Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 12 - STORM DRAINAGE

Section 7.12.8. Cross Drain Pipes.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Minimum Size. Cross drain pipes shall be not less than 15 inches in size when under the street.

B. Location. A storm drain pipe running parallel to the existing primary road shall not be located beneath any proposed acceleration/deceleration lanes. The Director of Engineering may modify or waive this requirement if unusual circumstances exist such as topography.

C. Inlet and Outlet Ends. The inlet and outlet end of all storm drain pipes, shall have concrete flared end sections, concrete headwalls, or mitered ends with concrete collars or slope-paved headwalls that comply with the standards of Georgia DOT. The collars shall be a minimum of four inches thick and extend 18 inches beyond the limits of the pipe.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:columbus-muscogee/zoning/7.12.8@2026-11-11-f7e1257160

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Columbus Zoning Ordinance, Section 7.12.8. Cross Drain Pipes | Georgia Commons