Chapter 89 - UNIFIED DEVELOPMENT CODE / Article XI - LAND DEVELOPMENT ACTIVITIES / Division 3 - FLOOD DAMAGE PREVENTION ORDINANCE

Sec. 89-1259. Installation of stormwater drainage facilities.

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-11

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Timing of installation. Construction of the stormwater system shall be initiated as part of the grading of the site. Stormwater detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development.

Installation of all other storm drainage pipes, culverts, headwalls, and ditches, shall be coordinated with the construction of streets and other site improvements, as appropriate.

(b) Maintenance responsibilities.

(1) It shall be the responsibility of the developer to maintain all facilities required by the stormwater management plan during construction and for a 1.5-year maintenance period following approval of the final subdivision plat or issuance of a certificate of occupancy, as applicable. The developer shall be responsible for periodic removal of silt that may collect during that period and for removing temporary structures or facilities at the completion of the construction.

(2) The owner of the property shall be responsible for maintaining the permanent facilities identified by the stormwater management plan to remain after construction is complete, following the 1.5-year maintenance period.

(3) Should an owner or developer, whichever is the responsible party, fail to maintain the stormwater management facilities in a state of service intended by the stormwater management plan, then the public works department shall notify the responsible party in writing of the deficiencies and specific minimum maintenance requirements to remedy such deficiencies.

(4) If the responsible party fails to perform the required maintenance work within a reasonable period of time (30 days maximum) then the owner shall be in violation of the provisions of this Development Code and subject to enforcement under the provisions of the administration and enforcement article of this Development Code.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bethlehem/zoning/89-1259@2026-11-11-ef27207ade

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bethlehem Zoning Ordinance, Sec. 89-1259. Installation of stormwater drainage facilities | Georgia Commons