Carrollton · Ordenanza de zonificación
Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT
7.13.03. Overbank Flooding Protection
Sobre este texto
- As published by Municode, current through 2025-11-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the 1-year, 24- hour storm under subsection
7.13.02 is waived or modified, then peak discharge rate attenuation of the 2-year through the 25-year return frequency storm event must be provided. The City Engineer may modify or waive the provisions of this subsection for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.