26-3.02.15. Duties and responsibilities of floodplain coordinator.
Sobre este texto
- As published by Municode, current through 2025-10-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The duties of the flood plain administrator shall include, but not be limited to:
(a) Review proposed development to assure that the permit requirements of this section have been satisfied.
(b) Review proposed development to assure that all necessary permits have been received from governmental agencies from which approval is required by federal or state law, including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Require that copies of such permits be provided and maintained on file.
(c) When base flood elevation data or floodway data have not been provided in accordance with section 26-3.02.15, then the flood plain administrator shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other sources in order to administer the provisions of the
LDC.
(d) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.
(e) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures in accordance with section 26-3.02.15(b).
(f) When flood-proofing is utilized for a structure, the flood plain administrator shall obtain certification of design criteria from a registered professional engineer or architect in accordance with section 26-3.02.15 and section 26-3.03.18.
(g) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.
(h) Notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to FEMA.
(i) For any altered or relocated watercourse, submit engineering data/analysis within six months to FEMA to ensure accuracy of community flood maps through the letter of map revision process.
(j) Assure flood carrying capacity of any altered or relocated watercourse is maintained.
(k) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the flood plain administrator shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this section.
(l) All records pertaining to the provisions of this chapter shall be maintained in the office of the flood plain administrator and shall be open for public inspection.
Historia
(Ord. No. 18-01, §§ 1, 2, 9-11-2018; Ord. No. 19-05, § 2, 8-13-2019)