Cordele · Ordenanza de zonificación
Appendix C - DEVELOPMENT REGULATIONS PEAK WATER DEMANDS FOR RESIDENTIAL DEVELOPMENTS
Appendix C. DEVELOPMENT REGULATIONS PEAK WATER DEMANDS FOR RESIDENTIAL DEVELOPMENTS
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Number of Dwelling Units 5 10 20 30 40 50 60 70 80 90 100 150 200 300 400 500 750 1000
PEH
R-12 R-7.5a R-7.5 R-4
PUD
or NC HC
CBD
GC II EI GPM per Dwelling Unit 8.0 5.0 4.3 3.8 3.4 3.0 2.7 2.5 2.2 2.1 2.0 1.6 1.3 1.2 0.9 0.8 0.7 0.6
TABLE 5.2
MINIMUM DESIGN FIRE FLOWS (1)
Zoning District Park Education and Health One Family Residential One Family Residential One and Two Family Residential Multiple Unit Residential Planned Unit Development Office Institutional Neighborhood Commercial Highway Commercial Central Business District General Commercial Intensive Industrial Extensive Industry
GPM
1250 500 750 750 1000 (2) 750 1000 1000 3000 1000 1250 1250 § 5.4
(1) Values given in this table represent minimum requirements. Should Fire Chief or Insurances Services Office, Inc. recommend higher fire flows, use the largest values.
(2) Use flows for various components of PUD.
(d) State Approval: It is the developer's responsibility to obtain the approval of the Environmental Protection Division of the Georgia Department of Natural Resources of all water distribution system additions and extensions. In addition to the other requirements, the City must receive a copy of the approval before the developer will be allowed to proceed with construction.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.