109.03.02. Roadway grading requirements.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. All streets and roads shall be graded to their full width by the subdivider so that pavements and sidewalks, where required or proposed for future installation, can be constructed on the shoulder as shown in standard detail 201 "Residential Streets" and standard detail 202 "Non-Residential Streets."

B. The entire area within the typical grading section shall be cleared and grubbed of all trees, bushes, stumps and debris. Such debris shall be disposed of in a lawful manner, and shall not be buried in the right-of-way.

C. Embankment.

1) The embankment shall be constructed in parallel layers.

2) The material shall be deposited and spread in uniform, horizontal layers not more than eight inches thick, loose measurement, for the full width of the cross-section where practicable, and these layers shall be kept uniform by the use of motor graders, bulldozers or other approved equipment.

3) Embankment shall be compacted to at least 95 percent of the maximum laboratory dry density.

4) Each layer shall be compacted within the range of optimum moisture content to permit the specified compaction. Successive layers shall not be constructed on previous layers that exhibit excessive pumping under construction equipment regardless of compaction. Material containing too much moisture shall be dried to the moisture content necessary to obtain stability and compaction.

5) If the material is too dry, water shall be added and uniformly mixed with the soil to the extent necessary to obtain stability and compaction.

6) Embankment at bridge structures shall be compacted to at least 100 percent of the maximum laboratory dry density for the full depth of the embankment, beginning at the top of the slope and extending 100 feet from the end of the bridge.

7) Embankments at structures.

a. No rock more than four inches in any diameter shall be placed within two feet of any drainage structure.

b. Before any traffic is allowed over any structure the contractor shall provide sufficient depth to adequately protect the structure from damage or displacement.

8) Compaction of the embankment shall be accomplished by the use of a sheep's foot roller or other approved method.

9) Embankment compaction tests shall be taken at an interval not exceeding 5,000 cubic yards or one per day. Compaction test results shall be reported to the city inspector immediately after results are obtained.

10) All areas that are not accessible by a roller shall be required to use an approved mechanical tamper to achieve compaction. The density requirements of this UDC shall apply.

11) Compaction backfill for minor structures shall be placed in uniform six-inch layers compacted to 95 percent of maximum dry density and the top 12 inches will be compacted to 100 percent of the maximum dry density.

12) Utility trenches cut in the subgrade shall have the backfill material placed in uniform six-inch layers compacted to 95 percent of maximum density and the top 12 inches will be compacted to 100 percent of the maximum laboratory dry density.

13) Compaction backfill for minor structures shall be taken at an interval not exceeding one per structure.

14) Compaction test results shall be reported immediately after results are obtained to the city inspector.

D. Cut and fill slope ratios shall start at the edge of the right-of-way and shall not exceed two-to-one (2:1).

In lieu of a cut or fill slope, a retaining wall may be utilized where necessary with the approval of the city engineer.

E. Cut or fill slopes shall be uniform for each section of cut or fill. When a cut made in rock requires blasting, the slope may be changed to a flatter slope upon written approval of the city engineer.

F. If paving is to be delayed, provisions shall be made to drain low points in the roadway. If curbing has not been installed, a break in the berm section may be provided. If curbing is in place, pipe sections which are functioning and maintained shall be used to provide drainage under the curb to side slopes.

G. It is expressly reserved by the City of Canton that any and all reasonable inspections of roads under construction in a subdivision may be initiated at any time by the City of Canton. All work must be approved by the city engineer prior to placement of base material. It is the City of Canton's right to inspect and verify that road grading specifications have been met.

H. In the event that the city inspector is not available at the time of the proof roll and the developer has notified the city inspector by telephone or e-mail at least 24 hours prior to the proof roll, then the developer may proceed under the direction of a city-approved geotech. The developer shall thereby be required to proceed by following the recommendations of the city-approved geotech.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2014-18, § 2, 8-21-2014)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:canton/zoning/109.03.02@2026-11-11-e91288a304

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Canton Zoning Ordinance, 109.03.02. Roadway grading requirements | Georgia Commons