the project design standards article of this Development Code, the improvements are to be reviewed, approved and inspected by the providing jurisdiction. Installation shall be coordinated with the construction of streets.

(2) A contractor holding an underground utilities contractor license shall install all elements of the system, including mains, lift stations, outfalls, and laterals.

(3) Pavement replacement. Where sewer lines are installed in existing paved streets, the streets in which the sewer lines are installed shall receive a full width asphalt repaving in accordance with county specifications.

(e) Septic tanks. Septic tanks may be permitted wherever sanitary sewage is determined by the Town’s designee to be not available under the provisions of the project design standards article of this Development Code. Installation of a septic tank system is subject to approval by the Barrow County Health Department under their procedures and regulations.

(f) Street installation.

(1) After the earth work has been completed, all storm drainage and other underground utilities have been installed under the roadbed, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades and cross section shown on the plans.

(2) If any sections of the subgrade are composed of unsuitable or unstable material, such material shall be removed to the depth directed by the public works department and replaced with suitable, thoroughly compacted material.

(3) Preparation ofsubgrade.

a. Prior to placement of the street base, the subgrade shall be compacted to 98 percent density.

b. When the street is to be used for construction traffic before the paving work is completed, a layer of No. 4 stone can be laid as a traffic surface if the developer so desires.

c. This material shall not be used as part of the base material.

d. It may be worked into the subgrade; or it shall be removed before the base course is set up for paving. Provision shall be made to drain low points in road construction when the final paving surface is delayed.

1. Provide break in the berm section when the curbing has not been constructed.

2. Use six-inch pipe sections to provide drainage under curb to side slopes.

e. Abutting property shall be suitably sloped to the right-of-way line.

f. Street base, curbing and paving. Street base, curbing and paving shall be installed by the developer in accordance with the requirements and standards of this Development Code.

(g) Testing requirements; streets. It is the responsibility of the developer to ensure that all required tests are made and reported to the public works department. The cost of all testing and quality control shall be performed at the expense of the developer by qualified testing laboratories. Testing standards are shown on the following Table 11.2.

Table 11.2: Testing Requirements Type of Test to be Performed Minimum Number of Tests Testing Standards Sub-grade Compaction Each 500 linear feet of roadway 1 per cul-de-sac 98% Max Density ASTM-1557 Field Tests ASTM D-1556 F-2922 and D-2167 Base Compaction Each 500 linear feet of roadway 1 per cul-de-sac 98% Max Density ASTM-1557 Field Tests ASTM D-1556 F-2922 and D-2167 Asphalt Density Each 500 linear feet of roadway 1 per cul-de-sac 92% Laboratory Density Asphalt Thickness Each 500 linear feet of roadway 1 per cul-de-sac Deficient in thickness not more than ¼"

(h) Protection ofshoulders.

(1) Immediately after grading and filling and respreading of topsoil, all areas of disturbed soil shall be fertilized and seeded (or in steep areas sodded or otherwise appropriately treated) with suitable vegetative cover to retard erosion.

(2) When all construction is completed, all slopes and shoulders shall be cleared of all rubbish and shall have a well-established stand of perennial grass to prevent undue erosion. Depending on the time of year, the Town’s designee may authorize that a temporary stand of rye (or other acceptable annual species) may be planted, provided that the grass will be replaced by an acceptable species of perennial grass at the start of the next appropriate planting season.

(i) Traffic control devices and streetlights.

(1) Street signs, traffic control signs, and devices such as striping and signalization, shall be provided through payment of fees to Barrow County.

(2) The installation of allstreet lighting fixtures within the right-of-way must be approved by the Town Council prior to such installation.

(j) Foreign material on streets.

(1) The developer, builders, and/or homeowners shall be responsible for keeping dirt, mud, building materials, concrete, etc., off of the pavement and curbing of existing public roads during construction of buildings in all developments covered by these regulations.

(2) Before the streets are accepted, all litter and trash shall be removed from the dedicated rights-ofway and surrounding areas.

(k) Bridge pilings. Bridge pilings shall be driven to state highway load standards for loading. Certification of pile load shall be by registered professional engineer.

(l) Burial of construction debris. No debris of any kind shall be buried at the site of any construction or development.

(m) Street cuts. All utility construction plans for street cuts within right-of-way shall be reviewed and approved, and a permit obtained from the appropriate transportation agency before construction begins.

(1) No existing roads can be open cut unless unusual circumstances warrant it. Construction of proposed utilities that cross under an existing paved streetshall be bored under existing pavement unless an open cut is approved by the appropriate transportation agency. Where required because of topography, location of existing utilities, or other factors, the appropriate transportation agency may allow the installation of utilities in other areas.

(2) Earth work. If open cut construction is approved, all trenches shall be backfilled and compacted in six-inch lifts the same day the trench is opened.

a. Trenches under the paving shall be returned to 98 percent compaction.

b. Compaction tests at a rate of one per 150 feet of trench shall be provided to verify compaction.

c. Trenches elsewhere shall be returned to 90 percent compaction.

(3) Pavement work.

a. All pavement cuts on public streets or roads shall be made by sawing prior to excavation to eliminate uneven and ragged edges.

b. The paving cut shall be widened to a minimum of 12 inches beyond the edges of the trench.

c. All trenches under paving shall be concreted with eight inches of class "A" 3,500 psi concrete base and 1½ inches of type "E" or "F" wearing course asphalt is to be spread.

d. The edges of the paving cut shall be smooth.

(n) Sidewalks.

(1) In residential subdivisions, when required under the project design standards article of this Development Code, sidewalks shall be installed by the developer or each builder prior to issuance of a certificate of occupancy.

a. Sidewalks shall be shown on construction drawings for the streets and shall be accommodated in grading plans and activities for right-of-way preparation, but may be installed on a lot-by-lot basis after the final plat for the subdivision or phase is approved by the Planning and Community Development Department.

b. Within a final-platted subdivision, the required sidewalk along each lot frontage shall be installed no later than when the driveway is installed, provided that allsidewalks throughout the final-platted subdivision shall be installed prior to the end of the period established under the guarantee in lieu of completed improvements section of the project design standards article of this Development Code.

(2) When required to be installed as part of a multi-family or nonresidential development project under the project design standards article of this Development Code, sidewalks shall be installed by the developer prior to issuance of a certificate of occupancy.

(3) Disturbed areas along sidewalks shall be backfilled, stabilized, and grassed.

(4) Sidewalk installation shall provide continuity to adjoining sidewalks as to grades, appearance and construction standards.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bethlehem/zoning/89-1260@2026-11-11-16ae337c2b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bethlehem Zoning Ordinance, Sec. 89-1260. Installation of streets and utilities | Georgia Commons