Columbus · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 8 - REPAIR, INSTALLATION AND CONSTRUCTION ON ALL RIGHTS-OF-WAY
Section 8.8.9. Excavated Material.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Excavated material stored on the roadway surface shall be cleaned from pavement surfaces and the surface shall be swept to the satisfaction of the field inspector. Under no circumstances shall the roadway be washed clean. The permittee shall use all available means to protect inlets from the infiltration of sediment into the drainage system including the use of approved filter barriers placed to protect the openings of inlets and pipes.
B. Excavated material stored on the shoulder of the roadway shall be removed completely and damaged vegetation shall be restored immediately. The method of restoration for vegetation shall be approved by the inspector and may include seeding and mulching, sod or placement of fiber or jute blankets.
C. Under no circumstances shall excess material be placed in or obstruct a drainage way including curb and gutter, or block access (ingress and egress) to someone's property. Excavated material from a job site shall be removed by the permittee by the end of each business day.
D. Drawing Number E-905 or current standard is on file in the Department of Engineering and shall be the standard detail for patching specifications.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.