8.13. Utility Easements

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-11

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Whenever it is necessary or desirable to locate a public utility line outside of a street right-of-way, the line must be located in an easement

dedicated to the Town (or other appropriate public entity) for such purpose.

A. Utility easements for electric and telephone service lines, sewage lines, water lines, or other similar utilities located along rear lot lines or side lot lines or passing through a lot must be at least 20 feet wide, and may be required to be wider depending on the depth of cut to maintain a 1:1 open cut slope. When warranted, temporary construction

easements widths may be required by the town. Pressurized water, sewer, or reuse lines proposed between residential buildings must be platted in common area no less than 30 feet wide and not on any part of an individual residential lot.

B. Easements for sanitary sewers may be required by the Town Engineer for future extension of lines, whether or not the

subdivision or development is currently proposed to be served by public sewer.

C. No structure may be built on a utility easement.

D. Utility easements for private utilities should be avoided except in cases where no other

satisfactory arrangements can be provided for the installation of private utilities.

Leer este código donde se publica (city website (Revize)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:braselton/zoning/8.13@2026-11-11-f7c1c73344

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Braselton Zoning Ordinance, 8.13. Utility Easements | Georgia Commons