Carrollton · Ordenanza de zonificación
Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT
7.14.01. Inspections to Ensure Plan Compliance During Construction
Sobre este texto
- As published by Municode, current through 2025-11-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Periodic inspections of the stormwater management system construction shall be conducted by the City Engineer or conducted and certified by a Professional Engineer (P.E.)
licensed in the State of Georgia, a registered landscape architect (RLA), or a registered surveyor who has been approved by the City Engineer. However, the P.E. or RLA who conducts the periodic inspection, if applicable, shall not be the person who certifies the plans pursuant to Section 7.14.02. The purpose of the inspections shall be to establish compliance with the approved stormwater management plan.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.