Carrollton · Ordenanza de zonificación
Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT
7.07.00. STORMWATER CONCEPT PLAN AND CONSULTATION
Sobre este texto
- As published by Municode, current through 2025-11-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
MEETING
Before any stormwater management permit application is submitted, the landowner or developer shall meet with the City Engineer, or his designee, for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed
land development project. This consultation meeting shall take place prior to the submission of any development or redevelopment plan. The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project; as well as to discuss and assess constraints, opportunities, and potential ideas for stormwater management designs before the formal site design engineering is commenced.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.