Cordele · Ordenanza de zonificación
Appendix C - DEVELOPMENT REGULATIONS PEAK WATER DEMANDS FOR RESIDENTIAL DEVELOPMENTS / Article VII - SCHEDULE OF FEES
Article VII. SCHEDULE OF FEES
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The schedule of fees for development plan review, copies of these Regulations, appeals, waivers, reinspections, and other items are on file in the Department of Community Development and may be altered or amended from time-to-time by the City Commission to help defray the costs of the administration of these Regulations.
Development plan review fees, if any, shall be paid at the time development plans are submitted for review. A development plan review fee shall be paid each and every time development plans or parts thereof are submitted or resubmitted.
The initial Schedule of Fees is as follows:
WATER:
SANITARY SEWER:
STORM DRAINAGE:
GAS:
PLAN REVIEW:
COPIES:
BOND:
BOND:
WARRANTY:
Item Structure, development, irrigation fire hydrants, building sprinklers, extensions, installation, meter, etc.
Charge Cost Taps, extensions, installa- Cost tion for structures, development, etc.
All installations, driveways, Cost development, etc.
Services $150 - ¼"; larger $100 plus Structures, utilities, site plan, grading, etc.
Xerox Blue Line Computer Plotted Bond Processing and approval for Private Development Private Development One year.
cost of meter and regulator;
pavement patch $300 Cost $0.25 page $5.00 each $15.00 each Cost $5,000 each
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.