Canton · Ordenanza de zonificación
Part III - DEVELOPMENT CODE / Chapter 111 - DESIGN STANDARDS: SEWER SYSTEM TABLE OF CONTENTS
111.03.01. General.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. The City of Canton reserves the right to make any changes in these requirements as may be deemed necessary. The design of the lift station shall be based on the future build out of the drainage basin upstream of the station.
B. Lift stations having a capacity less than 500 gpm (per pump) shall utilize two submersible centrifugal pumps each having a capacity of the design flow.
C. Lift stations having a capacity of 500 gpm or greater shall be reviewed on an individual basis and may have requirements differing from those outlined herein.
D. Grinder-type centrifugal pumps shall be used for pumps with a capacity of 100 gpm or less.
Historia
(Ord. No. 2014-18, § 2, 8-21-2014)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.