Braselton · Ordenanza de zonificación
Article 8 - SUBDIVISION AND DEVELOPMENT REQUIREMENTS
8.16. Health Department Certification and
Sobre este texto
- As posted on the city's website, retrieved 2026-11-11
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Public Utility Dedication
A. For lots not served by public sewer, certification by the applicable County department must be provided stating that the sewerage systems installed or proposed to be installed fully meets the requirements of the department’s regulations. The applicable department or agency certification statement must include written notice that each lot not on public sewer must have a septic tank
permit prior to the start of construction. For developments with public sewerage and
public water systems this certification may be omitted, but approval by the Town Engineer is required with a statement that public utilities are available to the development.
B. Public Utility Dedication must read as follows:
“Sanitary sewer piping, water system piping and appurtenances thereof, along with water and sewer easements shall be dedicated to the Town of Braselton after the date of
acceptance by the Town of Braselton with a 18 month warranty by the developer for
materials and installation defects or until 75% of the dwellings within the development are constructed from the date of this approval, whichever occurs later.”
Leer este código donde se publica (city website (Revize)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.