Buena Vista · Ordenanza de zonificación
Appendix A - ZONING / Article XV - GENERAL REQUIREMENTS AND MINIMUM STANDARDS OF DESIGN FOR THE SUBDIVISION OF LAND
156.2. Standards for stormwater management.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
156.2.1. A combination of storage and controlled release of stormwater runoff shall be required when the proposed development shall increase the peak rate of runoff by more than one percent for a ten-year frequency storm;
156.2.2. Should the peak rate of stormwater runoff from the site exceed the permitted peak release rate, then on-site retention or detention shall be required. All retention or detention facilities shall be designed for all intensities up to and
including the 100-year frequency for all duration of rainfall. All stormwater management facilities shall comply with the provisions of the Buena Vista Stormwater Ordinance. The peak runoff from the site after the development shall not be greater than the permitted peak release rate; and
156.2.3. The live retention or detention storage to be provided shall be calculated on the basis of the 100-year frequency rainfall, as published by the National
Weather Service for the affected site. The retention or detention volume required shall be that necessary to handle the runoff of the 100-year rainfall for any and all duration from the proposed development, less than that volume discharged during the same duration at the approved release rate as specified above.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.