Ir al contenido
Georgia Commons
Menú

Carrollton · Ordenanza de zonificación

Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT

7.13.02. Stream Channel Protection

Sobre este texto

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

requirements of this section for sites that discharge directly into larger streams, rivers, wetlands, or lakes, or to a manmade channel or conveyance system where the reduction in these flows will not have an impact on upstream or downstream streambank or channel integrity.

A. Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer.

B. 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event.

C. Erosion prevention measures such as energy dissipation and velocity control.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:carrollton/zoning/appendix-b-article-7-7.13.02@2025-11-03-12f765097e

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.