Ir al contenido
Georgia Commons
Menú

College Park · Ordenanza de zonificación

Appendix A - ZONING 3.46 / Article 8 - TREE PRESERVATION

8.14. Compliance and Enforcement.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

It is the responsibility of the Engineering Director Chief Building Inspector, or his/her designees to review the TPP to ascertain compliance with the provisions of this Article before a land-disturbance or soil erosion and sediment control permit will be issued. It is the responsibility of the Engineering Director Chief Building Inspector, or his/her designees to conduct a final inspection for compliance with this section before a certificate of occupancy will be granted. The Engineering Director Chief Building Inspector, or his/her designees have the authority to revoke, suspend, or void any land-disturbance permit or soil erosion and sediment control permit, stop all work on-site or any portion thereof, or withhold a certificate of occupancy when there has been a violation of any of the provisions of this Article.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:college-park/zoning/8.14@2026-11-11-fc08f28063

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

College Park Zoning Ordinance, 8.14. Compliance and Enforcement | Georgia Commons